Loading...
HomeMy WebLinkAbout11-06-23 Council Meeting SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER Mayor Barb Tolbert PLEDGE OF ALLEGIANCE ROLL CALL Mayor Barb Tolbert – Wendy APPROVAL OF THE AGENDA Mayor Pro Tem Jan Schuette INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS SWEARING IN Officer Abi Black Lieutenant Peter Barrett / City Attorney Steve Peiffle PROCLAMATION PUBLIC COMMENT For members of the public who wish to speak to the Council about any matter not on the Public Hearing portion of the meeting. Please limit remarks to three minutes. CONSENT AGENDA Mayor Pro Tem Jan Schuette 1. Minutes of the October 16 and October 23, 2023 Council meetings ATTACHMENT A 2. Accounts Payable ATTACHMENT B 3. Amendment to Contract with Airside Solutions ATTACHMENT C 4. Contract with Process Solutions ATTACHMENT D 5. Contract Amendment No. 1 with SCJ for the 211th Place Design ATTACHMENT E PUBLIC HEARING NEW BUSINESS 1. 2024 Lodging Tax Distribution ATTACHMENT F Staff Presentation: Kristin Garcia Council Liaison: Mayor Pro Tem Jan Schuette Arlington City Council Meeting Monday, November 6, 2023 at 6:00 pm City Council Chambers – 110 E 3rd Street SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required. 2. Appointments to Planning Commission ATTACHMENT G Staff Presentation: Marc Hayes Council Liaison: Michele Blythe 3. Dedication of Real Property for Public Right of Way for ATTACHMENT H 63rd Ave. NE and 188th St. NE Staff Presentation: Marc Hayes Council Liaison: Heather Logan 4. Request to Transfer American Rescue Plan Act (ARPA) Funds ATTACHMENT I Staff Presentation: Marc Hayes Council Liaison: Marilyn Oertle 5. Amendment No. 3 for Haller Wellfield Improvement Project ATTACHMENT J Staff Presentation: Jim Kelly Council Liaison: Debora Nelson COMMENTS FROM COUNCILMEMBERS INFORMATION/ADMINISTRATOR & STAFF REPORTS MAYOR’S REPORT EXECUTIVE SESSION RECONVENE ADJOURNMENT Mayor Pro Tem Jan Schuette / Mayor Barb Tolbert DRAFT Page 1 of 3 Council Chambers 110 East 3rd Street Monday, October 16, 2023 Councilmembers Present: Don Vanney, Debora Nelson, Marilyn Oertle, Jan Schuette, Michele Blythe, and Yvonne Gallardo-Van Ornam. Council Members Absent: Heather Logan, excused. Staff Present: Mayor Barb Tolbert, Paul Ellis, Sarah Lopez, Kristin Garcia, City Attorney Steve Peiffle, Tony Orr, and Wendy Van Der Meersche. Also Known to be Present: Kathy Vanney, Nathan Senff, Ken Dilbeck, Kristian-Michale Sherburne, Sera Sabol, Kimberly Leach, Kathleen Azpiri, and Elinor Richardson and family. Mayor Barb Tolbert called the meeting to order at 6:00 p.m., and the Pledge of Allegiance and roll call followed. APPROVAL OF THE AGENDA Mayor Pro Tem Jan Schuette moved to approve the agenda as presented. Councilmember Marilyn Oertle seconded the motion, which passed with a unanimous vote. INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS None. PROCLAMATIONS PUBLIC COMMENT None. CONSENT AGENDA Mayor Pro Tem Jan Schuette moved, and Councilmember Marilyn Oertle seconded the motion to approve the Consent Agenda that was unanimously carried: 1. Minutes of the September 19 Financial and Federal Audit Exit Conference, October 2 and October 9 Council meetings, October 6 Council retreat, and October 9, 2023 Joint meeting 2. Accounts Payable: Approval of EFT Payments and Claims Checks: #109084 through #109174 dated September 19, 2023 through October 2, 2023 for a total of $584,253.67; Approval of Payroll EFT Payments and Checks #30308 through #30313 dated September 1, 2023 through September 30, 2023 in the amount of $1,400,838.01. Minutes of the Arlington City Council Meeting Minutes of the City of Arlington City Council Meeting October 16, 2023 Page 2 of 3 PUBLIC HEARING None. NEW BUSINESS Grant Agreement with Department of Commerce for Commercial Kitchen Design City Administrator Paul Ellis requested Council authorize the Mayor to sign a grant agreement for funding from Department of Commerce for $563,579. Funds awarded under this grant shall be used by the City of Arlington for design only of a commercial kitchen facility at proposed location, in the Northeast corner of 51st Avenue and 172nd Street, on the Arlington Airport, near the proposed food truck court. Discussion followed with Mr. Ellis answering Council questions. Mayor Pro Tem Jan Schuette moved, and Councilmember Yvonne Gallardo-Van Ornam seconded the motion to authorize the Mayor to sign the grant agreement with the Department of Commerce. With a roll call vote, Councilmembers Vanney, Nelson, Oertle, Schuette, and Blythe voted no, with Councilmember Gallardo-Van Ornam voting yes. The motion failed 1 to 5. Youth Council Appointments Community Engagement Director Sarah Lopez requested Council consent to the appointments of Kristian-Michale Sherburne and Elinor Richardson, and reappointments of Sera Sabol, Kimberly Leach, Brooklyn Helle, Kathleen Azpiri, and Reese Baggen, to the youth council for October 2023 to June 2023. Those present introduced themselves to Council. Councilmember Yvonne Gallardo-Van Ornam moved, and Councilmember Don Vanney seconded the motion to consent to the appointments and re-appointments of the 2023-2024 youth council members, as proposed. The motion passed unanimously. Amendment of Ordinance No. 2016-005 Finance Director Kristin Garcia requested Council approve updates to Ordinance No. 2016-005. Staff is recommending updates to the biennial budget ordinance to align with current practices. Changes meet state law requirements and have been reviewed by legal counsel. The changes consist of stating that the preliminary budget will be delivered to the mayor and city administrator on the first business day of October instead of September 15. The second change is adding an RCW reference regarding the preliminary budget and budget message. The final change is changing the date from when the proposed budget modifications are presented to council from November 1 to November 30. Mayor Pro Tem Jan Schuette moved, and Councilmember Don Vanney seconded the motion to approve Ordinance No. 2023-014 Amending Ordinance 2016-005 Establishing a Biennial Budget and authorized the Mayor to sign it. The motion passed unanimously. Minutes of the City of Arlington City Council Meeting October 16, 2023 Page 3 of 3 COMMENTS FROM COUNCILMEMBERS Councilmember Yvonne Gallardo-Van Ornam praised the police department and spoke highly of her involvement in the Citizens Academy. ADMINISTRATOR & STAFF REPORTS None. MAYOR’S REPORT Mayor Tolbert welcomed youth councilmembers and is looking forward to the upcoming year. She stated she had the privilege of being a guest speaker at all five government classes last Friday. EXECUTIVE SESSION None. ADJOURNMENT With no further business to come before the Council, the meeting was adjourned at 6:22 p.m. _________________________________________ Barbara Tolbert, Mayor DRAFT Page 1 of 3 Council Chambers 110 East 3rd Street Monday, October 23, 2023 Councilmembers Present: Don Vanney, Heather Logan, Debora Nelson, Jan Schuette, Michele Blythe, Yvonne Gallardo-Van Ornam, and Marilyn Oertle, who joined with Zoom. Council Members Absent: None. Staff Present: Mayor Barb Tolbert, Paul Ellis, Kristin Garcia, Sheri Amundson, Jim Kelly, Kris Wallace, Marc Hayes, Marty Wray, Jonathan Ventura, Tony Orr, City Attorney Steve Peiffle, and Wendy Van Der Meersche. Also Known to be Present: Kathy Vanney, Bob Nelson, Ken Dilbeck, and Greg Miller. Mayor Barb Tolbert called the meeting to order at 6:00 pm, and the Pledge of Allegiance and roll call followed. APPROVAL OF THE AGENDA Mayor Pro Tem Jan Schuette moved to approve the agenda as presented. Councilmember Marilyn Oertle seconded the motion, which passed with a unanimous vote. INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS None. WORKSHOP ITEMS – NO ACTION WAS TAKEN 2024 Proposed Tax Levy Scenarios Finance Director Kristin Garcia reviewed proposed tax levy scenarios for 2024. Staff has prepared additional 2024 tax levy scenarios based on feedback from the budget retreat held on October 6. The scenarios were based on the following priorities: hiring additional police and maintenance staff, issuing debt to complete the maintenance & operation facility, taking banked capacity only as needed or over a period of time and maintaining the two-month reserve while minimizing excess fund balance. Four scenarios are presented; status quo – taking the 1% plus new construction, taking 90% of the banked capacity, taking 25% of the banked capacity and taking 20% of the banked capacity. The potential impact to taxpayers is nearly 0% under the status quo scenario, an estimated 4.5% increase under scenario 1, 1.2% increase under scenario 2 and less than 1% under scenario 3. Discussion followed with Ms. Garcia answering Council questions. After discussion, Ms. Garcia will prepare a resolution with Scenario #1. City Council Workshop Minutes of the City of Arlington City Council Workshop October 23, 2023 Page 2 of 3 Amendment to Contract with Airside Solutions, Inc. Airport Operations Manager Marty Wray reviewed an amendment to the contract with Air Side Solutions, Inc. Airport Staff went before City Council in September for approval of a sole source professional services agreement with Airside Solutions, Inc. to provide airport construction, procurement of materials, inventory of parts, and to train city staff in airfield lighting safety in the amount not to exceed $8,000 annually. The contract not to exceed amount must include not only these services, but also the cost of materials. This contract will be for an “as used” basis. It is not anticipated that this contract will exceed more than $50,000 annually. Discussion followed with Mr. Wray answering Council questions. Contract with Process Solutions Public Works Director Jim Kelly reviewed staff’s request to enter into a professional services contract with Process Solutions for engineering services to upgrade the System Platform Supervisory Control and Data Acquisition (SCADA) system. The Water Treatment Plant and Water Reclamation Facility both use Wonderware SCADA program to control and operate the facilities’ processes. The SCADA system includes programming and system monitoring to control the many integrated functions at each facility. The Wonderware program was replaced in 2019 with System Platform and it is now no longer supported by the program provider. The System Platform program will provide greater system reliability and IT security. The City has been working with Process Solutions for SCADA support for the past three years. Process Solutions is on the MRSC Consultant Roster, is a very good firm and they understand the City’s current SCADA system and what is needed to update and improve the existing system. Staff is recommending the City enter into a professional services agreement with Process Solutions. Discussion followed with Mr. Kelly answering Council questions. Contract with SCJ for 211th Design Public Works Director Jim Kelly reviewed staff’s request to amend the existing contract with SCJ Alliance for design of the 211th Place Corridor Restoration project. The City of Arlington contracted with SCJ Alliance in April 2023 for design of the 211th Place Corridor. This is a grant funded project that will be upgrading 211th Place between 67th Avenue and SR 530. This amendment includes improvements to the 211th Water Main, additional geotechnical work, and preparation of an Archeological Discovery Plan needed for archeological items found at the project site. Discussion followed with Mr. Kelly answering Council questions. September Financial Report Finance Director Kristin Garcia reviewed the September 2023 financial report. Discussion followed with Ms. Garcia answering Council questions. Minutes of the City of Arlington City Council Workshop October 23, 2023 Page 3 of 3 Request to Transfer American Rescue Plan Act (ARPA) Funds Community and Economic Development Director Marc Hayes reviewed staff’s request to transfer ARPA funds from the Food Truck Court project to the Smokey Point Community Park project. Discussion followed with Mr. Hayes answering Council questions. ADMINISTRATOR AND STAFF REPORTS None. MAYOR’S REPORT Snohomish County has partnered with the City to build pickleball courts at Haller Middle School. Association of Washington Cities will be focusing on public safety sales tax on their legislative agenda. COMMENTS FROM COUNCILMEMBERS Councilmember Heather Logan thanked IT Specialist Tony Orr for assisting with her laptop so quickly. Councilmember Yvonne Gallardo-Van Ornam thanked Finance Director Kristin Garcia for assisting her with information regarding the tax levy. COUNCILMEMBER REPORTS Councilmembers had nothing to report this evening. PUBLIC COMMENT None. REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING Councilmembers discussed and agreed to put items 2, 3, and 4 on the consent agenda for the November 6 Council meeting. EXECUTIVE SESSION ADJOURNMENT With no further business to come before the Council, the meeting was adjourned at 7:20 p.m. _________________________________________ Barbara Tolbert, Mayor City of Arlington Council Agenda Bill CA #2 Attachment November 6, 2023 Accounts Payable Claims Approval Claims Approval Finance; Kristin Garcia, Director 360-403-3431 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: N/A BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: ALTERNATIVES: City of Arlington Claims Approval for November 6th, 2023 Claims Certification: We, the undersigned City Council of the City of Arlington, Washington do hereby certify that the merchandise or services hereinafter specified have been received and that: Approval of Petty Cash Check #2028; EFT Payments and Claims Checks: #109175 through #109299 dated October 3rd, 2023 through October 16th, 2023 for a total of $891,626.61 City of Arlington Council Agenda Bill Item: CA #3 Attachment C COUNCIL MEETING DATE: November 6, 2023 SUBJECT: Amendment No. 1 to Contract with Airside Solutions, Inc. Contract Amendment, Professional Services Agreement, Airport Director Memo, Resolution, ADB Memo, and ADB Sales Map Airport; Marty Wray, Operations Manager EXPENDITURES REQUESTED: Anticipated not to exceed $50,000 annually Professional Services BUDGETED AMOUNT: $50,000 annually LEGAL REVIEW: DESCRIPTION: Airport Staff went before the City Council in September to approve a sole source professional services agreement with Airside Solutions, Inc. to provide airport construction, procurement of materials, inventory of parts, and to train city staff in airfield lighting safety in the amount not to exceed $8,000 annually. The contract not to exceed amount must include not only these services, but also the cost of materials. Therefore, we are requesting that the City Council allow an amendment to the contract to not exceed $50,000 annually. The City Council may recall that Airside Solutions, Inc. is an airfield lighting supplier, contractor, and is the only supplier in Washington State. They are the only company that can provide all of these services. Although there are other suppliers for this equipment in the country, they do not offer the training services as Airside Solutions, Inc. offers (refer to memo for a detailed list of companies). This contract will be for an “as used” basis. We do not anticipate that this contract will exceed more than $50,000 annually. Staff have used Airside Solutions, Inc. in the past for purchasing of materials, consulting services, and personnel training. The Arlington Municipal Airport currently has a sole source professional services agreement with Airside Solutions, Inc. The City Council previously approved sole source professional services agreements with Airside ALTERNATIVES: I move to approve the Amendment to Airside Solutions, Inc. contract and authorize the Mayor to sign the amendment. CONTRACT AMENDMENT Service Provider: Name, Title Signature City of Arlington: Name, Title Signature Contract Name Project No This amendment extends all of the terms of the existing Agreement, including the existing Scope of Work, with the exception of the new additional amendments: IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on ________________. Arlington Municipal Airport ---------------------------------------------------------------------------- 18204 59th Avenue Arlington, WA 98223 TO: Arlington City Council FROM: David Ryan DATE: September 5, 2023 SUBJECT: Sole Source Procurement of Airport Lighting and Equipment Services and Training Airport staff is requesting the Arlington City Council approve a contract between Airside Solutions, Inc. (an airfield lighting supplier and contractor) and the Arlington Municipal Airport. Airfield lighting and signage is a very specialized field and although there are several companies that sell various brands of lighting and signs, only Airfield Solutions carries the ADB (formerly Siemens) brand that our airport uses. They are also the only supplier in Washington State that I have been able to locate. There are few suppliers for this equipment throughout the US, but most of these only sell the parts and equipment and do not provide either construction, testing or training services, as does Airfield Solutions, Inc. Below are the only companies I was able to find in the US using a Google search: 1.) Airport Lighting Company, New York State. No training services available 2.) Flightlite, Sacramento, CA. No training services available 3.) Airport Lighting.Com. Online sales only. No training or testing services. 4.) Airport Suppliers, United Kingdom. No training or testing services. 5.) Airport Lighting Equipment, Idaho. No training or testing services. The contract we wish to enter into provides not only inventory control of spare parts and equipment, it provides testing services of the various airfield lighting electrical circuits, and training services to airport and M&O staff members (something no other supplier provides.) They are also the only company based in Washington State. This contract will be for an “as used” basis only. We do not anticipate that the consulting services and training costs will exceed more than $8,000 annually.       ADB SAFEGATE | 977 Gahanna Parkway | Columbus, Ohio 43230 - USA | T: +1 614 861 1304 | F: +1 614 864 2069 www.adbsafegate.com                 8/22/2023     Arlington Municipal Airport  Attn: Dave Ryan  18204 59th Drive NE  Arlington, WA 98223      Subject: Sole Source   Dave,    Airside Solutions in Washington State is the exclusive distributor of ADB Safegate products in the State of  Washington. If you have any questions regarding his please feel free to reach out to me at the below.        Regards,              Jim Taylor  Director of Sales, Airfield Ground Lighting  P# 614 257 2608  Jim.Taylor@ADBSAFEGATE.com     QC NB NS NL NL ON MBSKABBC NUNTYT PE VA NC SCGA FL AL KY PA MI WI AK ME NH MARICTNJDEMD V T DC HI AK NY OHIN TNAR LA MS IL IA MO MN KS NE SD ND TX OKNM CO WY MT AZ UT ID NV CA OR WA WV Sales Map: North America www.adbsafegate.comAirfield and Gate Solutions Technical Service: 1-800-545-4157, Press 3 Airfield SolutionsEastern U.S.Airfield SolutionsWestern U.S. Sales Manager, Nor theast Sales Manager, Central Chuck BertkeRegional Sales Director, Eastern U.Schuck.bertke@adbsafegate.comTel: +1 614-307-2572 Mike BushSenior Bid Managermike.bush@adbsafegate.comTel: +1 614-573-8212 Brenda LongwellSenior Bid Managerbrenda.longwell@adbsafegate.comTel: +1 614-573-8255 Jim TaylorRegional Sales Director, Western U.S.jim.taylor@adbsafegate.comTel: +1 614-573-8288Mobile: +1 614-357-2608 Bram ZeierBid Managerbram.zeier@adbsafegate.comTel: +1 614-573-8256 Jason WatsonBid Managerjason.watson@adbsafegate.comTel: +1 614-573-8214 Chuck BertkeRegional Sales Director, Eastern U.Schuck.bertke@adbsafegate.comTel: +1 614-307-2572 Jim TaylorRegional Sales Director, Western Regionjim.taylor@adbsafegate.comTel: +1 614-573-8288Mobile: +1 614-357-2608 Sales Manager, Great Lakes Sales Manager, Southwest/Oceania Galen DixonSales Managergalen.dixon@adbsafegate.comTel: +1 614-552-2694 Tim WinkelmanSales Managertim.winkelman@adbsafegate.comTel: +1 614-573-8283 Sales Team, Southeast Sales Team, Northwest Allen Enterprises, Inc.5659 Commerce Drive, Suite 100Orlando, FL 32839Tel: +1 407-857-6778Tel: +1 800-662-2177Fax: +1 407-857-7993 Sales TeamPerry SuganumaSales Managerperry@airportlights.com Bob WelterSenior Bid Managerbob@airportlights.com Keith MeeseAftermarket Sales & Support:keith@airportlights.com Airside Solutions, Inc.2222 West Valley Hwy North, Suite 140Auburn, WA 98001Tel: +1 253-833-6434Tel: +1 800-275-6649 Sales TeamRick LaffertyRegion Managerrlafferty@airsidesolutionsinc.com Jake NelsonOutside Salesjnelson@airsidesolutionsinc.com Mike StevensBid Managermstevens@airsidesolutionsinc.com Randy AshbyCustomer Service Managerrashby@airsidesolutionsinc.com Jared RiceCustomer Servicejrice@airsidesolutionsinc.com Gordon WinburnTechnical Sales & Support Managergwinburn@airsidesolutionsinc.com Aaron GoodrichTechnical Sales & Serviceagoodrich@airsidesolutionsinc.com Airfield SolutionsCanada ADB SAFEGATE Canada, Inc.3375 North Service Road, Unit C5Burlington, Ontario, L7N 3G2CanadaTel: +1 905-631-1597Fax: +1 905-631-5387 Russell MuellerNational Sales Managerrussell.mueller@adbsafegate.comTel: +1 905-631-1597 x3808 Devan LongSenior Bid Managerdevan.long@adbsafegate.comTel: +1 905-631-1597 x3804 Christopher HuynhBid Managerchristopher.huynh@adbsafegate.comTel: +1 905-631-1597 x3816 Emilie BanyogContract Administrator:emilie.banyog@adbsafegate.comTel: +1 614-573-8230 Gate SolutionsCanada and U.S. Doug WoehlerDirector of Sales, USA and Canada doug.woehler@adbsafegate.comTel: +1 732-991-2837 AftermarketSales & Service Sales Support TeamKathy Seabloom, ManagerWilson DegeoChristina CooperJohn SmithHannah Uttsalessupport@adbsafegate.comTel: +1 800-545-4157, Press 4Tel: +1 614-861-1304 (US)Tel: +1 905-631-1597 (Canada) City of Arlington Council Agenda Bill Item: CA #4 Attachment DCOUNCIL MEETING DATE: November 6, 2023 SUBJECT: Process Solutions Contract for upgrade of existing Wastewater and Water treatment plant Supervisory Process Solutions System Platform Proposal System Platform Upgrade Summary Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: Not to exceed $210,000 BUDGET CATEGORY: Water /Sewer Capital Funds BUDGETED AMOUNT: $630,000 (2023) and $520,000 (2024) LEGAL REVIEW: DESCRIPTION: Request to enter into a professional service contract with Process Solutions for engineering services to upgrade the System Platform SCADA system. The Water Treatment Plant and Water Reclamation Facility both use Wonderware SCADA program to control and operate the facilities’ processes. The SCADA system includes programming and system monitoring to control the many integrated functions at each facility. The Wonderware program was replaced in 2019 with System Platform and it is now no longer supported by the program provider. The System Platform program will provide greater system reliability and IT security. The City has been working with Process Solutions for SCADA support for the past three years. Process Solutions is on the MRSC Consultant Roster, is a very good firm and they understand the city’s current SCADA system and what is needed to update and improve the existing system. Staff is recommending the City to enter into a professional service agreement with Process Solutions. ALTERNATIVES: Remand to staff for additional information. I move to authorize City staff to prepare a professional services agreement for the SCADA System Platform upgrade with Process Solutions, and authorize the Mayor to sign it, subject to final review by the City Attorney. Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com PREPARED FOR James Kelly, P.E. City of Arlington PREPARED BY Chris Degutis, P.E. Senior Sales Engineer Process Solutions, Inc. 7112 265th St NW Stanwood, WA 98292 PROPOSAL DATE 10/16/2023 PROJECT NUMBER Q691210 Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com Subject: Quote – System Platform Process Solutions, Inc. is pleased to present the following T&M quote to the City of Arlington for the implementation of System Platform. SYSTEM PLATFORM OVERVIEW The System Platform SCADA (Supervisory Control and Data Acquisition) upgrade replaces the City’s existing controls with a centralized computer-based system. The System Platform SCADA implementation is comprised of a number of Windows based servers, Aveva SCADA software, and the existing PLC’s/Controllers that run the equipment in at the Water Reclamation Facility (WRF), Drinking Water Plant (WTP), and remote sites (lift station and reservoirs). System Platform allows for greatly improved IT security, control redundancy, lower maintenance over time, and historical redundancy. The systems also natively connect to Alarm Notification software that is used to call, email, or text users 24 hours per day in the event of an alarm or system failure. Compared to the Cities’ exiting SCADA software architecture, System Platform is the updated method for SCADA implementation, it will be upgradable much farther into the future and be supported for longer. ANTICIPATED SCOPE: 1. The upgrade will start with converting the existing computer network to a “Domain” based Windows network. This allows for more secure connections between computer systems and enhanced IT security. This conversion will allow all users to have their own unique credentials for accessing the SCADA system, and will reduce the time required for the Cities’ IT staff to maintain the network. Converting to a “Domain” network requires the addition of a “Domain Controller” to the network (This will be done with the help of the Cities’ IT staff). 2. Once added to the network, each new and/or existing PC/Server on the network will be “joined” to the domain, allowing for the enhancements associated with being part of a Domain network. 3. The next step will be to replace the existing user interfaces, historical data collection, and data logging that is currently in place at the WTP and WRF. This process will involve installing updated Aveva Software on new and/or existing servers, and programming new centralized user interfaces (SCADA Screens) for each portion of the plant based on the users required functions. 4. The existing SCADA system will be used as a starting point for the programming effort, but feedback from the City and its primary users will be instrumental in designing the new interfaces to make them as useful and intuitive as possible. 5. Reprogramming will be a stepwise process, programming one system at a time, and can be completed while the existing SCADA system remains online. Examples of systems in the plant the will be programmed include, but are not limited to: aeration basins, digester sludge system, headworks, UV treatment system, blowers, EQ Basin, and Reclaimed Water system. Each piece of the new system will be tested and approved by users as it is developed. 6. Upon completion of testing the new system, the old system will be taken offline. Taking it offline will consist of shutting down and/or repurposing old PC’s/Servers. The PLC’s/Controllers in the system will remain unchanged, but the new SCADA system will directly interact with these controllers to perform pertinent SCADA functions. NOTE - The current PLC system in the WTP is not capable to support System Platform so the scope of work at this time only includes the WRF. WTP may be added at a later time after the City updates WTP Hardware. Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com PROJECTED SCHEDULE This is a multi-month effort with that is anticipated to require up to 1,200 engineering hours to implement and test. Depending on scheduling this could take 4-8 months to complete. As this project is quoted as T&M only actual hours will be invoiced. Work will be scheduled upon request and receipt of PO. Pricing: Item Description Hourly Rate Controls Engineer $175.00 Shop Technician $135.00 Assumptions/Clarifications/Limitations: - Provided rates are straight-time. Multipliers for overtime and holiday rates applied as applicable. - Support offered on an hourly basis. - Onsite support has a minimum charge of 8 hours for each visit. Remote support has a minimum charge of 2.5 hour. Proposed Terms: 1. Monthly invoice, Net 30. 2. Published rates are valid until revised by PSI though issuance of an updated quote. Thank you for the opportunity. Sincerely, Chris Degutis, P.E. Senior Sales Engineer Process Solutions, Inc. Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com About Process Solutions, Inc. Located near Seattle, Washington, Process Solutions has over 35 years of experience providing control system solutions to end-users, OEMs, and government entities across industries and applications. With facilities totaling over 53,000 sq. ft., over 100 engineers and technicians on staff, and an output of 3,000+ control panels per year, Process Solutions is the Northwest largest control systems integrator. Process Solutions’ control systems services include: UL Control Panel Design and Fabrication • PLC & HMI Programming • SCADA Integration Industrial Refrigeration Control Systems • Machine Automation • Machine Monitoring Systems Process Solutions specializes in the design and build of UL 508A general purpose control panels and UL 698A, 1203, and 1604 hazardous location panels. Process Solutions is officially recognized and certified by industry-leading controls manufacturers, including Rockwell Automation, Siemens, and Wonderware for our quality, reputation, and expertise in the implementation of hardware and software controls technologies. Process Solutions has over 33 years of experience in control system design, build, and integration. Process Solutions design services include electrical and mechanical design compliant with UL, NEC, CE, and CSA standards. Each panel design is 3D modeled in AutoCAD and inspected for quality prior to production. Utilizing 20,000 Sq. Ft. of manufacturing and specialized tooling to streamline , Process Solutions’ team of 50+ control panels Commissioning & Support ’ engineers perform remote on- -project support, training, and upgrades. . Engineering & Documentation integrating Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com The data needed for monitoring and improving your production process is already flowing out of your machines… With systems starting at $2,990, you can add DAQuery to your order and start capturing your machine data to get impactful insights that can be leveraged to prevent downtime, eliminate manufacturing bottlenecks, improve product quality, and increase throughput. Designed to scale to your needs, DAQuery’s browser-based application can display your custom dashboards, trends, and live-date feeds on any networked device, including TV screens, phones, tablets, or HMIs, so you and operators can always stay informed from anywhere in or out of your facility. Learn more about DAQuery or book a demo at www.ProcessSolutions.com/DAQuery No Monthly or Annual License Fees Required Simply select the features and number of connections that fit your goals and make one payment per license for the life of your DAQuery system. *Upgrades and service quoted separately. Full-Service Remote System Setup Available Let Process Solutions’ team of DAQuery developers do the work for you and remotely configure your system with the settings, reports, and dashboards you want for just $1,990. A Data System That Is Actually Easy to Use Designed to be easy for anyone to use without any specialized training required. You can be monitoring your equipment within minutes of receiving your DAQuery System. Know what is happening at a glance with -Based Dashboards Track & improve product quality with Production & Batch Reports Immediately alert the right people when issues arise to reduce or prevent downtime with Configurable Event & Alarm Notifications Visualize data & eliminate bottlenecks with Live Data Trends Pass your next audit with CFR 21.11 Compliance To o l s & A p p s Process Solutions, Inc. 7112 265th St NW, Stanwood, WA 98292 | Phone 360-403-7037 | Fax 360-435-2866 www.processsolutions.com GENERAL CONDITIONS OF SALE AND FIELD SERVICE POLICY Unless otherwise indicated above, the following conditions of sale shall apply. This quotation is valid for a period of 30 days from date of quotation. All shipments shall be F.O.B. Process Solutions, Inc., Stanwood, Washington, pre-pay and add. Prices do not include state or local sales or use tax, licenses, inspection or permit fees. Straight time is a standard 8AM to 5PM 8-hour day, Monday through Friday, minimum of 8-billable hours per day while on site. All domestic travel time Monday through Friday, from portal to portal, up to 12 hours, will be invoiced at the straight time rate. There will be no charge for travel in excess of 12 hours, except for international travel and Alaska. Weekend travel time will be invoiced at 1.5x the quoted standard rate. Overtime applies to any time in excess of the standard time defined above and will be billed at 1.5x the quoted standard rate. Holiday time applies to anytime on any holiday as defined by the Process Solutions holiday schedule. Holiday hours shall be billed at 2x the quoted standard rate. Rates do not include travel/living expenses. These expenses will be invoiced at actual costs. All prices are in U.S. dollars. WARRANTY POLICY Except as otherwise provided, all new equipment manufactured by Process Solutions, Inc. is warranted to be free from defects in material and workmanship to the original user for one year from date of shipment from Process Solutions. Equipment sold but not manufactured by Process Solutions, Inc. will be warranted as to defects in material and workmanship to the extent of warranty policy of the original manufacturer of the equipment. If within the warranty period Process Solutions, Inc. receives from the original user notice of any supposed defect in any such equipment and is found to be defective (Process Solutions, Inc. will have been provided by the original user a reasonable opportunity to perform tests to determine defectiveness) will, at its option and expense, either repair the defective part or supply a replacement. Replacement parts will be invoiced at the time of shipment with credit to be issued for returned parts when received, provided they meet the warranty conditions. All parts are F.O.B. Process Solutions, Inc., Stanwood, Washington. This warranty is in lieu of and excludes all other warranties, both expressed and implied. There are no implied warranties of merchant ability or of fitness for a particular purpose for products covered by this contract. SYSTEM PLATFORM UPGRADE SUMMARY October 16, 2023 The System Platform SCADA (Supervisory Control and Data Acquisition) upgrade replaces the City’s existing controls with a centralized computer-based system. The System Platform SCADA implementation is comprised of a number of Windows based servers, Aveva SCADA software, and the existing PLC’s/Controllers that run the equipment in at the Water Reclamation Facility (WRF), Drinking Water Plant (WTP), and remote sites (lift station and reservoirs). System Platform allows for greatly improved IT security, control redundancy, lower maintenance over time, and historical redundancy. The systems also natively connect to Alarm Notification software that is used to call, email, or text users 24 hours per day in the event of an alarm or system failure. Compared to the Cities’ exiting SCADA software architecture, System Platform is the updated method for SCADA implementation, it will be upgradable much farther into the future and be supported for longer. The upgrade will start with converting the existing computer network to a “Domain” based Windows network. This allows for more secure connections between computer systems and enhanced IT security. This conversion will allow all users to have their own unique credentials for accessing the SCADA system, and will reduce the time required for the Cities’ IT staff to maintain the network. Converting to a “Domain” network requires the addition of a “Domain Controller” to the network (This will be done with the help of the Cities’ IT staff). Once added to the network, each new and/or existing PC/Server on the network will be “joined” to the domain, allowing for the enhancements associated with being part of a Domain network. The next step will be to replace the existing user interfaces, historical data collection, and data logging that is currently in place at the WTP and WRF. This process will involve installing updated Aveva Software on new and/or existing servers, and programming new centralized user interfaces (SCADA Screens) for each portion of the plant based on the users required functions. The existing SCADA system will be used as a starting point for the programming effort, but feedback from the City and its primary users will be instrumental in designing the new interfaces to make them as useful and intuitive as possible. Reprogramming will be a stepwise process, programming one system at a time, and can be completed while the existing SCADA system remains online. Examples of systems in the plant the will be programmed include, but are not limited to: aeration basins, digester sludge system, headworks, UV treatment system, blowers, EQ Basin, and Reclaimed Water system. Each piece of the new system will be tested and approved by users as it is developed. Upon completion of testing the new system, the old system will be taken offline. Taking it offline will consist of shutting down and/or repurposing old PC’s/Servers. The PLC’s/Controllers in the system will remain unchanged, but the new SCADA system will directly interact with these controllers to perform pertinent SCADA functions. The current PLC system in the WTP is not capable to support System Platform so the scope of work at this time only includes the WRF. WTP may be added at a later time after the City updates WTP Hardware. This is a multi-month effort with that is anticipated to require up to 1,200 engineering hours to implement and test. Depending on scheduling this could take 4-8 months to complete. City of Arlington Council Agenda Bill Item: CA #5 Attachment E COUNCIL MEETING DATE: November 6, 2023 SUBJECT: Contract Amendment #1 to the SCJ Alliance Contract for 211th Place Corridor Restoration Design ATTACHMENTS: Scope of Work and Fee from SCJ Alliance for 211th Place Corridor Amendment DEPARTMENT OF ORIGIN Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: $47,054.00 BUDGET CATEGORY: TIB Grant and Water CIP Funds BUDGETED AMOUNT: $395,487.00 (2023) LEGAL REVIEW: DESCRIPTION: Staff is requesting to amend the existing contract with SCJ Alliance for design of the 211th Place Corridor Restoration project. HISTORY: The City of Arlington contracted with SCJ Alliance in April 2023 for design of the 211th Place Corridor. This is a grant funded project that will be upgrading 211th Place between 67th Avenue and SR 530. This amendment includes improvements to the 211th Water Main, additional geotechnical work, and preparation of an Archeological Discovery Plan needed for archeological items found at the project site. The amendment and project contract cost is summarized below. Base Contract $318,778.70 Amendment #1 $ 47,054.00 Remand to staff for additional information. I move to approve Amendment No. 1 to the SCJ Alliance contract and authorize the Mayor to sign the amendment. 10/17/23 2:01 PM \\arlington\city\PW_Admin\Contracts\SCJ Alliance\06_211th Place Corridor Improvements\Amendment #1\Amendment 1_Draft.docx Contract Amendment No. 1 To Professional Services Agreement For 211th Place Corridor Improvements (P02.571) This amendment authorizes the modification of the Professional Services Agreement between the City of Arlington and SCJ Alliance. for the 211th Place Corridor Improvements contract, executed on May 8th, 2023. Unless modified below, all terms and conditions contained in the Professional Service Agreement remain current and in effect for the completion of the contract. It is mutually agreed that the above referenced agreement is amended as follows: AMENDMENT 1.Scope of Work - The project scope of work is increased for additional tasks as detailed in Exhibit B and dated September 21, 2023, and included with this amendment. 2.Fee - This additional work included under this amendment shall be performed for a not to exceed fee of $47,053.45 in accordance with the fee schedule included with this amendment as Exhibit D-1. EXECUTION IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written. SCJ Alliance City of Arlington Eric Johnston, PE Barbara Tolbert Date Date Exhibit B Amendment 1 211th Place NE – 67th Ave NE to SR 530 Arlington, Snohomish County, WA Prepared For: Ryan Morrison, PE Prepared By: Dan Ireland, PE Melissa Greenheck, PE Date Prepared: September 21, 2023 Introduction: It is our pleasure to provide the City of Arlington (City) with this amendment to incorporate the design of a water main design into the project, additional geotechnical services, and additional cultural services. Water Line Design: SCJ will lead the design of a 12-inch water main that will connect to the existing valves located west of the intersection at 67th Ave NE and will extend all the way to the western project limit at the SR 530 Roundabout. The new 12-inch water line will replace the existing 6-inch water line that will be abandoned in place. SCJ will be adding the following to the Contract based on the Understanding and Assumptions listed in this Exhibit: 1) Water Main and Service Design. 2) Water Construction Plans and Profile. 3) Water Construction Specifications 4) Water Estimate of Construction Costs. 5) Additional coordination with Utility Companies The addition of the water main design work is not estimated to have an impact on the design schedule. Cultural Resources: Additional Cultural Services are required to satisfy the Department of Archeological and Historic Program requirements based on findings during the field explorations. Legacy Anthropology has provided an amendment for these additional services that is attached to this amendment. The addition of the additional cultural work is not estimated to have an impact on the design schedule Geotechnical Services: Existing concrete panels were discovered under the existing asphalt at various depths and areas. The limits of the existing panels are undetermined and the method of mitigating the panels is unclear. HWA will be providing additional pavement cores that will help provide the City with additional information. The additional geotechnical field work is estimated to be an impact to the design schedule of a full 60% Design review package submittal. SCJ will continue to submit its 60% Design package per the schedule, but it will not be a complete package. The following phases of work include the additional work defined: City of Arlington – 211th Corridor September 21, 2023 Page 2 of 4 25 N Wenatchee Ave, Suite 238  Wenatchee, WA 98801  Office 509.886.3265  Fax 360.352.1509  scjalliance.com Phase 1 Project Management Project Meetings Incorporating the water design will require additional meetings and preparation estimated to be the following: 6) Initial Waterline Main Kickoff Meeting (1) (Completed) 7) Pothole review meeting (1) 8) Updated water main and service connection confirmation meeting (1) Understanding 1) This will not have an effect on other general project management elements already incorporated into the scope of work. Deliverables 1) Meeting exhibits and minutes Phase 6 60% PS&E Submittal Water Main Design 1) Sheet Setup. SCJ will create sheets to be used for the water main layout and review. 2) Water Main Location. SCJ will work on evaluating the location of the water main and provide the City with two options of where the main can be located within the corridor. This will be provided to the City for comment. 3) Updated Main Alignment. Based upon the City’s feedback, SCJ will make adjustments to the water main location to move forward with the design. Changes to the alignment of the main after this determination will be considered additional services. 4) 60% Construction Plans: SCJ will develop 60% level drawings that will include defining the alignment, service connections, valve locations, and hydrant locations. Utility conflict locations will be provided to investigate in the field. 5) 60% Cost Estimate: SCJ will incorporate water components into the overall 60% cost estimate. 6) 60% Special Provisions: SCJ will incorporate city-specific special provisions (provided by the City) into the overall 60% special provision for water line including any non-standard items SCJ identifies. Understanding 1) Initial Water alignment options 2) Updated Water alignment location. 3) 60% Water Sheets 4) 60% Water Special Provisions. 5) 60% Water Cost Estimate City of Arlington – 211th Corridor September 21, 2023 Page 3 of 4 25 N Wenatchee Ave, Suite 238  Wenatchee, WA 98801  Office 509.886.3265  Fax 360.352.1509  scjalliance.com Phase 7 Cultural Resources 1) Please see the attached Legacy Anthropology amendment for the description of additional services. Phase 8 Geotechnical Services 1) Existing concrete panels were discovered under the existing asphalt at various depths and areas. The limits of the existing panels are undetermined and the method of mitigating the panels is unclear. HWA will be providing additional pavement cores that will help provide the City with additional information to determine a make a decision. Please see the attached HWA amendment for the description of additional services. Phase 10 90% Design and Plan Preparation Task 1 Water Line Construction Plans This task involves making adjustments to the water design based on 60% review comments and advancing the plan set to include construction details and callouts. The following will be included in this task: 1) Water Line Sheets (4) 2) Water Detail Sheets (2) 3) Responses to 60% Water comments (1) Task 2 Water 90% Estimate 1) Water 90% Engineer’s Estimate: Develop quantities based on the 90% plans. Assign unit costs for quantified item and assign lump sum costs to other items based on professional judgment. Develop a 90% construction cost estimate that includes a 10% contingency. Task 3 Water Special Provisions 1) General and Special Provisions will be developed per the WSDOT and APWA format. We will identify non-standard items. We will develop a draft construction requirement, materials, measurement, and payment narratives for non-standard items identified in the contract plans. Understanding 1) There are no adjustments to the location, pipe types, of the main line, limits, or additional services during 90% design. 2) These estimated efforts assume one bid package submittal. 3) This amendment does not include the cost of pot-holing by a third party. 4) The existing line is to be abandoned in place when not impacted by other excavation activities. 5) This design will connect parcels with existing domestic water services. 6) This design will reconnect the service connection to the meter. 7) No additional permitting is required. 8) Pipe size and type will be provided by the City. 9) Water modeling to evaluate adequate pressures and flows will be provided by the City. City of Arlington – 211th Corridor September 21, 2023 Page 4 of 4 25 N Wenatchee Ave, Suite 238  Wenatchee, WA 98801  Office 509.886.3265  Fax 360.352.1509  scjalliance.com Deliverables 1) Responses to 60% comments. 2) 90% Water Plans. 3) 90% Water Special Provisions. 4) 90% Water Cost Estimate Phase 11 Final Design Task 1 Final Design 1) Final Water Plan Revisions: Following the receipt of TIB/City comments, we will finalize the water plans to construction-ready documents. This will include comment responses to 90% comments and continuous updates to the design memo. 2) Final Water Special Provisions: SCJ will incorporate TIB/City comments of the special provisions. It is estimated that this is a revision to the 90% specials already developed and not incorporating new non-standard items at this phase of the project. 3) Final Water Engineers Estimate: The project estimate will be updated and transferred to the bid proposal sheet for the bid package. Understanding 1) The completion of the 90% review meeting will be the beginning of this phase of work. 2) The completion of this phase will be a full plan, specification, and estimate ready for a public bid process. Deliverables 1) Response to 90% Comments. 2) Final Water Plan Sheets 3) Final Water Cost Estimate 4) Final Water Special Provisions Phase Phase Title SCJ Hours Amendment Estimate Previous Phase Amount New Phase Amount 1 Project Management 19.5 $3,414 $10,825 $14,239 6 60% Design 130 $15,579 $73,911 $89,490 7 Cultural Resources - $700 $6,515.30 $7,215.30 8 Geotechnical Services - $18,998 $72,950.90 $91,948.90 10 90% Design 40 $5,524 $47,781 $53,305 11 Final Design 24 $2,839 $18,141 $20,980 $47,054 Current Contract Amount: $318,778.70 Amendment Amount: $47,054 New Contract Amount: $365,832.70 Consultant Billing Rate Schedule - Exhibit D-2 SCJ Alliance Client:Hourly Rate Table Format: LAG Contract Project:Allowable Overhead Rate: 166.19% Job #:Negotiated Fixed Fee: 31.00% File Name:Labor Estimate.xlsm Billing Rate Table Version: 2/23/2023 Date: Direct Labor Allowable Negotiated Total Hourly Hourly Rate Overhead Profit Billing Rates NTE 166.19%31.00% NTE $126.56 $210.33 $39.23 $376.12 $99.00 $164.53 $30.69 $294.22 $86.08 $143.06 $26.68 $255.82 $71.71 $119.17 $22.23 $213.11 $63.56 $105.63 $19.70 $188.89 $49.03 $81.48 $15.20 $145.71 $60.06 $99.81 $18.62 $178.49 $56.54 $93.96 $17.53 $168.03 $52.97 $88.03 $16.42 $157.42 $46.23 $76.83 $14.33 $137.39 $34.62 $57.53 $10.73 $102.89 $57.75 $95.97 $17.90 $171.63 $49.61 $82.45 $15.38 $147.44 $41.86 $69.57 $12.98 $124.40 $38.45 $63.90 $11.92 $114.27 $32.18 $53.48 $9.98 $95.64 $66.11 $109.87 $20.49 $196.47 $48.76 $81.03 $15.12 $144.91 $41.72 $69.33 $12.93 $123.99 $36.39 $60.48 $11.28 $108.15 $33.00 $54.84 $10.23 $98.07 $49.89 $82.91 $15.47 $148.27 $54.10 $89.91 $16.77 $160.78 $37.96 $63.09 $11.77 $112.81 $34.10 $56.67 $10.57 $101.34 $29.70 $49.36 $9.21 $88.27 $31.00 $51.52 $9.61 $92.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $68.20 $113.34 $21.14 $202.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $42.85 $71.21 $13.28 $127.35 $0.00 $0.00 $0.00 $0.00 $42.85 $71.21 $13.28 $127.35 $32.13 $53.40 $9.96 $95.49 $62.01 $103.05 $19.22 $184.29 PC 1 Project Coordinator Project Accountant CI 2 Construction Inspector CI 1 Construction Inspector Graphic Designer PC 3 Project Coordinator - CM Only PC 2 Project Coordinator City of Arlington 211th NE - 67th Ave NE to SR530 23-00884 Actuals Not To Exceed Billing Rate Table (ANTE) Job Classifications 3/30/23 RE 2 Construction Resident Engineer P4 Planner E4 Engineer Senior Consultant Senior Project Manager PM3 Project Manager PM2 Project Manager PM1 Project Manager Senior Engineer P1 Planner Senior Technician Senior Landscape Architect T1 Technician L3 Landscape T3 Technician T2 Technician L2 Landscape L1 Landscape Senior Planner P3 Planner P2 Planner Construction Office Engineer CI 3 Construction Inspector CI 4 Construction Inspector Principal Construction Inspector T4 Technician Senior Construction Manager RE 3 Construction Resident Engineer E2 Engineer E1 Engineer L4 Landscape E3 Engineer RE 1 Construction Resident Engineer Consultant Labor Hour Estimate SCJ Alliance Client:City of Arlington Template Version: 2/23/2023 Project:211th NE - 67th Ave NE to SR530 Contract Type: LAG Contract No. of Sheets: No. of Sheets: No. of Sheets: No. of Sheets: N/A Job #:23-00884 No. of Lots: No. of Lots: No. of Lots: No. of Lots: N/A File Name: Labor Estimate.xlsm 77 57 44 48 28 39 35 79 41 37 46 Template Version:Dan Ireland Melissa Greenheck Andrew Metternich- Fields Caitlin Mehall Jay Kim Brown Jair Steve D Rikki Angi Juliana Loli Phase & Task No.Principal E4 Engineer E3 Engineer E4 Engineer Graphic Designer Project Accountant E1 Engineer Principal E3 Engineer L3 Landscape PM1 Project Manager Total Direct Labor Hours & Cost Total Cost PHASE 1 Task 1 1 1.0 1.0 2.0 344.74$ 2 -$ 3 -$ 4 2.0 1.0 3.0 625.70$ Subtotal Hours: 3.0 1.0 1.0 5.0 970.44$ Task 2 1 -$ Subtotal Hours: -$ Task 3 1 2.0 2.0 3.5 7.5 1,084.98$ 2 2.0 2.0 4.0 793.74$ 3 1.0 2.0 3.0 564.90$ Subtotal Hours: 5.0 6.0 3.5 14.5 2,443.62$ Total Phase Hours: 8.0 7.0 3.5 1.0 19.5 19.5 Total Phase Direct Labor: $616.00 $395.78 $98.00 $39.00 $1,148.78 3,414.06$ Phase & Task Title Kickoff Meeting Project Meetings Reporting Updated water main and service connection confirmation meeting Potholing Meeting Project Management PROJECT MANAGEMENT Amendment Setup General project correspondence and coordination Bi-Weekly Updates (20 & 30 mins each) 2 of 7 9/21/2023 Consultant Labor Hour Estimate SCJ Alliance Client:City of Arlington Template Version: 2/23/2023 Project:211th NE - 67th Ave NE to SR530 Contract Type: LAG Contract No. of Sheets: No. of Sheets: No. of Sheets: No. of Sheets: N/A Job #:23-00884 No. of Lots: No. of Lots: No. of Lots: No. of Lots: N/A File Name: Labor Estimate.xlsm 77 57 44 48 28 39 35 79 41 37 46 Template Version:Dan Ireland Melissa Greenheck Andrew Metternich- Fields Caitlin Mehall Jay Kim Brown Jair Steve D Rikki Angi Juliana Loli Phase & Task No.Principal E4 Engineer E3 Engineer E4 Engineer Graphic Designer Project Accountant E1 Engineer Principal E3 Engineer L3 Landscape PM1 Project Manager Total Direct Labor Hours & Cost Total CostPhase & Task Title PHASE 6 -$ -$ Subtotal Hours: -$ Task 2 1 2.0 2.0 3.0 12.0 19.0 2,420.67$ 2 2.0 1.0 4.0 20.0 27.0 3,206.50$ 3 4.0 4.0 8.0 1,083.67$ 4 4.0 4.0 411.55$ 5 4.0 12.0 16.0 1,757.70$ 6 4.0 4.0 411.55$ 7 1.0 4.0 5.0 542.31$ 8 1.0 4.0 5.0 542.31$ 9 -$ Subtotal Hours: 4.0 7.0 13.0 64.0 88.0 10,376.27$ Task 8 1 1.0 4.0 20.0 1.0 2.0 2.0 2.0 32.0 3,530.44$ 2 1.0 2.0 3.0 637.59$ 3 -$ Subtotal Hours: 2.0 4.0 20.0 3.0 2.0 2.0 2.0 35.0 4,168.03$ 60% Estimate Quantifying of Project Unit cost analysis Meter Adjustments 60% PS&E SUBMITTAL 60% Water Main Design Initial Water Main Options Updated Water Main Location (Under Trail) Updating Pothole Exhibits Water Profile Development Valve and Joint Detailing Service Connections Additional Utility Coordination for additional conflicts 3 of 7 9/21/2023 Consultant Labor Hour Estimate SCJ Alliance Client:City of Arlington Template Version: 2/23/2023 Project:211th NE - 67th Ave NE to SR530 Contract Type: LAG Contract No. of Sheets: No. of Sheets: No. of Sheets: No. of Sheets: N/A Job #:23-00884 No. of Lots: No. of Lots: No. of Lots: No. of Lots: N/A File Name: Labor Estimate.xlsm 77 57 44 48 28 39 35 79 41 37 46 Template Version:Dan Ireland Melissa Greenheck Andrew Metternich- Fields Caitlin Mehall Jay Kim Brown Jair Steve D Rikki Angi Juliana Loli Phase & Task No.Principal E4 Engineer E3 Engineer E4 Engineer Graphic Designer Project Accountant E1 Engineer Principal E3 Engineer L3 Landscape PM1 Project Manager Total Direct Labor Hours & Cost Total CostPhase & Task Title Task 9 1 2.0 1.0 2.0 2.0 7.0 1,034.46$ 2 -$ Subtotal Hours: 2.0 1.0 2.0 2.0 7.0 1,034.46$ Total Phase Hours: 4.0 11.0 13.0 4.0 84.0 4.0 4.0 4.0 2.0 130.0 130.0$ Total Phase Direct Labor: $308.00 $621.94 $572.00 $112.00 $2,908.08 $316.00 $164.00 $148.00 $92.00 $5,242.02 15,578.76$ PHASE 10 Task 3 1 1.0 1.0 1.0 3.0 499.75$ 2 4.0 12.0 16.0 1,906.77$ 3 -$ 4 -$ 5 -$ 6 -$ Subtotal Hours: 1.0 5.0 13.0 19.0 2,406.53$ Task 4 1 1.0 2.0 1.0 2.0 2.0 2.0 10.0 1,345.62$ 2 2.0 2.0 469.56$ Subtotal Hours: 1.0 2.0 3.0 2.0 2.0 2.0 12.0 1,815.18$ Special Provisions Water Plan and Profile adjustments Construction Plans 60% Comments/Resposnes Special Provisions 90% PS&E SUBMITTAL 90% Cost Estimate Quantity Estimate 4 of 7 9/21/2023 Consultant Labor Hour Estimate SCJ Alliance Client:City of Arlington Template Version: 2/23/2023 Project:211th NE - 67th Ave NE to SR530 Contract Type: LAG Contract No. of Sheets: No. of Sheets: No. of Sheets: No. of Sheets: N/A Job #:23-00884 No. of Lots: No. of Lots: No. of Lots: No. of Lots: N/A File Name: Labor Estimate.xlsm 77 57 44 48 28 39 35 79 41 37 46 Template Version:Dan Ireland Melissa Greenheck Andrew Metternich- Fields Caitlin Mehall Jay Kim Brown Jair Steve D Rikki Angi Juliana Loli Phase & Task No.Principal E4 Engineer E3 Engineer E4 Engineer Graphic Designer Project Accountant E1 Engineer Principal E3 Engineer L3 Landscape PM1 Project Manager Total Direct Labor Hours & Cost Total CostPhase & Task Title Task 5 1 1.0 2.0 2.0 2.0 2.0 9.0 1,301.93$ 2 -$ 3 -$ Subtotal Hours: 1.0 2.0 2.0 2.0 2.0 9.0 1,301.93$ Total Phase Hours: 2.0 8.0 15.0 3.0 4.0 4.0 4.0 40.0 40.0$ Total Phase Direct Labor: $154.00 $452.32 $519.30 $237.00 $164.00 $148.00 $184.00 $1,858.62 5,523.63$ Special Provisions Special Provisions 5 of 7 9/21/2023 Consultant Labor Hour Estimate SCJ Alliance Client:City of Arlington Template Version: 2/23/2023 Project:211th NE - 67th Ave NE to SR530 Contract Type: LAG Contract No. of Sheets: No. of Sheets: No. of Sheets: No. of Sheets: N/A Job #:23-00884 No. of Lots: No. of Lots: No. of Lots: No. of Lots: N/A File Name: Labor Estimate.xlsm 77 57 44 48 28 39 35 79 41 37 46 Template Version:Dan Ireland Melissa Greenheck Andrew Metternich- Fields Caitlin Mehall Jay Kim Brown Jair Steve D Rikki Angi Juliana Loli Phase & Task No.Principal E4 Engineer E3 Engineer E4 Engineer Graphic Designer Project Accountant E1 Engineer Principal E3 Engineer L3 Landscape PM1 Project Manager Total Direct Labor Hours & Cost Total CostPhase & Task Title PHASE 11 Task 1 1 1.0 8.0 4.0 4.0 4.0 21.0 2,465.19$ 2 1.0 2.0 3.0 373.81$ 3 -$ 4 -$ Subtotal Hours: 2.0 10.0 4.0 4.0 4.0 24.0 2,839.00$ Total Phase Hours: 2.0 10.0 4.0 4.0 4.0 24.0 24.0$ Total Phase Direct Labor: $113.08 $346.20 $164.00 $148.00 $184.00 $955.28 2,839.00$ Total Hours All Phases 14.0 28.0 13.0 7.5 1.0 109.0 7.0 12.0 12.0 10.0 213.5 213.5 Total Direct Labor Estimate All Phases $1,078.00 $1,583.12 $572.00 $210.00 $39.00 $3,773.58 $553.00 $492.00 $444.00 $460.00 $9,204.70 27,355.45$ Indirect Costs Subconsultants: HWA $18,998.00 Legacy Anthropology $700.00 Subconsultant Subtotal:19,698.00$ Subconsultant Markup:-$ Subconsultant Total:19,698.00$ Reimbursable Expenses: Copies, Printing, etc.-$ Mileage -$ Expenses Subtotal:-$ Expenses Markup:-$ Expenses Total:-$ Management Reserve:-$ Total Indirect Costs:19,698.00$ Total: 47,053.45$ FINAL DESIGN Final Plan Revisions Engineers Estimate FINAL DESIGN 6 of 7 9/21/2023 SCJ Alliance Client: Project: Job #:Template Version: File Name: Labor Estimate.xlsm Contract Type: Consultant Fee Determination DIRECT SALARY COST Classification Hours Direct Hourly Rate Amount Principal 14.0 $77.00 $1,078.00 E4 Engineer 28.0 $56.54 $1,583.12 E3 Engineer 13.0 $44.00 $572.00 E4 Engineer 0.0 $48.00 $0.00 Graphic Designer 7.5 $28.00 $210.00 Project Accountant 1.0 $39.00 $39.00 E1 Engineer 109.0 $34.62 $3,773.58 Principal 7.0 $79.00 $553.00 E3 Engineer 12.0 $41.00 $492.00 L3 Landscape 12.0 $37.00 $444.00 PM1 Project Manager 10.0 $46.00 $460.00 Total Direct Salary Cost $9,204.70 OVERHEAD Overhead Rate: 166.19% Direct Salary Cost:$9,204.70 Overhead Cost $15,297.29 FIXED FEE Fixed Fee Rate: 31.00% Direct Salary Cost:$9,204.70 Fixed Fee Cost $2,853.46 TOTAL SALARY COST Total Salary Cost $27,355.45 SUBCONSULTANTS Yes <<================$18,998 <<================$700 x Subconsultant Fee Subtotal:$0 $19,698.00 Q Subconsultant Markup:0%$0.00 REIMBURSABLE EXPENSES Copies, Printing, etc. 0.0% of the Direct Salary Costs $0.00 Mileage 0 miles at $0.655 per mile $0.00 Expenses Subtotal: $0.00 Expenses Markup:0%$0.00 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses)$47,053.45 MANAGEMENT RESERVE FUND (MRF) Management Reserve:$0.00 Total Estimated Budget: $47,053.45 HWA Select Phase Consultant Fee Determination Summary - Exhibit D-1 211th NE - 67th Ave NE to SR530 2/23/202323-00884 Legacy Anthropology Select Phase LAG Contract City of Arlington 9/21/2023 Page 7 1 Scope of Work for Permit and Monitoring, Legacy Anthropology LLC 211th Place NE, Arlington, Snohomish County, Washington Scope of Work for Archaeological Permit Application and Monitoring Plan for the City of Arlington 211th PL NE – 67th Ave NE to SR 530 (P- 02.571) Project, Arlington, Snohomish County, Washington For: Dan Ireland, SCJ Alliance September 12, 2023 Introduction Legacy Anthropology, LLC, is a cultural resources management company situated in Bellingham Washington. Our team is composed of Susan C. Larsen, who meets the Secretary of the Interior’s Qualifications for a Professional Archaeologist, and Nicholas E. Gouette. We have a combined 15 years of experience working in archaeology and have collectively participated in over 150 cultural resources management projects throughout Washington State. In addition, we are a certified Minority/Women Business Enterprise and a Disadvantaged Business Enterprise with the Washington State Office of Minority and Women’s Business Enterprises (Certification Numbers M5F0027665 and D5F0027665). Project Overview and Objectives The City of Arlington is planning improvements to 211th Place Northeast, a 0.42-mile-long freight and access road between State Route 50 and 67th Avenue Northeast (Project Area). This road lies within the footprint of the historic road into Arlington and is in need of improvements due to its age. The road may also experience an increase in traffic after the completion of a planned roundabout at the intersection of SR 530 and 211th Pl NE. Planned improvements include stormwater management upgrades, installation of guard rails, lighting, a 12-foot-wide multi-use path on the south side of the road, ADA compliant curb ramps, land scaping, and street amenities. During an archaeological survey, a precontact low density lithic scatter site (45SN879) was identified at the east side of the Project Area. The site was previously bisected by the construction of the road. Moving forward with the project will require a Monitoring Permit from the Department of Archaeology and Historic Preservation (DAHP) and monitoring by a Professional Archaeologist. This project is funded by the City of Arlington and the Transportation Improvement Board and is subject to compliance with the Governors Executive Order 21-02. The lead agency for this project is the City of Arlington . Scope of Work This work will include: • scope of work, invoicing, correspondence • consultation with Affected Tribes • application for a DAHP excavation/ monitoring permit for this Project • generation of cultural resources monitoring plan 2 Scope of Work for Permit and Monitoring, Legacy Anthropology LLC 211th Place NE, Arlington, Snohomish County, Washington This scope of work will not include: • data recovery of cultural resources • archaeological monitoring • additional archaeological testing (if any) required by the city, the DAHP, or the Affected Tribes in excess of this scope During the DAHP permit application process, the applicant is the Professional Archaeologist, and the co-applicant is the project lead. The permit application must include: an application cover sheet, background information, details of the proposed work, a protocol of immediate steps upon the identification of archaeological material, details of the professional archaeologist, details of the contractor, and a completed site inventory form. The application process will require correspondence between Legacy Anthropology, the city, and the engineer. The completed application will be sent by the DAHP to the Association of Washington Archaeology and affected Indian Tribes, local governments, and landowners for comment. The review and processing can take approximately 60 days. Task List and Schedule: Task Completion Hour DAHP Monitoring Permit • Correspondence with contractor, DAHP, and affected tribes • Permit application 6 $70 $420.00 Monitoring Plan: • Details protocols for archaeological monitoring of the Project Total 10 $700.00 Total $700.00 Payment Payment will be due in full within 30 days of issue of invoice for 100% completion of the DAHP monitoring permit application and the monitoring plan. By signing below, the client agrees to the above and to pay Legacy Anthropology the quoted sum for the described work. Legacy Anthropology will send an invoice as the work is completed and the client agrees to pay it within 30 days of issue. Signature________________________________________________ Date____________________ Project Cost Estimate HWA Ref: 2023-049 Arlington 211th - Supplemental Scope Date: 20-Sep-23 Arlington, Washington Prepared by: SKS Scope of Work This estimate assumes ROW permits and traffic control plans will be reused from the previous phase. Explorations include an additional two days of pavement coring Prepare logs of pavement cores and assign lab testing. Determine depth and extent of underlying concrete slab along roadway. Laboratory testing including cation exchange capacity and organic content testing will also be conducted on select samples near proposed infiltration facilities. The findings of our explorations and lab testing will be incorporated into the draft geotechnical report included on our previous scope. ESTIMATED HWA LABOR: Prin. IX Geol. VIII Engr. VIII Engr. V Geol. III Geol. IV Admin CAD Contracts TOTAL TOTAL $101.00 $85.00 $87.50 $58.50 $40.50 $46.00 $33.00 $32.50 $45.00 HOURS AMOUNT Mark Pavement Core Locations in Field & Arrange Utility Locates 4 4 8 $534 Conduct Pavement Coring (assume up to 2 days at 4 cores per day) 1 20 20 41 $1,789 1 4 5 $243 Perform Engineering Analyses 4 4 8 $584 Incorporate findings into draft geotechnical report 4 4 2 1 11 $709 Consultation / Project Management 1 2 3 $205 DIRECT SALARY COSTS 0 0 13 12 20 30 0 1 0 76 $4,062 LABORATORY TEST SUMMARY: ESTIMATED DIRECT EXPENSES: Est. No. Unit Total Mileage @ IRS rate $300 Pavement Coring (@ $75/core) $600 Test Tests Cost Cost Traffic Control in Field for Coring $4,000 4 $19 $76 Laboratory Testing $356 4 $70 $280 TOTAL DIRECT EXPENSES: $5,256 LABORATORY TOTAL: $356 PROJECT TOTALS AND SUMMARY: Direct Salary Costs (DSC)$4,062 OH @ 208.31% * DSC $8,462 Fixed Fee @ 30% * DSC $1,219 Total Labor $13,742 Direct Expenses $5,256 GRAND TOTAL: $18,998 Notes 1. All costs are estimated, and may be increased or decreased within the limits of the total budget at the discretion of HWA's PM. 2. Traffic control will be required and limited to non-arterial lane closures using signs/cones (no flaggers). Organic Content Test - Loss on Ignition (D2974) WORK TASK DESCRIPTION Prepare Pavement Core Logs and Assign Lab Testing PERSONNEL & 2023 HOURLY RATES Cation Exchange Capacity - EPA 9081 HWA Supplamental Estimate 9-20-2023 City of Arlington Council Agenda Bill NB #1 Attachment November 6, 2023 2024 Lodging Tax Distribution 2024 Lodging Tax Distribution Worksheet Finance; Kristin Garcia, Director 360-403-3431 EXPENDITURES REQUESTED: $132,450 BUDGET CATEGORY: Lodging Tax Fund BUDGETED AMOUNT: $200,000 (in 2024 budget) LEGAL REVIEW: DESCRIPTION: Hispanic Heritage Event. Three applications were not fully funded, two applications were short of meeting the match requirement and the third was reduced because of incorrect math in their application. The applications can be found on the City Council page on SharePoint in the documents folder. https://arlingtonwa.sharepoint.com/sites/CityCouncilHome/Shared%20Documents/Forms/AllItems.aspx A training session was video was published on the website. The application period opened on September 1 and applications were due September 30. The committee met on October 19, 2023 to review and discuss ALTERNATIVES: Do not approve funding distributions for 2024. Remand back to the lodging tax advisory committee for additional review and discussion. RECOMMENDED MOTION: I move to approve the 2024 funding distribution as recommended by the lodging tax advisory committee. Project Sponsor/Contractor Project Title Total Project Required 25% Project Match Actual Match Amount Requested (can't be more than 75% of total project costs) COMMITTEE RECOMMENDS Rating Arlington Arts Council Art in Legion Park 8,500$ 2,125$ 3,500$ 5,000$ 5,000$ 68 25%41%59% Arlington Fly-In Skyfest 165,000$ 41,250$ 135,000$ 30,000$ 30,000$ 98 25%82%18% City of Arlington Arlington Stillaguamish Eagle Festival 14,580$ 3,645$ 4,780$ 9,800$ 9,800$ 77 25%33%67% City of Arlington Hispanic Heritage Event 2024 3,910$ 978$ 1,410$ 2,500$ 2,500$ 65 25%36%64% City of Arlington Stronger Together Celebration 5,000$ 1,250$ 1,900$ 3,100$ 3,100$ 63 25%38%62% City of Arlington Summer Entertainment Series 20,740$ 5,185$ 5,340$ 15,400$ 15,400$ 63 25%26%74% DABA Arlington Street Fair 23,980$ 5,995$ 14,980$ 9,000$ 9,000$ 72 25%62%38% DABA Hometown Holidays 8,090$ 2,023$ 2,590$ 5,500$ 5,500$ 72 25%32%68% DABA Tourism Brochure Distribution 11,090$ 2,773$ 4,590$ 6,500$ 6,500$ 83 25%41%59% Stillaguamish Valley Museum 2024 Pioneer Day 9,986$ 2,497$ 6,236$ 3,750$ 3,750$ 67 25%62%38% Stilly Valley Chamber of Commerce Arlington Farm Tours 12,000$ 3,000$ 3,000$ 9,000$ 9,000$ 78 25%25%75% Stilly Valley Chamber of Commerce 2024 Arlington Show and Shine 27,638$ 6,909$ 15,638$ 12,000$ 11,400$ 77 25%57%43% Stilly Valley Chamber of Commerce Arlington Farmers Market 16,000$ 4,000$ 3,500$ 12,500$ 11,000$ 82 25%22%78% Stilly Valley Chamber of Commerce 4th of July Parade 14,000$ 3,500$ 3,000$ 11,000$ 10,500$ 68 25%21%79% TOTALS 340,514$ 135,050$ 132,450$ 2024 Lodging Tax Distribution City of Arlington Council Agenda Bill NB #2 Attachment GCOUNCIL MEETING DATE: November 6, 2023 Planning Commission Appointments Redacted Applications of Jennifer Benton and Nathan Senff Community and Economic Development; Marc Hayes, Director 360-403-3457 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: 0 BUDGETED AMOUNT: 0 LEGAL REVIEW: DESCRIPTION: Planning Commission Vice-Chairperson, Amy Rusko Planning Manager, and Marc Hayes CED Director interviewed four applicants to fill the two vacant positions on the Planning Commission. From those interviews, two individuals (Jennifer Benton and Nathan Senff) were selected for recommendation to fill the open positions. The interview panel believes these individuals will complement the existing Planning Commission and provide a valuable contribution to our community. Jennifer is a teacher at Stanwood High School. She is intelligent, articulate, a first-time homeowner who understands and accepts growth, is very interested in helping Arlington remain a desirable/livable location, and is a pleasure to have a conversation with. Nathan is a teacher at Grace Academy. He is forward thinking, provides a lot of enthusiasm, speaks well, and listens to both sides of the conversation before responding. He is involved in community events and truly cares about Arlington. ALTERNATIVES: Remand to staff for additional information. I move to confirm the appointments of Jennifer Benton and Nathan Senff to the Planning Commission. City of Arlington Council Agenda Bill Item: NB #3 Attachment H COUNCIL MEETING DATE: November 6, 2023 Dedication of Real Property for Public Right of Way for 63rd Ave. NE and 188th St. NE Legal Description with Exhibit Map and Illustrative Map Community and Economic Development; Marc Hayes, Director 360-403-3457 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: 0 BUDGETED AMOUNT: 0 LEGAL REVIEW: DESCRIPTION: Exhibit “A”, for future widening and improvements of 63rd Ave. NE and 188th St. NE. Dedication of real property for right of way purposes related to new development typically occurs through the land use process pursuant to 20.56.170 AMC. ALTERNATIVES: Remand to staff for additional information. LEGAL DESCRIPTION OF DEDICATED RIGHT-OF-WAY THE NORTH 10 FEET PARALLEL WITH AND ADJACENT TO 188TH AVENUE NE, TOGETHER WITH THE WEST 25 FEET OF THE FOLLOWING DESCRIBED PROPERTY: THE WEST 165 FEET OF THE NORTH 264 FEET OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 22, TOWNSHIP 31 NORTH, RANGE 5 EAST, W.M., EXCEPT THE NORTH 20 FEET CONVEYED TO SNOHOMISH COUNTY UNDER AUDITOR’S FILE NO. 1047424, SITUATE IN CITY OF ARLINGTON, COUNTY OF SNOHOMISH, STATE OF WASHINGTON City of Arlington Council Agenda Bill Item: NB #4 Attachment ICOUNCIL MEETING DATE: November 6, 2023 Request to transfer ARPA funds from Food Truck Court project to Smokey Point Community Park project. None. Community and Economic Development; Marc Hayes, Director 360-403-3457 EXPENDITURES REQUESTED: $1,000,000 BUDGET CATEGORY: BUDGETED AMOUNT: $1,300,000 LEGAL REVIEW: DESCRIPTION: Due to material and overall increases in construction costs, the Smokey Point Community Park project, Phase 1, construction cost came in at $2,704,178.97. With the addition of contractors GC’s/Fee/Bond @10%, a 5% Project Contingency, and WSST @ 9.3%, this equates to an additional $709,617.12. Our budgeted amount for Phase 1 of the project was $3,000,000.00, as approved by Council in April. To date we have expended $404,111.00. in site design, architectural design, survey, geotechnical studies, and contract/project administration, leaving an available $2,595,888.00 from the original budgeted amount. This leaves the project with a $818,908.09 shortfall to construct a completed Phase 1. This leaves two choices moving forward. One solution would be to remove elements of the park, such as structures (stage, restrooms) and landscaping, this is not a desired option. The second option would be to transfer the $1,000,000.00 in ARPA funds from the proposed Food Truck Court project, to cover the cost overrun and build the Smokey Point Park per plan. This option is the preferred choice since the park is ready to go to bid in November, and the Food Truck Court is still being designed, and would not be able to be constructed by the time that the ARPA funds must be expended, (Dec. 2024). By doing so, this would defer the construction of the permanent Food Truck Court, allowing us time to create an alternate funding source for the construction of the Food Truck Court, which will be presented to Council in the near future. Related to this option, approximately $300,000.00 would still remain in the Food truck Court project, and we would continue to operate a temporary Food Truck Court pilot program, and in cooperation with the Airport, the Airport would install public restrooms on the proposed permanent Food Truck Court parcel and we would move the FTC pilot project to that site City of Arlington Council Agenda Bill NB #5 Attachment ALTERNATIVES: Remand to staff for additional information. applied to the Smokey Point Community Park project, for construction. City of Arlington Council Agenda Bill Item: NB #5 Attachment JCOUNCIL MEETING DATE: November 6, 2023 Brown and Caldwell Contract Amendment No. 3 for Haller Wellfield Improvement Project ATTACHMENTS: Scope of Work and Fee Public Works; Jim Kelly, Director 360-403-3505 EXPENDITURES REQUESTED: $253,000.00 BUDGET CATEGORY: Water Capital Fund (405) BUDGETED AMOUNT: $1,050,000.00 (2023) $100,000 (2024) LEGAL REVIEW: DESCRIPTION: Scope and Fee for Brown and Caldwell to provide 30-100% design documents for the Haller Well and Wellhouse siting for the Haller Wellfield Improvement Project. Public Works has been working for several years on securing and developing new water sources to ensure water availability for Arlington’s future. In October 2021 the City entered into contract with Brown and Caldwell to develop the plan for installing two new production wells at the Haller wellfield site and subsequent monitoring. The original contract has taken the design to 30% and received approval from the Department of Health, we are now ready to complete the design (30% to 100%) and prepare a construction package ready for bid. Base Contract $149,700.00 (Oct 2021) Amendment #1 $ 30,000.00 (Jan 2023) Amendment #2 TIME ONLY EXTENSION (Jul 2023) Amendment #3 $ 253,000.00 Remand to staff for further consideration. I move to approve a contract amendment with Brown and Caldwell in the amount of $253,000.00 for 100% design documents for the Haller Wellfield Improvement Project and authorize the Mayor to sign the amendment, subject to final review by the City Attorney. Exhibit A Scope of Work | 1 Arlington Haller Amendment 03_Post 2nd City Review_101823 701 Pike Street, Suite 1300 Seattle, WA 98101-2310 T: 206.624.0100 Scope of Work Haller Wellfield Improvement Project Amendment 03 City of Arlington October 18, 2023 Amendment Overview Amendment 02 adds the following phases to the existing contract: · Phase 400: Detailed Design It also adds time to project management since the contract is extending many months. One additional phase that will be scoped after completion of Phase 400: · Phase 500: Services During Construction Phase 100: Project Management Effort is added for overall project management, tracking, and reporting and provide monthly invoicing. Task 210: Client Meetings This subtask assumes monthly check-in meetings throughout the project duration. The BC Team will meet with the City for a 90% design workshop. It also assumes two additional client meetings. Task 220: Project Schedule BC will work with the City to maintain the design schedule with routine check-ins. Additionally, BC will maintain an internal MS Project schedule to meet internal scheduling standards. Task 230: On-going PM This task includes update of a project and quality management plan, monthly invoicing and progress updates, and leadership and coordination of the design team. Assumptions: · This amendment will add eight months to the project management schedule (October 2023 through June 2024). · Review and incorporation of City Division 01 specifications into the project will not be completed by Brown and Caldwell. It is assumed that the City will include this information between the 90% and 100% submittal. Haller Wellfield Improvement Project – Amendment 3 2 Arlington Haller Amendment 03_Post 2nd City Review_101823 Phase 400: Detailed Design This phase provides for advancing the preliminary design to a set of bid-ready documents, then provides services during the bidding period. Task 402: Geotechnical Site Investigation The City will hire HWA to perform a geotechnical assessment of the wellfield and stair’s locations. This effort is to coordinate this task and review the results. Task 410 Wellfield Final Design The detailed design advances the preliminary design drawings and specifications, based on the listed activities and assumptions: · Drawings will be prepared using BC CAD standards. Revit will not be utilized. 2D CAD drawings using the 2019 version. · Technical specifications and Division 01 specifications will be prepared by BC in 50 Division CSI Master Format using BC standard specifications. · The City will provide front-end specifications, either in CSI format (i.e., Division 00) or APWA format (i.e., WSDOT Division 1 with any local special provisions). · No site visits will be conducted. · New production well capacity testing will be completed by the City, with reports provided to BC, anticipated in mid-December. · Work products will be electronic only. · Unless specifically contradicted or updated by assumptions below, assumptions from the predesign phase carry over to this phase. Deliverables for this phase: · Intermediate (60%) design drawings and specifications · Final (90%) design drawings and specifications · AACE Class 2 Opinion of Probable Construction Cost · Final (Bid Ready) design drawings and specifications, sealed and signed by engineers licensed in the State of Washington Subtask 411 Team Meetings, Design Coordination, and Front End Specifications Activities and Assumptions: · Internal kick-off meeting: 1 hour · Regular design meetings: hour-long meetings, every other week, for six months · Interdisciplinary coordination meetings, assumed one hour per month · Front end specifications, assumed 24 hours Subtask 412 Process Mechanical Activities: · Updates to previous calculations · Continued development of layouts, details, section drawings · Change flowmeter to magmeter · Specification development · Coordinate with vendors on specification review · Control strategies development with I&C · P&ID development with I&C Haller Wellfield Improvement Project – Amendment 3 3 Arlington Haller Amendment 03_Post 2nd City Review_101823 Assumptions: · Pump sizing is based on initial well capacity estimates, changes in well capacities may result in resizing of pumps. Pump resizing effort is included. · One plan drawing, one section drawing, and one detail drawing will be added to convey design information. · Technical specifications will be added for piping and valves. · Pipe stress calculations are not included. Pipe supports are going to be designed by the Contractor. Subtask 413 Civil Activities: · Updates to previous calculations · Coordination with inside the fence survey · Coordination with geotechnical analysis completed by HWA · Continued development of drawings and details · Revise site layout to accommodate site access from the east. · Specification development, assume 11 civil specifications · Add connection for future Haller North wellfield · Add drawing to depict contractor laydown/site access · Add landscape plan · Modify drawings and specifications based on discipline review Assumptions: · Pump to waste infiltration vault will be pre-cast · One site landscape drawing will be provided. Landscaping assumed to be limited to perimeter shrubbery and turf grass. · No irrigation will be provided. · A buried tee with blind flange will be provided for connection to the future Haller North wellfield supply. · No fencing is included as part of this design. · Wellhouse finished floor elevation to be designed to keep finished floor out of 100-year flood elevation based on Snohomish County Stillaguamish Basin Climate Change document (July 2022). Finished floor for Wellhouses 4 and 5 set to 72.2 feet. · Finished floor for Wellhouses 2 and 3 will not be modified. · No access road improvements or additional paving/impervious area are part of this design. Subtask 414 Electrical Activities: · Updates to previous calculations · Equipment selection, and updates to existing wellhouse 2 MCC · Continued development of demolition plans, single line(s), electrical room layout, site electrical layout including conduit/cable routing,, panel schedules, and lighting, power and controls plan(s) · Continued review of plant equipment requirements · Updates to site grounding to include new wellhouses 4 and 5 · Develop electrical specifications for equipment, conduit and cable, installation and testing · Review of I&C, Process Mechanical and Building Mechanical equipment specifications Haller Wellfield Improvement Project – Amendment 3 4 Arlington Haller Amendment 03_Post 2nd City Review_101823 Assumptions: · Security for new wellhouses will be provided by a specialized City contractor. This project will include conduit/raceways for future installation locations of cameras and door security equipment. The City’s contractor will install all cable and equipment under a separate contract. The City will specify locations for future equipment and size/number of raceways required at each location prior to 90% deliverable. · Fire alarm design is not required as buildings are unoccupied. · Drawings will be added showing site electrical layout, panel schedules, and wiring diagrams for equipment. Existing MCC in Wellhouse 2 to remain. Five (5) new, standalone, VFD enclosures for 5 pumps will be installed in Wellhouse 2 electrical room. · Existing MCC 003 identified to feed Wellhouses, has capacity for the increase in wellhouse load. MCC 003 feeder breaker can be swapped out to accommodate the increase in load. Existing well- house 2 MCC1002 main breaker can be swapped out to accommodate. · The existing power feeder to the wellhouses’ service is to be replaced. The existing network Fiber- Optic feeder is to remain in place and be reused and reterminated to support the new remote IO panel. The existing pathways will be reused where feasible. · No temporary power will be required during shutdown. City has contingency plans for procuring Snohomish County PUD water is needed. No temporary power or cutover plans are required or included. Design assumes cut overs will take a day or two and not a month or two. · Pump sizing is based on initial well capacity estimates, changes in well capacities may result in resizing of pumps, Electrical system resizing effort is not included. · The City will have the MCC megger tested for corrosion and capacity. · Existing well pump motors are inverter duty rated and will accept a VFD with no modifications. · New motors will match existing configuration with over temperature protection and anti-condensa- tion motor heaters. · New pumps to have same startup discharge valve arrangement as it is for existing well pumps. Subtask 415 Instrumentation and Controls (I&C) Activities: · Complete P&IDs, add control wiring diagrams and instrumentation installation details. · Coordinate with City for Wellfield control system hardware and software based on City’s I&C upgrades for the Water Treatment Plant. · Coordinate with City for communication protocol between Wellfield and Water Treatment Plant. · Develop control descriptions and instrumentation specifications. · Review of process mechanical equipment specifications. · Review of electrical variable frequency drive specification for external signal interface to remote in- put output (RIO) panel. Assumptions: · One new RIO panel will be added in Wellhouse 2 to serve all wellhouses and network to Water Treatment Plant’s PLC via existing fiber optic cabling. · The two new wellhouses will have readouts for local instruments and local controls for pumps. · New flowmeters will be provided for the new and existing wellhouses. No pH, temperature, or conductivity probes will be provided. Subtask 416 Building Mechanical Activities: · Develop installation details for HVAC equipment. Haller Wellfield Improvement Project – Amendment 3 5 Arlington Haller Amendment 03_Post 2nd City Review_101823 · Develop specifications for equipment, installation, and testing. · Code review and analysis Assumptions: · Heating and cooling will be provided via mini-split heat pump in the Wellhouse 2 electrical room only. Wellhouses 4 and 5 will be cooled via exhaust fans. · Heating will be provided via Electric Unit Heaters in Wellhouses 4 and 5 for freeze protection only. · No plumbing work is assumed. · No changes to existing heater or exhaust fan in Wellhouse 3. Subtask 417 Architectural Activities: · Design new wellhouses 4 and 5 to match existing aesthetics. · Insulation / finishing of Wellhouse 2 electrical room to meet current energy code. Assumptions: · New wellhouses will be similar in style to existing site buildings. Subtask 418 Structural Activities: · Updates to previous calculations · Continued development of new wellhouse structures Assumptions: · New wellhouses will be CMU block with steel beams for roof structure · Pump to waste infiltration vault will be pre-cast · Deep foundations or piles will not be required. · Steel framing and decking will be used for roof. · Seismic information from HWA is required at beginning of 90% design. · Two drawings will be provided to cover the plan and sections of the wellhouse. Subtask 419: QA/QC and Design Submittal Preparation Activities: · Senior review of detailed design package · Preparing 90% design submittal for City review Task 420: Stairs Final Design Subtask 421 Civil Activities: · Update stairway design to 6-feet wide · Sizing of ditch culvert needed under stair landing · Add fencing near existing bridge to block footpath to Cox Ave Subtask 422 Structural Activities: · Continued development of stairway design drawings and calculations Haller Wellfield Improvement Project – Amendment 3 6 Arlington Haller Amendment 03_Post 2nd City Review_101823 · Coordination with geotechnical findings · Detailing of handrails · Detailing of signage anchorage and foundations per comment #12 · Detailing of fencing foundations per comment #12 Assumptions: · Stairway will be widened to 6-feet wide · Landings shall be extended to 4ft in direction of travel · Geotechnical report shall provide foundation recommendations and address slope stability. · Stair shall be cast-in-place concrete on grade (contingent on geotechnical report) · Assuming deep foundations will not be required (contingent on geotechnical findings) · One drawing will be provided. Task 430: Construction Cost Estimate BC’s Cost Estimating group will prepare a Class 2 Opinion of Probable Construction Cost based on the 90% documents. Task 440: Bid Documents Respond to City comments on the Final Design and prepare a bid-ready set of drawings and specifications. Activities: · Respond to City comments in a spreadsheet or table format. · Update drawings and specifications in response to comments. · Provide sealed and signed drawings and specifications, in electronic format, for City to post for bid. Task 450: Bid Support Activities: · Attend the pre-bid conference and one site tour (BC project manager and one technical team member) · Provide technical input on bidder questions. · Prepare bid addenda · Support review and evaluation of bids and bidder qualifications Assumptions: · City will schedule and organize pre-bid activities. These activities will last 4 hours. · BC will respond to 10 bidder questions. · Up to two bid addenda will be prepared, consisting of spec revisions and/or drawing updates. Task 460: Permit Support Activities: · Finalize SEPA checklist · Complete energy code envelope forms Assumptions: · All permitting will be submitted, and fees paid for by the City · The City is responsible for determining which permits are required to construct. · The City will handle the building permit application and the application for the County flood hazard permit. Haller Wellfield Improvement Project – Amendment 3 | 7 Arlington Haller Amendment 03_Post 2nd City Review_101823 Schedule Assumptions: · City review period for 60% design is 3 weeks. · City review period for Final Design will be two weeks. · Well drilling will begin in mid-October. Well capacities for 4 and 5 will be known by mid-December. · Results from seismic analysis for site classification will be available by January 23rd. Amendment 3 Haller Wellfield Expansion Proposed Budget Ly n n S t e p h e n s Di a n e Y a n Jo e M o r e n o Na t h a n Be r g l a n d Ke i t h R i c e Te r r y G a t l i n Sh a n t a m N a y a k Al e x R e e d Br e n z i e Pe n a l b a Li n n e a L u b k e Ch r i s t i n e A u d o Gi n o M a z z o t t i Bo b M a n t z Ab b i D o r n Am a n d a L a w l e r Ri c h a r d S e l l o n a Ma r k G i s s e Da n J a c k s o n To m L e m o n Ja c o b B e l l Br e e z e W a l t e r Bi l l A g s t e r Ma r t h a Kn o w l t o n Jo a n n a W i l s o n Wagner Phase Task Description PM PA Overall QC/ Mech QC DM/Mech Building Mech Building Mech QA/QC Electrical Electrical Electrical CAD I&C I&C QA/QC Structural Structural QAQC Civ QAQC/ Permitting Civil Civil CAD Struc CAD I&C CAD Proc- Mech CAD Proc- Mech CAD Cost Estimator Cost Estimator PIC Acct. Total Labor Hours Total Labor Effort Cost Expense Total Expense Cost Total Effort $269 $110 $275 $246 $155 $269 $135 $269 $145 $269 $250 $173 $300 $300 $151 $159 $173 $124 $190 $124 $225 $300 $385 $110 100 Project Management 46 8 0 32 0 0 7 0 0 4 0 4 0 0 4 0 0 0 0 0 0 0 2 8 115 $26,099 $0 $1,871 $1,871 $27,970 210 Client Meetings 12 10 7 4 4 4 41 $9,007 $1,871 220 Project Schedule 8 6 14 $3,629 230 Ongoing-PM 26 8 16 2 8 60 $13,463 400 ***Detailed Design 34 0 12 156 50 4 138 16 49 58 8 96 8 20 128 90 66 16 4 64 24 4 0 0 1045 $194,665 $30,365 $30,365 $225,030 402 Geotechnical Investigation 2 6 4 1 13 $2,339 410 Wellfield Final Design 411 Team Meetings, Design Coordination, front end specs 12 42 12 12 12 12 12 114 $24,164 $1,920 412 Process-Mechanical 72 2 32 106 $22,075 413 Civil 74 69 143 $22,145 414 Electrical 120 49 169 $23,305 415 I&C 40 16 56 $12,744 416 Building Mechanical 36 2 32 70 $9,928 417 Architectural 0 $0 $22,865 418 Structural 52 34 86 $14,878 419 QA/QC and Design Submittal Preparation 8 12 16 4 16 8 8 16 88 $23,971 420 Stairs Final Design 421 Civil 20 20 40 $6,200 422 Structural 16 32 48 $8,304 430 Construction Cost Estimate 2 4 24 4 34 $8,123 440 Bid Documents 4 10 2 2 2 2 22 $4,994 $3,660 450 Bid Support 6 8 2 4 4 8 8 40 $8,102 $1,280 460 Permit Support 4 4 8 16 $3,393 $640 TOTAL 80 8 12 188 50 4 145 16 49 62 8 100 8 20 132 90 66 16 4 64 24 4 2 8 1160 $220,764 $30,365 $1,871 $32,236 $253,000