HomeMy WebLinkAboutOrdinance No. 2019-008 Adopting the Arlington_Marysville Manufacturing Industrial Center Subarea Plan, 2018 Comprehensive Plan Amendment, Pln #491 ORDINANCE NO. 2019--008
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON, ADOPTING THE ARLINGTON-
MARYSVILLE MANUFACTURING INDUSTRIAL CENTER SUBAREA PLAN, 2018 COMPREHENSIVE
PLAN AMENDMENT, PLN #491
WHEREAS the City of Arlington is required to plan under RCW 36.70A.040; and
WHEREAS, the City of Arlington has the authority to review and update the
Comprehensive Plan and the development regulations which implement it; and
WHEREAS, the City's Community & Economic Development staff, Planning Commission,
and City staff discussed and recommended proposed revisions they concluded were needed to
comply with Chapter 36.70A RCW; and
WHEREAS, the City of Arlington Planning Commission reviewed the proposed adoption of
the Arlington-Marysville Manufacturing Industrial Center Subarea Plan, 2018 Comprehensive
Plan Amendment, PLN #491, and conducted a public hearing on April 16, 2019 to receive public
comments on the proposed revisions to the comprehensive plan; and
WHEREAS, based on its review of the requirements of Chapter 36.70A RCW, the analysis
and proposed revisions prepared, and the public comments received, the Planning Commission
recommended approval to the City Council; and
WHEREAS, the City Council held a public workshop on the proposed plan on April 22,
2019; and considered the matter at its May 6, 2019 regular meeting; and
WHEREAS, based on its review of the requirements of Chapter 36.70A RCW, the analysis
and proposed revisions prepared by their Boards and Commissions and staff, and the public
comments received, the City Council finds and declares that the review and needed revisions
have been prepared in conformance with applicable law, including Chapter 36.70A RCW, Chapter
43.21C RCW, and the approved public participation and adoption process;
NOW, THEREFORE, the City Council makes the following findings in support of the
Arlington-Marysville Manufacturing Industrial Center Subarea Plan 2018 Comprehensive Plan
Amendment, File no. PLN #491:
1. RCW 39.70A0130(2) allows for the adoption of sub-area plans outside of the docket
period, provided the appropriate environmental review has occurred under RCW
43.23C. The relevant review has been completed.
2. Well attended public meetings were held on April 4 and October 16, 2018. At those
meetings, information was disseminated, and input sought which would inform the
development of the sub-area plan.
3. The draft Arlington-Marysville manufacturing Industrial Sub-area plan was
presented and discussed at the November 6th planning Commission workshop.
ORDINANCE NO. 2019-008 1
4. The Sub-area plan and Existing Conditions Report were presented and discussed at
the November 20th Planning Commission meeting.
5. Snohomish County has already recognized the Arlington-Marysville manufacturing
Industrial Center; the proposed new comprehensive Plan Sub-area plan will allow
the City to continue the application process with PSRC for regional recognition of
the Center.
6. The Sub-area plan is consistent with both County planning policies and goals as well
as PSRC's Vision 2040 policies.
NOW, THEREFORE, the City Council of the City of Arlington does hereby ordain as follows:
Section 1. The City approves and incorporates by reference in its Comprehensive Plan
the City of Arlington Arlington-Marysville Manufacturing Industrial Center Subarea Plan October,
2018 Draft prepared by Berk Consulting.
Section 2. Section 1.4 of the Arlington Comprehensive Plan is hereby modified to
read as follows:
1.4 DOCUMENTS ADOPTED BY REFERENCE
The City of Arlington Comprehensive Plan incorporates by reference the following
documents:
• 2005 Arlington GMA Comprehensive Plan, except as otherwise amended by the
2015 Update.
• Arlington/ Marysville Manufacturing Industrial Center Subarea Plan
• West Arlington Subarea Plan.
• Arlington Water Systems Plan.
• Arlington Sewer Systems Plan.
• Arlington 2016 Transportation Plan.
• Stillaguamish Valley Economic Development Plan.
Snohomish County Countywide Planning Policies, June 2013.
• Multi-County Planning Policies.
• City of Arlington Comprehensive Plan Introduction
• 1-5 SEPTEMBER 2017
• PSRC Vision 2040.
• PSRC Transportation 2040.
• Updated Regional Transportation Demand Management Action Plan.
• Updated Transportation 2040 financial strategy.
• Coordination with planned Community Transit services.
• Coordination with Sound Transit planning.
• Puget Sound Cleans Air Agency Growth Management Policies.
• Regional Open Space Strategy.
• International Building Codes, including Fire Code.
ORDINANCE NO 2019-008 2
• Puget Sound Water Quality Management Plan.
• NPDES Phase II Stormwater permit.
• 2012 Stormwater Management Manual for Western Washington.
• Lakewood School District Capital Facilities Plan.
• Arlington School District Capital Facilities Plan.
• Snohomish County UGA Land Capacity Analysis Technical Report, June 10, 2015
The documents listed will have direct influence on decision-making where provisions
are prescriptive. Where advisory only, the documents will be balanced with other
policies, regulations and priorities.
Section 3. Ordinance to be Transmitted to Department. Pursuant to RCW 36.70A.106
a copy of this Ordinance shall be transmitted to the Washington Department of Commerce as
required by law.
Section 4. Severability. If any provision, section, or part of this ordinance shall be
adjudged to be invalid or unconstitutional, such adjudication shall not affect the validity of the
ordinance as a whole or any section, provision or part thereof not adjudged invalid or
unconstitutional.
Section 5. Effective Date. This ordinance or a summary thereof consisting of the title
shall be published in the official newspaper of the City, and shall take effect and be in full force
five (5) days after publication.
PASSED BY the City Council and APPROVED by the Mayor this 6th day of May, 2019.
CITY OF ARLINGTON
Barbara Tolbert, Mayor
Attest:
Erin Keator, City Clerk
Approved as to form:
Y')��r
S t e v n J. P ifif We
City Attorney
ORDINANCE NO. 2019-008 3
CERTIFICATION OF ORDINANCE
I, Erin Keator, being the duly appointed and City Clerk of the City of Arlington, Washington, a
municipal corporation, do hereby certify that the following Ordinance No. 2019-008 was
approved at the May 6, 2019 City Council meeting.
ORDINANCE NO. 2019-008
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON
ADOPTING THE ARLINGTON-MARYSVILLE MANUFACTURING INDUSTRIAL
CENTER SUBAREA PLAN, 2018 COMPREHENSIVE PLAN AMENDMENT, PLN#491
A true and correct copy of the original ordinance is attached.
Dated this 8th day of May 2019.
El-
Erin Keator
City Clerk for the City of Arlington