CALL TO ORDER
Mayor Barb Tolbert
PLEDGE OF ALLEGIANCE
ROLL CALL
Mayor Barb Tolbert – Wendy
APPROVAL OF THE AGENDA
Mayor Pro Tem Jan Schuette
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS
SPECIAL MEETING – ACTION WILL BE TAKEN
1. Ordinance Amending Ordinance No. 2022-040 ATTACHMENT A
Staff Presentation: Jim Kelly
Council Liaison: Debora Nelson
WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN
1. Ordinance to Amend Arlington Municipal Code Regarding ATTACHMENT B
Airport Commission Meeting Start Time
Staff Presentation: Dave Ryan
Council Liaison: Don Vanney
2. Washington State Transportation Improvement Board ATTACHMENT C
Grant Agreement for 211th Place
Staff Presentation: Jim Kelly
Council Liaison: Jan Schuette
3. Award of Division/Broadway Restoration Project Design to LDC, Inc. ATTACHMENT D
Staff Presentation: Jim Kelly
Council Liaison: Jan Schuette
4. Amendment #1 to the Brown & Caldwell Contract ATTACHMENT E
for the Haller Wellfield Improvement Project
Staff Presentation: Jim Kelly
Council Liaison: Debora Nelson
Arlington City Council Workshop and Special Meeting
Monday, January 9, 2023 at 6:00 pm
City Council Chambers – 110 E 3rd Street
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
5. Supplement #2 to Contract with Toole Design Group, LLC ATTACHMENT F
Staff Presentation: Jim Kelly
Council Liaison: Jan Schuette
ADMINISTRATOR & STAFF REPORTS
MAYOR’S REPORT
COMMENTS FROM COUNCILMEMBERS/COUNCILMEMBER REPORTS
PUBLIC COMMENT
For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.
REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING
EXECUTIVE SESSION
Consideration of real estate sales price [RCW 42.30.110(1)(c)]
Mayor Barb Tolbert / Steve Peiffle
RECONVENE
ADJOURNMENT
Mayor Pro Tem Jan Schuette / Mayor Barb Tolbert
City of Arlington Council Agenda Bill Item: SM #1 Attachment A
ORDINANCE 2023-001 1
ORDINANCE NO. 2023-001
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON
AMENDING THE CONSUMER PRICE INDEX INCREASES IN THE ARLINGTON MUNICIPAL CODE
CHAPTER 13.12 PERTAINING TO UTILITY RATES AND DECLARING AN EMERGENCY
WHEREAS, the City of Arlington has the authority to set rates and charges for its
utility system; and
WHEREAS, the City of Arlington continues to examine equitable rates for water, sewer,
and stormwater service; and
WHEREAS, the City’s municipal code contains a CPI adjustment factor which the City
Council wishes to reduce for 2023; and
WHEREAS, the City Council adopted Ordinance No. 2022-040 on December 5, 2022,
which ordinance amended utility rates to be effective January 15, 2023; and
WHEREAS, the City has determined that Ordinance 2022-040 contained the wrong
schedule which must be corrected; and
WHEREAS, it is necessary to adopt a corrected ordinance as an emergency so that the
correct rates will be effective at the start of the January 15, 2023 billing cycle;
NOW, THEREFORE, the City Council of the City of Arlington do hereby ordain as follows:
Section 1. Arlington Municipal Code Section 13.12.040 shall be and hereby is amended
to read as follows:
13.12.040 - Water rates and charges.
Applicable state and city utility taxes are included in the following rates and
charges for water service. The total monthly water charges for every service shall
include the Base Charge, and the consumption charge, as set forth below.
Beginning on January 15, 2024, the rates set forth for the year 2024 shall be
increased annually by the October reported percentage increase of the
consumer price index (CPI) for the Seattle-Tacoma-Bellevue area for all urban
consumers, or other measure commonly used by the city should it change; and
provided further, however, that notwithstanding any reduction in the CPI, rates
shall not decrease.
ORDINANCE 2023-001 2
(1) Minimum monthly Base Charge schedule:
Charge
By
Meter
2022 INSIDE
CITY RATE
2023
INSIDE CITY
RATE
2023
OUTSIDE
CITY
RATE
to
(2) Monthly rate schedule charged for water consumption:
Rate per 100
cubic feet
2022
INSIDE CITY
RATE
INSIDE CITY
RATE
OUTSIDE
CITY RATE
First 300 cf
Included in
Base
Charge for
SFR and
Commercial
water
services
only
Included in
Base
Charge for
SFR and
Commercial
water
services
only
Base
Charge for
SFR and
water
services
only
(3) Fair and equitable minimum rates for water consumers having meters
larger than four inches shall be fixed by the city council and written agreements
ORDINANCE 2023-001 3
shall be entered with the users setting forth said rates. The city council may
enter into contracts with water users deviating from such rates where special
circumstances dictate; provided that, such rates shall not be discriminatory.
(4) Temporary water service. Temporary water service for construction
purposes, or for any other purpose temporary in nature that will not require a
permanent service installation must be obtained through a Fire Hydrant Use
Permit as stipulated in AMC 13.04.100(e). Charges for temporary use of water
shall be as follows:
Temporary Water Services Charges
Equipment Rental $50.00
$$3.04$3.13
$3.203.30
$3.203.30
(A) The security deposit shall be refunded to the customer after the
equipment has been returned and inspected for any damages; customer shall be
solely responsible for all damages. Customers shall be billed on a monthly basis
for monthly equipment rental charges and usage fees from the date of
temporary service installation.
(B) Beginning on January 15, 2024, the usage rates set forth for temporary
water service shall be increased annually by the October reported percentage
increase of the consumer price index (CPI) for the Seattle-Tacoma-Bellevue area
for all urban consumers, or other measure commonly used by the city should it
change; provided, however, that notwithstanding any reduction in the CPI, rates
shall not decrease.
ORDINANCE 2023-001 4
Section 2. Arlington Municipal Code Section 13.12.130 shall be and hereby is amended
to read as follows:
13.12.130 Residential sewer rates and charges.
Applicable state and city utility taxes are included in the following rates and charges for
sewer service. The total monthly sewer charges for every SFR and MFR service shall be a flat fee
and not based on metered water consumption.
The effective dates for the following sewer rates will be based on the city's billing cycle
for use beginning on January 1, 2023. Beginning on January 15, 2024, the rates set forth for the
year 2023 shall be increased annually by the October reported percentage increase of the
consumer price index (CPI) for the Seattle-Tacoma-Bellevue area for all urban consumers, or
other measure commonly used by the city should it change; provided, however, that
notwithstanding any reduction in the CPI, rates shall not decrease.
charge 2022 RATE 2023 RATE
Family $72.4370.15 $74.6072.25
Family $55.7654.00 $57.4355.62
Section 3. Arlington Municipal Code Section 13.12.140 shall be and hereby is amended
to read as follows:
13.12.140 Commercial sewer rates and charges.
(a) All sanitary sewer services connected to any public or private premises that are
defined as "Commercial classification" in Section 13.12.110 shall be charged for sanitary
sewer service upon the basis of water consumption. State and city utility taxes are
included in the following rates and charges for sewer service.
The effective dates for the following rates will be based on the city's billing cycle for use
beginning on January 1, 2023. Each user shall pay a minimum monthly charge of one
base rate plus a volume rate for all consumption over three hundred cubic feet per
month.
ORDINANCE 2023-001 5
(sewer)
Base rate (includes
300 cubic feet of
cubic feet of metered
(b) Beginning on January 15, 2024, and on January 15th each year thereafter the
rates set forth for the year 2023 shall be increased annually by the October reported
percentage increase of the consumer price index (CPI) for the Seattle-Tacoma-Bellevue
area for all urban consumers, or other measure commonly used by the city should it
change, provided, however, that notwithstanding any reduction in the CPI, rates shall
not decrease.
Section 4. Arlington Municipal Code Section 13.12.150 shall be and hereby is amended
to read as follows:
13.12.150 Industrial user classification and charges.
The rates and charges for industrial users, as defined in Sections 13.08.240, 13.08.250,
and Chapter 13.36, shall be as follows:
(1) All user charges shall be based upon equitable unit charges established for flow
BOD (biochemical oxygen demand) loading and TSS (total suspended solids) loading, based
upon the average BOD, TSS and other parameter(s) concentrations (as established by the public
works director) monitored for the industrial user and the flow recorded in the monitoring
manhole or water use.
(2) A minimum monthly charge will be established by the city to cover the basic
sewer costs and monitoring of the industrial user's wastewater discharge, and in the event the
monthly sewer bill does not exceed this amount the industrial user shall agree to pay the
estimated minimum monthly charge. This charge shall be reviewed from time to time and
adjusted to ensure the charge is covering the monitoring services and sewer costs provided and
must be reviewed every two years. Initially, the monthly charges shall be based on the
following, unless otherwise established in the negotiated discharge permit:
(A) For an industrial user with waste strength less than two hundred fifty mg/1,
measured as five-day BOD and TSS, and other parameters within limits established in Sections
13.08.240, 13.08.250, [and Chapter] 13.36, and whose discharge does not require regular
monitoring other than flow, the minimum monthly charge is as set forth below:
ORDINANCE 2023-001 6
(B) For an industrial user with waste strength in excess of two hundred fifty mg/l for
two months or more per year, the minimum monthly charge is as set forth below:
Charges
strength >250
(C) Beginning January 15, 2024, and each January 15th thereafter, the charges set
forth in subsections (l)(A) and (l)(B), shall be increased annually, by the October reported
percentage increase of the consumer price index (CPI) for the Seattle-Tacoma-Bellevue area for
all urban consumers, or other measure commonly used by the city should it change; provided,
however, that notwithstanding any reduction in the CPI, rates shall not decrease.
(3) Until such time as a sewer user charge analysis can be conducted to establish
equitable charges under a negotiated discharge permit between the city and the industrial user,
the following shall be used as the basis for industrial user charges:
(A) Flow based charge per cubic foot of wastewater discharged;
(B) BOD charge per pound of BOD discharged; and
(C) TSS charge per pound of TSS discharged, pursuant to the following table:
(D) Beginning January 15, 2024, and each January 15th thereafter, the charges set
forth in subsection (c), shall be increased annually, by the October reported percentage
increase of the consumer price index (CPI) for the Seattle-Tacoma-Bellevue area for all urban
consumers, or other measure commonly used by the city should it change; provided, however,
that notwithstanding any reduction in the CPI, rates shall not decrease.
(4) Flow shall be based upon one hundred percent of the water consumption or rate
of flow of wastewater discharge into the sewer (measured in an industrial user installed flow
measurement and recording equipment installed in control manhole, pursuant to Chapter
13.36). Strength of wastewater discharged shall be established based upon twenty-four-hour
composite samples made by the city at the control manhole and tested by the city's wastewater
ORDINANCE 2023-001 7
treatment plant laboratory or state certified testing laboratory. All testing shall be in
accordance with the latest edition of "Standard Methods for Examination of Water and
Wastewater," APHA, AWWA and WPCF. BOD and TSS, pounds per day, shall be calculated based
upon concentration of composite samples and established flow rates.
(5) Appeal.
(A) If any user believes that a portion of the user's metered flow, larger than ten
percent, is not discharged into the sewer system (when flow measurement is not provided in
the control manhole), the user should make written application to the public works director for
review of the user's flow of wastewater. If the public works director agrees that charges for the
user should be adjusted, they shall so notify the city council, which may approve such change,
or direct a recomputation of the user's sewer rates.
(B) If the public works director does not agree to the adjustment of user charges,
the user may further appeal to the city council, which may direct further study or take other
appropriate action.
Section 5. Arlington Municipal Code Section 13.12.540 shall be and hereby is amended
to read as follows:
13.12.540 Initial service charge rates.
In accordance with the rate structure established herein, there is hereby levied upon all
developed real property within the boundaries of the utility, the following service charges:
(1) State and city utility taxes are included in the following rates and charges for
stormwater service. See Table 3.
(2) Beginning on January 15, 2024, the rates set forth for the year 2023 shall be
increased annually by the October reported percentage increase of the consumer price index
(CPI) for the Seattle-Tacoma-Bellevue area for all urban consumers, or other measure
commonly used by the city should it change; provided, however, , that notwithstanding any
reduction in the CPI, rates shall not decrease.
(3) For all other developed property including multifamily, condominiums and
mobile home parks within the boundaries of the utility, except as specified under Section
13.28.130, the monthly service charge shall be based on the above table (Table 3) per month
multiplied by the number of equivalent service units determined by the utility to be contained
in such parcel. For all single-family property owners qualifying for the senior low-income utility
discount established in Section 13.12.140, the discount shall apply to stormwater service
charges.
ORDINANCE 2023-001 8
Section 6. Severability. Should any section, paragraph, sentence, clause or phrase
of this Ordinance, or its application to any person or circumstance, be declared unconstitutional
or otherwise invalid for any reason, or should any portion of this Ordinance be preempted by
state or federal law or regulation, such decision or preemption shall not affect the validity of
the remaining portions of this Ordinance or its application to other persons or circumstances.
Section 7. Effective Date/Emergency. The City Council hereby finds and declares
that an emergency exists which necessitates that this ordinance become effective immediately
in order to preserve the public health, safety, and welfare. This ordinance shall become
effective immediately upon passage, provided that the rates shall be effective on the first day
of the city’s regular billing cycle beginning January 15, 2023. The City Clerk is directed to
publish this ordinance at the earliest possible date.
PASSED BY the City Council and APPROVED by the Mayor this 9th day of January, 2023.
CITY OF ARLINGTON
_____________________________
Barbara Tolbert, Mayor
Attest:
_____________________________
Wendy Van Der Meersche, City Clerk
Approved as to form:
_________________________
Steven J. Peiffle
City Attorney
City of Arlington Council Agenda Bill Item: WS #1 Attachment B
new City Council meeting time and to provide a shorter workday for staff and decreasing overtime expenses.
ORDINANCE 2023-002 1
ORDINANCE NO. 2023–002
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON
AMENDING SECTION 2.44.040 OF THE
ARLINGTON MUNICIPAL CODE REGARDING MEETING TIMES
FOR THE ARLINGTON AIRPORT COMMISSION
WHEREAS, the COVID-19 pandemic has changed the conduct of business for the City of
Arlington and other municipalities; and
WHEREAS, increased access to “live-streamed” Airport Commission meetings has led to
reduced in-person attendance and increased remote attendance by citizens; and
WHEREAS, the City Airport Commission and staff would benefit from an earlier Airport
Commission meeting time, and believe the citizens can remain connected with Airport
Commission meetings through the increased use of technology; and
WHEREAS, the City Council wishes to amend Section 2.44.040 of the Arlington Municipal
Code to reflect a change in meeting times;
NOW, THEREFORE, the City Council of the City of Arlington does hereby ordain as
follows:
Section 1. Arlington Municipal Code Section 2.44.040 shall be and hereby is
amended to read as follows:
Regular meetings of the Arlington Airport Commission shall be held on the
second Tuesday of each month, beginning at six (6:00) p.m. Meetings shall be
held at Putnam Hall at the Arlington Airport Office, 18204-59th Drive NE,
Arlington, Washington; provided, however, that whenever such regular meeting
falls upon a Tuesday declared in RCW 1.16.050 now or in the future as a legal
holiday, then the regular meeting of the airport commission shall be held upon
the following Tuesday at the same time and place.
Section 2. Severability. Should any section, paragraph, sentence, clause or phrase of
this ordinance, or its application to any person or circumstance, be declared unconstitutional or
otherwise invalid for any reason, or should any portion of this ordinance be pre-empted by
state or federal law or regulation, such decision or pre-emption shall not affect the validity of
the remaining portions of this ordinance or its application to other persons or circumstances.
Section 3. Effective Date. The title of this ordinance which summarizes the contents
shall be published in the official newspaper of the City. This ordinance shall take effect and be
in full force five (5) days after the date of publication as provided by law.
ORDINANCE 2023-002 2
PASSED by the City Council of the City of Arlington and APPROVED by the Mayor this 17th
day of January, 2023.
CITY OF ARLINGTON
____________________________________
Barbara Tolbert, Mayor
ATTEST:
___________________________________
Wendy Van Der Meersche, City Clerk
APPROVED AS TO FORM:
___________________________________
Steven J. Peiffle, City Attorney
City of Arlington Council Agenda Bill Item: WS #2 Attachment C
thwalkways, and geotechnical issues with the embankment on the north side of the road. The connection of 211th Place at SR-530 has been a dangerous intersection and the site of many collisions. WSDOT will be constructing a roundabout at the SR-530/211th Place intersection in 2023. This will improve 211th Place and SR-530 intersection movements, and will likely increase traffic on 211th Place. City staff developed the 211th Place Improvement Project to addresses embankment and roadway prism improvements, utility and drainage improvements, pedestrian pathway improvements, and street th
TIB project number 8-1-817(009)-1). ALTERNATIVES: Remand to staff for more additional information. RECOMMENDED MOTION: Workshop; discussion only. At the January 17, 2023 Council meeting, the recommended motion will be, “I move to authorize the Mayor to sign the grant agreement with the Transportation Improvement Board.”
Washington State Transportation Improvement Board 8-1-817(009)-1
Fuel Tax Grant Agreement
Fuel Tax Agreement Page 1 of 5 November 2012
City of Arlington
8-1-817(009)-1
211th Place
SR 530 to 67th Ave NE
STATE OF WASHINGTON
TRANSPORTATION IMPROVEMENT BOARD
AND
City of Arlington
AGREEMENT
THIS GRANT AGREEMENT (hereinafter “Agreement”) for the 211th Place, SR 530 to 67th Ave
NE (hereinafter “Project”) is entered into by the WASHINGTON STATE TRANSPORTATION
IMPROVEMENT BOARD (hereinafter “TIB”) and City of Arlington, a political subdivision of the
State of Washington (hereinafter “RECIPIENT”).
1.0 PURPOSE
For the project specified above, TIB shall pay 79.7194 percent of approved eligible project costs
up to the amount of $2,300,000, pursuant to terms contained in the RECIPIENT’S Grant
Application, supporting documentation, chapter 47.26 RCW, title 479 WAC, and the terms and
conditions listed below.
2.0 SCOPE AND BUDGET
The Project Scope and Budget are initially described in RECIPIENT’s Grant Application and
incorporated by reference into this Agreement. Scope and Budget will be further developed and
refined, but not substantially altered during the Design, Bid Authorization and Construction
Phases. Any material alterations to the original Project Scope or Budget as initially described in
the Grant Application must be authorized by TIB in advance by written amendment.
3.0 PROJECT DOCUMENTATION
TIB requires RECIPIENT to make reasonable progress and submit timely Project
documentation as applicable throughout the Project. Upon RECIPIENT’s submission of each
Project document to TIB, the terms contained in the document will be incorporated by reference
into the Agreement. Required documents include, but are not limited to the following:
a) Project Funding Status Form
b) Bid Authorization Form with plans and engineers estimate
c) Award Updated Cost Estimate
d) Bid Tabulations
e) Contract Completion Updated Cost Estimate with final summary of quantities
f) Project Accounting History
4.0 BILLING AND PAYMENT
The local agency shall submit progress billings as project costs are incurred to enable TIB to
maintain accurate budgeting and fund management. Payment requests may be submitted as
Washington State Transportation Improvement Board 8-1-817(009)-1
Fuel Tax Grant Agreement
Fuel Tax Agreement Page 2 of 5 November 2012
often as the RECIPIENT deems necessary, but shall be submitted at least quarterly if billable
amounts are greater than $50,000. If progress billings are not submitted, large payments may
be delayed or scheduled in a payment plan.
5.0 TERM OF AGREEMENT
This Agreement shall be effective upon execution by TIB and shall continue through closeout of
the grant or until terminated as provided herein, but shall not exceed 10 years unless amended
by the Parties.
6.0 AMENDMENTS
This Agreement may be amended by mutual agreement of the Parties. Such amendments shall
not be binding unless they are in writing and signed by persons authorized to bind each of the
Parties.
7.0 ASSIGNMENT
The RECIPIENT shall not assign or transfer its rights, benefits, or obligations under this
Agreement without the prior written consent of TIB. The RECIPIENT is deemed to consent to
assignment of this Agreement by TIB to a successor entity. Such consent shall not constitute a
waiver of the RECIPIENT’s other rights under this Agreement.
8.0 GOVERNANCE & VENUE
This Agreement shall be construed and interpreted in accordance with the laws of the state of
Washington and venue of any action brought hereunder shall be in the Superior Court for
Thurston County.
9.0 DEFAULT AND TERMINATION
9.1 NON-COMPLIANCE
a) In the event TIB determines, in its sole discretion, the RECIPIENT has failed to
comply with the terms and conditions of this Agreement, TIB shall notify the RECIPIENT,
in writing, of the non-compliance.
b) In response to the notice, RECIPIENT shall provide a written response within 10
business days of receipt of TIB’s notice of non-compliance, which should include either a
detailed plan to correct the non-compliance, a request to amend the Project, or a denial
accompanied by supporting details.
c) TIB will provide 30 days for RECIPIENT to make reasonable progress toward
compliance pursuant to its plan to correct or implement its amendment to the Project.
d) Should RECIPIENT dispute non-compliance, TIB will investigate the dispute and
may withhold further payments or prohibit the RECIPIENT from incurring additional
reimbursable costs during the investigation.
9.2 DEFAULT
RECIPIENT may be considered in default if TIB determines, in its sole discretion, that:
Washington State Transportation Improvement Board 8-1-817(009)-1
Fuel Tax Grant Agreement
Fuel Tax Agreement Page 3 of 5 November 2012
a) RECIPIENT is not making reasonable progress toward correction and
compliance.
b) TIB denies the RECIPIENT’s request to amend the Project.
c) After investigation TIB confirms RECIPIENT’S non-compliance.
TIB reserves the right to order RECIPIENT to immediately stop work on the Project and
TIB may stop Project payments until the requested corrections have been made or the
Agreement has been terminated.
9.3 TERMINATION
a) In the event of default by the RECIPIENT as determined pursuant to Section 9.2,
TIB shall serve RECIPIENT with a written notice of termination of this Agreement, which
shall be served in person, by email or by certified letter. Upon service of notice of
termination, the RECIPIENT shall immediately stop work and/or take such action as may
be directed by TIB.
b) In the event of default and/or termination by either PARTY, the RECIPIENT may
be liable for damages as authorized by law including, but not limited to, repayment of
grant funds.
c) The rights and remedies of TIB provided in the AGREEMENT are not exclusive
and are in addition to any other rights and remedies provided by law.
9.4 TERMINATION FOR NECESSITY
TIB may, with ten (10) days written notice, terminate this Agreement, in whole or in part,
because funds are no longer available for the purpose of meeting TIB’s obligations. If
this Agreement is so terminated, TIB shall be liable only for payment required under this
Agreement for performance rendered or costs incurred prior to the effective date of
termination.
10.0 USE OF TIB GRANT FUNDS
TIB grant funds come from Motor Vehicle Fuel Tax revenue. Any use of these funds for
anything other than highway or roadway system improvements is prohibited and shall subject
the RECIPIENT to the terms, conditions and remedies set forth in Section 9. If Right of Way is
purchased using TIB funds, and some or all of the Right of Way is subsequently sold, proceeds
from the sale must be deposited into the RECIPIENT’s motor vehicle fund and used for a motor
vehicle purpose.
11.0 INCREASE OR DECREASE IN TIB GRANT FUNDS
At Bid Award and Contract Completion, RECIPIENT may request an increase in the maximum
payable TIB funds for the specific project. Requests must be made in writing and will be
considered by TIB and awarded at the sole discretion of TIB. All increase requests must be
made pursuant to WAC 479-05-202 and/or WAC 479-01-060. If an increase is denied, the
recipient shall be liable for all costs incurred in excess of the maximum amount payable by TIB.
In the event that final costs related to the specific project are less than the initial grant award,
TIB funds will be decreased and/or refunded to TIB in a manner that maintains the intended
ratio between TIB funds and total project costs, as described in Section 1.0 of this Agreement.
Washington State Transportation Improvement Board 8-1-817(009)-1
Fuel Tax Grant Agreement
Fuel Tax Agreement Page 4 of 5 November 2012
12.0 INDEPENDENT CAPACITY
The RECIPIENT shall be deemed an independent contractor for all purposes and the
employees of the RECIPIENT or any of its contractors, subcontractors, and employees thereof
shall not in any manner be deemed employees of TIB.
13.0 INDEMNIFICATION AND HOLD HARMLESS
The PARTIES agree to the following:
Each of the PARTIES, shall protect, defend, indemnify, and save harmless the other PARTY, its
officers, officials, employees, and agents, while acting within the scope of their employment as
such, from any and all costs, claims, judgment, and/or awards of damages, arising out of, or in
any way resulting from, that PARTY’s own negligent acts or omissions which may arise in
connection with its performance under this Agreement. No PARTY will be required to
indemnify, defend, or save harmless the other PARTY if the claim, suit, or action for injuries,
death, or damages is caused by the sole negligence of the other PARTY. Where such claims,
suits, or actions result from the concurrent negligence of the PARTIES, the indemnity provisions
provided herein shall be valid and enforceable only to the extent of a PARTY’s own negligence.
Each of the PARTIES agrees that its obligations under this subparagraph extend to any claim,
demand and/or cause of action brought by, or on behalf of, any of its employees or agents. For
this purpose, each of the PARTIES, by mutual negotiation, hereby waives, with respect to the
other PARTY only, any immunity that would otherwise be available to it against such claims
under the Industrial Insurance provision of Title 51 RCW. In any action to enforce the provisions
of the Section, the prevailing PARTY shall be entitled to recover its reasonable attorney’s fees
and costs incurred from the other PARTY. The obligations of this Section shall survive
termination of this Agreement.
14.0 DISPUTE RESOLUTION
a) The PARTIES shall make good faith efforts to quickly and collaboratively resolve any
dispute arising under or in connection with this AGREEMENT. The dispute resolution
process outlined in this Section applies to disputes arising under or in connection with
the terms of this AGREEMENT.
b) Informal Resolution. The PARTIES shall use their best efforts to resolve disputes
promptly and at the lowest organizational level.
c) In the event that the PARTIES are unable to resolve the dispute, the PARTIES shall
submit the matter to non-binding mediation facilitated by a mutually agreed upon
mediator. The PARTIES shall share equally in the cost of the mediator.
d) Each PARTY agrees to compromise to the fullest extent possible in resolving the dispute
in order to avoid delays or additional incurred cost to the Project.
e) The PARTIES agree that they shall have no right to seek relief in a court of law until and
unless the Dispute Resolution process has been exhausted.
Washington State Transportation Improvement Board 8-1-817(009)-1
Fuel Tax Grant Agreement
Fuel Tax Agreement Page 5 of 5 November 2012
15.0 ENTIRE AGREEMENT
This Agreement, together with the RECIPIENT’S Grant Application, the provisions of chapter
47.26 Revised Code of Washington, the provisions of title 479 Washington Administrative Code,
and TIB Policies, constitutes the entire agreement between the PARTIES and supersedes all
previous written or oral agreements between the PARTIES.
16.0 RECORDS MAINTENANCE
The RECIPIENT shall maintain books, records, documents, data and other evidence relating to
this Agreement and performance of the services described herein, including but not limited to
accounting procedures and practices which sufficiently and properly reflect all direct and indirect
costs of any nature expended in the performance of this Agreement. RECIPIENT shall retain
such records for a period of six years following the date of final payment. At no additional cost,
these records, including materials generated under the Agreement shall be subject at all
reasonable times to inspection, review or audit by TIB personnel duly authorized by TIB, the
Office of the State Auditor, and federal and state officials so authorized by law, regulation or
agreement.
If any litigation, claim or audit is started before the expiration of the six (6) year period, the
records shall be retained until all litigation, claims, or audit findings involving the records have
been resolved.
Approved as to Form
Attorney General
By:
Signature on file
Lead Agency Transportation Improvement Board
Chief Executive Officer Date Executive Director Date
Print Name Print Name
blank
City of Arlington Council Agenda Bill Item: WS #3 Attachment D
(fee being negotiated)
is eligible to receive, and has been awarded, a NHS Asset Management Grant to fund NHS corridor preservation activities. The City has developed the Division/Broadway Restoration Project that includes grant funded preservation activities and other improvements including, traffic circle improvements, curb ramp improvements, enhanced cross walks, and improved street lighting. Since this project is partially funded by a federal grant, it must follow federal policies for design and construction; WSDOT will be the City’s certifying agency to monitor federal policy compliance. Staff issued a Request for Proposals in November 2022 for project design services. Three proposals were received and interviews were conducted by a panel of three city staff and one WSDOT representative. LDC,
December 28, 2022
SCOPE OF WORK and FEE FOR CIVIL ENGINEERING SERVICES
DIVISION/ BROADWAY RESTORATION PROJECT STPUS-NHPP9931 (024) P-02-521
Land Development Consultants, Inc. (LDC) is pleased to submit the following proposal for professional
services in conjunction with your Division/ Broadway Restoration project with the city of Arlington.
BACKGROUND
The city intends to design and rehabilitate the pavement surface along Division Street (West Ave to
Broadway St) and Broadway Street (Division St to Burke Ave). The project will also design roundabout
truck aprons at the two roundabouts and other pedestrian crossing/traffic calming features along the
corridor. This proposal is based upon a request from the client as well as our familiarity with the City of
Arlington Design Standards and WSDOT LAG Requirements. Please see the below scope of services for
the required services below:
• WSDOT/ APWA Specification format will be utilized.
• Base Maps will be produced by others and electronically submitted to LDC.
• All project deliverables will be produced within six months from notice to proceed.
• Traffic Analysis, private utility updates, and arborists evaluations are excluded from this scope of
services.
• City will provide traffic data, and truck counts to support pavement design.
TASK 01- PROJECT COORDINATION AND MEETINGS
Project coordination is essential to the success of this project. LDC will coordinate with the city regarding
project deliverables, design standards, permitting, and project schedule:
• Prepare project management plan (PMP), prior to kickoff meeting
• Hold project kickoff meetings & review PMP.
• Review City Transmit data:
o Topographic Survey (PDF & CAD Files)
o IMS Pavement Data
o City ADA Measurements
• Bi-weekly project coordination phone calls
• Miscellaneous phone calls and email coordination
• Project meetings upon city request (up to four meetings)
• A maximum of four project coordination meetings in person will be held beyond the project
kickoff meeting.
• LDC strives to respond quickly to all emails and phone calls received from the city.
TASK 02 – PAVEMENT ANALYSIS (HWA)
The intent of this task is to review existing site conditions and to develop a cost-effective pavement
restoration plan.
• Review with city, proposed boring locations, one goal is to not trigger traffic control review by
WSDOT which would slow approval process. Traffic control is preferably limited to city streets.
• Prepare traffic control plans and submit to City for approval
• Mark locations of 4 pavement cores in highly distressed areas along Broadway Street & arrange
utility locates.
• Perform 6-inch diameter pavement cores at 6 locations to assess depth of cracking, existing
pavement layer thickness and shallow subgrade support conditions
• Prepare photographic logs of pavement cores and assign lab testing.
• Perform engineering analyses using traffic data provided by the city
• Prepare a memo presenting pavement core logs, figure showing locations of each core, and
pavement design/rehabilitation recommendations
• Site Walk at time of site coring work
• Prepare full depth restoration exhibit.
• All costs are estimated and may be increased or decreased within the limits of the total budget at
the discretion of HWA’s project manager.
• No Street Use Permits/ROW Use fees will be required.
• Pavement cores will be patched with Aquaphalt cold patch.
• Flaggers will not be required for traffic control.
• Minimize full dig out, relationship to road diet.
• Possibly thicken pavement at bus stop.
TASK 03 – SAFETY & ALTERNATIVES ANALYSIS (TRANSPO)
Transpo will identify safety improvements within the project limits, scope and resources and present
alternatives to the design team for discussion with the City of Arlington. Potential modifications to
Division Street and Broadway Street could include, but is not limited to:
• Narrowing of lanes
• Extended curbs to narrow lanes, remove roadway width that is not needed and shorten crossings
• Realignment of crossings to improve safety, comfort and visibility for pedestrians
• Closure of one direction of traffic on some well-connected block streets to provide for reduced
crossing distances and improved traffic operations and intersection safety
• Physical traffic calming including speed humps and raised crossings
• New medians on Broadway
Transpo will identify up to two (2) packages of alternatives for safety improvements on Division Street
and Broadway Street for review and feedback by the design team and the City of Arlington. Alternatives
will be presented along with pros and cons to consider in the selection of a preferred alternative, with or
without further modifications. Transpo will make up one (1) round of modifications to the preferred
alternative package of safety improvements based on City feedback. Design of modifications will be at a
10% conceptual level and will not include detailed engineering design until the final selection of preferred
treatments by the City of Arlington.
• Up front Transpo/LDC will present schematic ideas to foster a collaborative dialogue with the
City. This can be accomplished at an over the shoulder review meeting.
• Transpo is entitled to rely upon the completeness and accuracy of information and services
furnished by LDC and the City.
• Safety improvements will need to be limited in scope to remain within the City’s available funding
for the roadway restoration project
• The City and Community Transit are in favor of in-lane bus stops on Broadway if other safety
treatments can be realized through the change from out-of-lane stops.
• Level of effort includes time for one (1) meeting to discuss the alternatives and identify City
preferences and requested modifications
• Detailed engineering design will be performed by LDC under a separate Task.
Transpo will provide, to LDC/City:
• A memo documenting the alternatives and identification of a preferred package of safety
improvements for Division Street and Broadway Street
o The memo will include an appendix with sketches of the form and 10% design details of
the preferred alternative treatments
TASK 03 – SAFETY & ALTERNATIVES ANALYSIS
Transpo will identify safety improvements within the project limits, scope, and resources and present
alternatives to the design team for discussion with the City of Arlington. Potential modifications to
Division Street and Broadway Street could include, but is not limited to:
• Narrowing of lanes
• Extend curbs to narrow lanes, remove roadway width that is not needed and shorten crossings
• Realignment of crossings to improve safety, comfort, and visibility for pedestrians
• Closure of one direction of traffic on some well-connected block streets to provide reduced
crossing distances and improved traffic operations and intersection safety
• Physical traffic calming including speed humps and raised crossings
• New medians on Broadway
Transpo will identify up to two (2) packages of alternatives for safety improvements on Division Street
and Broadway Street for review and feedback by the design team and the City of Arlington. Alternatives
will be presented along with pros and cons to consider in the selection of a preferred alternative, with or
without further modifications. Transpo will make up one (1) round of modifications to the preferred
alternative package of safety improvements based on City feedback. Design of modifications will be at a
10% conceptual level and will not include detailed engineering design until the final selection of preferred
treatments by the City of Arlington.
• Transpo is entitled to rely upon the completeness and accuracy of information and services
furnished by LDC and the City.
• Safety improvements will need to be limited in scope to remain within the City’s available funding
for the roadway restoration project.
• The City and Community Transit are in favor of in-lane bus stops on Broadway if other safety
treatments can be realized through the change from out-of-lane stops.
• Level of effort includes time for one (1) meeting to discuss the alternatives and identify City
preferences and requested modifications.
• Detailed engineering design will be performed by LDC under a separate Task.
Transpo will provide, to LDC:
• A memo documenting the alternatives and identification of a preferred package of safety
improvements for Division Street and Broadway Street.
o The memo will include an appendix with sketches of the form and 10% design details of
the preferred alternatives treatments.
TASK 04 – 30% DESIGN
The intent of this Task is to develop 30% plans and opinion of costs. Contract Specifications will be
produced at the 90% design phase.
• Prepare 30% Design Plan set
o Cover Plan Sheet (1 plan sheet)
o City General Construction Notes (1 plan sheet)
o Erosion Control and Site Preparation Plans (4 plan sheets)
o Paving & Channelization Plans (4 plan sheets)
o Roundabout Restoration Plan (2 Plan Sheets)
o ADA Ramp Detail Grading (4 Plan Sheets)
o Details (1 Plan Sheet- Typical Pavement Restoration Details)
o Detour Route Plan (1 Plan Sheet)
• Prepare 30% Opinion of Costs
• Typical plan sheet layout will be 1” =40’ at half size.
• 16 ADA Ramp replacements will be identified but not fully designed until 90% design phase.
• A maximum of 18 – 11” x 17” (Electronic PDF) plans sheets will be delivered for 30% design
package.
• City review comments will be incorporated into the 90% design plan set.
• RRFB and other pedestrian crossing treatment will be designed and shown on the paving plans.
• Other related traffic calming improvements will be shown on the paving plans.
• Roundabout truck cement concrete truck apron will be shown on the roundabout restoration plan
along with modifications to splinter islands and pedestrian crossings.
TASK 05 – 90% DESIGN
The intent of this task is to develop 90% plans, specifications, and opinion of costs.
• Prepare 90% plan set
o Cover Plan Sheet (1 plan sheet)
o City General Construction Notes (1 plan sheet)
o Erosion Control and Site Preparation Plans (4 plan sheets)
o Erosion Control and Site Preparation Details (1 plan sheet)
o Paving and Channelization Plans (4 plan sheets)
o Roundabout Restoration Plans (2 plan sheets)
o ADA Ramp Detail Grading (4 plan sheets)
o Details (2 plan sheets)
o Planting Plan (2 plan sheets)
o Detour Route Plan (1 plan sheet)
o Traffic Control Plans (2 plan sheets)
• Prepare 90% Specifications
• Prepare 90% Opinion of Costs
• Typical plan sheet layout will be 1” =40’ at half size.
• Roundabout restoration plan will be 1” =20’ at half size.
• A maximum of 24 – 11” x 17” (Electronic PDF) plan.
• Sheets will be delivered for 90% design package.
• Formal ROW plans will not be prepared. ROW lines provided by project surveyor will be added to
the plan set.
• City review comments will be incorporated into the IFB plan set.
• Design a maximum of 16 ADA Ramps.
• RRFB and other pedestrian crossing treatment will be designed and shown on the paving plans.
• Other related traffic calming improvements will be shown on the paving plans.
• Roundabout truck cement concrete truck apron will be shown on the roundabout restoration plan
along with modifications to splinter islands and pedestrian crossings.
TASK 06 – FINAL DESIGN (IFB)
The intent of this task is to develop Final Design plans, specifications, and opinion of costs.
• Prepare Final Design plan set
o Cover Plan Sheet (1 plan sheet)
o City General Construction Notes (1 plan sheet)
o Erosion Control and Site Preparation Plans (4 plan sheets)
o Erosion Control and Site Preparation Details (1 plan sheet)
o Paving and Channelization Plans (4 plan sheets)
o Roundabout Restoration Plans (2 plan sheets)
o ADA Ramp Detail Grading (4 plan sheets)
o Details (2 plan sheets)
o Planting Plan (2 plan sheets)
o Detour Route Plan (1 plan sheet)
o Traffic Control Plans (2 plan sheets)
• Prepare Final Design Specifications
• Prepare Final Design Opinion of Costs
• Typical plan sheet layout will be 1” =40’ at half size.
• Roundabout restoration plan will be 1” =20’ at half size.
• A maximum of 24 – 11” x 17” (Electronic PDF) plan.
• Sheets will be delivered for 90% design package.
• Formal ROW plans will not be prepared. ROW lines provided by project surveyor will be added to
the plan set.
• City review comments will be incorporated into the IFB plan set.
• Design a maximum of 16 ADA Ramps.
• RRFB and other pedestrian crossing treatment will be designed and shown on the paving plans.
• Other related traffic calming improvements will be shown on the paving plans.
• Roundabout truck cement concrete truck apron will be shown on the roundabout restoration plan
along with modifications to splinter islands and pedestrian crossings.
TASK 07 – ILLUMINATION ANALYSIS
Transpo will perform a rudimentary illumination analysis for pedestrian crossing locations along
approximately four city blocks. The anticipated to be completed using Agi32 software based on the
provided topographic survey and existing pole locations. The purpose of the illumination analysis is to
identify key areas for safety improvements by the City in general terms. The study is limited to pedestrian
crosswalks since that is where the most interface is anticipated among all modes of transportation.
• Transpo is entitled to rely upon the completeness and accuracy of information and services
furnished by LDC and the City.
• The illumination analysis will need to be limited in scope to remain withing the City’s available
funding for the roadway restoration project.
• No meetings are assumed as part of this task.
• No detailed design or construction plans are included in this task.
• One (1) submittal is included in the anticipated fee.
Transpo will provide, to LDC:
• A brief memo documenting the existing illumination at each of the crosswalk locations and
general guidance on potential improvements.
TASK 08 – RRFB DESIGN
LDC will design up to two RRFB crossings
• RRFB’s to be solar powered.
• Design will be part of the 90% and IFB plan set.
TASK 09 – PUBLIC OUTREACH
Public outreach will be minimal
• Attend up to one public meeting
• Prepare up to 10 city council power point presentation slides
• One on one stakeholder meetings are excluded
TASK 10 – NEPA DOCUMENTATION & LOCAL PERMITTING
Permit requirements for this project are limited. The following work elements will be prepared.
• Preparation of NEPA documentation
• EO21-02 EZ/Project Review Form (as needed)
• WSDOT permitting if any will be produced by the city.
• Local permitting will not be required and is not included in this scope.
• A maximum effort of 20 hours will be exhausted to produce project NEPA documentation.
SERVICES EXCLUDED:
• Survey
• ROW Plans & ROW Acquisition
• Illumination Design
• Construction Management & Inspection Services
• Construction Engineering Support
• Material Testing
• Stormwater Quality & Detention Design
• Traffic Analysis
• ADA Ramp Measurements
• Formal Landscape Architecture
• Arborist Services
• Advertisement Reproduction Costs
• One-on-one Stakeholder Meetings
All filling, checking, and inspection fees required by the agencies, utilities, etc. are not part of this
agreement and are paid by the owner.
This proposal is based upon the written design standards, ordinances of the jurisdiction that governs the
site and our understanding of the WSDOT LAG manual that are in effect at the date of this letter.
We are available immediately to commence the proposed scope of services upon receipt of a signed copy
of this contract. Please feel free to contact the undersigned with any questions or comments.
Sincerely,
LDC, Inc.
Darrell Smith, PE
Director of Civil Engineering
Client Name: City of Arlington
Date: 12-29-2022
Task Code Principal / Director
Hours
Project
Manager/Sr.
Planner Hours
E.I.T. Hours E.I.T.
Hours Planner Hours Planner Hours Senior
Designer Hours
Senior CAD Tech
Hours
Director of Land
Surveying
Hours
Vice President Project
Administrator
Darrell Smith Tom Abbott Ryan Ferguson Nate Martin Ian Faulds Joel Farias Brian Nelson Jeff Grossman Vince Townsend Mark Villwock Riley Mckee
$102.80 $56.80 $35.60 $34.64 $45.20 $27.52 $43.32 $40.00 $67.68 $96.16 $25.36
LDC Consulting Cost:
Subconsultant(s):
Misc Reimbursable Expenses:
TOTAL ESTIMATED COST 69,779.54$
Task
1.0 Project Management
4.0 30% Design
Over Head
(142.99%)
Name
Costs
5.0 90% Design
6.0 Final Design (IFB)
2.0 Pavement Analysis
3.0 Safety & Alternatives Analysis
8.0 RRFB Design
9.0 Public Outreach
Fee (30%)Total
$26,341.50 $5,526.58 $50,290.00$18,421.92
EXHIBIT B: Proposed Budget / Fee
City of Arlington Council Agenda Bill Item: WS #4 Attachment E
Wellfield, installation of associated infrastructure to bring new wells online, abandoning an existing well, and demolition of an existing wellhohydrogeological study, as well as changes to the wellhouse design. Consultant is seeking additional funds to cover the out of scope work. Initial Contract Amount $ 149,700.00
BrownAND • Caldwell
701 Pike Street, Suite 1300
Seattle, WA 98101-2310
T: 206.624.0100
Scope of Work
Haller Wellfield Improvement Project
Amendment 01
City of Arlington
December 6, 2022
Amendment Overview
Amendment 01 adds the following phases to the existing contract:
•Phase 800: Upgrade Existing Pumps
•Phase 801: Wellhouse Structures Revisit
•Phase 802: Individual Wellhouse Structures Preliminary Design
•Phase 803: Additional Project Management
Phase 800: Upgrade Existing Pumps
During preliminary wellfield design under the existing contract, the City asked BC to estimate performance of
the existing wellfield pumps assuming those pumps were driven by variable frequency drives (VFDs). This
directive was for out of scope work. This effort had been estimated at $5-10k on 8/15/22.
Activities:
•Coordination with vendors of existing pumps and motors
•Hydraulic modeling for various wellfield operation scenarios
•Electrical room layout considering additional VFDs
•Coordination with existing MCC vendor to investigate VFDs and MCC capacity
•Revising Project Engineering Report with new direction to upgrade existing pumps with VFDs
Assumptions:
•Existing pumps can be operated with VFDs without replacement of existing motors
•VFD specifications will be provided as part of the detailed design
Deliverables:
No deliverables specific to this phase. This work supplements deliverables under Phase 300. Effort was incorporated into Project Engineering Report.
I Brown ANO Caldwell I
Arlington Haller Amendment 01 v3
1
EXHIBIT A
EXHIBIT A
EXHIBIT A
| 4
Arlington Haller Amendment 01 v3
Schedule
EXHIBIT A
EXHIBIT A
City of Arlington Council Agenda Bill Item: WS #5 Attachment F
progressed, additional work/updates to the base map and design were needed due to changes made by Gayteway in their frontage improvement plans. Additional work is also needed in order to have final design updates incorporated into ready to bid documents for advertisement in 2024 (LAG updates, design standards, etc.). This work is being deferred to when we are closer to advertising the project in order to capture all current WSDOT requirements. Initial Contract Amount $ 39,404.19 Supplement #1 $ 64,878.00
1
74TH AVENUE TRAIL (P02.417), STPUS-2695(001)
SUPPLEMENT #2
The Toole Design team (CONSULTANT) will perform the following amended scope of work as part of the City of
Arlington’s (CITY) 74th Ave Trail project (PROJECT).
Purpose of the Amendment
Various elements of the PROJECT have been modified or have transpired in a manner that was not anticipated
by the original project scope of work. This amendment identifies these elements and the level of effort needed
to complete the issue for bid contract plans.
Task 1: Project Management
Additional work resulting from changes in the project schedule
The PROJECT schedule has been extended by approximately 18 months, with a revised advertisement date
assumed to be in late 2023. This change in schedule results in additional project management work, including:
• Additional coordination phone calls with CITY Project Manager
• Additional progress reports and invoices
• Additional management of CONSULTANT team
Task 5: 90% and 100%/Bid Set Submittals
Additional work resulting from changes to the PROJECT basemap
The PROJECT basemap, supplied by the CITY, needed to be revised throughout the design process to meet the
project submittal dates, the CONSULTANT team advanced the design to a point where these basemap revisions
required additional work. The additional work includes:
• Basemap survey updates to provide information on the frontage improvements at the Gayteway
Development required revising the trail grading more than anticipated. The site was not developed as
shown on the approved plan. The slope was steeper and the pedestrian walkway was shifted south
causing trail rework to match in to the new pedestrian crossing location.
• Basemap updates to provide parcel lines required revising the right-of-way plans more than
anticipated.
Additional work related to design details
The CONSULTANT team understands that the CITY may desire additional changes to fencing and paving details
in the vicinity of the wayside plaza area (at Prairie Creek); changes to these details will require additional work
to resolve due to the late stage of design. Additionally, the trail and buffer section adjacent to the Gayteway
Development may be modified to avoid private property impacts.
Additional work related to the bid set submittal
WSDOT comments on the project manual were received with the 100% Submittal comments; however, with
the change in schedule, the CITY PM requested that addressing these comments be deferred until a time closer
to the new advertisement date as the WSDOT Standard Specifications and General Special Provisions (GSPs)
are likely to change. We agree with this approach, but it will result in additional work and likely coordination
with WSDOT Local Programs to ensure the project manual is in line with the current Standard Specifications,
GSPs, and federal funding requirements at the time of advertisement.
74th Ave Trail - Amendment
City of Arlington
Toole Design Group Project No. 70167 Hourly Subtotals Fee Subtotals
November 8, 2022 Toole Design NV5
Hours and Budget Estimate 16,859.64$ 1,824.32$ 18,683.96$
Labor Hours Total 86 14 100
Work Element Description
Task 1 - PM and Coordination
Task 1 Totals 18 0 18 3,863.54$
Task 5 - 90% and 100%/Bid Set Submittals
5.2: 100%/Bid Submittal
Task 5 Totals 68 14 82 14,820.42$
Task 1-6 Subtotal (Hours)86 14 100
Task 1-6 Subtotal (Fee)16,859.64$ 1,824.32$ 18,683.96$
Direct Expenses
Travel and Per Diem -$ -$
Reproduction Expenses -$ -$
Other -$ -$
Total -$ -$ -$
Total
18,683.96$