HomeMy WebLinkAbout09-23-24 Council WorkshopSPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
CALL TO ORDER
Mayor Don Vanney
PLEDGE OF ALLEGIANCE
ROLL CALL
Mayor Don Vanney – Wendy
APPROVAL OF THE AGENDA
Mayor Pro Tem Michele Blythe
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS
Citizen presentation to police, fire and paramedics
Mayor Don Vanney
WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN
1.Low Bid Award 640 for Booster Pump Station ATTACHMENT A
Staff Presentation: Jim Kelly
Council Liaison: Rob Toyer
2. Ordinance Amending Arlington Municipal Code Chapter 13.12 ATTACHMENT B
Staff Presentation: Kristin Garcia
Council Liaison: Michele Blythe
3. July and August Financial Reports ATTACHMENT C
Staff Presentation: Kristin Garcia
4. Community and Economic Development Quarterly Report ATTACHMENT D
Staff Presentation: Marc Hayes
ADMINISTRATOR & STAFF REPORTS
MAYOR’S REPORT
COMMENTS FROM COUNCILMEMBERS/COUNCILMEMBER REPORTS
PUBLIC COMMENT
For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.
Arlington City Council Workshop
Monday, September 23, 2024 at 6:00 pm
City Council Chambers – 110 E 3rd Street
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING
EXECUTIVE SESSION
RECONVENE
ADJOURNMENT
Mayor Pro Tem Michele Blythe / Mayor Don Vanney
City of Arlington Council Agenda Bill WS #1 Attachment
September 23, 2024 Award of 640 Zone Booster Pump Station Project
Pump System Diagram
Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: $995,867.28 BUDGET CATEGORY: Water Capital Fund BUDGETED AMOUNT: $1,150,000.00 (2024-2025) LEGAL REVIEW: DESCRIPTION: Award of 640 Zone Booster Pump Station project.
project, this project will install a booster pump station to feed the 640-pressure zone from the 530-pressure zone. Staff has already bid and awarded the manufacture and delivery of a skid mounted system booster pump system and emergency generator. RH2’s design will incorporate these two pre-purchased items with necessary infrastructure design to establish a 640-pressure zone fed by the City of Arlington Water Department. The construction of the Booster Pump Station was bid in August 2024. Ten (10) bids were received and opened on September 12. The qualified low bidder is Trico Companies and staff is recommending the ALTERNATIVES: Remand to staff for additional information.
Workshop; discussion only. At the October 7, 2024 Council meeting, the motion will be,“I move to award the 640 Booster Pump Station project to the qualified low bidder, Trico Companies, and authorize the mayor to sign the construction contract.”
REV.DESCRIPTION DATE APPROVED
1 INITAL LAYOUT 11/3/2023 TDV
2 SET-UP FOR 4TH SERVICE PUMP EXPANSION 1/10/2024 TDV
FLUID MEDIUM POTABLE WATER
FLOW (GPM)SYSTEM
PRESSURE (TDH)
JOCKEY 100 (PER PUMP)160
SERVICE 480 (PER PUMP)160
NOTES:
316SS PIPE SUPPORTS NOT SHOWN.1.
WELDED STEEL BASE TO BE POWDER COATED GRAY.2.
HEADERS AND SPOOLS TO BE 316SS WITH SLIP RINGS & 3.
BACKING FLANGES.
SHIP LOOSE PARTS
1. Enderss and Hauser ProMag 400
2. 6" Diameter Spool @ 12 Long
PES MODEL 705
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
KL
M.T.S.#-
-
DO NOT SCALE DRAWINGIS PROHIBITED.
WRITTEN PERMISSION OF PUMPTECH, INC.
IN PART OR AS A WHOLE WITHOUT THE
PUMPTECH, INC. ANY REPRODUCTION
DRAWING IS THE SOLE PROPERTY OF
THE INFORMATION CONTAINED IN THIS
TWO PLACE DECIMAL +/- 0.07
MATERIAL
FINISH
SALES PERSON
PURCH APPR
MFG APPR
INIT.
SIZE
B
JB
2
-
ARLINGTON 640 ZONE BOOSTER
M06539
CITY OF ARLINGTON
DWG. NO.
WES
JJ
S.O.#168694
A/S
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
ONE PLACE DECIMAL +/- 0.5
PROPRIETARY AND CONFIDENTIAL:
TOLERANCING PER:
MATERIAL
FINISH
DRAWN
CHECKED
DATE
SIZE
B
DWG. NO.
Wt: - SHEET 1 OF 2SCALE: 1:28
REV
UNLESS OTHERWISE SPECIFIED:
USED ON: --
NAME
7/22/22
-
AD 7/22/22
M06539
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL: +/- 1/8
ANGULAR: +/- 1
INTERPRET GEOMETRIC
STATUS: LAYOUT
PRESSURE
GAUGE
JOCKEY PUMP
SERVICE PUMP
FRONT VIEW
TRANSDUCER
WX-458-C
1/2" DRAINPUMP RISER
FORMED 304SS
WELL-X-TROL
ELECTRICAL PANEL
205"
1
9
"
TOP VIEW
TANK DRAIN
PRESSURE GAUGE
(6) PLCS
3/4" DIA HOLE
(6) PLC
TRANSDUCER
TRANSDUCER
4" BUTTERFLY VAVE
150# 6" SUCTION
150# 6" DISCHARGE
ANCHOR
BRACKET WITH
4" CHECK VALVE
DRAIN VALVE
7
3
"
5
1
/
2
"
DWG. NO.
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
-
M.T.S.#-
REV
DO NOT SCALE DRAWINGIS PROHIBITED.
WRITTEN PERMISSION OF PUMPTECH, INC.
IN PART OR AS A WHOLE WITHOUT THE
PUMPTECH, INC. ANY REPRODUCTION
DRAWING IS THE SOLE PROPERTY OF
THE INFORMATION CONTAINED IN THIS
TWO PLACE DECIMAL +/- 0.07
MATERIAL
FINISH
SALES PERSON
PURCH APPR
MFG APPR
INIT.
SIZE
B
JB
NAME S.O.#168694
WES
M06539
PES MODEL 705
CITY OF ARLINGTON
ARLINGTON 640 ZONE BOOSTERJJ
USED ON: -
A/S
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
ONE PLACE DECIMAL +/- 0.5
PROPRIETARY AND CONFIDENTIAL:
TOLERANCING PER:
MATERIAL
FINISH
DRAWN
CHECKED
DATE
SIZE
B
DWG. NO.
7/22/22
KL
SCALE: 1:26 SHEET 2 OF 2
-
UNLESS OTHERWISE SPECIFIED:
Wt: -
7/22/22
-
-
AD
2M06539
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL: +/- 1/8
ANGULAR: +/- 1
INTERPRET GEOMETRIC
STATUS: LAYOUT
END VIEW
1/2" THICK STEEL BASE
POWDER COATED GRAY
ISO VIEW
9
0
1
/
2
"
58 1/2"
City of Arlington Council Agenda Bill WS #2 Attachment
September 23, 2024 Ordinance Amending Chapters 13.12 and 13.28 Pertaining to Stormwater Utility Rates
Ordinance Amending Chapters 13.12 and 13.28
Finance; Kristin Garcia, Director 360-403-3431 EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: proposed language is to provide consistency with other sections of the code regarding water and sewer collection of accounts and more clearly specifies that if an account is turned over to collection or a lien is filed against the property, the customer may incur additional fees.
ALTERNATIVES:
RECOMMENDED MOTION: Workshop; discussion only. At the October 7, 2024 Council meeting, the recommended motion will be, “I move to approve the ordinance amending Arlington Municipal Code Chapters 13.12 and 13.28 pertaining to stormwater utility rates, and authorize the Mayor to sign it”.
ORDINANCE 2024-XXX 1
ORDINANCE NO. 2024-XXX
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON
AMENDING ARLINGTON MUNICIPAL CODE CHAPTERS 13.12 and 13.28 PERTAINING TO
STORMWATER UTILITY RATES
WHEREAS, the City of Arlington has the authority to set rates and charges for its utility
system; and
WHEREAS, the City of Arlington continues to examine equitable rates for water, sewer,
and stormwater service; and
WHEREAS, the City wishes to correct two sections of the municipal code to confirm that
it has the right to send delinquent accounts to collection; and
WHEREAS, the City Council considered this amendment at their workshop on September
23, 2024 and at their regular meeting held on October 7, 2024, and determined approving the
amendment was in the best interest of the City and its citizens;
NOW, THEREFORE, the City Council of the City of Arlington do hereby ordain as follows:
Section 1. Arlington Municipal Code section 13.12.210 shall be and hereby is amended
to read as follows:
13.12.210 - Due date for charges.
The monthly utility bill for water, sewer, and stormwater service shall be paid
immediately upon billing and will be considered delinquent if not paid in full twenty
calendar days from the billing date in which the service was originally charged. A grace
period of five calendar days from the due date will be allowed before penalties are
assessed. A penalty of five percent for each thirty days or fraction thereof shall be
assessed against all delinquencies after said grace period. In the event that the city shall
turn over an account under this chapter to an attorney, collection agency or other
person for collection, the person responsible for payment of the account shall be
responsible for actual costs of collection, including collection agency fees, reasonable
attorney’s fees and other costs incurred in collection.
ORDINANCE 2024-XXX 2
Section 2. Arlington Municipal Code Section 13.28.270 shall be and hereby is amended
to read as follows:
13.28.270 - Storm and surface water rates.
(a) General. The city council shall establish service rates within AMC 13.12 for the
operation and maintenance of the drainage system, for related drainage services, and
for the operation of the stormwater utility. Shall , which shall establish classifications of
customers or service and rate structures, using any method or methods authorized by
law. In the event that the city shall turn over an account under this chapter to an
attorney, collection agency or other person for collection, the person responsible for
payment of the account shall be responsible for actual costs of collection, including
collection agency fees, reasonable attorney’s fees and other costs incurred in collection.
(b) Rate Basis. Drainage rates shall be based on revenue requirements necessary to
cover all costs of the utility, as authorized by the city council, the adoption of the annual
budget and subsequent amendments and shall be guided by adopted financial policies
and bond covenants.
(c) Rate Adjustments. Rates shall be evaluated periodically as part of the review and
adoption of the annual budget. Rate adjustments shall be recommended by the director
as needed to meet revenue requirements of the utility. The recommendation shall
consider equity, adequacy, costs, NPDES II requirements and other factors allowed by
law.
(d) Rate Relief. The city council may establish drainage rate relief measures, as
authorized by state law and as detailed in the stormwater credit manual, for specific
customer classes where, through site design, regular system maintenance, education
and other approaches, the impacts of stormwater on the drainage system are reduced.
Section 3. Severability. Should any section, paragraph, sentence, clause or phrase
of this Ordinance, or its application to any person or circumstance, be declared unconstitutional
or otherwise invalid for any reason, or should any portion of this Ordinance be preempted by
state or federal law or regulation, such decision or preemption shall not affect the validity of
the remaining portions of this Ordinance or its application to other persons or circumstances.
Section 4. Effective Date. This Ordinance or a summary thereof shall be published
in the official newspaper of the City. The Ordinance shall take effect five (5) days after
publication as provided by law.
ORDINANCE 2024-XXX 3
PASSED BY the City Council and APPROVED by the Mayor this 7th day of October, 2024.
CITY OF ARLINGTON
_____________________________
Don E. Vanney, Mayor
Attest:
______________________________
Wendy Van Der Meersche, City Clerk
Approved as to form:
______________________________
Steven J. Peiffle
City Attorney
City of Arlington Council Agenda Bill WS #3 Attachment September 23, 2024 July and August 2024 Financial Report
Narrative General Fund Operating Statement Revenue Charts Other Fund Operating Statements ARPA Funds Status Update Smartsheet Active Project Report
Finance; Kristin Garcia, Director 360-403-3431 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION:
ALTERNATIVES:
2024 August Financial Report – Kristin Garcia, Finance Director
Sales Tax:
Total revenues are down about 18% from last year (10% if Amazon revenue is excluded). As compared to
budget, we’re about 8% under budget. Interest rates are starting to come down and we’re heading
into holiday season, I expect the budget gap to get smaller as we approach year end.
Utility Tax Revenue:
Total utility tax revenue is about 10% over budget and we’ve received about 3% more than we did
this time last year. Utility tax growth is helping to offset the slowdown in sales tax revenue.
4,629,074
5,623,146
YTD 2024 YTD 2023
Total Sales Tax Revenue
4,629,074
7,800,693
Budget to Actual
YTD Actual 2024 Budget
2,753,830
2,675,150
Total Utility Tax Revenue
2023 Actual 2024 Actual
GENERAL FUND
Other Revenues:
Here is a snap shot of how other revenues in the general fund are performing ;
• Leasehold Tax – about 10% higher than what we collected this time last year and almost 20%
over budget.
• Gambling tax – is at 110% of budget year to date.
• Licenses/Permits – which is mostly from cable franchise fees and business licenses. Cable
franchise fees are consistent and stable while business license revenue is already exceeding
budget.
• Fines/Forfeitures – is from traffic infractions and has been consistently running under budget
but is consistent with last year’s revenue. The revenue budget will be adjusted down in the
next biennium.
• Miscellaneous Revenue – includes investment income, donations and reimbursements.
Actual revenue as compared to last year is consistent, however the percent of budget to actual
is quite a bit less in 2024 than from last year. The difference in percent to budget between
the two years is because;
o Two large reimbursements were received last year; one from the Washington
Association of Sheriffs and one from North County Regional Fire Authority (NCRFA).
o The 2024 budget includes reimbursement from NCRFA’s portion of station 48 debt
which will be billed in October - so budget to actual is lower in 2024 until that revenue
is received.
Expenses:
Expenses are continuing to stay below budget and are consistent as a percent to budget with where
we were this same time last year – meaning we’re doing a good job managing cost increases and
staying within budget parameters.
Cemetery Fund – Fund balance in August was $927. Monitoring closely. If cash flow ends negative
for any particular month, the general fund is the only fund legally allowed to subsidize . The only other
option if we do not subsidize, is making changes in operating structure and expenses.
OTHER FUNDS
ARPA Fund – the city has about 30% ARPA funds remaining that need to be spent by year end or “fully
obligated” by year end. We’re on track to spend a majority of the funds by 12/31/2024. There may
be a chance we need to extend a couple of contracts to fully expend by first quarter 2025.
The 2014 bond refunding (refinancing) process is continuing forward. Paul and I had a rating call with
S&P on September 9th. We have a due diligence call with the bond underwriter on September 23rd
and expect to price the bonds on October 3rd with closing on October 17th. Net savings right now is
about 3.8%, the bond ordinance had a minimum threshold of 3% so we’re currently above target
range.
None
Did you know on the city’s intranet site, you can access the Smartsheet dashboard at any time. The
dashboard will show the list of current contracts, budget information, which projects have grants,
contract expiration dates and whether the contracts are on schedule or complete.
https://arlingtonwa.sharepoint.com/
POLICY UPDATES/OTHER INFORMATION
DEPARTMENT UPDATES
EDUCATIONAL
• October – budget retreat to review the 2025/2026 preliminary budget
• November – Public hearings on 2025 property tax levy and 2025/2026 biennial budget
These are items that have been approved by council and may be included in budget amendments at
year end, depending on the overall expenses of the applicable fund. This list isn’t intended to be all
inclusive but to capture those items council has approved separately throughout the year.
Council
Approval Date
Item Amount Notes
1/16/2024 Dump Truck $71,045 The wastewater department has had a
dump truck scheduled for replacement
but deferred due to cost and availability
of trucks. Purchased from Snohomish
County. Paid for by wastewater
equipment replacement funds.
4/1/2024 Solar Project – Airport $667,970 In 2023, council approved a $550,000
contract for this work which got delayed.
The project had a change of scope and
resulted in an increase cost. The project
will be funded by a $250,000 WSDOT
grant, the rest will be paid from airport
operating funds.
4/1/2024 AXON body worn cameras $20,927 The hiring of additional police officers
requires adding user licenses. By
entering into a new 5 year agreement
and adding the new licenses will reduce
the overall increase of the contract term.
Paid for by general fund.
4/8/2024 Nutanix Server
Replacement
$120,821 This was scheduled for replacement in
2025 however the current system can’t
accommodate current workloads while
maintaining the failover/disaster
recovery efforts. Paid for from
department contributions into
equipment replacement fund.
7/18/2022 Smartsheeet annual
subscription
$58,000 Council approved the Smartsheet
software in 2022. Smartsheet is used for
city wide contract and project
UPCOMING COUNCIL AGENDA ITEMS
COUNCIL APPROVED BUDGET AMENDMENTS
management. This item was
inadvertently left out of the 2024 budget
modifications for the 2024 renewal. Paid
for by department contributions into the
equipment replacement fund.
5/6/2024 Kubota Backhoe $50,706 Replace 1994 John Deere backhoe that
has reached the end of its useful like.
Paid for by parks equipment replacement
fund.
5/13/2024 Airport Fiber Project $165,400 Providing for additional security and
enhanced internet capability for airport
tenants. Paid for by unused capital
budget in Airport operating fund.
Increase police
department contribution
to equipment
replacement
$100,000 The annual contribution amounts into the
PD equipment replacement fund weren’t
adjusted when the take home care
program was implemented.
7/01/2024 Parking for 3rd and 5th
Streets
$299,273 Original budget in 2022 was $80,000 but
the full scope of work and cost estimate
was unknown at the time. Funded by
fuel tax.
7/01/2024 Auto Theft Grant $66,071 A grant was received from the
Washington Auto Theft Prevention
Authority for the purchase of 2 in car
camera systems and the ongoing annual
subscription will be added to the current
AXON contract.
7/01/2024 Phase II Smokey Point
Community Park
$2,406,984 Phase II to include play structures and
related installation. Funded by mitigation
fees, ARPA and REET.
7/01/2024 Taxiway Alpha Project $1,040,881 The bids came in higher than initially
budgeted for and the original cost
estimate did not include the aircraft
holding bay which was added based on
customer feedback. The project is
funded by the FAA, WSDOT and airport
reserves.
ARPA Program Summary
August 2024
Updated Budget Amount Spent to Date:Completed By:
Laptops for remote work/field use $ 306 306$ Complete
Touchless entry lock systems for City $ 281,318 281,318$ Complete
Cold weather shelter $ 20,000 20,000$ 2022 Contract Complete
Tourism Event Funding $ 89,287 89,287$ Complete
Parklets $ 119,847 119,847$ Complete
Utility Credit program $ 40,036 40,036$ Complete
Smokey Point Park Land $ 964,837 964,837$ Complete
Winter Festival $ 220,000 239,096$ Complete
Food distribution (food bank) $ 65,000 65,000$ Complete
Cyber security upgrades $ 180,000 173,480$ Complete
After school program/childcare (Boys & Girls Club) $ 77,000 77,000$ Complete
Design/build food truck court $ 94,663 94,663$ Design stopped. Remaining amount re-
purposed to Smokey Pt Park
COVID Position $ 246,000 198,700$ Expenses thru 2024
COVID supplies $ 12,985 8,694$ ongoing thru 2024 as needed
Utility system security improvements $ 237,310 158,704$ adding access control to more locations
Communications $ 80,000 67,409$ Contract thru 12/2024
Arlington Community Resource Center $ 360,000 175,918$ Contract thru 12/2024
NW Innovation Center $ 25,000 24,400$ Contract thru 12/2024
Cold weather shelter $ 20,000 15,254$ Contract thru 12/2024
Smokey Point Park Improvements $ 2,600,961 1,130,692$ Under contract (re-allocated $1 million
from Food Truck Court)
TOTAL ARPA BUDGET 5,734,550$ 3,944,644$ 1,789,906$
Active Projects - Council Report
Department Prime Contractor / Vendor Project Name Start Date Expiration Date Contract Amount Grant Amount Grant Funded Grant Name Health % Complete
1 Administration Port of Everett Port of Everett MOU 08/31/23 $0.00 No 0%
2 Administration Stilly Valley Chamber of Commerce Business Education Series 03/06/23 12/31/24 $5,000.00 $5,000.00 Yes ARPA 79%
3 Administration Carahsoft, Zencity at Carahsoft Zencity Carahsoft Agreement - Communications 05/01/23 03/31/25 $39,348.00 No 83%
4 Administration Brady Black Art Brady Black Mural 2023 08/07/23 05/30/24 $20,000.00 No 100%
5 Administration Tom Boyce City Tree Planting Review 08/24/23 10/29/23 $90/hr NTE $900 No 0%
6 Administration North County Regional Fire Authority Fire Suppression Services 08/01/21 Exchange for use of
Station 48 No 0%
7 Administration North County Regional Fire Authority Fire Marshal Investigation/Inspection Services 06/14/23 01/01/28 Per Exhibit B of Contract No 0%
8 Administration Snohomish County Emergency Management Services 12/31/21 Annual Service Charge No 0%
9 Administration None One Washington 12/31/37 $563,412.68 No 0%
10 Administration Center for Justice Social Work Center for Justice Social Work, Internship Program 08/01/23 07/31/25 $750,000.00 $750,000.00 Yes Health Care Authority 58%
11 Administration Rainier Asphalt & Concrete Trail Bollard Improvement Project 12/22/23 12/31/23 $51,978.63 No 100%
12 Administration Caroline Sumpter Art Crown Ridge Medians 12/19/23 02/01/24 $7,000.00 No 98%
13 Administration TerraVista NW LLC Jensen Park Restroom site plan 06/20/23 12/30/23 $32,500.00 No 92%
14 Administration Digital Face Media CIC and Meet Me in Arlington marketing 01/03/24 12/31/24 $33,800.00 No 100%
15 Administration Portia Smith Meet me in Arlington Shop Local Project 01/03/24 12/31/24 $24,000.00 $24,000.00 Yes ARPA 58%
16 Administration NWIRC NWIRC 2024 Program 01/13/24 12/31/24 $5,000.00 No 50%
17 Administration Strategies 360 Government Relations 12/31/24 $36,000.00 No 0%
18 Administration Civics Plus AMC Municipal Code Updates 08/01/25 $6,546.67 No 0%
19 Administration GMP Consultants LLC Maintenance Division Assessment 05/15/24 06/30/24 $12,950.00 No 100%
20 Administration Western Governors University Peter Barrett Master's Degree Tuition 11/01/23 11/01/24 $9,910.00 No 48%
21 Administration Mandy Kruger Mandy Kruger Bachelor's Degree Tuition 06/07/23 10/16/23 $3,889.00 No 100%
22 Administration Erica Knapp Art Mural Centennial Greetings 06/21/24 12/31/24 $10,800.00 No 50%
23 Administration Stilly Valley Center Restrictive Covenant - Low Income Housing 07/16/44 $0.00 No 0%
24 Administration Caroline Sumpter Art for Swinging Benches 08/01/24 11/01/24 $9,509.10 No 53%
25 Airport Airside Solutions Airfield Lighting Maintenance Project 11/01/23 11/01/26 $8,000.00 No 21%
26 Airport Avalos Cleaning Services LLC Arlington Municipal Airport Janitorial Services 01/01/24 12/31/24 2,379.24 / monthly No 25%
27 Airport Precision Approach Engineering Precision Approach Engineering IFE (2) - Fencing 12/08/23 01/31/24 $3,000.00 No 100%
28 Airport Dowl Engineering Taxiway Alpha Improvements Project 01/09/24 12/31/24 $290,788.00 Yes tbd 100%
29 Airport Dowl Engineering Perimeter Fencing Improvements Project 01/27/24 12/31/24 $62,634.00 Yes tbd 102%
30 Airport Fred C. Strickland & Associates LLC Airport Property Appraisal 03/12/24 08/16/24 $20,000.00 No 100%
31 Airport Reece Construction Airport Snow removal equipment transport 12/07/23 12/31/23 $9,837.00 No 100%
32 Airport Dowl Rwy 16/34 Mill and Overlay Project 04/19/21 12/31/24 $2,917,379.41 $291,261.00 Yes Rwy 16/34 Mill & Overlay 100%
33 Airport Dowl Dowl Engineering Professional Services Agreement 01/31/23 01/31/28 TBD by project No 55%
34 Airport Veregy Energy Savings Contract Services/ Airport Admin Office Building Solar
Project 02/20/24 09/30/24 $667,970.00 $250,000.00 Yes Arlington Airport Administration
Office Building Solar Project 75%
35 Airport Jacobs Engineering Group, Inc Airport Master Plan Update & AGIS Survey - IFE 05/03/24 05/31/24 $6,500.00 No 100%
36 Airport C&S Engineers, Inc Taxiway A Improvement CA IFE 06/28/24 07/05/24 $3,928.50 No 100%
37 Airport Out on a Limb Tree Service LLC Airport Tree Removal 07/02/24 07/15/24 $44,266.50 No 95%
38 Airport Cannon Construction Airport Fiber Installation Project 06/28/24 12/31/24 $165,398.68 No 53%
39 Community and Economic
Development GMP Consultants Permit Center Manager Recruitment 12/04/23 12/31/24 $9,500.00 No 76%
Page 1 of 5Exported on September 16, 2024 11:34:19 AM PDT
Department Prime Contractor / Vendor Project Name Start Date Expiration Date Contract Amount Grant Amount Grant Funded Grant Name Health % Complete
40 Community and Economic
Development
Washington State Department of
Revenue Business Licensing Services Agreement None No 0%
41 Community and Economic
Development Island Crossing Subarea Plan 02/01/24 08/01/25 $238,908.50 No 27%
42 Community and Economic
Development FCS Group Arlington Tax Increment Area / Food Truck Financial Feasibility Analysis 07/10/23 04/26/24 Hourly varies, NTE
$9,999 No 100%
43 Community and Economic
Development Law Offices of Alex Sidles Hearing Examiner Services 12/11/23 12/31/24 $9,999.99 No 0%
44 Community and Economic
Development Materials Testing & Consulting, Inc.Special Inspection Services - SP Community Park 01/22/24 11/30/24 $24,869.00 No 25%
45 Community and Economic
Development Reece Construction SPCC - Reece Construction 01/22/24 09/30/24 $2,299,670.93 No 45%
46 Community and Economic
Development Avalos Cleaning Services, LLC CED Janitorial Services - Current 01/26/24 12/31/24 $663.45 per month No 19%
47 Community and Economic
Development
Washington State Food Truck
Association Food Truck Court - WSFTA 02/01/24 12/31/24 $0.00 No 0%
48 Community and Economic
Development Otak Inc.2024 Comprehensive Plan Update 08/15/23 05/01/24 $390,000.00 No 82%
49 Community and Economic
Development Otak, Inc.Food Truck Court 11/08/22 12/27/23 $100,000.00 $100,000.00 Yes ARPA 100%
50 Community and Economic
Development
Rock Project Management Services,
LLC Smokey Point Community Park 04/17/23 11/30/24 $818,680.00 $1,013,723.00 Yes ARPA Funding 81%
51 Finance SWI Home Pros Finance Customer Service Window Relocation 06/24/24 08/31/24 $5,121.77 No 70%
52 Finance Volunteers of Western WA Arlington
Community Resource Center Capacity Funding - Community Support Svcs.01/04/22 12/31/24 $360,000.00 $360,000.00 Yes American Rescue Plan Act 47%
53 Finance NWIRC WA Data Workshop for Business Development and Recovery 12/31/24 $25,000.00 Yes ARPA 0%
54 Finance Northwest Innovation Resource
Center NWIRC Business Development and Recovery 02/01/22 12/31/24 $25,000.00 $25,000.00 Yes ARPA 77%
55 Finance WebCheck Inc.WebCheck Access Agreement 12/15/22 N/A
$15.00/transaction
Contract amount
averaged by year
No 0%
56 Finance Banner Bank Banking Services 09/01/20 09/01/24 Per fee schedule No 0%
57 Finance Volunteers of America - Arlington
Community Resource Center VOA - Program Assistance 01/01/24 12/31/24 $40,000.00 No 100%
58 Finance Boys and Girls Club of Snohomish
County Childcare services 01/01/24 12/31/24 $77,000.00 $77,000.00 Yes ARPA 100%
59 Finance The Organizational Health Collective Team Development and Succession Planning 02/01/24 06/30/24 $11,500.00 No 100%
60 Finance Volunteers of America - Arlington
Community Resource Center VOA - Cold Weather Shelter 11/01/23 12/31/24 $20,000.00 Yes ARPA 75%
61 Finance Volunteers of America - Arlington
Community Resource Center VOA - Affordable Housing 03/01/24 12/31/24 $50,000.00 No 51%
62 Finance Stillaguamish Senior Center dba Stilly
Valley Center Capacity Funding 04/03/23 12/31/24 $50,000.00 No 65%
63 IT - Information Services Far West Technologies Arlington Airport Gates 10/30/23 12/31/25 $74,613.65 No 52%
64 IT - Information Services FarWest Technologies Arlington Airport - Thor's Hanger Cameras 12/11/23 12/31/23 $7,583.23 No 100%
65 IT - Information Services Park Place Technologies LLC Nutanix Extended Support 06/01/23 06/30/25 $5,755.19 No 100%
66 IT - Information Services Snohomish County Information Technology Services 01/15/26 $50,000.00 No 0%
67 IT - Information Services Comcast Cable Communications Cable Service Franchise Agreement 03/25/31 5% of gross revenues No 0%
68 IT - Information Services Right Systems, Inc Network Switch Upgrade 12/01/24 $93,778.19 $75,000.00 Yes State and Local Cybersecurity
Grant Program 100%
69 IT - Information Services Right Systems Firewall Upgrade 05/18/24 05/31/24 $9,040.00 No 97%
70 IT - Information Services Right Systems Managed Services 03/21/24 03/11/27 $6,339.40/mo No 10%
71 IT - Information Services Far West Technologies Lift Stations Security Pilot Program 10/04/23 06/01/24 $6,726.32 No 100%
72 IT - Information Services Cannon Construction, LLC SR530 Utility Crossing Fiber Pull/Splicing 09/30/24 $149,959.60 No 0%
73 IT - Information Services Right Systems Inc Nutanix Replacement 07/01/24 $120,821.41 No 95%
74 IT - Information Services Copiers Northwest Copier Maintenance 03/31/27 $0.00 No 0%
75 IT - Information Services Timeless Designs, Inc City Hall 2nd Floor IT Offices 04/26/23 07/26/23 $74,974.34 No 100%
76 Maintenance & Operations Great Floors LLC City Hall Flooring Upgrade 11/28/23 05/31/24 $55,743.00 No 91%
77 Maintenance & Operations EHM Architecture, Inc City Hall Exterior Lift Installation & Stairs Reconstruction 10/30/23 12/31/24 $31,975.00 No 71%
Page 2 of 5Exported on September 16, 2024 11:34:19 AM PDT
Department Prime Contractor / Vendor Project Name Start Date Expiration Date Contract Amount Grant Amount Grant Funded Grant Name Health % Complete
78 Maintenance & Operations KCDA (Hermanson)Police Station HVAC Upgrade 01/01/24 06/28/24 $399,130.00 No 36%
79 Maintenance & Operations Great Floors Police Station/Council Chambers Flooring Upgrade 02/07/24 06/01/24 $119,743.62 No 91%
80 Maintenance & Operations SWI Home Pros, LLC City Hall Water Damage Repair 04/09/24 04/30/24 $13,799.13 No 100%
81 Maintenance & Operations Dapper Electric City Hall Exterior Outlets Installation 05/16/24 05/31/24 $4,647.85 No 100%
82 Maintenance & Operations Northwest Security & Sound LLC City of Arlington Monitoring & Security 03/06/23 12/31/25 $4197.12 / yr.No 63%
83 Maintenance & Operations Specialized Pavement Marking LLC 2023 Thermoplastic Program 10/12/23 09/30/23 $89,975.00 No 0%
84 Maintenance & Operations Environmental Abatement Services,
Inc Rudy York House Asbestos Abatement 01/08/24 01/31/24 $13,823.17 No 75%
85 Maintenance & Operations EcoBrite Services Janitorial Services 2024-2025 08/01/24 07/31/25 $32,172.24 No 0%
86 Police Snohomish County Human Services Law Enforcement Embedded Social Worker 01/01/23 12/31/23 $199,468.03 No 100%
87 Police Northwest Incident Support Hope Unlimited Chaplain Support Services 05/03/21 N/A $5,000.00/yr No 100%
88 Police Found Therapy Services PLLC Arlington PD Wellness Services 06/23/23 12/31/24 $7,500.00 No 68%
89 Police Feldman & Lee, P. S.Public Defender Grant Program - COA/Lake Stevens/Feldman & Lee 01/01/22 12/31/25 $16,560.00 Yes Public Defense Social
Services Program 83%
90 Police Snohomish County Jail Services 12/31/23 n/a No 0%
91 Police Arlington School District School Resource Officer 06/20/23 06/30/24 100% of SRO salary and
benefits, excluding OT No 0%
92 Police City of Everett City of Everett In-Service Training 01/01/22 12/31/26 $800.00 No 50%
93 Police The Government
(NACSURFWARCENDIV CRANE)Crane Division Naval Surface Warfare Center - Night Goggles 01/16/24 12/11/24 $1,500.00 No 100%
94 Police LexisNexis LexisNexis Risk Solutions - Accurint 12/31/24 $150/hr No 0%
95 Police Zachor, Stock & Krepps, Inc., P.S.Zachor, Stock & Krepps Inc., P.S.01/01/24 12/31/25
$19,361.43 monthly
(2024) $20,135.88
monthly (2025)
No 29%
96 Police AXON Enterprises AXON Body Worn Camera 04/05/24 07/01/29 $444,474.19 No 20%
97 Police IDI idiCORE 05/01/24 05/01/25 140.00 monthly No 17%
98 Police Pacific Northwest Support Services Chaplain/Support Wellness/Peer Coaching 12/31/24 $5,000.00 No 0%
99 Public Works Republic Services WRF Grit & Screenings Disposal 01/01/24 12/31/26 $96,818.04 No 12%
100 Public Works Toole Design Group 74th Ave Trail 08/06/21 12/31/24 $104,282.19 $63,528.00 Yes STP - Non-Motorized 101%
101 Public Works Perteet Smokey Point Corridor 08/06/20 12/31/24 $1,575,650.00 $959,788.00 Yes STP 76%
102 Public Works Generator Services Northwest, LLC Emergency Generator Maintenance Services 11/15/21 11/15/24 $37,604.06 No 131%
103 Public Works Buell Calibration & Controls, LLC Liquid Flow Meter Calibration Services 06/17/21 06/17/25 $17,735.03 No 57%
104 Public Works Buell Calibration & Controls, LLC Air Flow Meter Calibration Service 06/17/21 06/17/25 $23,859.17 No 87%
105 Public Works BHC Consultants WRF Membrane Replacement, Optimization, & Services During
Construction 08/03/21 12/31/23 $82,886.00 No 101%
106 Public Works RH2 520 Zone Booster Pump Station 08/03/21 12/31/24 $267,760.00 No 70%
107 Public Works PumpTech, LLC 640Booster Pump System 02/05/24 12/31/24 $335,629.31 No 62%
108 Public Works BHC Consultants Arlington Water Treatment Plant Expansion Design Ph 2 09/16/21 12/31/25 $833,746.00 No 25%
109 Public Works Brown & Caldwell Inc Haller Wellfield South Improvement Design 10/19/21 12/31/24 $149,700.00 No 42%
110 Public Works Consor North America (formerly
Murraysmith, Inc)Prairie Creek Drainage Improvements Phase 2B 12/07/21 12/31/24 $303,453.00 No 100%
111 Public Works Mott MacDonald, LLC (Pacific
Groundwater Group)Haller Wellfield Improvements 01/04/22 12/31/24 $136,228.00 No 76%
112 Public Works Olson Brothers Pro-Vac LLC Sanitary Sewer Inflow & Infiltration Control 10/18/22 10/18/24 $253,930.00 No 30%
113 Public Works Reece Construction 2022 Utility Improvement and Pavement Preservation 12/09/21 08/01/23 $2,919.092.37 N/A No N/A 100%
114 Public Works SCJ Alliance SR530 and Smokey Point Blvd Intersection Improvement Project 12/17/19 12/31/24 $268,025.00 No 89%
115 Public Works LDC, Inc.Division/Broadway Restoration Project 03/08/23 06/30/24 $69,779.54 $360,555.00 Yes NHS 94%
116 Public Works RH2 67th Ave Sewer 05/17/22 12/31/24 $120,011.00 No 106%
117 Public Works SCJ Alliance 169th St Connecting Segment 04/25/22 12/30/25 $51,129.00 No 22%
Page 3 of 5Exported on September 16, 2024 11:34:19 AM PDT
Department Prime Contractor / Vendor Project Name Start Date Expiration Date Contract Amount Grant Amount Grant Funded Grant Name Health % Complete
118 Public Works Transpo Group Arlington Transportation Master Plan 07/05/22 09/30/24 $154,700.00 No 94%
119 Public Works RH2 Sewer Model Hydraulic Analysis & Coordination 08/04/22 06/30/24 $71,400.00 No 96%
120 Public Works RH2 Water Model Hydraulic Analysis & Coordination 08/04/23 06/30/24 $57,183.00 No 87%
121 Public Works Hokkaido Drilling, Inc Potable Water Production Well installation 10/18/22 12/31/23 $528,465.50 No 48%
122 Public Works Parametrix 2023 Utility Improvement & Pavement Preservation 11/15/22 07/31/23 $190,239.71 No 96%
123 Public Works DN Tanks Gleneagle Reservoir Roof Replacement Project 03/08/23 09/20/23 $454,760.00 No 96%
124 Public Works RH2 2023-2026 On-Call Water & Sewer System Engineering Support 12/29/22 12/29/23 $40,000.00 No 0%
125 Public Works Transpo Group Arlington Traffic Calming Program 01/20/23 12/31/24 $45,000.00 No 23%
126 Public Works Tenelco, Inc.Biosolids Hauling and Beneficial Use 03/27/23 03/28/26 Unit priced No 0%
127 Public Works SCJ Alliance 211th Place Corridor Improvements 05/08/23 12/31/24 $318,778.70 $230,000.00 Yes Fuel Tax Grant 8%
128 Public Works SkyCorp LTD Silo Demo & Lime Removal 02/17/23 03/30/23 $39,894.50 No 100%
129 Public Works KLJ Financial Consulting Public Works Financial Consulting 03/28/23 03/31/25 $65,460.00 No 28%
130 Public Works Reid Middleton 204th St & 74th Ave Intersection Improvements 04/10/23 12/31/23 $12,500.00 No 19%
131 Public Works Terra Vista NW, LLC Arlington Parking Lots 03/03/23 12/31/24 $10,500.00 No 112%
132 Public Works Blueline Group 59th Ave Sidewalk Project 04/05/23 12/31/23 $20,110.00 No 49%
133 Public Works Univar Solutions USA, Inc Sodium Hydroxide Bulk Delivery 02/03/21 12/31/23 $23,760.00 No 65%
134 Public Works Cascade Columbia Distribution Co.Sodium Hypochlorite Drum Delivery 02/05/21 12/31/23 $5,924.16 No 70%
135 Public Works Univar Solutions USA, Inc Sodium Hypochlorite Bulk Delivery 07/13/23 12/31/25 $10,220.00 No 34%
136 Public Works Reece Construction Company Legion Hall Water Main Replacement 11/27/23 10/31/23 $28,285.75 No 100%
137 Public Works Process Solutions System Platform Upgrade 11/07/23 12/31/24 $210,000.00 No 104%
138 Public Works Commonstreet Consulting, LLC 2023 ROW Services (188th Roundabout - Jammeh, 211th Corridor)06/30/24 $22,996.00 No 12%
139 Public Works Commonstreet Consulting, LLC 2023 ROW Services (188th Roundabout - Longhorn Saloon)06/30/24 $29,610.00 No 63%
140 Public Works Always Active Services, LLC 174th Pl NE Stormwater Improvement 08/29/23 10/31/23 $16,121.75 No 86%
141 Public Works Confluence Law, PLLC Hammer Water Rights Legal Services 09/20/23 $5,000.00 No 100%
142 Public Works Washington Electrical COntracting Anoxic Basin Wiring Upgrade 12/10/23 01/31/24 $9,686.97 No 100%
143 Public Works Resound Energy Public Works Utility Lights & Security Upgrade 12/12/23 03/31/24 $107,255.29 No 95%
144 Public Works HWA Geosciences, Inc Haller South Geotechnical Investigation 11/27/23 03/31/24 $18,669.00 No 100%
145 Public Works Process Solutions Engineering Support for SCADA Services & Systems Integration 12/19/23 12/31/26 $300,000.00 No 21%
146 Public Works Blue Marble Environmental, LLC 2023-2025 Solid Waste Recycling Coordination 07/01/23 06/30/25 $21,107.53 $15,830.65 Yes
SOLID WASTE
MANAGEMENT LOCAL
SOLID WASTE FINANCIAL
ASSISTANCE
5%
147 Public Works DK Systems Inc 108 W Haller Ave MBR Support Building HVAC 03/31/24 $27,552.34 No 100%
148 Public Works Mott MacDonald, LLC (Pacific
Groundwater Group)Arlington Hammer Water Rights Support 01/22/24 12/31/24 $8,699.00 No 96%
149 Public Works Washington Electrical Contracting On-Call Electrical Services 03/19/24 03/11/27 $300,000.00 No 11%
150 Public Works H & L Tree and Landscape Services Gleneagle Reservoir Landscape Restoration 06/17/24 07/10/24 $18,826.93 No 100%
151 Public Works Diverse Earthworks Inc Arlington Parking Lots 3rd & 5th Streets 09/30/24 $299,273.72 No 0%
152 Public Works SkyCorp LTD Longhorn Saloon Demolition 07/26/24 08/30/24 $10,602.10 No 95%
153 Public Works Rock Project Management Services,
LLC 2024 Construction Management Support 12/31/25 $337,344.00 No 0%
154 Public Works RH2 Water Model Update & Calibration 01/31/25 $52,910.00 No 0%
155 Public Works RH2 Sewer Model Update & Calibration 01/31/25 $44,603.00 No 0%
156 Public Works Earthwork Solution, LLC LS7 & LS11 Air Vac Replacement 09/30/24 $53,157.40 No 0%
157 Public Works Wescon Enterprises, Inc.Macleod Ave Sidwalk & Slope Repair 10/31/24 $29,161.24 No 0%
Page 4 of 5Exported on September 16, 2024 11:34:19 AM PDT
Department Prime Contractor / Vendor Project Name Start Date Expiration Date Contract Amount Grant Amount Grant Funded Grant Name Health % Complete
158 Public Works Process Solutions WTP PLC Upgrade 12/31/24 $86,101.08 No 0%
159 Public Works SCJ Alliance 180th St Connector 04/09/24 12/31/26 $597,102.07 $482,687.00 Yes FHWA 4%
160 Public Works Reece Construction Company Cox Street Traffic Calming & Pedestrian Crossing 12/31/24 $28,576.49 << Grant Amount >>No 0%
161 Broadway Haller Water Main
162 Laminar Law - Hearing Examiner Services
163 Washington State Department of Corrections
164 2024 - 2026 Embedded Social Worker
165 Arlington WRF In-Plant Pump Replacement
166 Utility Iron Adjustment Services
Page 5 of 5Exported on September 16, 2024 11:34:19 AM PDT
City of Arlington Council Agenda Bill WS #4 Attachment
September 23, 2024 Community and Economic Development Quarterly Report
Q3 Report
Community and Economic Development; Marc Hayes, Director EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: BUDGETED AMOUNT: 0 LEGAL REVIEW: DESCRIPTION:
Review of development projects and work being conducted by the CED department and address any questions that Council may have.
ALTERNATIVES: Information only.
Community and Economic Development
Quarterly Status Report
Reporting Period: Q3 2024
Staffing Report:
• We are still in search of a viable candidate to fill the Development Services Manager position.
Update on Current Contracts/Grants/Agreements:
• Otak is the prime consultant for the 2024 Comprehensive Plan Periodic Update. The goals
and policies have been reviewed by the Planning Commission and revisions are being
completed and readied for presentation to Council for review.
• Contract has been signed with Rock Project Management Services, to provide project
management/construction management services for Phase II of the Smokey Point
Community Park project. Project is being prepared to be advertised for bid, this will occur
on 9/24, with a bid opening on 10/9.
• We are making progress with MAKERS Architecture and Urban Design LLP and the planning
work for the Island Crossing Subarea. We held a public open house at Putnam Hall on May
8 which was well attended, with over 25 participants. Since then, we have held two Advisory
Group meetings consisting of landowners/ stakeholders in IC. The first AG meeting
addressed transportation issues and conceptual road designs. The second AG meeting
focused on land use and viability of certain types of businesses. A proforma is being
completed focusing on specific types of businesses on specific parcels.
• Contracted with Peregrin Sorter (Laminar Law) to provide the City’s Hearing Examiner
services.
• Under agreement with Washington State Food Truck Association to provide oversight of
vendor requirements and scheduling for the Pilot Program.
• CED is in the process of bidding the demolition of the ReMyx’d building. Bid opening
scheduled for 10/9.
• Applied for an Aquatic Organism Passage (AOP) grant in partnership with the Tulalip Tribes
for the replacement of the Edgecomb Creek/ 67th Ave. NE culvert crossing.
Challenges:
• Continuing to review/permit the backlog of projects, currently in the queue, as time allows.
Opportunities:
• Amy applied for and received notification that Arlington was successful in being selected for
the Paper to Digital grant funding of $325,000.00 These funds will allow the city to purchase
an updated permitting software program to meet the requirements of SB 5290, as well as
initiate the process of migrating all city files into the Microfiche system for permanent
digitized file retention.
New Programs/General Information Meetings:
GIMs:
• CED met with the development group that is proposing to develop the Lindsey Annexation
Master Planned Neighborhood area along SR 531. This development will require the creation
of a sub-area plan and an Environmental Impact Statement, which should occur in early 2025.
• CED met with Ace Acme septic services, looking to expand their biosolids operation.
• CED met with Architects representing Snohomish County Public Works to discuss proposed
changes to the existing Arlington site.
• CED met with Quarterra, to discuss their proposed project on the SE corner of SR 530/59th
Ave.NE
• CED held a pre-construction meeting for the SnoCo PUD Crosswinds Substation.
• CED met with individuals proposing to construct a 153,500 s.f. industrial warehouse building
on 51st Ave. NE, south of The Outpost.
• CED met with Coast Const. looking to build a mixed-use project on the Olympic Pl. parcel they
own, just north of Safeway.
• Met with WSDOT and developer to discuss the proposed roundabout at SR 531/85th Ave. NE
• CED held a pre-construction meeting for the Allen Townhomes, a 36-unit townhome project
on SR 531, east of SR 9.
• Held a pre-construction meeting for the Wet Rabbit Carwash located at the SE corner of SR
9/204th St. NE.
Active Development Projects:
• Ironwood Place-102-unit mixed-use project located at 67th Ave.NE/Woodlands Way,
• Allen Townhomes-36-unit residential townhome project located on SR 531 east of SR 9
• Arlington Townhomes-17 lot residential townhome project located on Highland Dr.
• Goldstream Ventures-96-unit mixed-use project located on Smokey Point Blvd. across from
the Stillaguamish Senior Center.
• Bridgemont-18 lot single family residential project located on 186th St. south of high school
• The Outpost-500-unit mixed-use project located on 51st Ave. NE/168th St. NE
• SnoCo PUD District Office – commercial office located at 59th Ave. NE,
• SnoCo PUD Crosswinds Substation-electrical utility infrastructure
• TEC Equipment-motor vehicle sales located on Smokey Point Blvd., east of Pilot Travel Center
• McIlrath Hangars-57 T hangars aircraft hangars located on Airport Blvd.
You can always view the project location by clicking this link:
https://experience.arcgis.com/experience/b53bc9cf22874530aca0b3fed3853a25
New Programs:
Items of Concern:
Items for Discussion:
Upcoming Planning Commission Items: October 1, 2024 /October 15, 2024
1. October 1 workshop –Lakewood and Arlington School District’s Capital Facilities Plans
review.
2. October 15 Meeting - Lakewood and Arlington School District’s Capital Facilities
Plans. Action item w/Findings of Fact.
Upcoming Council Items: October 28, 2024 /November 4, 2024
1. October 28 workshop - Lakewood and Arlington School District’s Capital Facilities
Plans w/Planning Commission Findings of Fact.
2. November 4 meeting – Public Hearing for Lakewood and Arlington School District’s
Capital Facilities Plans adoption.