HomeMy WebLinkAbout8401 179th Pl NE_BLD4604_2025 ✔
8401 179th pl ne Arlington wa 98223
11580.00
Remove old materials and install new
✔
Dan Cheek 206 276-6757
Dancheek@live.com
8401 179th pl ne Arlington Wa 98223
Dan Cheek 206 276-6757
Dancheek@live.com 206 276-6757
8401 179th pl ne Arlington Wa 98223
Hope Construction 504 inc. 4255519504
hopeconstruction504@gmail.com 4255519504
10105 Montana rd Everett Wa 98204
HOPECC5785C8 01-31-2024
Shingle ✔
1 ✔
✔
Daniel Cheek 04/05/2022
CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
8401 179TH PL NE Permit #: 4604
PERMIT EXPIRES 180 DAYS AFTER
Parcel #: 00958500010000
DATE OF ISSUANCE.
Scope of Work: Residential Re Roof Valuation: 11580.00
OWNER APPLICANT CONTRACTOR
CHEEK DANIEL & APOK-CHEEK
Dan Cheek Hope Construction 504 Inc.
ERICA
8401 179TH PL NE 8401 179th PL NE 10105 Montana Rd
ARLINGTON, WA 98223-4054 Arlington, WA 98223 Everett, WA 98204
206-276-6757 425-551-9504
LIC: HOPECC5785C8 EXP: 01/31/2024
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #: EXP: LIC #: EXP:
JOB DESCRIPTION
PERMIT TYPE: Residential Re-Roof CODE YEAR: 2018
STORIES: CONST. TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance
advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation,
guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is
determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City
ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE
OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
4/6/2022
Signature Print Name Date Released By Date
CONDITIONS
Approved permit shall be onsite during installation. Call for inspections.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
04/06/2022 Processing/Technology $25.00
04/06/2022 Re-Roof Residential $75.00
04/06/2022 State Surcharge - 1st DU $6.50
Total Due: $106.50
Total Payment: $0.00
Balance Due: $106.50
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon
!"# $%&&'
()"*# +,$%&&'
()"*(--.. / 00123%4
()"*565758 9:;,<3=,>?2/@
6 *" +,;&:$%&&'
A * 1 1B1
C) D+,E%&&'F:;G&HE=I
7" JK L &M;D&,3;+:&==N
O)P * 00B/ H
7QPR
#PS J7 .
6 *.P" * TU
V""P*"W P @X&M;D&,3;+:
Y 6 -
Y..P- 0
CZ. 0 @
R
7P. $[4
(..\*- +&:],,^=,&M
4+9E&:_ DD9&MM&<+:&ME9;`3;=,a,&9+I& a,&94%=,& b=,;,<
$cde 0 f
2B/B 0
!" # $ # $ %
& $ "& $ " "' "( # $" "' "( )
*+,-. /012341
5,,-678"9,,:
$ ;
<) =>?@A?BC"DEFG?H
I-JKL,
$ $ #"M $ " #"M
<) $"NOP')<Q ')
RS,,-L8TLU"V-.-L6 /1311
W+,
$ N $ #"MX
<) Y$ #" $ "! "NZ"[ " $"\
]^.+-88"