Loading...
HomeMy WebLinkAbout128 W Burke Ave Unit 1, 2, and 3_BLD601_2026 CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 - PHONE; (360)403-3551 BUILDING PERMIT Address:128 W.Burke Ave Permit#:601 Parcel#:00461801700800 Valuation:628000.00 OWNER APPLICANT CONTRACTOR Name:PERASSO II LLC Name:Rob Perasso Name:Rob's Electric Inc Address:4405 103RD ST SE Address:4405 103rd Ave SE Address:4405 103rd Ave SE City,State Zip:EVERETT,WA 98205 City,State Zip:Lake Stevens,WA 98258 City,State Zip:Lake Stevens,WA 98258 Phone: Phone:425-334-6834 Phone:425-334-6834 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Multi-Family CODE YEAR: 2012 STORIES: 3 CONST.TYPE: DWELLING UNITS: 3 OCC GROUP: BUILDINGS: I OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RC W 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID, IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE:SaIns iny relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form an co d City li n# 04" .54' / /fe Signat re Print Name Date Released By Dific CONDITIONS Adhere to approved plans. Pending water supply (hydrant)fire protection. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 7/20/2016 Building Permit Fee $5,238.53 7/20/2016 Building Plan Review Fee 40$3, 5 04 7/20/2016 Furnace 40 7/20/2016 Gas Outlets Base Fee 1 to 5 $75.0 7/20/2016 Mechanical Permit Base Fee $30.00 7/20/2016 Park-Community MF $4, 7 .00 7/20/2016 Park-Mini MF $1,49 .00 1 7/20/2016 Plumbing Permit Base Fee 308.00 .00 7/20/2016 Plumbing Permit Fee(Enter Fixture Fee) $396.00 7/20/2016 State Building Code Surcharge Fee 0 .5$4 7/20/2016 State Surcharge per Dwelling $ . 0 7/20/2016 State Surcharge per Dwelling $2.00 ,0 7/20/2016 Traffic Mitigation-City $5 7/20/2016 Water Heater 3250 $75.. 0 Total Due: $20,209.57 Total Payment: $0.00 Balance Due: $20,209.57 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon RESIDENTIAL PERMIT APPLICATION Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 THIS APPLICATION IS TO BE USED WHEN APPLYING FOR A NEW SINGLE-FAMILY, DUPLEX, TOWNHOUSE, ADDITION, DECK, OR ACCESSORY STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS AND TWO (2)SETS OF STRUCTURAL CALCULATIONS. THE APPLICATION MUST ALSO INCLUDE THE PLUMBING SUBMITTAL AND THE MECHANICAL SUBMITTAL FORMS. THE ZONING VERIFICATION CAN BE SUBMITTED PRIOR. Date: 3 /-I / Address: ? c;� ul &4-5 S d Plat: �'L,� / ? -�e.RiEt2- C� yp Owner/Applicant: .b t�-r,cs 0 03� �-A- �� L_� 's V-S V� Signature: ?920 S Verification of accuracy and agreement to follow the City of Arlington Municipal Code(electronic is ok) ENTAIL: a�'C�� "bSej,,4w, +tc. • ®mac Phone: (h) V2�_— 371/ - (c) Va-s'- 3.3 0 Describe Proposal (include cross street): Single-family Duplex Townhouse D;Addition Accessory structure Tri /c'Jc 1. Proposed Area: 1 t Floor y�2 2"d Floor 2315 Garage /6Gq Total SF) y9Z� ar'4 Ae 2161 2. Valuation (cost): 3. Contractor: 6`S cl ic- /it L Phone: 4. Address: G��/0 �s 103 0" Ayd S-L-z Uc- S-A✓ee lr elk P—SZ-5,51 5. License Number: CC o I terns 6S€ �<K to/ me Expiration: 2 Plumbing Section (continue filling out if plumbing is involved) (Check all that apply and indicate the number of fixtures proposed) Bath/Shower Combo (4.0) x 9 0 Sink (1.5) x Shower(2.0) x 0 0: Lavatory (1.0) x Clothes Washer (4.0) x 3 a Water Closet (2.5) x El (1.5) x� Water Heater x 3 Hose Bibb (2.5) x (a 0: Other(list) Rev 2013 Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2012 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only-ACCA procedures for sizing cooling systems should be used to determine cooling toads. The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of 0.30. The incorporated Insulation requirements are the minimum prescriptive amounts specified by the 2012 WSEC. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, some values will be calculated.for you. If you do not see the selection you need in the drop-down options, please call the WSU Energy Extension Program at(360)956-2042 for assistance. Project Information Contact Information Perrasso Triplex-Unit 1 Architectural Design Associates,PS Lots#8&49 Burke Ave. 2221 Everett Ave#104 Arlington,Washington Everett,WA.98201 Heating SVstem Type: *Forced Air Furnace C Heat Pump To see detailed instructions for each section,place your cursor on the word'Instructions". Design Temperature Instructions — Design Temperature Difference(AT) 47 l Marysville_ AT=Indoor(70 degrees)-Outdoor Design Temp Area of Building Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) 1,599 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 14,391 Glazinq and Doors U-Factor X Area = UA Instructions 0.30 262 78.68 Insulation Attic U-Factor X Area = UA Instructions R 49 0.026 918 23.87 • Single Rafter or Joist Vaulted Ceilings U-Factor Area UA Instructions No selection Select R Value !,l I -- Above Grade Walls(see Figure 1) U-Factor Area UA 0.056 1,702 95.31 Floors U-Factor Area UA Instructions R 30 0.029 1263 36.63 I , Below Grade Walls(see Figured U-Factor Area UA Instructions �-Select R-value .�,� No selection 0 --- Slab Below Grade(see Figure 1) F-Factor Len th UA Instructions Li Select cnnditioninq No selection U Slab on Grade(see Figured F-Factor Length UA Instructions 0.540 64 34.56 .; R 10 perimeter �, Location of Ducts Instructions Unconditioned Space Duct Leakage Coefficient `,., •�.., 1.10 Sum of UA 269.04 Envelope Heat Load 12,645 Btu/Hour Figure 1. Sum ofUAXAT Air Leakage Heat Load 7,305 Btu I Hour VolumeX 0.6XATX.018 Above ti,agc Building Design Heat Load 19,950 Btu I Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 21,945 Btu I Hour • Ducts in unconditioned space:Sum of Building Heat Loss X 1.10 Ducts in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 30,723 Btu I Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Auitding and Duct Heat Loss X 1.25 for Heat Pump (07101113) Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2012 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads. The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of 0.30. The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2012 WSEC. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, some values will be calculated for you. If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at(360)956-2042 for assistance. Project Information Contact Information Perrasso Triplex-Unit 2 Architectural Design Associates,PS Lots#8&#9 Burke Ave. 2221 Everett Ave#104 Arlington,Washington Everett,WA.98201 Heating System Type: *Forced Air Furnace CHeat Pump To see detailed instructions for each section,place your cursor on the word"Instructions" Design Temperature Instructions Design Temperature Difference(AT) 47 Marysville __ AT=Indoor(70 degrees)-Outdoor Design Temp Area of Building Conditioned Floor Area ` Instructions Conditioned Floor Area(sq ft) 1,620 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 14,580 Glazing and Doors U-Factor X Area = UA Instructions 0.30 228 68A8 Insulation Attic U-Factor X Area = UA Instructions i a 0.026 888 23.09 Single Rafter or Joist Vaulted Ceilings U-Factor Area UA Instructions —� No selection Select R Value •L.� --- Above Grade Walls(see Figure 1) U-Factor Area UA Instructions R-21 0.056 1.099 61.54 � � Floors U-Factor Area UA Instructions 0 029 1,284 3724 Below Grade Walls(see Figure 1) U-Factor Area UA Instructions No selection 0 Select R-value --- Slab Below Grade(see Figure 1) F-Factor Ler� UA Instructions �' Select conditiorn No selection nu � ." Slab on Grade(see Figure 1) F-Factor Length UA Instructions I R.10 Perimeter . 0.540 54 3456 Location of Ducts Instructions Duct Leakage Coefficient t .Unconditioned Space ' 1 10 Sum of UA 224.91 Envelope Heat Load 10,571 Btu/Hour Figure 1. SumofUAXAT Air Leakage Heat Load 7,401 Btu/Hour VolumeX 06XATX 018 At��6r+d� Building Design Heat Load 17,972 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 19,769 Btu/Hour Ducts in unconditioned space:Sum of Building Heat Loss X 1.10 Ducts in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 27,676 Btu/Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heat Pump (07101113) Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2012 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heatinq loads only.ACCA procedures for sizing cooling systems should be used to determine coolinq loads. The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of 0.30, The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2012 WSEC. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, some values will be calculated for you.If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at(360)956-2042 for assistance. Project Information Contact Information Perrasso Triplex-Unit 3 Architectural Design Associates,PS Lots H8&49 Burke Ave. 2221 Everett Ave#1 104 Arlington,Washington Everett,WA.98201 Heatinq System Type: *Forced Air Furnace OHeat Pump To see detailed instructions for each section,place your cursor on the word'Instructions". Design Temperature Instructions Design Temperature Difference(AT) 47 l`irl i�'`�I i' • AT=Indoor(70 degrees)-Outdoor Design Temp Area of Building Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) 1,712 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 15,408 Glazinq and Doors U-Factor X Area = UA Instructions 0,30 327 97.95 Insulation Attic U-Factor X Area = UA Instructions —R 49 — 0.026 958 24.91 Single Rafter or Joist Vaulted Ceilings U-Factor Area UA Instructions No selection Select R Value Above Grade Walls(see Figure 1) U-Factor Area UA R 21 _ 0.056 1,963 109.93 Floors U-Factor Area UA Instructions 3 0.029 1.400 40.60 t _ il J Below Grade Walls(see Figure 1) U-Factor Area UA Instructions 1 No selection 0�Select R�� • --- Slab Below Grade(see Figure 1) F-Factor Len th UA Instructions No selection ._Select conditioning ! --- �ti� Slab on Grade(see Figure 1) F-Factor Length UA Instructions 0 540 62 33.48 R 10 Perimeter •I , Location of Ducts Instructions I 1 Duct Leakage Coefficient 1 Unconditioned Space •l I 1 10 Sum of UA 306.87 Envelope Heat Load 14,423 Btu/Hour Figure 1. SumofUAXAT Air Leakage Heat Load 7,821 Btu/Hour VolumeX 0.6XATX.016 nnovrc,,c. Building Design Heat Load 22,244 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 24,468 Btu/Hour Ducts in unconditioned space:Sum of Building Heat LossX 1 10 Ducts in conditioned space:Sum of Building Heal Loss X 1 Maximum Heat Equipment Output 34,255 Btu/Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heal Pump (07y01/13) Permit#: 601 Permit Date: 03/02/15 Permit Type: MULTI-FAMILY Project Name: Perasso Triplex Applicant Name: Rob Perasso Applicant Address: 4405 103rd Ave SE Applicant, City, State, Zip: Lake Stevens, WA 98258 Contact: Rob Perasso Phone: 425-334-6834 Email: rob@robselectricinc.com Scope of Work: 3 Story Triplex Townhouse Valuation: 628000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 09/13/2016 Permit Expires: Permit Form Type: Civic Plus Number: Status: COMPLETE Assigned To: Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 00461801700800 128 W BURKE AVE,UNIT PERASSO II LLC 910 Undeveloped 1,2&3 (Vacant)Land Contractors Contractor Primary Contact Phone Address Contractor Type License License# Rob's Electric Inc Rob Perasso 425-334-6834 4405 103rdAve CONSTRUCTION ROBSEI*IO1ML SE CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status 04/18/2017 C20.BUILDING Separation walls 2 layers 04/18/2017 BUILDING Approved FINAL gyp both sides triplex only. Corrections- 03/16/2017 C09.FRAMING Pre-framing inspection.will 03/16/2017 z.Rick Karns Needs re-call. reinspection C20.BUILDING Party walls inspected one 03/10/2017 FINAL s ide sheathed ok to insulate. 03/09/2017 BUILDING Approved KO.3/10/17 Shear inspection-add galv. 02/21/2017 Inspection nails to bottom plate 02/21/2017 z.Rick Karns Approved throughout.Add nails to various locations. 02/01/2017 C20.BUILDING Roof sheathing Approved 01/31/2017 BUILDING Approved FINAL 1/31/17 KO. 12/01/2016 Inspection Floor slab insulation and 11/30/2016 BUILDING Approved vapor barrier approved KO. 10/20/2016 C20.BUILDING Approved FINAL Plan Reviews Date Review Type Description Assigned To Review Status 03/02/2015 BLD Ok to issue pending water supply(hydrant)fire protection. z.Christopher Young Fees Fee Description Notes Amount Park-Community MF Multi-family $4,491.00 Park-Mini MF Multi-family $1,308.00 Traffic Mitigation-SF Single Family split fee in half with duplex $5,032.50 Building Permit Table 4-1 628K $5,238.53 Gas Piping/Units Enter#of units x3 $30.00 Mechanical Base Permit Fee x3 $75.00 Plumbing Base Permit Fee x3 $75.00 Mechanical Commercial Permit Table 4-7;Per Unit $396.00 State Surcharge-add'1 DU Residential Additional Units $2.00 Building Plan Review Table 4-2 $3,405.04 State Surcharge- 1st DU Residential- 1st Unit $4.50 State Surcharge-add'l DU Residential Additional Units $2.00 Water Heater(Tank) x3 $75.00 Forced Air Heat fee per Btu x3 $75.00 Total $20,209.57 Attached Letters Date Letter Description 03/19/2015 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 09/13/2016 Robert Perasso 61311593 cc $20,209.57 Outstanding Balance $0.00 Notes Date Note Created By: 03/02/2017 Water connection has not had final inspection from the Water Department. Kristin Foster Uploaded Files Date File Name 09/13/2016 1839593-601 Issued Permit.pdf 03/02/2015 979258-128 W Burke Ave-Triplex Application.pdf