Loading...
HomeMy WebLinkAbout16720 40th Ave Ne Unit A_BLD426_2026 (3) BUILDING INSPECTION REPORT — MECHANICAL Permit No. 426 Address: 16720 40th Dr. #A Contractor: Yanez Owner: Yanez Date: 9/3/2014 ® APPROVAL ❑ PARTIAL APPROVAL ❑ CORRECTION ❑ OTHER APPLIANCE: Gas piping for Gas Stove GAS PIPING: © DRIP LEG: SHUT-OFF VALVE: ® SEISMIC: ❑ PRESSURE TEST: M REGULATOR VENTING: ❑ PIPING SUPPORT: M ACCESS: ❑ % INCH - 6 FEET: ❑ MATERIAL: %- 1 INCH -8 FEET: Fx 1 1/4 OR LARGER- 10 FEET: ❑ Date: 9/3/2014 INSPECTOR: YOUNG RESIDENTIAL MECHANICAL PERMIT APPLICATION Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 THIS APPLICATION IS TO BE USED WHEN APPLYING FOR NEW MECHANICAL INSTALLATION AND OR GAS PIPING FOR EXISTING RESIDENCES. PLEASE FILL OUT ALL PAGES OF THIS APPLICATION AND INCLUDE ALL INFORMATION. Project Address: 1(oI ZO A 10AA/\ -P� ''N,, V_: - Project Description: '-- -�= �k � STD 'w vTTA G A� S 10_' L,_ Owner: M e-f-cc �^'VVL Z Address: �1 Phone: (<(�S Z O r 1 Y7_5 Email: �J Lm Pe" -L gVvQ i l co y� Applicant: Address: Phone: Email: Applicant Signature: OvIcL Electronic Signature if submitting on-line I hereby certify that the above information is correct and that the construction, installation for the above mentioned property will be in accordance with the applicable laws of the City of Arlington and the State of Washington. CONTRACTOR INFORMATION Contractor Name: Company: License Number: Expiration: Phone: Email: `�gd STAFF USE ONLY- Permit#: �`-f' Accepted by: % Date: ' RESIDENTIAL MECHANICAL ' PERMIT APPLICATION Department of Community& Economic Development City of Arlington• 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 SELECT ALL PROPOSED APPLIANCES ❑ Furnace (80+) ❑ Fireplace Insert ❑ Outdoor BBQ ❑ Heat Pump ❑ Freestanding Stove ❑ Hydronic Piping ❑ Type II Hood ❑ Commercial Cooking Appliance ❑ PV System ❑ Boiler Gas Piping ❑ Storage Tank ❑ AC Unit ❑ Solid-Fuel Appliance ❑ Other Gas Piping Information Not Applicable: ❑ Pipe Material: 51K-40- Qt Pt� Pipe Size: -5A P Distance From Meter to Furthest Appliance. Total BTU's of all Appliances: • New gas piping requires a pressure test to hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured every 6 to 8 feet • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of all appliances Ja• W W - — --— — w � CITY OF ARLINGTON ` 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551 BUILDING PERMIT 16720 40TH AVE NE UNIT A Permit#:426 PERMIT EXPIRES 180 DAYS AFTER Parcel#: 00866700009400 DATE OF ISSUANCE. Scope of Work: Install gas piping to new cook stove Valuation: .00 OWNER APPLICANT CONTRACTOR YANEZ MARCO Marco Yanez Marco Yanez 16720 A 40TH AVE NE UNIT 94 16720 40th Avenue NE,#A 16720 40th Avenue NE,#A ARLINGTON,WA 98223 Arlington,WA 98223 Arlington,WA 98223 425-220-4875 425-220-4875 LIC: EXP: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Marco Yanez 16720 40th Avenue NE,#A Arlington,WA 98223 425-220-4875 LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: RESIDENTIAL MECHANICAL CODE YEAR: 2012 STORIES: CONST.TYPE: DWELLING UNITS: 1 OCC GROUP: BUILDINGS: 1 OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. �1 Z07/17/2014 Applicant Signature Date Building Official Date CONDITIONS Gas piping is required to be on test for final inspection. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 09/11/2026 Gas Piping/Units $10.00 09/11/2026 Plumbing Base $25.00 Total Due: $35.00 Total Payment: $35.00 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail Permit#: 426 Permit Date: 07/15/14 Permit Type: RESIDENTIAL MECHANICAL Project Name: Yanez Applicant Name: Marco Yanez Applicant Address: 16720 40th Avenue NE, #A Applicant, City, State, Zip: Arlington,WA 98223 Contact: Marco Phone: 425-220-4875 Email: uliyanez7l@gmail.com Scope of Work: Install gas piping to new cook stove Valuation: 0.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 07/18/2014 Permit Expires: Permit Form Type: Civic Plus Number: Status: COMPLETE Assigned To: Launa Black Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 142 Single Family 00866700009400 16720 40TH AVE NE UNIT YANEZ MARCO Residence A Condominium Common Wal Contractors Contractor Primary Contact Phone Address Contractor Type License License # Marco Yanez Marco Yanez 425-220-4875 16720 40th Avenue OWNER NE,#A Plan Reviews Date Review Type Description Assigned To Review Status 07/15/2014 Misc OK to issue z.Christopher Young Fees Fee Description Notes Amount Gas Piping/Units Enter#of units $10.00 Plumbing Base Permit Fee $25.00 Total $35.00 Attached Letters Date Letter Description 07/17/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 07/18/2014 Marco Yanez Cash $35.00 Outstanding Balance $0.00 Uploaded Files Date File Name 09/04/2014 16720 40th Dr.docx 07/15/2014 426-application.pdf