HomeMy WebLinkAbout17931 59th Ave Ne_BLD415_2026 (3) • COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community & Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223
Phone (360) 403-3551
THIS APPLICATION MUST BE ACCOMPANIED BY THREE (3) SETS OF CONSTRUCTION
PLANS, TWO (2) SETS OF STRUCTURAL CALCULATIONS, ONE (1) SET OF NREC ENERGY
CODE APPLICATIONS AND ONE (1) OCCUPANTS STATEMENT OF INTENDED USE.
Type of Permit: * Change of Use/Remodel O Commercial Addition
O Tenant Improvement
Project Address: 17931 59the Ave NE, Suite 2B, Arlington, WA 98233
Project Valuation: 15,000
Project Description: Build interior walls from the floor to ceiling steel support beams
Owner: Arlington Advanced Manufacturing Park, LLC
Address: 3316 Fuhrman
City: Seattle
State:
Washin
gton
ZIP: 98102
Contact Person: Brent Nicholson Phone: 12069799681
Cell Phone: 12069799681
E-mail: Brent@nicholsondev.com
Address: 3316 Fuhrman
City: Seattle
State:
Washi
ngton
ZIP: 98102
Contractor Information
Contractor Same as Yes 0 No
Applicant:
Contractor: Phone:
Address:
City: State: ❑ ZIP:
License Number: n/a Expiration: n/a
Project Name/Tenant: Shelby J. Eckroth
Site Address: 17931 59th Ave NE Bldg/Suite/Unit 213
IBC Construction II B IBC Occupancy Type: IF1
Type:
Description of Use: Production and processing of recreational cannabis
Building Square 17280 Number of Stories: 2
Footage:
Square Footage Per 16444 and 836
Floor:
Will there be any installation, modification or removal of the following?
(Check all that apply)
❑ Automatic fire extinguishing systems
❑ Compressed gas systems
❑ Fire alarm and detection systems
❑ Fire pumps
❑ Flammable and combustible liquids (tanks, piping etc...)
❑ Hazardous materials
❑ High piled/rack storage
❑ Industrial ovens/furnace
❑ Private fire hydrants
❑ Spraying or dipping operations
❑ Standpipe systems
❑ Temporary membrane structure, tents (>200sq ft) or canopies (>400 sq ft)
Provide details on any of the above checked items:
Installation, changes, modifications or removal of any of the above may require additional
submittals,information, or permits during the plan review or construction process.
Building Division:
The Building Division shall review any revisions and addenda. Approved copies will be given to the
contractor to maintain as part of the approved plan set.
The City Inspector will monitor the special inspection functions for compliance with the agreement
and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered
and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types
of special inspection required, and shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to
insure all required City approvals are obtained, prior to work shown on the revisions being
performed.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special
inspector or agency.
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC, the
approved plans and this document may void this agreement and the Building Officials approval of
the special inspector. In such case a new special inspector and/or firm would need to be proposed
for approval. A failure of the design and/or construction parties to perform in accordance with this
agreement may result in a STOP WORK notice being posted on the project, until nonconforming
items have been resolved.
ACKNOWLEDGEMENTS:
The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm
work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/
alarm permits require a separate permit application and may also require separate plan review.
Please note that any tenant improvement work in a space that involves food handling or preparation
requires Snohomish County Health District approval before the permit can be issued. You must
provide the Permit Center a copy of the approval letter or the approved plans. Contact the
Snohomish County Health District at (425) 339-5250 with any questions or for more information.
An intake appointment is required for all large Tenant Improvement Building Permit Applications. To
determine if your project requires an intake appointment, to schedule an appointment or to ensure
that you have the most current information, please contact the City of Arlington Permit Center at
(360) 403-3551 or by email to permitcenter&arlingtonwa.gov.
I have read and agree to comply with the terms and conditions of this agreement.
0
Please Attach Plans and Supporting Documents (PDF Only)
Wall Permit 062514.xlsx.pdf
STAFF USE ONLY:
Permit Number: Accepted Receipt #
By:
Date Received: Amount Received:
By submission of this form, I hereby certify that the above information is correct and that the
construction on, and the occupancy and the use of the above-described property will be in
accordance with the laws, rules and regulation of the State of Washington.
17931 59th Ave NE Suite 2B, Arlington Wa 98223
..............5
X
X
w
.4x1,-aas„K
I
sc„ D
D
D
� Bathroom
D 6' i
51' S1 51' 51 51' 51'
ROOM 2 ROOM 3 ROOM 4 ROOM 5 ROOM 6 ROOM 7
38 x 51=1938 51x24=1224 SIx24=1224 51x24=1224 53x24=1224 53x18+12
=1038
36'
33.6'
s
32'
23'
ROOM 1 D
54x39+133=2239
2' 4ft door 6'
D D D
5'door
6' 76'
D 8 5'door 4'door
ROOM 8
16'
22x142=3124
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
217'
Key WALLS
Yellow:new walls to be installed Hell IT
D Doors Materials:metal studs,
Purple:existing external doors and roll up doors gypsum board and are tape
* Blue arrow:sprinklers every B ft N-5
WI Window x1
scale is 1 sq ft per square
CITY OF ARLINGTON
` 18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551
BUILDING PERMIT
17931 59th Ave Permit#:415
PERMIT EXPIRES 180 DAYS AFTER
Parcel#: 31052200403100 DATE OF ISSUANCE.
Scope of Work:Production and Processing of Recreational Cannabis Valuation: 15000.00
OWNER APPLICANT CONTRACTOR
Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing
3316 Fuhrman Ave E,Ste 200 3316 Fuhrman Ave 3316 Fuhrman Ave
Seattle,WA 98102 Seattle,WA 98102 Seattle,WA 98102
206-979-9681 206-979-9681
LIC: EXP:
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: COMMERCIAL ALTERATION CODE YEAR: 2012
STORIES: 1 CONST.TYPE:
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: 1 OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is
determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City
ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE
OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
07/02/2014
Applicant Signature Date Building Official Date
CONDITIONS
See redlined plans for additional requirements-Adhere to approved plans.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The
property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment
or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant
authorities before commencing construction.The property owner shall ensure that the construction project complies with all
applicable design review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS,
MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
09/11/2026 Building Permit $334.61
09/11/2026 State Surcharge-1st DU $4.50
09/11/2026 Building Plan Review $217.50
Total Due: $556.61
Total Payment: $556.61
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
C20.BUILDING FINAL Completed
Permit#: 415
Permit Date: 06/26/14
Permit Type: COMMERCIAL ALTERATION
Project Name: Shelby Eckroth
Applicant Name: Arlington Advanced Manufacturing Park
Applicant Address: 3316 Fuhrman Ave
Applicant, City, State, Zip: Seattle,WA 98102
Contact: Brent Nicholson
Phone: 206-979-9681
Email: brent@nicholsondev.com
Scope of Work: Production and Processing of Recreational Cannabis
Valuation: 15000.00
Square Feet: 17143
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 07/02/2014
Permit Expires:
Permit Form Type:
Civic Plus Number:
Status: COMPLETE
Assigned To:
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31052200403100 17931 59th Ave Arlington Advanced
Manufacturing Park
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
#
Arlington Advanced Brent Nicholson 206-979-9681 3316 Fuhrman Ave CONSTRUCTION
Manufacturing CONTRACTOR
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
08/06/2014 C20.BUILDING 1502 Producer/Processor 08/06/2014 09/24/2014 z.Christopher Young Completed
FINAL
Plan Reviews
Date Review Type Description Assigned To Review Status
06/26/2014 COMMERCIAL Ok to issue with redlined drawings.Proposed square z.Christopher Young
ALTERATION footage equates to a Tier 2 operation per city ordinance.
06/26/2014 COMMERCIAL No comments,LT PW-ADMIN-GIS
ALTERATION
06/26/2014 COMMERCIAL Building#2 is protected by an RPBA.GS PW-WAT-REV
ALTERATION
06/26/2014 COMMERCIAL z.Tom Cooper
ALTERATION
06/26/2014 COMMERCIAL No Land-Use Issues
ALTERATION
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $334.61
State Surcharge- 1st DU Residential- 1st Unit $4.50
Building Plan Review Table 4-2 $217.50
Total $556.61
Attached Letters
Date Letter Description
07/02/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
07/02/2014 Shelby Eckroth 50822788 cc $556.61
Outstanding Balance $0.00
Uploaded Files
Date File Name
06/26/2014 415 Application.pdf
06/26/2014 415 Wall Permit 062514.xlsx.pddf
Date: 09/11/2026
Permit#: 415
Permit Date: 06/26/2014
Review Date: 06/26/2014
Permit Type: COMMERCIAL ALTERATION
Review Type: COMMERCIAL ALTERATION
Target Date: 07/03/2014
Scheduled Time:
Completed Date: 06/27/2014
Description: No comments, LT
Review Status:
Assigned To: PW-ADMIN-GIS
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31052200403100 Arlington Advanced Manufacturing Park
Arlington Advanced Manufacturing Park 3316 Fuhrman Ave E, Ste 200
17931 59th Ave Seattle,WA 98102
Zoning: Lot: Block:
Date: 09/11/2026
Permit#: 415
Permit Date: 06/26/2014
Review Date: 06/26/2014
Permit Type: COMMERCIAL ALTERATION
Review Type: COMMERCIAL ALTERATION
Target Date: 07/03/2014
Scheduled
Time:
Completed 06/27/2014
Date:
Description: Ok to issue with redlined drawings. Proposed square footage equates to a Tier 2 operation per
city ordinance.
Review Status:
Assigned To: z.Christopher Young
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31052200403100 Arlington Advanced Manufacturing Park
Arlington Advanced Manufacturing Park 3316 Fuhrman Ave E, Ste 200
17931 59th Ave Seattle,WA 98102
Zoning: Lot: Block: