Loading...
HomeMy WebLinkAbout17931 59th Ave Ne_BLD415_2026 (3) • COMMERCIAL REMODEL PERMIT APPLICATION Department of Community & Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 Phone (360) 403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY THREE (3) SETS OF CONSTRUCTION PLANS, TWO (2) SETS OF STRUCTURAL CALCULATIONS, ONE (1) SET OF NREC ENERGY CODE APPLICATIONS AND ONE (1) OCCUPANTS STATEMENT OF INTENDED USE. Type of Permit: * Change of Use/Remodel O Commercial Addition O Tenant Improvement Project Address: 17931 59the Ave NE, Suite 2B, Arlington, WA 98233 Project Valuation: 15,000 Project Description: Build interior walls from the floor to ceiling steel support beams Owner: Arlington Advanced Manufacturing Park, LLC Address: 3316 Fuhrman City: Seattle State: Washin gton ZIP: 98102 Contact Person: Brent Nicholson Phone: 12069799681 Cell Phone: 12069799681 E-mail: Brent@nicholsondev.com Address: 3316 Fuhrman City: Seattle State: Washi ngton ZIP: 98102 Contractor Information Contractor Same as Yes 0 No Applicant: Contractor: Phone: Address: City: State: ❑ ZIP: License Number: n/a Expiration: n/a Project Name/Tenant: Shelby J. Eckroth Site Address: 17931 59th Ave NE Bldg/Suite/Unit 213 IBC Construction II B IBC Occupancy Type: IF1 Type: Description of Use: Production and processing of recreational cannabis Building Square 17280 Number of Stories: 2 Footage: Square Footage Per 16444 and 836 Floor: Will there be any installation, modification or removal of the following? (Check all that apply) ❑ Automatic fire extinguishing systems ❑ Compressed gas systems ❑ Fire alarm and detection systems ❑ Fire pumps ❑ Flammable and combustible liquids (tanks, piping etc...) ❑ Hazardous materials ❑ High piled/rack storage ❑ Industrial ovens/furnace ❑ Private fire hydrants ❑ Spraying or dipping operations ❑ Standpipe systems ❑ Temporary membrane structure, tents (>200sq ft) or canopies (>400 sq ft) Provide details on any of the above checked items: Installation, changes, modifications or removal of any of the above may require additional submittals,information, or permits during the plan review or construction process. Building Division: The Building Division shall review any revisions and addenda. Approved copies will be given to the contractor to maintain as part of the approved plan set. The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed. Design Professionals: The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and shall include a schedule for inspection and testing. The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals are obtained, prior to work shown on the revisions being performed. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT: A failure of the special inspector or firm to perform in keeping the requirements of the IBC, the approved plans and this document may void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved. ACKNOWLEDGEMENTS: The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/ alarm permits require a separate permit application and may also require separate plan review. Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health District approval before the permit can be issued. You must provide the Permit Center a copy of the approval letter or the approved plans. Contact the Snohomish County Health District at (425) 339-5250 with any questions or for more information. An intake appointment is required for all large Tenant Improvement Building Permit Applications. To determine if your project requires an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of Arlington Permit Center at (360) 403-3551 or by email to permitcenter&arlingtonwa.gov. I have read and agree to comply with the terms and conditions of this agreement. 0 Please Attach Plans and Supporting Documents (PDF Only) Wall Permit 062514.xlsx.pdf STAFF USE ONLY: Permit Number: Accepted Receipt # By: Date Received: Amount Received: By submission of this form, I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. 17931 59th Ave NE Suite 2B, Arlington Wa 98223 ..............5 X X w .4x1,-aas„K I sc„ D D D � Bathroom D 6' i 51' S1 51' 51 51' 51' ROOM 2 ROOM 3 ROOM 4 ROOM 5 ROOM 6 ROOM 7 38 x 51=1938 51x24=1224 SIx24=1224 51x24=1224 53x24=1224 53x18+12 =1038 36' 33.6' s 32' 23' ROOM 1 D 54x39+133=2239 2' 4ft door 6' D D D 5'door 6' 76' D 8 5'door 4'door ROOM 8 16' 22x142=3124 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 217' Key WALLS Yellow:new walls to be installed Hell IT D Doors Materials:metal studs, Purple:existing external doors and roll up doors gypsum board and are tape * Blue arrow:sprinklers every B ft N-5 WI Window x1 scale is 1 sq ft per square CITY OF ARLINGTON ` 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551 BUILDING PERMIT 17931 59th Ave Permit#:415 PERMIT EXPIRES 180 DAYS AFTER Parcel#: 31052200403100 DATE OF ISSUANCE. Scope of Work:Production and Processing of Recreational Cannabis Valuation: 15000.00 OWNER APPLICANT CONTRACTOR Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing 3316 Fuhrman Ave E,Ste 200 3316 Fuhrman Ave 3316 Fuhrman Ave Seattle,WA 98102 Seattle,WA 98102 Seattle,WA 98102 206-979-9681 206-979-9681 LIC: EXP: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL ALTERATION CODE YEAR: 2012 STORIES: 1 CONST.TYPE: DWELLING UNITS: 0 OCC GROUP: BUILDINGS: 1 OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. 07/02/2014 Applicant Signature Date Building Official Date CONDITIONS See redlined plans for additional requirements-Adhere to approved plans. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 09/11/2026 Building Permit $334.61 09/11/2026 State Surcharge-1st DU $4.50 09/11/2026 Building Plan Review $217.50 Total Due: $556.61 Total Payment: $556.61 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail C20.BUILDING FINAL Completed Permit#: 415 Permit Date: 06/26/14 Permit Type: COMMERCIAL ALTERATION Project Name: Shelby Eckroth Applicant Name: Arlington Advanced Manufacturing Park Applicant Address: 3316 Fuhrman Ave Applicant, City, State, Zip: Seattle,WA 98102 Contact: Brent Nicholson Phone: 206-979-9681 Email: brent@nicholsondev.com Scope of Work: Production and Processing of Recreational Cannabis Valuation: 15000.00 Square Feet: 17143 Number of Stories: 1 Construction Type: Occupancy Group: ID Code: Permit Issued: 07/02/2014 Permit Expires: Permit Form Type: Civic Plus Number: Status: COMPLETE Assigned To: Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 31052200403100 17931 59th Ave Arlington Advanced Manufacturing Park Contractors Contractor Primary Contact Phone Address Contractor Type License License # Arlington Advanced Brent Nicholson 206-979-9681 3316 Fuhrman Ave CONSTRUCTION Manufacturing CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status 08/06/2014 C20.BUILDING 1502 Producer/Processor 08/06/2014 09/24/2014 z.Christopher Young Completed FINAL Plan Reviews Date Review Type Description Assigned To Review Status 06/26/2014 COMMERCIAL Ok to issue with redlined drawings.Proposed square z.Christopher Young ALTERATION footage equates to a Tier 2 operation per city ordinance. 06/26/2014 COMMERCIAL No comments,LT PW-ADMIN-GIS ALTERATION 06/26/2014 COMMERCIAL Building#2 is protected by an RPBA.GS PW-WAT-REV ALTERATION 06/26/2014 COMMERCIAL z.Tom Cooper ALTERATION 06/26/2014 COMMERCIAL No Land-Use Issues ALTERATION Fees Fee Description Notes Amount Building Permit Table 4-1 $334.61 State Surcharge- 1st DU Residential- 1st Unit $4.50 Building Plan Review Table 4-2 $217.50 Total $556.61 Attached Letters Date Letter Description 07/02/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 07/02/2014 Shelby Eckroth 50822788 cc $556.61 Outstanding Balance $0.00 Uploaded Files Date File Name 06/26/2014 415 Application.pdf 06/26/2014 415 Wall Permit 062514.xlsx.pddf Date: 09/11/2026 Permit#: 415 Permit Date: 06/26/2014 Review Date: 06/26/2014 Permit Type: COMMERCIAL ALTERATION Review Type: COMMERCIAL ALTERATION Target Date: 07/03/2014 Scheduled Time: Completed Date: 06/27/2014 Description: No comments, LT Review Status: Assigned To: PW-ADMIN-GIS Time In: Time Out: Hours: Property Information Parcel#: 31052200403100 Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing Park 3316 Fuhrman Ave E, Ste 200 17931 59th Ave Seattle,WA 98102 Zoning: Lot: Block: Date: 09/11/2026 Permit#: 415 Permit Date: 06/26/2014 Review Date: 06/26/2014 Permit Type: COMMERCIAL ALTERATION Review Type: COMMERCIAL ALTERATION Target Date: 07/03/2014 Scheduled Time: Completed 06/27/2014 Date: Description: Ok to issue with redlined drawings. Proposed square footage equates to a Tier 2 operation per city ordinance. Review Status: Assigned To: z.Christopher Young Time In: Time Out: Hours: Property Information Parcel#: 31052200403100 Arlington Advanced Manufacturing Park Arlington Advanced Manufacturing Park 3316 Fuhrman Ave E, Ste 200 17931 59th Ave Seattle,WA 98102 Zoning: Lot: Block: