HomeMy WebLinkAbout19129 Smokey Point Blvd_BLD379_2026 (3) BUILDING INSPECTION REPORT — Commercial Final
Permit No. 379
Address: 19129 Smokey Point Blvd
Contractor: Cascade Kropz — Lisa Kihm
Owner: R & B Development, LLC
Date: 7/7/2014
® APPROVAL ❑ PARTIAL APPROVAL
❑ CORRECTION ❑ OTHER
INSPECTION: 1502 Retail Business — Remodel of existing space
ADDRESS NUMBERS: ❑ ACCESS: ❑
ADA EXTERIOR: ® ADA INTERIOR:
FIRE EXTINGUISHERS: ® SPRINKLER: ❑
FINAL ELECTRICAL: ® FIRE ALARM: ❑
LIFE SAFETY: ® LANDSCAPING: ❑
OCCUPANCY LOAD SIGN: ❑ SIGNAGE: ❑
RATED ASSEMBLY: ❑ FIRE FINAL:
ELEVATOR FINAL: ❑ BLDG FINAL:
Date: 7/7/2014 Inspector: YOUNG
COMMERCIAL CHANGE-OF-USE PERMIT PACKET Department of Community&E... Page 1 of 2
COMMERCIAL CHANGE-OF-USE
PERMIT PACKET
Department of Community&Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223
Phone (360)403-3551
Existing Use(s): storage J
Proposed Use(s): Imerchantile
Project Address:* 19129 Smokey Point Blvd. S Parcel ID# 1310517004001
Project Valuation:* ($6,000 (cost of proposed renovation)
Project Description:* add parkin lot, interior remodel l
Legal Description:* Section 17 Township 31 Range 05 Quarter SE PAR 3 OF SNOT
Owner:* JR & B Developers LLC
Address:* L0226 State Ave i
City: �Mar sville State:* WA ZIP: 982T1
*
Contact Person:' Lisa Kihm Phone:* 425-923-0591
Cell Phone: 1425-923-0591 — Fax Number:
E-mail: cascadekropz@gmail.com
Address: A429 Ave D#199
City: (Snohomish State: WA ZIP: 98290
Contractor Information
Contractor: Cascade Kropz LLC Phone: 425-923-0591
*
Address: 1429 Ave D#199
City: Snohomish State: [WA ZIP:* 98290
License Number:* n/a Expiration: n/a
Plumbing Contractor:* n/a I Phone: n/a ]
*
https:Hadobeformscentral.com/?f=yR8vwVbVwaScAiG7-B21rw 5/21/2014
COMMERCIAL CHANGE-OF-USE PERMIT PACKET Department of Community&E... Page 2 of 2
Address:* n/a
City: n/a State: n/a I ZIP:* n/a
*
License Number: Expiration: n/a
Mechanical Contractor: n/a Phone: n/a
*
Address: n/a
City:* n/a State: n/a ZIP:* n/a
License Number:* in/a Expiration: n/a
Prev Next Page 2 of 3 5%Complete
Report Abuse I Terms of Us. Powered by Adobe FormsCentral
https://adobeformseentral.com/?f=yR8vwVbVwaScAiG7-B21rw 5/21/2014
COMMERCIAL CHANGE-OF-USE PERMIT PACKET Department of Community &E... Page 1 of 2
COMMERCIAL CHANGE-OF-USE
PERMIT PACKET
Department of Community&Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223
Phone(360)403-3551
Project Name/Tenant:` lCascade Kropz LLC
Site Address: 119129 Smokey Point Blvd. ] Bldg/Suite/Unit Suite B
IBC Construction Type: III IBC Occupancy Type: JGroup M
Description of Use: Iretail sale of useable marijuana, marijuana-infused products and m,
Building Square Footage: 11750 Number of Stories:* 12
Square Footage Per 875
Floor:
Will there be any installation, modification or removal of the following?
(Check all that apply)
❑ Automatic fire extinguishing systems
❑ Compressed gas systems
❑ Fire alarm and detection systems
❑ Fire pumps
❑ Flammable and combustible liquids (tanks, piping etc...)
❑ Hazardous materials
❑ High piled/rack storage
❑ Industrial ovens/furnace
❑ Private fire hydrants
❑ Spraying or dipping operations
❑ Standpipe systems
❑ Temporary membrane structure, tents (>200sq ft) or canopies (>400 sq ft)
Provide details on any of the above checked items:
Installation, changes, modifications or removal of any of the above may require additional
submittals,information, or permits during the plan review or construction process.
I have read and agree to comply with the terms and conditions of this agreement.
https://adobeformscentral.com/?f=yR8vwVbVwaScAiG7-B21rw 5/21/2014
COMMERCIAL CHANGE-OF-USE PERMIT PACKET Department of Community &E... Page 2 of 2
Please Attach Plans and Supporting Documents (PDF Only)"
Select File
STAFF USE ONLY:
Permit Number: Accepted 0 Receipt# 0
By:
Date Received: g� Amount Received:
By submission of this form, I hereby certify that the above information is correct and that the
construction on, and the occupancy and the use of the above-described property will be in
accordance with the laws, rules and regulation of the State of Washington.
Prev Submit Page 3 of 3
Report Abuse I Terms of Use Powered by Adobe FormsCentral
https://adobefonnscentral.com/?f=yR8vwVbVwaScAiG7-B21rw 5/21/2014
COMMERCIAL CHANGE-OF-USE PERMIT PACKET Department of Community & E... Page 1 of I
COMMERCIAL CHANGE-OF-USE
PERMIT PACKET
' Department of Community&Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223
Phone(360)403-3551
The following minimum information is required for your Commercial Change-of-Use Permit
Application. Mark each box to designate that the information has been provided. Please submit this
checklist as part of your submittal documents. Incomplete applications will not be accepted.
A Change-of-Use in occupancy is any proposed use that is not consistent with the current permitted
use of the building or portion thereof. Occupancy classification is based on the uses outlined in the
State adopted Codes.
Existing Use(s): Check all that apply Proposed Use(s): Check all that apply
Assembly Institutional Assembly l_. Institutional
[] Business ❑ Mercantile � a Business Mercantile
[.] Educational [] Residential [] Educational [ Residential
Factory W1 Storage [:] Factory [ Storage
Submittal Requirements Checklist
One (1) City of Arlington Commercial Change-of-Use Permit Application(One permit
application per building or structure is required)
[] One (1) City of Arlington Commercial Change-of-Use Submittal Requirements Form
� ] Three (3)Architectural Drawings
[, Two (2) Structural Drawings (if applicable)
[ Two(2) Structural Calculations (if applicable)
�] One (1) NREC Code Compliance Forms
[J] One (1) Occupant's Statement of Intended Use Form
One(1) Letter of Verification of Water and Sewer Availability from City of Marysville
(if applicable)
A Change-of-Use of an existing occupancy may trigger impact fees. The City of Arlington
recommends a General Information Meeting (GIM)for any proposed Change-of-Use. GIM
meetings are held every Wednesday on a first come-first serve basis. Please call (360)-403-
3551 to schedule an appointment.
Next Page 1 of 3
Report Abuse I Terms of Use Powered by Adobe FormsCentral
https://adobefonnscentral.com/?f=yR8vwVbVwaScAiG7-B21rw 5/21/2014
s7/ 14
C KiZoPZ t.�
I`1l2q �mo�G2 P % ot r)It/d. t5Llr(-e 13
forl ) WA-
16T-I)q WA94WO L4 5� ey��
LOCA-VOM 0V ,4PfE P4V-V—1 �1.�j KkWiffsc
1-�SA. lLi �►.n 425- qZ-3,06ql
�jC157"I J�(EJ
loox 100
EIe'.VA.-vyl` zqa:(r �
61-braqt
AA �Rcc�Ess
Gravel � ,�- 20ol
�arkrn9 RA�n� w/hr�nr� il5
b/IS/)¢
C4�pCaC�% I<Irop z.
up
FGa
I q I Z q S rn okey Po'l nt 81 vd. �--
sui+� 8
Arlio9+vn ) WA
y -1
LiSa 4z5-qa3-e59r
C,atpcade, Kropr,
proposed Ghan�es
WM.L-f Wm,�T
4-11
?oiRreF
�� ctc�jccs-r Oyv Ly
T It 4V 7"/1 O�LA
V/ W
r
t�,��► s � ID CI�tB�K-
co►►�r'uc�rf' l� WiNDow
�ubU� z�lq
M Ac,KnDooR
u i en+tr on y
EXi+ D o►'
s unlo
on ►ns� � �Fair�-
UniSP.�,� XAA � �� LIT EA(T 51(µf
I R ZR Smol�e�d �fi $�vA. P 4
ILI
Arl ing-IT � W�1- OAL IT y jr
�sa +26-q2-3 -�lr ,�r� �r� -:�
CAtA4VE*o KROM Ivu
pff,y- MY jalu-m Smo Podio+ b1m. 5u'rf-�P
96
Tub lotA1)A
Ind OX20/ �J�I
hand ►�.`rl
C�r►n'� iarl ��-v�
610ptnot
s��p�
CITY OF ARLINGTON
` 18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551
BUILDING PERMIT
19129 SMOKEY POINT BLVD Permit#:379
PERMIT EXPIRES 180 DAYS AFTER
Parcel#: 31051700400100 DATE OF ISSUANCE.
Scope of Work: Change from Storage to Merchantile Valuation: 6000.00
OWNER APPLICANT CONTRACTOR
R&B DEVELOPERS LLC Lisa Kihm CK INVESTMENT GROUP LLC
10226 STATE AVE 1429 Ave D#199 1429 AVENUE D PMB#344
MARYSVILLE,WA 98271 Snohomish,WA 98290 SNOHOMISH,WA 98290
425-923-0591 425-923-0591
LIC: EXP:
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: CHANGE OF USE CODE YEAR:
STORIES: CONST.TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is
determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City
ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE
OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
05/29/2014
Applicant Signature Date Building Official Date
CONDITIONS
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The
property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment
or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant
authorities before commencing construction.The property owner shall ensure that the construction project complies with all
applicable design review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS,
MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
09/11/2026 Building Permit $166.58
09/11/2026 State Surcharge- 1st DU $4.50
09/11/2026 Building Plan Review $108.28
09/11/2026 Traffic Mitigation-C/MF $7,583.77
Total Due: $7,863.13
Total Payment: $7,863.13
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
INSPECTION INFORMATION I Pass/Fail
Permit#: 379
Permit Date: 05/27/14
Permit Type: CHANGE OF USE
Project Name: Cascade Kropz
Applicant Name: Lisa Kihm
Applicant Address: 1429 Ave D#199
Applicant, City, State, Zip: Snohomish, WA 98290
Contact: Lisa Kihm
Phone: 425-923-0591
Email: cascadekropz@gmail.com
Scope of Work: Change from Storage to Merchantile
Valuation: 6000.00
Square Feet: 0
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 06/02/2014
Permit Expires:
Permit Form Type:
Civic Plus Number:
Status: COMPLETE
Assigned To:
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
19129 SMOKEY POINT R&B 399 Other
31051700400100 BLVD DEVELOPERS LLC Miscellaneous
Manufacturing NEC
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
CK INVESTMENT 425-923-0591 1429 AVENUE D OWNER
GROUP LLC PMB#344
Plan Reviews
Date Review Type Description Assigned To Review Status
05/27/2014 CHANGE OF USE Ok to issue z.Christopher Young
05/27/2014 CHANGE OF USE Marc Hayes
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $166.58
State Surcharge-1st DU Residential-1st Unit $4.50
Building Plan Review Table 4-2 $108.28
Traffic Mitigation-C/MF Commercial/Multi-family 2.26 trips @$3,355.00 $7,583.77
Total $7,863.13
Attached Letters
Date Letter Description
05/29/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
06/02/2014 Lisa Kihm 50486318 cc $7,863.13
Outstanding Balance $0.00
Uploaded Files
Date File Name
07/07/2014 19129 Smoke y Point.docx
05/27/2014 BLD 379 Application.pdf
05/27/2014 BLD 379 Plans.pdf