HomeMy WebLinkAbout17323 Smokey Point Blvd_BLD281_2026 (3) DEMOLITION
PERMIT APPLICATION
Department of Community Development
City of Arlington-238 N Olympic Ave. -Arlington,WA 98223-Phone(360)403 3551 -FAX(360)403 3418
THIS APPLICATION MUST BE ACCOMPANIED TWO(2)SETS OF FULLY DIMENSIONED PLOT PLANS AND SITE CLEAN-UP
PLAN, TWO(2)COPIES OF AN ASBESTOS ABATEMENT REPORT COMPLETED BYAN APPROVED AGENCY.
Typo of Permit:(chock ono) 0 Residential ®Commercial
Project Address; 17323 Smokey point Blvd,Arlington WA 98223 Parcel ID#: 31052100305300
Lot#; 2 Subdivision: Dwelling Valuation: $30,000
Building Area(Sq Ft) 429 No.of floors: 1 Number of Buildings:(R01)
Owner: J&J GROUP LLC Phone Number. 425-647-0130
Address: 7630 116TH CT SE city. NEWCASTLE State: WA zip Code: 98056
Contact Person:Jaskaran Sarao Ph a Number. 425449-2860
Cell Phone: 425-647-0130 IoFax:CALL &TNLc t E-mail: jjgrpz@gmail.com
Address: 12326 SE 23rd PL City: BELLEVUE State: WA Zip Code: 98005
Scope of work:
I
I
Contractor: AJ Group LLC Phone Number. 4256470130
Address; 7630 116TH CT SE City: NEWCASTLE State: WA zip Code: 98056
Contractor's License Number; Property Owner Expiration:
t
I hereby certify that the above Information is correct and that the construction on,and the occupancy and the use of the above-
described property will be in acc rdance with the laws,rules and regulations of the Stat of Washington.
01/27/2013
Applicants Signature Date
Jaskaran Sarao
Print Applicants Name
Received
FOR STAFF USE ONLY JAN2014
aba-81 -0)0
Pff—
Permit# Accepted By Amount Received Receipt# Date Received
WEB Fors—125 Page 1 of 1 711OCJY
Generated by CamScanner from intsig.com
0
(D
CD
N
CD
OL
cr
�G
67�t{aT.F.TF�:'I:M i3�':li'.' Ata.;I1P•�.1 J�l1RAI+
N
in
C�
:3 PRE-DEMOUno-N PSPUMON REFORr
CD
TWES N—ImmArrn.o Ccr[ifird aF1FF:a ]ncncvt�r
L fTiTh Jai -tea �S�'a1_
i•
cn
CQ -
O
L�aTIIC?�t'i 81L40a 'ifnE aPV-�w an-AHOU PRE-DE►lGLMONI
asww T��-**Ate` �� *L:���.r��m��r�-t�of the m. cur v►•as m
rm ��Cr - Brier to aier abcdnhd demolition
of&.-inqzc6m_a1]Nan auaial wNr iess.and mo,%imWc crom_
hu 1bm sampiks umm ot1Ma=d M dgxb m the gmfam of the
Sibm e:.Tit"e a-E=='6 Sammks with 11]w»in WnL awi h hatch#13191K7.00.
T��hae OWSBOVks um COUtBC25d IbE=Ti=S o f a d&d PZT-,N AI AP cxstified Labotamry;
(40 CFR Pan i4J),and TSCA
Tide ii Afs' s'ASELARA(40 CFR Paz 7-673)A re—gu3aticum
Tlrc vur as d'%-md umr pmb=ed hgb m (PLNO a-th dispersion
US EPA=cfficnd 6C*R-9;116 as wed in 40 CFR Chapter 1(71-
f«a3a y Plle,71532-Sir F--'p,-=adm A_�ew s99-m.Pcdwizm_t,lighl IMM-WVY
at bemeim 1 OT,;and 1%detemicm]e\tk Levels blow 1%
cm 0IEr kae cam as'�aae'
i 16 ALat�II;.�*+^r+^x, �1L'S �ap YbS 3�21.7�!�T rC�4L'C��7tT I�S�IC MT�11N15
asP.sr*urmrr.�:r..yrV•�s ice;sae irsiac a ix�In-s:i ae�m:- >�-e�,�scea.�;tr!-��cxn?��m•iv aqv r1�aFe
=ttrialz mm an-mTd m this repwi tmtet lit
tears:�srtritc:�.tsa i!+a�2 4 v isti'�t C+,ILXr mt.\1L�P la?vcat e�.
St18Y OF FL'►TeZGS
s.Frsc Page 1
Poi(a-1 V-r-lk t LS&;,F.�:fk l o(D•t Oki.
G)
CD
I
CD
CD
Cl
Cy
The followma Lli!ia Ou."x"i li I '!IC ;aIlIt"I t. II:
3
Cn mareritdx
0 Table 4 1
Sam ph! [d Dtm,-.vnt:n
CD
I Latter I tv
-01 L-11 cr
0
A-Q2
Laver I w-"aill-Icar.i nd 7
lw=m
A 02 LaVer 2 (I. -qum B1mder
Cn A0_,Laver I Reetvm, rzhum ffi:cr
2 B finder caic. Lw-
0 A-04.-'Laver 2 Nfetal bindt=-MvIc--ilaatr:� �14=
0:_
3 Lamer I Rwdna
er
A-O&T-ayer'27
-A A-06/Uyer I C—effim!r
The findings in this report ar--ccnsfim=wiam.—� Pe m: =m==m;mkds�n=mi�
7-cm-- --m
prescribed by the EPA and AHM-�-Lab _zr=CC=ma:c,
IrtfiF
TLCOTMIN -
Apr
Project Lacatarr. i7323 Smj,.rf Il9stok 41 3--z
Project 0 1 SARAO
AIIEItA INSPECTION REPORT ALC 500- l/SAMo
PROJECT BACKGROUND INI'-ORMATION
The building is approximately 780 sf in size,and the property will be demolish.
LAR,as an inspection team,followed all the proper rules for handling samples;and was
particularly watchful on handling the samples taken from the referenced property.
CONCLUSIONS AND RECOMMENDATIONS
NEGATIVE ACM/NON-Asbestos-Containing Materials(ACM),(see table# 1)
ALL MATERIALS SAMPLED NEGATIVE FOR ASBESTOS CONTAINING
MATERIALS.
All analyzed testing performed by NVL Laboratories.
The sampled material in tables#1.
The results,assessments,conclusions and recommendations stated in this report are factually representative of the
conditions and circumstances observed at this project location on the dates of inspection. We cannot assume
responsibility for any change in conditions or circumstances that occurred after the inspection.Therefore any
materials not surveyed in this report must be treated as Asbestos Containing Materials(ACM)until determined
otherwise by a Certified Asbestos Inspector and NVLAP certified laboratory.
ALCOTRAIN Page
PH(425)425-306.4583.FAX(206)902-1063.
AHERA INSPECTION REPORT NOV 14TM,2013
Project Location: 17323 Smokey Point Blvd, Arlington, WA
Project 0 3.SARAO
Generated by CamScanner from intsig.com
AHIiRA INSPECI-IoN IiliPrlliT ALC 500.01/SARAo
QUALITY CONTROI, PROCEDt)RE'S
The integrated resourees,technologies,and discipline to Conduct the inspection and analysis
based on the following principles:
• All applicable regulations are nddressed in order to assure that our field inspection and
lab personnel meet their responsibilities,do so cost-effectively,and arc equipped with the
practical knowledge they need in order to understand and comply with regulations that
affect them.
• Care is taken to make certain that the information provided and actions recommended are
practical and cost effective in achieving regulatory compliance.
• All project results,reports and recommendatiotls arc reviewed for accuracy,content and
quality prior to presentation. We recognize that the information in each assignment we
undertake,that the information we develop,and the conclusions and advice we provide
will be used to support important management decisions.
Quality Assurance Program outline:
• Provide specific objectives so that project activities can be evaluated with regards to
precision,accuracy,reproducibility,completeness,and comparability.
• Provide specific guidance on the proper methodology for all activities.
• Be provided with ongoing training to enhance their technical skills.
• Be trained in QA/QC procedures and QC activities.
• Review all reports until they are acceptable in terms of technical and editorial quality and
all quality assurance activities have been successfully performed.
ASBESTOS INSPECTION&BULK SAMPLING METHODOLOGY
Asbestos Building Inspectors are certified under the requirements of the Environmental
Protection Agency(EPA)Asbestos Hazard Emergency Response Act(AHERA)40 CFR 763,
Subpart E.
Written report meets the Washington state"Good Faith Inspection"requirements as cited in
RCW 49.26.016 and implemented by Labor and Industries(L&n regulation,WAC 296-62-
07721, and reg.III, article 4 of the Puget Sound Clean Air Agency(PSCAA). This report
identifies the location,quantity,and asbestos concentration of all suspect building materials,and
the analytical reports from subcontracted laboratories.
Field information was organized as per the AHERA concept of Homogeneous Area(HA).A HA
is defined as a suspect material of similar age,appearance, function and texture.Each material
was grouped together as'a specific HA,sampled and then assessed for condition.
Bulk samples of suspect ACM were analyzed by Polarized Light Microscopy(PLM)with
dispersion staining. By: NVL Laboratories a National Voluntary Laboratory Accreditation
Program(NVLAP),accredited laboratory to analyzed samples for ACM content.
ALCOTRAIN Page
PH(425)425-306-4583,FAX(206)902-1063.
AHERA INSPECTION REPORT NOV 14-,2013
Project Location; 17323 Smokey Point Blvd, Arlington, WA
Project#1 3. SARAO
V C�1141 UL%-, a LJY VGI 1 IIJ%,GI 11[%-1 11 VI 11 111 LQ711�.1iV1
AI(ERA INSPECTION REPORT ALC 500.01/SARAO
For the purposes of this inspection,suspect Asbestos Containing Matcrial(ACM)has been
placed in three(3)material categories: thermal systems insulation(TS1),surfacing materials and
miscellaneous materials.Only materials containing more than 1%total asbestos are classified as
asbestos containing material (ACM).
The number of samples collected and their locations were based on the AHERA regulations and I'
the guidelines provided by the EPA document 560/5-85-030a October 1985,Asbestos in
buildings:Simplified Sampling Scheme for Friable Surfacing Materials. j
Once collected each bulk sample was sealed in an unadulterated plastic bag. Chain of custody, j
procedures were followed to maintain sample integrity,during handling and data reporting at
LAR,Inc and the analytical laboratory as specified in code 40 of Federal regulations(CFR)
Chapter 1 (1-1-87edition)Part 763, Subpart F,Appendix A.Each sample was analyzed using
polarized light microscopy(PLM)/dispersion staining techniques,in accordance to US
EPA Method 600/R- 3/116 by NVL Laboratories.
CORE SAMPLES
Core samples of friable and non-friable suspect materials were collected by penetrating the
suspect material to its substrate.The bulk samples collected were placed in sealed containers,
labeled with an identifying code and a sample log was kept-Representative samples of each
sampling area were then submitted to the laboratory to be analyzed for asbestos content.The
inspection involved the following tasks:
• A visual determination as to the extent of visible and accessible suspect materials and
conditions of the material.
• Collection of suspect building materials for asbestos content.
• A Chain of Custodyrecord was prepared to accompany bulk samples to the laboratory.
The assessment process includes classifying the material as Friable ACM or Non-Friable ACM.
Friable ACM is the term given to any material that contains more than one percent(11/6)asbestos
by weight and can be crumbled,pulverized,or reduced to powder by hand or mechanical
pressure.
Limitations of Survey
Asbestos inspections are non-comprehensive by nature and our assessment is limited to only
those locations inspected and sampled. This survey was not designed to identify all potential
concerns or eliminate all risk associated with abatement. No warranty,express or implied,is
' made.LAR,INC is not responsible for materials which require destructive means to access,or
materials which are hidden from sight,those materials hidden behind walls,or materials which
cannot be found with reasonable diligence. Suspect materials that may be present inside crawl
space cavities,electrical wiring or which were otherwise inaccessible were not included in the
scope of findings for this inspection.
AHERA Inspection Nov 1411,2013
ALCOTRAIN Page 5
PH(425)425-3064583 FAX(206)902-1063
AHERA INSPECTION REPORT NOV 14",2013
ProjectLocation: 17323 Smokey Point Blvd, Arlington, WA
Project# 1.SARAO
i
fi
AHERA INSPECTION REPORT ,1':z sa'-%j f
AHERA REPORT Nov 14th,2013
AHERA Asbestos Inspector VICTOR ARROYO
Certification# 3509-12-04-5658
Expiration 04/20/2014
Project Location: 17323 Smokey Point Blvd, Arlingtozi, kA
Customer: I. SARAO
*attachmentr.NVL Laboratories data maMskeport;LAR chain of cw&Dd3•.
ALCOTRAIN Page 6
PH(425)425•3064553.FAX(206)902.1063.
ProjectLocatlon: 17323 Srwkey Point Blvd, Arlington, WA AHERA 1NSPEcnM REPORT NOV 14-.2M3
Project# J.SARAO
Generated by CamScanner from intsig.com
CITY OF ARLINGTON
` 18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551
BUILDING PERMIT
17323 SMOKEY POINT BLVD Permit#:281
PERMIT EXPIRES 180 DAYS AFTER
Parcel#: 31052100305300 DATE OF ISSUANCE.
Scope of Work:Deomolition of house Valuation: 30000.00
OWNER APPLICANT CONTRACTOR
J&J Group,LLC Jaskaran Sarao J&J Group,LLC
7630 116th CT SE 12326 SE 23rd PI 7630 116th CT SE
Newcastle,WA 98056 Bellevue,WA 98005 Newcastle,WA 98056
425-647-0130 425-449-2860 425-449-2860
LIC: EXP:
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: DEMOLITION CODE YEAR:
STORIES: CONST.TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is
determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City
ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE
OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
01/30/2014
Applicant Signature Date Building Official Date
CONDITIONS
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The
property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment
or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant
authorities before commencing construction.The property owner shall ensure that the construction project complies with all
applicable design review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS,
MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
09/08/2026 Demolition $100.00
09/08/2026 State Surcharge-1st DU $4.50
Total Due: $104.50
Total Payment: $104.50
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
INSPECTION INFORMATION I Pass/Fail
Date: 09/08/2026
Permit#: 281
Permit Date: 01/29/2014
Review Date: 01/29/2014
Permit Type: DEMOLITION
Review Type: Residential Demolition
Target Date: 01/31/2014
Scheduled Time:
Completed Date: 01/29/2014
Description: Asbestos survey indicates no ACM's involved. Demo permit can be issued.
Review Status:
Assigned To: z.Christopher Young
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31052100305300 J&J Group, LLC
J&J Group, LLC 7630 116th CT SE
17323 SMOKEY POINT BLVD Newcastle,WA 98056
Zoning: 581 Eating Places (Restaurants)Lot: Block: 425-647-0130
Permit#: 281
Permit Date: 01/29/14
Permit Type: DEMOLITION
Project Name: J&J Group
Applicant Name: Jaskaran Sarao
Applicant Address: 12326 SE 23rd PI
Applicant, City, State, Zip: Bellevue,WA 98005
Contact: Jaskaran Sarao
Phone: 425-449-2860
Email:jjgrpz@gmail.com
Scope of Work: Deomolition of house
Valuation: 30000.00
Square Feet: 429
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 01/31/2014
Permit Expires:
Permit Form Type:
Civic Plus Number:
Status: COMPLETE
Assigned To:
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31052100305300 17323 SMOKEY POINT J&J Group,LLC 425-647-0130 581 Eating Places
BLVD (Restaurants)
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
#
J&J Group,LLC Jaskaran Sarao 425-449-2860 7630 116th CT SE CONSTRUCTION
CONTRACTOR
Plan Reviews
Date Review Type Description Assigned To Review Status
O1/29/2014 Residential Demolition Asbestos survey indicates no ACM's involved.Demo z Christopher Young
permit can be issued.
Fees
Fee Description Notes Amount
Demolition $100.00
State Surcharge- 1st DU Residential- 1st Unit $4.50
Total $104.50
Attached Letters
Date Letter Description
O1/30/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
O1/31/2014 J&J Group,LLC Jaskaran 49042770 cc $104.50
Saran
Outstanding Balance $0.00
Notes
Date Note Created By:
O1/29/2014 City of Marysville Utilities.Application information has been sent to Marysville. Amy Rusko
Uploaded Files
Date File Name
O1/29/2014 BLD 281.pdf
O1/29/2014 Property Info.pdf
Sn o h o m i s h Online Gowromsnt Information :Sorvices
County 4�
Weshingiton
Structure Information
Close Window
General Description
Parcel Number 31052100305300 (R01)
Structure Class Dwelling
Structure Type 1 Story
Year Built 1968
Exterior Features
Foundation Cone or CB
Exterior T 111 Plywood
ROOF Type: Gable Pitch Medium Cover Composition
Interior Features
Bedrooms 1
Full or 3/4 Baths 1 1/2 Baths 0
Heat Wall Units
Floor Area
Floor 1 Base SF 429 Finished SF 429
Garage(s) & Carport(s)
None
Other Features
r•
•.L_
r r
r _ �
I 1
.J�
04
iR
rr
� y
• y •, �w
•
0 jl 1S U�L� I
1 w�►�i. �ti� ��M
` � `
f
J �/ �
C }R � I ��77_'-rTrT.
� � , te�
� T .�
� / •`7"
• �.
r , (i � 1
t • � �
•�
.T-� -