HomeMy WebLinkAbout19002 59th Dr Ne_BLD259_2026 (3) BUILDING INSPECTION REPORT — Commercial Final
Permit No. 259
Address: 19002 59th Dr.
Contractor: Alliance Partition Systems
Owner: Mission Aviation Academy
Date: 2/5/2014
® APPROVAL ❑ PARTIAL APPROVAL
❑ CORRECTION ❑ OTHER
INSPECTION: Building Final
ADDRESS NUMBERS: ❑ ACCESS: ❑
ADA EXTERIOR: ❑ ADA INTERIOR: ❑
FIRE EXTINGUISHERS: ® SPRINKLER:
FINAL ELECTRICAL: ® FIRE ALARM: ❑
LIFE SAFETY: ® LANDSCAPING: ❑
OCCUPANCY LOAD SIGN: ❑ SIGNAGE:
RATED ASSEMBLY: ❑ FIRE FINAL:
ELEVATOR FINAL: ❑ BLDG FINAL:
Date: 2/5/2014 Inspector: Young
COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington • 18204 591h Ave NE•Arlington, WA 98223 • Phone (360)403-3551
THIS APPLICATION MUST BE ACCOMPANIED BY THREE(3) SETS OF CONSTRUCTION PLANS, TWO(2) SETS
OF STRUCTURAL CALCULATIONS, ONE(1) SET OF NREC ENERGY CODE APPLICATIONS AND ONE(1)
OCCUPANTS STATEMENT OF INTENDED USE.
Type of Permit: F1Change of Use/Remodel ❑ Commercial Addition Tenant Improvement
Project Address: 19002 49th Dr NE, Arlington, WA 98223 Parcel ID#:
Project Description Mission Aviation Training Academy Legal Description:
Project Valuation: $48,000
Owner: Mission Aviation Training Academy Phone Number: 425-231-5855
Address: 19002 49th Dr NE City: Arlington State: WA Zip Code: 98223
Contact Person:Dary Finck Phone Number: 425-231-5855
Cell Phone: 425-231-5818 Fax: 360-659-0449 E-mail: dary.finck@gmail.com
Address: 19002 49th Dr NE City: Arlington State: WA Zip Code: 98223
Contractor: Alliance Partition Systems Phone Number: 360-659-0400
Address: 18824 Smokey Point Blvd. Ste 101 City: Arlington State: WA Zip Code: 98223
Contractor's License Number: ALLIAPS876PU Expiration: 06/14/2014
Plumbing Contractor: Phone Number:
Address: City: State: Zip Code
Contractor's License Number: Expiration:
Mechanical Contractor: Phone Number:
Address: City: State: Zip Code:
Contractor's License Number: Expiration:
hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-
described property will be in accordance with the laws, rules and regulation of the State of Washington.
Applicants Signature Date 12/10/2013
Print Applicants Name Mike Powers
RECEivED
013
FOR STAFF USE ONLY
-Z COA Engine; ring Deft.
Permit# Accept d BJ Amount Received Receipt# Date Received
- ' COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community&Economic Development
City of Arlington • 18204 59"Dr. NE •Arlington,WA 98223 • Phone (360)403 3551
Project Name/Tenant MATA
Site Address 19002 49th Dr NE Bldg/Unit/Suite
IBC Construction Type II-B IBC Occupancy Type B & S-2
Description of Use Flight Training
Building Square Footage Number of Stories
Square Footage Per Floor
Will there be any installation, modification or removal of the following? (Check all that apply)
Automatic fire extinguishing systems
Compressed gas systems
Fire alarm and detection systems
Fire pumps
Flammable and combustible liquids(tanks, piping etc .)
Hazardous materials
High piled/rack storage
Industrial ovens/furnace
Private fire hydrants
Spraying or dipping operations
Standpipe systems
Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft)
Provide details on any of the above checked items:
Installation,changes,modifications or removal of any of the above may require additional submittals,
information,or permits during the plan review or construction process.
° COMMERCIAL REMODEL
i PERMIT APPLICATION
Department of Community&Economic Development
City of Arlington • 18204 59`h Dr. NE •Arlington,WA 98223 • Phone (360)403-3551
Building Division:
The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the approved plan
set.
The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and
shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals
are obtained, prior to work shown on the revisions being performed.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document,may
void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would
need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may
result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved.
ACKNOWLEDGEMENTS:
The building permit does not include any mechanical,electrical, plumbing or fire sprinkler/alarm work. These permits are issued
separately. Mechanical, electrical, plumbing, or fire sprinkler/alarm permits require a separate permit application and may also require
separate plan review.
Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health
District approval before the permit can be issued.You must provide the Permit Center a copy of the approval letter or the approved
plans. Contact the Snohomish County Health District at(425)339-5250 with any questions or for more information.
An intake appointment is required for all large Tenant Improvement Building Permit Applications.To determine if your project requires
an intake appointment,to schedule an appointment or to ensure that you have the most current information, please contact the City of
Arlington Permit Center at(360)403-3551 or by email to permitcenter@ci.arlington.wa.us.
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Date:
Applicant: Date
U
i
1
p a, Iwo
VA
Ir
el
04 66COAltj C'p W'A 11
� r
•�\ ,
Ft
1
I
Il
`5 IR -rAaAo5
' RECEIVE® SCALE, �/I`' bd1 APPROVED BY; EDRAWN BY '
DATE; I M I Z 1 ISEDMID
A DEC 10 2013
COA Engineering Dept.
I �s �- DRAWING NUMBER
CITY OF ARLINGTON
` 18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551
BUILDING PERMIT
19002 59th Drive NE Permit#:259
PERMIT EXPIRES 180 DAYS AFTER
Parcel#: 31051500300100 DATE OF ISSUANCE.
Scope of Work: Valuation:48000.00
OWNER APPLICANT CONTRACTOR
City of Arlington Mission Aviation Training Academy Alliance Partition Systems
18204 59th Drive NE 19002 59th Drive NE 18824 Smokey Point Blvd,#101
Arlington,WA 98223 Arlington,WA 98223 Arlington,WA 98223
425-231-5855 360-659-0400
LIC:ALLIAPS876PU EXP: 10/31/2023
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: COMMERCIAL ALTERATION CODE YEAR: 2012
STORIES: CONST.TYPE:
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: 1 OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is
determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City
ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE
OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
12/17/2013
Applicant Signature Date Building Official Date
CONDITIONS
Adhere to approved plans. See redlined plans for additional requirements.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The
property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment
or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant
authorities before commencing construction.The property owner shall ensure that the construction project complies with all
applicable design review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS,
MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
09/08/2026 Building Permit $816.54
09/08/2026 State Surcharge-1st DU $4.50
09/08/2026 Building Plan Review $530.75
Total Due: $1,351.79
Total Payment: $1,351.79
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
C20.BUILDING FINAL Approved
C09.FRAMING Approved
Date: 09/08/2026
Permit#: 259
Permit Date: 12/10/2013
Review Date: 12/10/2013
Permit Type: COMMERCIAL ALTERATION
Review Type: COMMERCIAL ALTERATION
Target Date: 12/23/2013
Scheduled Time:
Completed Date: 12/18/2013
Description: see note
Review Status:
Assigned To: z.Tom Cooper
Time In:
Time Out:
Hours:
Notes
Automatic Fire Protection needs to be provided to new areas and those created below new area
12/18/2013 if any.
Provide fire extinguishers to new area.
Property Information
Parcel#: 31051500300100 City of Arlington
City of Arlington 18204 59th Drive NE
19002 59th Drive NE Arlington,WA 98223
Zoning: Lot: Block:
Permit#: 259
Permit Date: 12/10/13
Permit Type: COMMERCIAL ALTERATION
Project Name: Mission Aviation Training Academy
Applicant Name: Mission Aviation Training Academy
Applicant Address: 19002 59th Drive NE
Applicant, City, State, Zip: Arlington,WA 98223
Contact: Dary Finck
Phone: 425-231-5855
Email: dary.finck@gmail.com
Scope of Work:
Valuation: 48000.00
Square Feet: 0
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 12/18/2013
Permit Expires:
Permit Form Type:
Civic Plus Number:
Status: COMPLETE
Assigned To: Launa Black
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31051500300100 19002 59th Drive NE City of Arlington
Contractors
Contractor Primary Contact Phone Address Contractor Type License License#
Alliance Partition Mike Powers 360-659-0400 18824 Smokey CONSTRUCTION Labor&Industries ALLIAPS876PU
Systems Point Blvd,#101 CONTRACTOR
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C20.BUILDING Final electrical approved on
02/05/2014 FINAL 2/4/14.All work completed 02/05/2014 02/05/2014 z.Christopher Young Approved
per plan.
01/16/2014 C09.FRAMING 01/16/2014 01/16/2014 Marc Hayes Approved
Plan Reviews
Date Review Type Description Assigned To Review Status
12/10/2013 COMMERCIAL Ok to issue with redlined plans. z.Christopher Young
ALTERATION
12/10/2013 COMMERCIAL see note z.Tom Cooper
ALTERATION
12/10/2013 COMMERCIAL Launa Black
ALTERATION
Fees
Fee Description Notes Amount
Building Pen-nit Table 4-1 $816.54
State Surcharge-1st DU Residential-1st Unit $4.50
Building Plan Review Table 4-2 $530.75
Total $1,351.79
Attached Letters
Date Letter Description
12/17/2013 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
12/18/2013 MATA check#4397 Launa Black $1,351.79
Outstanding Balance $0.00
Uploaded Files
Date File Name
02/05/2014 19002 59th.docx
12/10/2013 BLD-259.pdf
Date: 09/08/2026
Permit#: 259
Permit Date: 12/10/2013
Review Date: 12/10/2013
Permit Type: COMMERCIAL ALTERATION
Review Type: COMMERCIAL ALTERATION
Target Date: 12/23/2013
Scheduled Time:
Completed Date: 12/16/2013
Description: Ok to issue with redlined plans.
Review Status:
Assigned To: z.Christopher Young
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31051500300100 City of Arlington
City of Arlington 18204 59th Drive NE
19002 59th Drive NE Arlington,WA 98223
Zoning: Lot: Block: