Loading...
HomeMy WebLinkAbout1216 E 5th St_BLD157_2026 (3)COMMERCIAL MECHANICAL SUBMITTAL REQUIREMENTS Department cf Community Development City of Arlington • 238 N Olympic Ave. • Arlington, WA 98223 • Phone (360) 403 3551 • FAX (360) 403 3418 THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS, AND ONE (1) SET OF WASHINGTON STATE ENERGY CODE APPLICATIONS. Type of Permit: ® Residential Apartment Commercial ),Valuation: O O'O �,1 )(Project Address: t 16 � ' rJ,„ cW- 01 Parcel ID #: Lot #: Subdivision: %Project Description: Owner: kRL,�I5(,R UI.- 17ISMie-,i I Phone Number: 360- &a - NSi Address: �3!5 S�-�r�� 1G� A44� City:ARL.fj (�TQII State: Zip Code: ggZz3 , Contact Person: Ref)0V Phone Number: '5100 - (051 - 1 41�;Ll_ Cell Phone: 360- I45LI Fax: 36C)-1(35-Cf40Ja_ E-mail: T-Hayes@asd.wednet.edu Address: 135 S F+���+k `t� City: A4ZuJ �+'`L,1 State: Zip Code: % z2 J Please List Quantity of Fixtures Below: FURNACE UP TO 100K BTU CLOTHES DRYER _ _ GAS OUTLETS FURNACE OVER 100K FLR FURN INSTALURELOCATE SUSPENDED HTR/UNIT HTR\ BOILER UP TO 3 HP APPLIANCE REPAIR APPLIANCE VENT/OTHER BOILER UP TO 4-15 HP TYPE I OR II HOOD VENTILATION EQUIPMENT BOLIER UP TO 16-30 HP AIR AHNDLING UP TO 10K CFM VENTILATION FANS A BOILER UP TO 31-50 HP AIRHANDLING OVER 1 OK CFM OTHER VENTILATION SYSTEM BOLIER UP TO 51 HP AND UP INCINERATOR (AST) TANK STORAGE/PIPING ALL f0THER UNITS. „ -, , HEAT PUMP (UST) TANK STORAGE/PIPING Contractor: AAL(A.1 V-1-ON1 SCkIPS - ISrRzt 64' Phone Number: A00 ' 6231 , 1459 Address: -Q J-15 5' f�t& �J 6"11A IQC- City: AZL W t1_J 01� State: Zip Code: Q kZz Contractor's License Number: Expiration • Provide applicable WSEC Worksheet(s) and appliance cut sheet(s) along with application • Provide applicable NFPA or other Reference Standard Material along with application I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above - described property will be in accordance with the laws, rules and regulation of the State of Washington. plicants Signature Date .rroN y Ap1� Nyi<S Print Applicants Name FOR STAFF USE ONLY �L►� ��� ��, razes -, ,�� �� Permit # Accepted By Amount Received Receipt # �t9 3t R ve`}�K ' `. %61 Recc all piping to be sized per ASHRAE F36. POWER SUPPLY BOILER 1_ iCR IPUMP�i_ PUMP POWER i CONTROL SIGNS-- CONTROLS �/ `RELAYI SUPPLY FROM BCS-1 I i -T 3-IOX PIPE DIA 8-11 r 2STRAIGHT PIPE I ONLY. i 60-1 5.b KN-6 T -I S POWER SUPPLYV— BOILER 1—� i0R IPUMPI_ PUMP POWER CONTROL SIGNALS-- CONTROLS 17y �RELAYI SUPPLY FROM BCS-1 i T B-2 -� rL 2 4 6D—laxb KN_6 Y � r POWER SUPPLY---------- I I T OAS AS CONTROL SIGNAL — — — — L- -- (OPTIONAL) I Fi TO B-1 BOILER CONTROL �_� I CONTROL SIGNALS— — — — — SYSTEM TO B-2 — Note: This drawing shows suggested piping configuration, Y Check with local codes and ordinances for additional requirements --6 T"E. rptr�tRv WC }ice mo HYDRONIC PRIMARY/SECONDARY — 2 FULLY CONDENSING CA LIFORNIA HYORONICS CORPORATION OG rA✓ �'R�O�o�C�CW. 'AMUT Edcn*ion BOILERS, BUILT IN TEMP PROTECTION WITH EXTERNAL - a a7� aRUImK PRIMARY PUMP STARTER AND SYSTEM PUMP COLUMBIA HYORONICG COMPANY M YYS r? y[ YM�KTJwr. ERciREER /.0 REV O C f A RHr ELEASED RSG S/2E/ at�Vv �. H-PS-Y 402-2BI-1 =� FLOWSN EAI�SYSTlY>t" AUG 01 2013 COA PERMIT CENTER 3ut> 15-7 CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 1216 E 5TH ST Permit #: 157 PERMIT EXPIRES 180 DAYS AFTER Parcel #: 31051200200300 DATE OF ISSUANCE. Scope of Work: Replacement of Boiler Valuation: 37000.00 OWNER APPLICANT CONTRACTOR ARLINGTON SCHL DIST 16 315 N FRENCH AVE ARLINGTON, WA 98223 360-631-1459 LIC: EXP: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Arlington School District 135 S French Ave Arlington, WA 98223 360-631-1459 LIC #: EXP: LIC #: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: STORIES: CONST. TYPE: DWELLING UNITS: OCC GROUP: BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC 110/IRC 110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. �1 08/02/2013 Applicant Signature Date Building Official Date CONDITIONS L & I inspection is required The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Date 09/01 /2026 09/01 /2026 PERMIT FEES Description Mechanical Base Mechanical Commercial Plan Review Total Due: Total Payment: Balance Due: CALL FOR INSPECTIONS Fee Amount $25.00 $25.00 $50.00 $50.00 $0.00 Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail Permit #: 157 Permit Date: 08/01/13 Permit Type: COMMERCIAL MECHANICAL Project Name: Arlington School District Applicant Name: Applicant Address: Applicant, City, State, Zip: Contact: Phone: 360-631-1459 Email: t hayes@asd.wednet.edu Scope of Work: Replacement of Boiler Valuation: 37000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 08/08/2013 Permit Expires: Form Permit Type: Civic Plus Number: Status: COMPLETE Assigned To: Property Parcel # Address 31051200200300 1216 E 5TH ST Contractors Contractor Primary Contact Arlington School District Legal Description Owner Name Owner Phone ARLINGTON SCHL DIST 16 Phone Address Contractor Type 135 S French Ave CONSTRUCTION CONTRACTOR Plan Reviews Date Review Type Description Assigned To Zoning 681 Nursery, Primary & Secondary School License License # Review Status COMMERCIALMECHANICAL 08/01/2013 OK to issue. Requires L&I inspection. z.Christopher Young COMMERCIAL 08/01/2013 MECHANICAL Tracking Fees Fee Description Notes Amount Mechanical Base Permit Fee $25.00 Mechanical Commercial Plan Review Table 4-1 $25.00 Total $50.00 Attached Letters Date Letter Description 08/02/2013 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Arlington School District / Boiler Permit - 1216 08/01/2013 Tony Hayes Credit #31113 E Fifth St $50.00 Outstanding Balance $0.00 Notes Date Note Created By: 07/07/2014 No inspection ever scheduled Chris Young Uploaded Files Date File Name 08/01/2013 ASD Application.pdf 08/01/2013 ASD Piping:pdf