HomeMy WebLinkAbout06-01-26 Council Meeting
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
CALL TO ORDER
Councilmember Yvonne Gallardo-Van Ornam
PLEDGE OF ALLEGIANCE
ROLL CALL
Councilmember Yvonne Gallardo-Van Ornam – Raelynn
APPROVAL OF THE AGENDA
Councilmember Rob Toyer
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS
Recognition and Presentation for Cemetery Board Member Allen Ice
Councilmember Yvonne Gallardo-Van Ornam
Sno-Isle Library Update on Programs and Services Presentation
Sno-Isle Libraries Executive Director, Eric Howard and Arlington Community Library Manager, Erica
Brown
PROCLAMATIONS
PUBLIC COMMENT
For members of the public who wish to speak to the Council about any matter not on the Public Hearing
portion of the meeting. Please limit remarks to three minutes.
CONSENT AGENDA
Councilmember Rob Toyer
1. Minutes of the May 18 and May 26, 2026 Council meetings ATTACHMENT A
2. Accounts Payable ATTACHMENT B
3. 188th and Smokey Point Boulevard Roundabout (RAB) Project ATTACHMENT C
Change Order #3
4. Snohomish County PUD Distribution Easement for the ATTACHMENT D
Jensen Park Townhomes
5. Resolution Adopting a Revised Fee Schedule ATTACHMENT E
6. Renewal of the Intergovernmental Agreement (IGA) for services ATTACHMENT F
Between Snohomish County and the City of Arlington for Snohomish
County Diversion Center Participation
PUBLIC HEARING
Arlington City Council Meeting
Monday, June 1, 2026 at 6:00 pm
City Council Chambers – 110 E 3rd Street
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
None
NEW BUSINESS
1. March and April Financial Reports ATTACHMENT G
Staff Presentation: Shelby Burke
2. Low Bid Award for the 67th Avenue Sewer Interceptor ATTACHMENT H
Upsizing Project
Staff Presentation: Jim Kelly
Council Liaison: Heather Watland
3. Emergency Declaration for Repair of Water Treatment Plant (WTP) ATTACHMENT I
High Service Pump
Staff Presentation: Jim Kelly
Council Liaison: Tim Abrahamson
COMMENTS FROM COUNCILMEMBERS
INFORMATION/ADMINISTRATOR & STAFF REPORTS
MAYOR’S REPORT
EXECUTIVE SESSION
RECONVENE
ADJOURNMENT
Councilmember Yvonne Gallardo Van-Ornam / Councilmember Rob Toyer
DRAFT
Page 1 of 4
Council Chambers 110 East 3rd Street Monday, May 18, 2026
Councilmembers Present: Heather Watland, Rob Toyer, Yvonne Gallardo-Van Ornam Michele Blythe, Nathan Senff, Tim Abrahamson, and Leisha Nobach.
Council Members Absent: None.
Staff Present: Mayor Don Vanney, Paul Ellis, Raelynn Jones, Jim Kelly, Sheri Amundson, City Attorney Oskar Rey, Chelsea Brewer, Jonathan Ventura, Sarah Lopez, and Thad Newport.
Also Known to be Present: Kathy Vanney, Randy Nobach, Steve Maisch, Holly Sloan-Buchanan, Ruth Gonzales, Maxine Jenft, members of the press, and others. Mayor Don Vanney called the meeting to order at 6:00 p.m., and the Pledge of Allegiance and roll call followed. Mayor Don Vanney provided a statement regarding a potential warehouse/distribution project near 172nd Street in the Cascade Industrial Center. He confirmed that no building permit application has been submitted, the project is not a data center, and data centers are not allowed under the current zoning. He provided instructions and time limitations for those providing public comment.
APPROVAL OF THE AGENDA Mayor Pro Tem Michele Blythe moved to approve the agenda as presented. Councilmember Nathan Senff seconded the motion, which passed with a unanimous vote.
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS Mayor Vanney presented the Mayor’s Volunteer Award to Maxine Jenft for her service in the community. Airport Director Marty Wray introduced Airport Commissioner Ruth Gonzales. Mayor Vanney recognized Ms. Gonzales for her service to the Commission and presented her with a plaque.
PROCLAMATIONS Mayor Don Vanney read the Public Works Week proclamation.
Minutes of the Arlington
City Council Meeting
Minutes of the City of Arlington City Council Meeting April 6, 2026
Page 2 of 4
PUBLIC COMMENT Rosalva Bravo-Bagby, Oak Harbor, provided remote comment. Annie Fitzgerald, Marysville, provided remote comment. Jessica Rhodes, Olympia, provided remote comment. Arianna Henderson-Hatfield, Lake Stevens, provided comment. Lynda Jensen, Arlington, provided comment. Julie Winchell, Arlington, provided comment. Jim Haffner, Arlington, provided comment. Kerri Belluomini, Snohomish County, provided comment. Stewart Anderson, FEMA, provided comment. Rita Meehan, Arlington, provided comment. Jennifer Hulme, Arlington, provided comment. Holly Sloan-Buchanan, provided comment. Hillary McGuire, Arlington, provided comment.
CONSENT AGENDA Mayor Pro Tem Michele Blythe moved, and Councilmember Nathan Senff seconded the motion to approve the Consent Agenda that was unanimously carried: 1. Minutes of the May 4 and May 11, 2026 Council meetings and May 7, 2026 Special Meeting. 2. Accounts Payable: Approval of EFT/ACH Payments and Claims Checks #115826 through #115900, dated April 21st, 2026 through May 4th, 2026 in the amount of $1,416,112.91, and approval of Payroll EFT Payments and Check #30495 through #30499 dated April 1st, 2026, through April 30th, 2026, in the amount of $1,838,542.07. 3. Ordinance Approving Amendment to Arlington Municipal Code Chapter 20.76 Screening and Trees 4. Ordinance Approving Amendment to Arlington Municipal Code Chapter 20.94 Annexations 5. Ordinance Approving Amendment to Arlington Municipal Code Chapter 20.98 State Environmental Policy Act (SEPA) 6. Community Aviation Revitalization Board (CARB) Electric Sweeper Loan – Offer Acceptance and Resolution 7. Contract Amendment #7 to the SCJ Alliance Contract for the Island Crossing Roundabout
PUBLIC HEARING None.
NEW BUSINESS
Federal Emergency Management Agency (FEMA) Memorandum of Agreement (MOA) Airport Operations Manager Monroe Whitman requested Council approve the Memorandum of Agreement (MOA) between the Federal Emergency Management Agency (FEMA) and the City of Arlington. Under this MOA, the City authorizes FEMA’s temporary use of Arlington Municipal Airport to establish and operate an incident support base,
Minutes of the City of Arlington City Council Meeting April 6, 2026
Page 3 of 4
federal staging area, responder support camp, personnel mobilization center, manufactured housing unit staging area, or field medical station.
The City currently has an agreement with the Washington State Military Department and, historically, the Airport has made its staging area available for use in the event of a major emergency or natural disaster, including the storage and staging of emergency supplies and equipment on airport property in support of response and relief operations. Discussion followed with Mr. Wray answering council questions.
Councilmember Nathan Senff moved, and Councilmember Tim Abrahamson seconded the motion to approve the Memorandum of Agreement between the Federal Emergency Management Agency and the City of Arlington and authorize the Mayor to sign it. The motion passed unanimously.
Update City Council Rules of Procedure and Code of Ethics for Meeting Time The City Council Rules of Procedure and Code of Ethics needs to be updated to reflect the change in City Council meeting times to 6:00 p.m. City Administrator Paul Ellis explained that on October 17th, 2022, City Council approved a change of the official time for City council meetings, moving them to 6:00 p.m. The proposed update to the City Council Rules of Procedure and Code of Ethics reflects the change. Councilmember Leisha Nobach moved, and Councilmember Rob Toyer seconded the motion to approve the changes to the City Council Rules of Procedure and Code of Ethics to update meeting times to 6:00 p.m. The motion passed unanimously.
Sole Source Resolution for Procurement and Servicing of Wilo Pumps and Mixers and
Associated Support Equipment Public Works Director Jim Kelly asks for Council approval to allow Mayor to sign a sole source resolution recognizing Correct Equipment, Inc. as the only appointed Wilo USA, LLC water and wastewater pump and mixer sales representative for our service area. The City of Arlington uses Wilo USA pumps and mixers in many processes (Water Treatment Plant, Water Reclamation Facility, Lift Stations, Booster Pump Stations, etc.). Wilo pumps and mixers and associated components are manufactured by Wilo USA, LLC and distributed locally by Correct Equipment, Inc. Correct Equipment is the authorized agent in the Arlington geographical area for Wilo products and, as such, staff is requesting a sole source resolution allowing the City to waive Washington Public Works bid requirements and contract directly with Correct Equipment for purchase and or related services for these products. Discussion followed with Mr. Kelly answering council questions. Councilmember Yvonne Gallardo-Van Ornam moved, and Councilmember Michele Blythe seconded the motion to recognize Correct Equipment as the authorized agent for purchase and/or related services for Wilo pump systems and approve a sole source resolution allowing the City to contract directly with Correct Equipment, Inc. The motion passed unanimously.
Minutes of the City of Arlington City Council Meeting April 6, 2026
Page 4 of 4
COMMENTS FROM COUNCILMEMBERS Councilmember Yvonne Gallardo-Van Ornam acknowledged and thanked the multiple community service groups that participated in community service events throughout Arlington. Councilmember Tim Abrahamson also acknowledged and thanked the multiple community service groups that participated in community service events throughout Arlington and to continue the good work. Councilmember Nathan Senff expressed his appreciation to participants and vendors of the Farmer’s Market held by the Stilly Valley Chamber of Commerce and encouraged folks to attend.
ADMINISTRATOR & STAFF REPORTS None.
MAYOR’S REPORT None.
EXECUTIVE SESSION None.
ADJOURNMENT With no further business to come before the Council, the meeting was adjourned at 6:51 p.m. _________________________________________ Don E. Vanney, Mayor
DRAFT
Page 1 of 4
Council Chambers 110 East 3rd Street Tuesday, May 26, 2026
Councilmembers Present: Heather Watland, Rob Toyer, Yvonne Gallardo-Van Ornam, Michele Blythe, Nathan Senff, Tim Abrahamson, and Leisha Nobach.
Council Members Absent: None.
Staff Present: Mayor Don Vanney, Paul Ellis, Raelynn Jones, Shelby Burke, Jim Kelly, Thad Newport, Lorene Robinson, Sarah Lopez, Mandy Kruger, Jonathan Ventura, Rory Bolter, and Chelsea Brewer.
Also Known to be Present: Randy Nobach, Steven Maisch, Holly Sloan-Buchanan, Julie Winchell, members of the press and others. Mayor Don Vanney called the meeting to order at 6:00 pm, and the Pledge of Allegiance and roll call followed.
APPROVAL OF THE AGENDA Mayor Pro Tem Michele Blythe moved to approve the agenda as presented. Councilmember Tim Abrahamson seconded the motion, which passed with a unanimous vote.
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS None.
WORKSHOP ITEMS – NO ACTION WAS TAKEN
Low Bid Award for the 67th Avenue Sewer Interceptor Upsizing Project Public Works Director Jim Kelly presented the preliminary bid tab low bid award for the 67th Avenue Sewer Interceptor Upsizing Project. In 2022, the city entered into contract with RH2 Consultants for engineering design services for the upsizing of the City’s 67th Avenue interceptor gravity sewer line from 200th Place NE to north of Woodlands Way, approximately 4,835 feet. Due to the length of this project, it was designed in two construction phases. The City publicly bid Phase 1 of the project and bids were opened on May 12, 2026. Reece Construction is the apparent low bidder with a bid of $1,582,000.55. Staff is qualifying the bids and will have a final recommendation at the June 1, 2026 council meeting. Discussion followed with Mr. Kelly answering Council questions.
Minutes of the Arlington
City Council Workshop
Minutes of the City of Arlington City Council Workshop May 26, 2026
Page 2 of 4
188th and Smokey Point Boulevard Roundabout (RAB) Project, Change Order #3 Public Works Director Jim Kelly reviews Change Order #3 to the 188th Street Roundabout Project, additional expenses for sanitary sewer north approximately 1,090 feet and connect to Lift Station 6. Public Works publicly bid the 188th and Smokey Point Boulevard Project in fall 2025, the contract was awarded to SRV Construction Inc. As part of this project, the existing 8-inch sanitary sewer main was being upgraded to an 18-inch sewer main within the project limits. Change Order #2 was issued to extend the 18-inch sewer main approximately 1,100 feet to Lift Station 6. This change order is for costs incurred during the additional 18-inch sewer installation and other sewer conflicts associated with the remaining contracted sewer installation work. All of the sewer costs will be paid for from the Sewer CIP fund, there is sufficient funding in the Sewer CIP fund to cover this change order. Discussion followed with Mr. Kelly answering Council questions.
Snohomish County PUD Distribution Easement for Jensen Park Townhomes Development Services Engineering Manager Thad Newport presented the Snohomish County Public Utility District No. 1 (PUD) request for an easement ten (10) feet in width to place a new underground electrical service to provide electrical power for the Jensen Park Townhomes project. This new electrical service will be placed adjacent to the Public Right of Way of Jensen Farm Lane. The PUD requests, from time to time, easements for the placement of electrical infrastructure associated with their distribution and transmission systems. This electrical service was requested by the PUD in order to provide power for the private development. Discussion followed with Mr. Newport answering Council questions.
Incorporation of Electric Vehicle Charging Station Rates and update of the 2026
Airport Rate Chart for the City of Arlington Municipal Airport Airport Operations Coordinator Lorene Robinson presents the proposed electric vehicle (EV) charging station rates for the City of Arlington Municipal Airport and updated airport rates and fees provided in the 2026 Airport Rate Chart and recommend including them in the City’s Resolution for Rates and Fees Schedule. The City has not yet adopted rates for EV charging station use. The Airport currently has a Level 2 charger installed in the parking lot and is prepared to open it for public use once rates are approved. Based on outreach and review of nearby EV charging rates, staff propose the following rates:
• Energy fee: $0.27 per kWh while charging
• Occupancy fee: $0.27 per minute after charging is complete, with a 10-minute grace period and a maximum fee of $25.00 Other updates to this rate chart include annual rate adjustments based on the Consumer Price Index (CPI) and land appraisals. The Airport Commission approved the 2026 Airport Rates and Fees Chart, including EV charging rates, at the May 11, 2026, Commission meeting.
Minutes of the City of Arlington City Council Workshop May 26, 2026
Page 3 of 4
The city has not yet adopted rates for use of EV charging stations. As electric vehicle use has increased, airport staff developed a proposed rate structure to support operations, provide transparency to users, and promote fair access to charging spaces at the Arlington Municipal Airport. Discussion followed with Ms. Robinson answering Council questions.
Resolution Adopting a Revised Fee Schedule City Administrator Paul Ellis presents the amended fee resolution and indicates that Staff is proposing changes to the Fee Resolution to update fees and rates for 2026 and provide minor clerical corrections to the document. The proposed changes involve multiple department updates including the Community and Economic Development Department and the Arlington Municipal Airport. The fee resolution sets the fees for city services, and the proposed changes reflect updates to fees and services of multiple departments. Discussion followed with Mr. Ellis answering Council questions.
Intergovernmental Agreement (IGA) for services between Snohomish County and the
City of Arlington, particularly Snohomish County Diversion Center participation. Police Chief Jonathan Ventura requests the City Council approve a renewal Intergovernmental Agreement for services between Snohomish County and the City of Arlington for Snohomish County Diversion Center participation. There is currently no direct service fee (only incidental costs) to use the center as it is funded by State and County Chemical Dependency and Mental Health tax revenue. The City must contract with a social services professional to participate. The Arlington Police Department launched a Law Enforcement Embedded Social Worker (LEESW) program in 2018, pairing an officer with social worker. This Co-response team is committed to addressing issues affecting our community members, including homelessness, substance addiction, and mental health. The Diversion Center is critical tool to their success. Discussion followed with Mr. Ventura answering Council questions.
Community Engagement Quarterly Report Community Engagement Director Sarah Lopez presented the Community Engagement Quarterly Report for May 2026. In addition, Public Information Officer Mandy Kruger provided an overview of the Meet Me In Arlington program showcasing the web page and analytics. Discussion followed with Ms. Kruger and Ms. Lopez answering questions.
ADMINISTRATOR AND STAFF REPORTS None.
MAYOR’S REPORT Mayor Vanney thanked Community Engagement Director Sarah Lopez, Public Information Officer Mandy Kruger, and Police Chief Jonathan Ventura for the information they provided to the public during recent events.
Minutes of the City of Arlington City Council Workshop May 26, 2026
Page 4 of 4
COMMENTS FROM COUNCILMEMBERS Councilmember Tim Abrahamson thanked the community volunteers, Police Department and Fire Department that helped set up the flags for Memorial Day. He also discussed the topic of data centers and proposed the city pass an ordinance prohibiting data centers within the City limits. Discussion followed regarding the topic of data centers with Councilmembers Michelle Blythe, Nathan Senff, Leisha Nobach, Heather Watland, Rob Toyer, and Yvonne Gallardo-Van Ornam providing comments.
PUBLIC COMMENT Cierra Meske, Lake Stevens; provided comment.
REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING Councilmembers discussed and agreed to put the following items on the Consent Agenda for the June 1, 2026 Council meeting: 1. Low Bid Award for the 67th Avenue Sewer Interceptor Upsizing Project 2. 188th and Smokey Point Boulevard Roundabout (RAB) Project Change Order #3 3. Snohomish County PUD Distribution Easement for Jensen Park Townhomes 4. Electric Vehicle Charging Station Rates and Updates to the 2026 Airport Rate Chart for the Arlington Municipal Airport 5. Resolution Adopting a Revised Fee Schedule 6. Renewal of the Intergovernmental Agreement (IGA
EXECUTIVE SESSION City Administrator Paul Ellis announced the need for an executive session to discuss the performance of a public employee [RCW 42.30.110(1)(g)], with no action to be taken afterward, to begin at 6:53 p.m. and last ten minutes until 7:03 p.m.
ADJOURNMENT With no further business to come before the Council, the meeting was adjourned at 7:05 p.m. _________________________________________ Don E. Vanney, Mayor
City of Arlington Council Agenda Bill CA # 2 Attachment B
June 1, 2026 Accounts Payable Claims Approval
Claims Approval
Finance, Shelby Burke Finance Director 360-403-3423 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: N/A BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION:
ALTERNATIVES:
City of Arlington
June 1st, 2026 Council Meeting
Claims Certification:
We, the undersigned City Council of the City of Arlington, Washington, do hereby certify that
the merchandise or services hereinafter specified have been received and that:
Approval of EFT/ACH Payments and Claims Checks #115901 through #116098, dated May
5th, 2026, through May 18th, 2026, in the amount of $1,916,922.53.
City of Arlington Council Agenda Bill Item: CA #3 Attachment CCOUNCIL MEETING DATE: June 1, 2026 188th and Smokey Point Boulevard Roundabout (RAB) Project, Change Order #3
188th Roundabout Change Order #3
Public Works; Jim Kelly, Public Works Director 360-403-3505 EXPENDITURES REQUESTED: $132,172.49 BUDGET CATEGORY: Sewer Capital Improvement Fund BUDGETED AMOUNT: $ 750,000.00 (Sewer CIP) LEGAL REVIEW: DESCRIPTION: Change Order #3 to the 188th Street Roundabout Project, additional expense for sanitary sewer north approximately 1,090 feet and connect to Lift Station 6. HISTORY: Public Works publicly bid the 188th and Smokey Point Boulevard Project in fall 2025, the contract was awarded to SRV Construction Inc. As part of this project, the existing 8-inch sanitary sewer main was being upgraded to an 18-inch sewer main within the project limits. Change Order #2 was issued to extend the 18-inch sewer main approximately 1,100 feet to Lift Station 6. This change order is for costs incurred during the additional 18-inch sewer installation and other sewer conflicts associated with the remaining contracted sewer installation work. All of the sewer costs will be paid for from the Sewer CIP fund, there is sufficient funding in the Sewer CIP fund to cover this change order. ALTERNATIVES: Remand to staff for additional information
I move to approve the Contract Change Order #3 to the 188th and Smokey Point Boulevard Project and authorize the Mayor to sign it.
1 of 2
CHANGE ORDER 03
Change Order Title: Sewer Extension Date: 5/20/2026
Project Name: 188th St Roundabout Project No: PW-T23.003
Contractor: SRV Construction Federal Aid No: STBGUM-CM-2691(013)
Owner: City of Arlington
The Contract is Modified as Follows:
Original Contract Amount: $ 4,524,126.49
Current Contract Amount: $ 5,624,029.88
Amount of this Change: $ 132,172.49
Revised Contract Amount: $ 5,756,202.37
Contract time is: Unchanged Increased Decreased by 6 Work Days Cal. Days
New Contract Duration: Work Days Calendar Days
Approvals (Not valid until signed by Agency)
Contractor –
______________________________ ___________________________________ ______________
Print Name Signature Date
Reviewed
James Kelly, Public Works Director ___________________________________ ______________
Signature Date
Reviewed
Kris Wallace, Public Works Accountant ___________________________________ ______________
Signature Date
Approved by Agency
Don E. Vanney, Mayor ___________________________________ ______________
Signature Date
Change Order Description:
This change includes additional costs associated with extending sanitary sewer north to LS-06.
1. Repair/replacement of pavement adjacent to trench that failed due to existing old SR-99 concrete panels slid
into excavation.
2. Additional work for LS-11 force main and gas main crossing in roundabout, work entailed realignment of force
main for constructability.
3. Additional surveying for north sewer extension, roundabout sewer/gas/force main conflicts, and south sewer
extension.
188th Roundabout Project
CHANGE ORDER 02 (CONT)
2 of 2
The Contract is Modified as Follows:
188th St Roundabout Change Order #3 Summary Log
CDD No. Description COP # Amount Signed by
Contractor Additional Comments
CCD-007 PAVEMENT
RESTORATION COP-007 $90,273.50 3/9/2026 Extra Trench Paving
CCD-008 SHORING ADJUSTMENT COP-008 $2,733.00 4/1/2026 Sheet Piles Damage
CCD-010
SSMH 47 Inside Drop
and misc. work.
FA: 5341, 5335 & 5336
COP-010 $5,256.82 3/11/2026
Accommodate LS-11 force
main connection to new
manhole connecting to LS-06
CCD-012 Pavement Grind COP-012 $7,977.85 3/16/2026
Pavement Planning to align
trench patch seam out of
wheel path
CCD-013.1
Ex SSFM & Ex Gas
conflict at SSMH 41_ SS
stubs
COP-013 $27,281.79 4/28/2026
Relocation of SSFM due to
trench conflict with Gas & SS
utility proximity (construct-
ability issue)
CCD-018 Extra Material and
Relocation COP-018 $48,811.70 5/15/2026
Cost of materials pre-
ordered and not need due to
SS relocation from mis-
identified gas main
CCD-13.1 Credit for SS reduction
on S end of project --- ($95,310.00) ---
FA5334
FA5337
FA5338
Work to modify LS-06
tie-in to accommodate
gravity connection
--- $15,147.83 3/12/2026
Surveying for SS alignment,
FM tie-in, gas conflice, and
relocation of South SS run
---
Extra surveying cost for
ewer main extension
and relocations.
--- $30,000.00 ---
Surveying for SS alignment,
FM tie-in, gas conflice, and
relocation of South SS run
CCHANGE ORDER #3 TOTAL $132,172.49
Attachments:
• Construction Change Directives CCD-007, CCD-008, CCD-010 (FA5341, FA5335 & FA5336),
CCD-012, CCD-013.1, and CCD-018
COP-007: 188TH RAB PROJECT - ROADWAY RESTORATION
SMOKEY POINT BLVD ROADWAY RESTORATION, DUE TO ROADWAY FAILURE DURING SEWER EXTENSION
See CCD-007, Plans and x-section
PREPARED BY:K. Stewart
DATE:3/9/2026
Description Bid Item SRV Quant. COA Quant. Unit
SRV Bid
ItemPricing SRV Total Price COA Total Pricing
SAWCUT NEW 2395 600 LF $4.80 $11,496.00 $2,880.00
REMOVAL OF 6" CONCRETE A-18 478 222 CY $51.00 $24,378.00 $11,333.33
REMOVAL OF 6" HMA A-18 478 245 CY $51.00 $24,378.00 $12,495.00
6" CSBC BACKFILL A-22 886 411 TON $33.55 $29,725.30 $13,792.78
6" HMA INSTALL A-24 982 501 TON $156.50 $153,683.00 $78,423.89
4" EDGE STRIPE A-98 2350 1200 LF $1.00 $2,350.00 $1,200.00
TOTAL $246,010.30 $120,125.00
Credit to Change Order- 02
(Based on area of 1175 LF x 6 LF width)
REMOVAL OF 6" HMA A-18 130 67 CY $51.00 $6,630.00 $3,400.00
REMOVAL OF 6" CONCRETE A-18 130 67 CY $51.00 $6,630.00 $3,400.00
6" CSBC BACKFILL A-22 241 123 TON $33.55 $8,085.55 $4,137.83
6" HMA INSTALL A-24 268 137 TON $156.50 $41,942.00 $21,388.33
TOTAL $63,287.55 $32,326.17
NET ADJUSTMENT $182,722.75 $87,798.83
City of Arlington Council Agenda Bill CA #4 Attachment
June 1, 2026 PUD Easement Request
Easement
Community and Economic Development; Thad Newport, Development Services Engineering Mgr. EXPENDITURES REQUESTED: None BUDGET CATEGORY: BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: to place a new underground electrical service to provide electrical power for the Townhomes project. This new electrical service will be placed adjacent to the Public Right of Way of
The PUD requests, from time to time, easement for the placement of electrical infrastructure associated with their distribution and transmission systems. This electrical service was requested by the PUD in order to provide power for the private development. ALTERNATIVES: Remand back to staff for additional information.
authorize the Mayor to sign the Easement.
AFTER RECORDING, PLEASE RETURN TO:
Public Utility District No. 1 of Snohomish County
Attn: Jennifer Southard
Lead, Real Estate Services
P.O. Box 1107
Everett, Washington 98206-1107
E-
WO#100154040 N# 10000237249
________________________________________________________________________
DISTRIBUTION EASEMENT
Grantor (“Owner”): The City of Arlington, a Washington municipal corporation
Grantee: Public Utility District No. 1 of Snohomish County
Short Legal Description: Ptn. of NE ¼, SE ¼, Sec. 11, Twp. 31, R. 5
Tax Parcel No: 00875500099900
THIS DISTRIBUTION EASEMENT (“Easement”) is made this day of ______2026,
by and between The City of Arlington, a Washington municipal corporation (“Owner”), and Public
Utility District No. 1 of Snohomish County, a Washington State municipal corporation (“District”). The
Owner, and District are sometimes referred to individually herein as “Party” and collectively as “Parties”.
The District is referred to as “Grantee”.
WHEREAS, Owner is the owner of certain lands and premises situated in the County of
Snohomish, State of Washington, legally described as follows (hereinafter “Property”):
TRACT D, JENSEN FARM DIVISION 2, RECORDED UNDER AUDITOR’S FILE NO. 9712125002,
BEING A PORTION OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF
SECTION 11, TOWNSHIP 31, RANGE 5 EAST, W.M.
Situate in the County of SNOHOMISH, State of Washington
WHEREAS, the Grantee is desirous of acquiring certain rights and privileges across, over,
under, upon and through the Property.
NOW, THEREFORE, the Parties agree as follows:
1. Distribution Easement. Owner, for good and valuable consideration, receipt of which is
hereby acknowledged, hereby conveys and grants to Grantee, its agents, contractors, successors and
assigns, a non-exclusive easement for the perpetual right, privilege, and authority to patrol, construct,
erect, reconstruct, alter, improve, extend, repair, operate, and ma intain overhead and/or underground
electric distribution lines and facilities, Grantee-owned communication wires and cables, and other
necessary or convenient appurtenances, across, over, under, through and upon the following portion of
Owner’s Property (hereinafter “Easement Area”):
THE SOUTHERLY TEN FEET (10’) OF THE ABOVE DESCRIBED REAL PROPERTY ADJACENT
TO THE JENSEN FARM LANE RIGHT OF WAY.
2. Access To and Across Property. Grantee has the right of ingress to and egress from the
Easement Area across the adjacent Property of Owner where same is reasonably necessary for the
purpose of exercising its easement rights described in Section 1.
3. Owner’s Reservation of Rights and Use of Easement Area. Owner reserves the right to
use the Easement Area in a manner that does not interfere with the Grantee’s use of the Easement
Area, and/or present a hazard to Grantee’s electric distribution lines and facilities, communication wires
and cables, and other appurtenances. The Owner shall not construct or permit to be constructed any
structures of any kind in the Easement Area without prior approval of the Grantee.
4. Clearing of Power Line Right of Way. Grantee has the right at all times to clear said
Easement Area and keep the same clear of all brush, debris and trees.
5. Trimming or Removal of Hazardous/Danger Trees. Grantee has the right at all times to
cut, slash, or trim and remove brush, timber or trees from the Property which in the opinion of Grantee
constitute a hazard to said lines and facilities, communication wires and cables, and other
appurtenances or the Grantee's access thereto. Trees, brush or other growth shall be deemed
hazardous to the lines or facilities or access of the Grantee when they are of such a height that they
could, upon falling, strike the nearest edge of the Easement Area at a height of more than fifteen feet
(15’). Except in emergencies, Grantee shall, prior to the exercise of such right, identify such trees and
make a reasonable effort to give Owner prior notice that such trees will be trimmed or removed.
6. Title to Removed Trees, Vegetation and Structures. The title to all brush, debris, trees
and structures removed from the Easement Area and the Property pursuant to Sections 4 and 5 shall be
vested in the Grantee, and the consideration paid for this Easement and rights herein described is
accepted by Owner as full compensation for said removed brush, debris, trees and structures . Owner
shall be entitled to request fallen timber be set aside for Owner’s personal use. Grantee shall make
reasonable effort to set aside said fallen timber provided doing the same is safe in Grantee’s sole
opinion. Title to any fallen timber set aside in this manner shall revert to the Owner.
7. Restoration Provision. To the extent that Owner’s Property is disturbed and/or damaged
by Grantee’s exercise of its rights hereunder, Grantee shall restore the condition of the Property as
nearly as reasonably possible to its existing condition prior to said exercise of its rights.
8. Title to Property. The Owner represents and warrants having the lawful right and power
to sell and convey this Easement to Grantee.
9. Binding Effect. This Easement and the rights and obligations under this Easement are
intended to and shall run with the Property and shall benefit and bind the Parties and their respective
heirs, successors and assigns.
10. Governing Law and Venue. This Easement shall be governed by and construed in
accordance with the laws of the State of Washington. The venue for any action to enforce or interpret
this Easement shall lie in the Superior Court of Washington for Snohomish County, Washington.
11. Authority. Each party signing this Easement, if on behalf of an entity, represents that
they have full authority to sign this Easement on behalf of such entity.
12. Grantee Acceptance. By recording this Easement, Grantee hereby accepts all
provisions set forth under this agreement.
IN WITNESS WHEREOF, this instrument has been executed the day and year first above written
OWNER(S):
The City of Arlington, a Washington municipal corporation
By: _____________________________________
Its: ______________________________________
(REPRESENTATIVE ACKNOWLEDGMENT)
State of Washington
County of
I certify that I know or have satisfactory evidence that
signed this instrument, on oath stated that (he/she/they) (was/were) authorized to execute the instrument and
acknowledged it as the of the City of Arlington to be the free and
voluntary act for the uses and purposes mentioned in the instrument.
Given under my hand and official seal this ______ day of _____________, 2026.
Signature of
(Seal or Stamp) Notary Public
Print Name:
Residing at: _
My appointment expires
City of Arlington Council Agenda Bill CA #5 Attachment
COUNCIL MEETING DATE: June 1, 2026 SUBJECT: Resolution Adopting Fee Schedule ATTACHMENTS: Amended Fee Resolution DEPARTMENT OF ORIGIN Executive; Paul Ellis, City Administrator EXPENDITURES REQUESTED: None BUDGET CATEGORY: BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: Staff is proposing changes to the Fee Resolution to update fees and rates for 2026 and provide minor clerical corrections to the document. The proposed changes involve multiple department updates including the Community and Economic Development Department and the Arlington Municipal Airport.
HISTORY: The fee resolution sets the fees for city services, and the proposed changes reflect updates to fees and services of multiple departments. ALTERNATIVES: Remand to staff for additional information.
I move to approve the amendments proposed to the fee resolution as presented and authorize the Mayor to sign the resolution.
Page 1
RESOLUTION NO. 2026-XXX
A RESOLUTION REPLACING RESOLUTION NO. 2026-001,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase and decrease, or certain services or practices are
discontinued, and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these
various services so that the public is not subsidizing individual benefits derived therefrom; and,
WHEREAS, the City has reviewed the fees in relationship to estimated staff time to
complete various tasks, and believes some fees should be updated; and
WHEREAS, the City Council held a public hearing concerning the establishment of the fees;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON AS
FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section 1. Fees and Charges – General
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices. In some instances, the City provides certain goods and merchandise for
sale. Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all fees
of a multi-phased project in advance; however, doing so does not vest applicable
fees due. Fees due are those in effect at the time the specific action or phase of an
action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 2
Section 2: Land Use Fees. Fees for various services, actions, and permits regarding land
use, as per AMC Title 20 Land Use Code, shall be as listed in Table 2.1: Land Use Fees.
Table 2: Land Use Fees
Action Fee ($)
Land Use Permits
Permit
Special Use or Type II Permit Hearing Examiner Fee
if required
Conditional Use Permit Hearing Examiner Fee
Administrative Conditional Use Permit
Temporary / Seasonal Event
Homeless Encampment
Mobile Sales and Deliveries
Development Agreement
Associated with Land Use Actions 1,100.00 plus additional costs if accrued
Not Associated with Land Use Actions if
Preliminary Plat
Major Plat or Unit Lot Subdivision ≥ 10 Examiner Fee
Plat or Unit Lot Subdivision ≤ 9
Final Plats
Major Plat or Unit Lot Subdivision ≥ 10 plus actual cost of consultant
Plat or Unit Lot Subdivision ≤ 9 plus actual cost of consultant
Binding Site Plan
Binding Site Plan ≥ 10 Lots Examiner Fee
actual cost of consultant
Binding Site Plans ≤ 9 Lots plus actual cost of consultant
Text and/or Design Deviation
Lot Line Adjustment or Changes to Number of Lots plus actual cost of consultant
Subarea Plan
Subarea Plan (rivately nitiated)of
Design Review
Administrative For Development Projects
Administrative For Single Lot Residential
Developments with Building Permit for Residential
Infill, Old Town Residential District, Subdivisions and
within Private Initiated Subare
180.00
Design Deviation to Planning Commission
Mixed-Use Development
Conditional Use or Type III Permit 4,000.00 plus Hearing Examiner Fee
Special Use or Type II Permit Examiner
if required
Zoning or Type I Permit 2,300.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 3
Action Fee ($)
Forest Practice Permit
Permit Review 450.00
Forest Practice Permit Application 125.00 plus 125.00 per acre
Conversion Option Harvest Plan Approval 125.00 plus 125.00 per acre
To Lift Moratorium 300.00
Inspection Fee 150.00 per hour plus 125.00 per acre
Tree Replacement Mitigation In-Lieu Fee with
Permit: Number of Trees Removed x 3 for
32.50 per replacement tree
Hearing Examiner
Single Family Residence or Duplex (1 Structure)
Variance, Special Use Permits, Conditional Use
,
1,750.00
Commercial Multi Family Public Agency:
Variances, Special Use Permits, or Conditional Use
Permits, Shoreline Substantial Development Permits,
Rezone Recommendations, Type II Permits or Type III
3,000.00
Multi Permit Application (Consolidated Hearings, not
including Appeals) Mixed-Use Development Permits,
Preliminary Subdivision, Plats, or Binding Site Plans,
Shoreline Variances, Conditional Use Permits, Type II
Permits, e III Permits
3,850.00
Appeals of Administrative Decisions, Interpretations,
Enforcement Orders, Licensing Decisions, and SEPA
Threshold Determinations, as well as other
Regulatory, Enforcement, or Quasi-Judicial matters
not addressed in the flat-fee rate schedule
225.00 per hour
Appeals
To Hearing Examiner plus actual cost of Hearing Examiner
/Growth Management
Hearing Board/Superior Court 1000.00 Deposit
Reconsideration of Decision By:
Community Development Director and/or Designee
Planning Commission
Hearing Examiner 250.00 plus actual cost of Hearing Examiner
Permit Extension
Resubmittal Extension
Administrative Interpretations
Interpretation of Zoning Code and Maps
Amendment to or Modification of Permit
Insignificant Design Deviations
Minor Amendment
Major Amendment actual cost of Hearing Examiner
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 4
Action Fee ($)
Boundary Line Adjustment
Boundary Line Adjustment / Lot Line Elimination 1,700.00 plus actual cost of consultant
Land Use Zoning Code Ordinance Amendment
Amendment to Text of
Amendment to Zoning Map (Rezone)
< 5 acres 1,200.00
Comprehensive Plan Amendment
Minor Amendment (ycle)
Major Amendment (5 ycle)
Annexations
Submission of 10% Petition
Submission of 60% Petition
Boundary Review Board Application Filing Fee 50.00 paid directly to Snohomish County
If it goes to Boundary Review Board Hearing
Shoreline Development Permit
Shoreline Development Exemption Letter
Shoreline Substantial Development Permit or
Shoreline Variance in conjunction with a Land Use
550.00
Shoreline Substantial Development Permit or
Shoreline Variance not in conjunction with a Land
1,100.00
Shoreline Conditional Use Permit 00.00 plus Hearing Examiner Fee
Significant Tree & Street Tree Removal
Significant Tree Removal requires replacement
rate of 3:1 or pay mitigation in lieu fees per
replacement tree
150.00 per replacement tree x 3 = 450.00
per tree removed
Street Tree Removal requires replacement
of 1:1 or pay mitigation in lieu fees per replacement
tree
1,030.00 per tree removed
Variance
Administrative (in addition to land use permit)
Hearing Examiner:mit or if
Administrative Variance is recommended to Hearing
paid a
1,300.00 plus actual cost
of Hearing Examiner
General Information Meeting
wo eetings
Subsequent eetings 350.00 per meeting
SEPA Review (note: review of checklist included with
Land Use Permit fee)
SEPA Only (ermit)
Environmental Impact Statement (EIS)1,100.00 plus actual cost of consultant
Outside Costs
Services or Attorney
with , Civil or Permits
Actual Cost of Service, Review
and/or Written Reports
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 5
Action Fee ($)
Change of Use
Change of Use Land Use Site Plan Review
(additional Design Review Fees may apply) 180.00
Critical Area Review
Critical Area Variance actual cost of consultant
Reasonable Use Exception
Letter of Exemption
Critical Area Site Plan Review (no land use permit) 180.00 plus Recording Fees
Floodplain Development
Flood Hazard Permit (in addition to permit)
Deferral of Impact Fee
Application
Request of Utility Services Outside City Limits
Utility Extension Agreement Family
Residence / Duplex 250.00
Utility Extension Agreement Other Development
Utility Water/Sewer Availability
Residential
Commercial
Property Tax Exemption Certificate
Public Notice / Publication
Public Notice Preparation and Posting
Newspaper Publication Actual cost of publication per
Everett Herald fee
Postage for Mailings Actual cost of postage per USPS fee
Recording
Recording Fees / Conformed Copies Snohomish County Auditor
Project Pre-Submittal Review
Submittal Review Fee ½ the cost of the actual permit fee
Miscellaneous Staff Time
Administrative Staff
Planning / Civil Staff9
Processing / Technology Fee
Added to all Land Use, Civil, Utility, & Building
Permits 25.00
Credit Card Processing Surcharge / Service Fee 3% of actual cost
Electronic Funds Transfer Fee 0.50 per transaction
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 6
Section 3: Public Works Fees. Fees for various services, actions, and permits shall be
listed in Tables 3-1: Review Fees, 3-2: Grading Plan Review Fees, 3-3: Grading Plan Fees,
and 3-4: Public Works Labor and Equipment Charges. Grading Plan Fees from Table 3-3
are applied to all permit types that involve cut and fill on a site regardless of the
overarching permit required.
Table 3-1: Review Fees
Action Fee ($)
Civil Review 6% of Engineer’s Estimated Cost of Construction
with a minimum charge of 1,600.00
Administrative Review Fee 250.00 each
Miscellaneous Engineering Fee 550.00 each
As-Built Review Fee Included in the Civil Review Fee
Final Plat Review Fee Included in the Civil Review Fee
Inspection Fee 150.00 per hour, ½ hour minimum
Outside Consultant Review Fee Actual Costs
Simple Site Plan Review:
(Single Family Residence with maximum 2 lots
275.00 per Lot
Action Fee ($)
Right of Way
6% of Engineer ’s Estimated Cost of Construction
or maximum 1,100.00 with a minimum charge of
125.00
1,100.00
Miscellaneous
–
200.00
1,100.00 plus actual cost
Permit for Non-Construction Use of Right of Way
per AMC Chapter 12.50
Application
quare foot (nnual)
Commercial Zones including, but not limited 0.45
Business Zones including, but not limited to, 0.40
600.00 plus actual cost of Hearing Examiner
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 7
Table 3-2: Grading Plan Review Fees
50 cubic yards or Less 100.00
51 to 100 cubic yards 120.00
101 to 1,000 cubic yards 160.00
c
First 1,000 cubic yards
for each additional ubic fraction thereof
200.00
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards
for each additional ubic fraction hereof
300.00
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards
for each additional 10,000 ubic fraction hereof
400.00
200,001 cubic yards or More
For the first 200,000 cubic yards
for each additional 10,000 ubic fraction hereof
500.00
dditional eview required by changes, additions, or
revisions to approved plans.New Plan Review Fee
Table 3-3: Grading Permit Fees
Base Permit Fee 100.00
50 cubic yards or less 120.00
51 to 100 cubic yards 160.00
c
First 100 cubic yards
for each additional 100 ubic fraction hereof
200.00
1,001 to 10,000 cubic yards
First 1,000 cubic yards
for each additional 1 ubic fraction hereof
300.00
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards
for each additional 1 ubic fraction hereof
500.00
100,001 cubic yards or more
For the first 100,000 Cubic Yards
for each additional 10,000 ubic fraction hereof
600.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 8
Table 3-4: Public Works Labor and Equipment Charges
A. Services and work included in the below schedule will be charged a 15%
administrative/overhead fee for accounting, billing and general City administrative
costs.
B. All work or services not included in the below schedule must be mutually agreed
upon prior to the commencement of work.
C. Equipment and machinery that is not explicitly included in the below schedule will
be charged at the rate set forth in the most current Rental Rate Blue Book for
Construction Equipment (“Blue Book”). If the equipment or machinery rate is not
available in the Blue Book, the City will determine an appropriate fee or rate based
on the original cost of the asset plus operating and maintenance cost and/or
comparable rates charged by other organizations.
Item Fee ($)
Labor Rate Cost
Lead Maintenance Worker
Senior Maintenance Worker
Maintenance Worker
Administrative Staff
Equipment Rate Cost
Pick Up Truck
Dump Truck
Back
Jetter Truck
Snow Plow 90
Street Sweeper
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 9
Section 4: Building, Plumbing, Mechanical, Fire Permit and Plan Review Fees.
For determining the value of a structure, the most current Building Valuation Data as
published by the International Code Council, is adopted by reference. Fees shall be as
listed in Tables 4-1: Building Permit Fees, 4-2: Building Plan Fees, 4-3: Miscellaneous
Building Permit Fees and 4-4: Miscellaneous Building Inspection & Plan Review Fees.
Table 4-1: Building Permit Fees
4
1.00 – 500.00 35.50 0.00 to 500.00
501.00 – 2,000.00 35.50
4.57
For the first 500.00
PLUS for each additional 100.00, or fraction thereof, to
and including 2,000.00
2,001.00 – 25,000.00 104.05
21.03
For the first 2,000
PLUS for each additional 1,000.00, or fraction thereof, to
25,001.00 – 50,000.00 587.74
15.24
For the first 25,000.00
PLUS for each additional 1,000.00, or fraction thereof, to
and including 50,000.00
50,001.00 – 100,000.00 967.24
10.61
For the first 50,000.00
PLUS for each additional 1,000.00, of fraction thereof, to
and including 100,000.00
100,001.00 – 500,000.00 1,497.74
8.41
For the first 100,000.00
PLUS for each additional 1,000.00, or fraction thereof, to
and including 500,000.00
500,001.00 – 1,000,000.00 4,861.74
7.19
For the first 500,000.00
PLUS for each additional 1,000.00, or fraction thereof, to
and including 1,000,000.00
1,000,001.00 and Up 8,456.74
5.49
For the first 1,000,000.00
PLUS for each additional 1,000.00 or fraction thereof
Table 4-2: Building Plan Review Fees
All Valuations 65% of Building Permit Fee Based on Valuation Calculation per Table 4-1
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 10
Table 4-3: Miscellaneous Building Permit Fees
100.00 plus Inspection Fee
(portable and stand-alone)250.00 plus Inspection Fee
(over 7 Feet in Height)100.00 plan review plus Inspection Fee
500.00
500.00
100.00
Table 4-1 & 4-2
75.00
500.00
500.00
100.00
-–75.00
-–100.00 plan review; permit fee, Table 4-1
(permit not required under 4 feet)100.00 or IBC Valuation, whichever is greater
Sign Permit Table 4 & 4 ; minimum 100.00
Solar Permits Table 4 & 4
Swimming Pool or Spa
ee for each pool or spa; private or public Table 4-1 & 4-2
Washington State Surcharge (RCW 19.27.085)
Commercial Building Permit
Residential Building Permit
Each Additional Residential Unit
Table 4-4: Building Permit Fees
Inspections outside of normal business hours 150.00 per hour (minimum charge 1 hour)
Re-inspection fees (includes two inspections) 75.00 per hour
Inspection of which no fee is specifically indicated 75.00 per hour (minimum charge 1 hour)
For use of outside consultants for plan review and
inspections, or both Actual costs
Operating Permit Inspections
Stop Work Order (working without a valid permit) Double ermit f
whichever is less
Revise Site Plan after Plan Review is Completed
Permit Extension 2% of total building permit f ;
minimum 110.00 and maximum 500.00
Revise Building Plan During Plan Review
< 50% Review Completion
> 50% Review Completion New Plan Review Fee
Revised Building Plans after Issuance of Permit New Plan Review Fee
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 11
4.2 Plumbing Permit and Plan Fees. Plumbing fees shall be as listed in Table 4-5:
Plumbing Permit Fees and Table 4-6: Plumbing Plan Review Fees.
Table 4-5: Plumbing Permit Fees
per unit. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of
-
Additional Plan Review Fees $ 75.00
Alteration / Repair Piping $ 15.00
Backflow Assembly $ 25.00
Base Plumbing Fee $ 25.00
Bath / Shower Combo $ 15.00
Building Main Waste $ 25.00
Clothes Washer $ 15.00
Dishwasher $ 15.00
Drinking Fountain $ 15.00
Floor Drains $ 15.00
Grease Interceptor $ 75.00
Grease Trap $ 25.00
Hose Bibb $ 15.00
Icemaker / Refrigerator $ 15.00
Irrigation – per meter $ 25.00
Kitchen Sink & Disposal $ 15.00
Laundry Tray $ 15.00
Lavatory $ 15.00
Medical Gas Piping ≤ 5 Inlets / Outlets $ 60.00
Medical Gas Piping for each additional Inlet / Outlet > 5 $ 5.00
Miscellaneous – Regulated by Plumbing Code (not otherwise specified) $ 15.00
Pretreatment Interceptor $ 15.00
Re-Inspection Fee (all) $ 75.00
Roof Drains $ 15.00
Shower (only) $ 15.00
Sink (Bar, Service, etc.) $ 15.00
Toilets $ 15.00
Urinal $ 15.00
Vacuum Breakers $ 25.00
Water Heater $ 25.00
Water Heater - Tankless $ 25.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 12
Table 4-6: Plumbing Plan Review Fees
All Valuations 65% of Building Permit Fee Based on Valuation Calculation per Table 4-1
4.3 Mechanical Permit Fees. Mechanical permit fees shall be as listed in Table 4-7:
Mechanical Permit Fees and Table 4-8: Mechanical Plan Review Fees.
Table 4-7: Mechanical Permit Fees
calculated per unit. A plan review fee of 65% per Table 4-8 for mechanical permits will be assessed
ee
-
Additional Plan Review Fees $ 75.00
Air Conditioning Unit ≤ 100 Btu/h $ 15.00
Air Conditioning Unit > 100 Btu/h $ 25.00
Air Conditioning Unit > 500 Btu/hp $ 50.00
Air Handling Units $ 15.00
Base Mechanical Fee $ 25.00
Boiler < 100 Btu/h > 3 hp $ 15.00
Boiler > 1 million Btu/h < 50 hp $ 25.00
Boiler > 1.5 million Btu/h < 50 hp $ 50.00
Boiler > 100 Btu/h 3-15 hp $ 15.00
Boiler > 500 Btu/h 15-30 hp $ 25.00
Commercial Hoods – Type I / II $ 25.00 / 50.00
Diffusers $ 15.00
Dryer Ducting $ 15.00
Ductwork (drawings required) $ 25.00
Evaporative Coolers $ 15.00
Exhaust / Ventilation Fans $ 15.00
Fireplace / Insert / Stove $ 15.00
Forced Air Heat ≤ 100 Btu/h $ 15.00
Forced Air Heat > 100 Btu/h $ 25.00
Gas Clothes Dryer $ 15.00
Gas Fired Air Conditioning Unit ≤ 100 Btu/h $ 15.00
Gas Fired Air Conditioning Unit > 100 Btu/h $ 25.00
Gas Fired Air Conditioning Unit > 500 Btu/hp $ 50.00
Gas Piping ≤ 5 Units $ 15.00
Gas Piping for each additional unit > 5 $ 2.00
Heat Exchangers $ 15.00
Heat Pump-Condensing Unit $ 25.00
Hot Water Heat Coils $ 15.00
Miscellaneous – Regulated by Mechanical Code (not otherwise specified) $ 15.00
Package Units ≤ 100 Btu / > 100 Btu $ 25.00 / 50.00
Range / Cook Top – Gas Fired $ 15.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 13
Refrigeration Unit ≤ 100 Btu/h $ 15.00
Refrigeration Unit > 100 Btu/h $ 25.00
Refrigeration Unit > 500 Btu/h $ 50.00
Re-Inspection Fee (all) $ 75.00
MECHANICAL PERMIT FEES (Per Unit)
Commercial mechanical permits are required to submit line drawings. A permit fee shall be
calculated per unit. A plan review fee of 65% per Table 4-8 for mechanical permits will be assessed
ee
Residential Range Hood $ 15.00
Unit Heaters ≤ 100 Btu/h $ 15.00
Unit Heaters > 100 Btu/h $ 25.00
Variable Air Volume Boxes (part of Air Conditioning System) $ 10.00
Wall Heaters – Gas Fired $ 25.00
Water Heater – Gas Fired $ 25.00
Table 4-8: Mechanical Plan Review Fees
All Valuations 65% of Building Permit Fee Based on Valuation Calculation per Table 4-1
4.4 Fire Permits and Plan Review Fees. Fire permit fees shall be as listed in Table 4-9:
Fire Permit Fees and Table 4-10: Fire Plan Review Fees.
Table 4-9: Fire Permit Fees
FIRE SPRINKLER SYSTEMS (105.7.1, 105.7.4, 105.7.11)
**
1 to 2 75.00
3 to 5 125.00
6 to 10 175.00
11 to 20 225.00
21 to 40 300.00
41 to 100 375.00
101 to 200 475.00
201 to 300 575.00
> 300 600.00 plus 50.00 per 100 additional devices
For Hydraulically designed systems multiply the fees above by 2
*
1 to 100 375.00
101 to 200 475.00
201 to 300 600.00
> 300 625.00 plus 50.00 per 100 additional devices
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 14
FIRE SPRINKLER SYSTEMS (105.7.1, 105.7.4, 105.7.11)
**
1 to 10 175.00
11 to 25 225.00
26 + 275.00
* – NFPA 13D SYSTEM INSTALLED – NOT REQUIRED – FEE REDUCED 50%
Pre-Engineered 200.00
Custom Engineered 275.00
Class I – New or Existing 150.00
Class II – New or Existing 150.00
Fire Pump 300.00 each
Additional Hydrostatic Pressure Test
(1 test included per permit) 150.00
Additional Cover Inspection
(1 cover inspection included per permit)75.00
SPRAY BOOTHS (105.7) & INDUSTRIAL OVENS (105.7.7)
Spray Booths Fee ($)
Engineered w/ Documents
Built or used w/o Documents
Industrial Oven
NOTE: SEPARATE SPRINKLER SYSTEM REQUIRED
** Devices include separate individual portions of a Fire Sprinkler System such as:
Sprinklers, Risers, Valves, Pull Stations, Beam Detectors, and other such Devices
(Each piece is one device).
FIRE ALARM SYSTEM NFPA 72 (105.7.3)
1 to 2 75.00
3 to 5 125.00
6 to 10 175.00
11 to 20 225.00
21 to 40 300.00
41 to 100 375.00
101 to 200 475.00
> 200 500.00 plus 50.00 per 100 additional devices
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 15
FIRE ALARM SYSTEM NFPA 72 (105.7.3)
NEW COMMERCIAL SYSTEM
Number of Sprinklers or Devices* Fee ($)
1 to 100 350.00
101 to 200 475.00
> 200 500.00 plus 50.00 per 100 additional devices
NOTE: In additional to device* fees shown, the following fees also apply.
FACP AND/OR TRANSMITTER
New 200.00
Replace 125.00
NOTE: All Central Station Monitoring must be UL or FM Listed.
*Devices include separate individual portions of a Fire Alarm System such as:
Initiating Devices, Notification Appliances, Flow Switches, Supervisory Switches, Magnetic Door
Hold-Open Devices, Remote Annunciators, Pull Stations, Beam Detectors, and other such Devices
(Each piece is one device).
Table 4-10: Fire Plan Review Fees
< $12,000.00 200.00
$12,000.00 and Over 65% of Building Permit Fee Based on Valuation Calculation per Table 4-1
Section 5: Annual Fire Self-Inspection Program Fees. Fees for the annual fire self-
inspection program and re-inspections shall be as listed in Table 5: Annual Fire Self-
Inspection Fees.
Table 5: Annual Fire Self-Inspection Fees
Life-Safety Inspections of Businesses
Annual Base Fee 60.00
Initial Inspection 0.00
Satisfactory Re-Inspection 0.00
Unsatisfactory Re-Inspection for Corrections 100.00
Unsatisfactory Re-Inspection for Corrections
Second and Each Additional 200.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 16
Section 6: Fees for the Use of City Owned Facilities. Fees for various services, actions,
and permits regarding use of City owned facilities shall be as listed in Table 6: Fees for
the Use of City Owned Facilities.
Table 6: Fees for the Use of City Owned Facilities
community youth related activities and Neighborhood Watch meetings may be waived
One to Three Hours 20.00 per hour
Over Three Hours 90.00
-
One to Four Days 100.00 per rental
Ballfield Rental (Youth) 20.00 per hour – 2 hours minimum
Ballfield Rental (Adult) 40.00 per hour – 2 hours minimum
Ballfield Lighting (Sept-Mar) 5.00 per hour of use after 5:00 pm
Ballfield Lighting (Apr-Aug) 5.00 per hour of use after 7:00 pm
4 X 20 Foot Bed 25.00 per season
4 X 8 Foot Raised Bed 15.00 per season
4 X 4 Foot Raised Bed 10.00 per season
2 X 8 Foot Bed 10.00 per season
Section 7: Fees for the Arlington Municipal Airport. Fees for various services and
actions regarding the Arlington Municipal Airport shall be as listed in Table 7: Fees for
the Arlington Municipal Airport.
Table 7: Fees for the Arlington Municipal Airport
-
Single Hangar 289.08 monthly
Twin Hangar 458.68 monthly
Storage Unit (various sizes) Range from 100.60
per unit/monthly
Rental Rates – Tie Down and Parking
Down Aircraft 50.00 monthly
Transient Aircraft Parking
Large Aircraft Parking
Auto Parking Rates
Short Term Parking
Long Term Parking 50.00 monthly
Land Lease Rates
Aviation Land per square foot
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 17
Industrial Land 0.42 per square foot
Commercial Land 0.91 per square foot
Ultralight Area 0.29 per square foot
T-Hangar Development 0.30 per square foot
Mill Site 0.25 per square foot
Action / Service Rate / Fee ($)
Short Term Land Use – Special Events (Subject to Sales Tax)
Emergency Vehicle Operator Course (EVOC)
Triangle Area 183.12 per day
Use Agreement
Aviation Land 0.34 per square foot
Industrial Land 0.42 per square foot
Mill Site 0.25 per square foot
Administrative Fee 100.00
Power Panels 200.00 per day
Landside Parking 100.00 monthly
Proximity Cards
New Card 1st card free
Additional Cards 10.00 each
Card Renewal – Biennial 10.00 each
Lost or Stolen 40.00 each
Putnam Hall Meeting Room
Deposit 50.00
Hourly Rate 15.00
Daily Rate 75.00
Electric Vehicle (EV) Charging Station Rates
Base Rate 0.27 per kWh
Surcharge for Occupying Parking Space After Vehicle
Charging is Complete
0.27 per minute
$25.00 (includes grace period of 10
Miscellaneous Fees
Fuel Fees 0.05 per gallon
25.00
5.00
Late Charge on all Billed Accounts Past 20 Days
Section 8: Appeal Fees for Violations and Abatement. Fees for various services and
actions regarding violations and abatement as per Chapter 11.01 of the Arlington
Municipal Code shall be as listed in Table 8: Appeal Fees for Violations and Abatement.
Table 8: Appeal Fees for Violations and Abatement
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 18
Action Fee ($)
Appeals
To Hearing Examiner 600.00 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317.00
Section 9: Licensing Fees. Licensing fees for various licenses issued under various
sections of the Arlington Municipal Code shall be as listed in Table 9: Licensing Fees.
Table 9: Licensing Fees
New Application / Renewal Business License under AMC Chapter 5.28 60.00
Peddlers & Solicitors License under AMC Chapter 5.04 25.00
Vehicles for Hire License under AMC Chapter 5.12
- First Vehicle
Each Vehicle thereafter
35.00
Sexually Oriented Adult Entertainment under AMC 5.36
Annual License for License of Manager and Entertainers Required
Annual License for the Adult Entertainment Business is Required
Section 10: Dog Licensing Fees.
10.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09 shall
be listed in Table 10: Dog Licensing Fees.
10.2 Per RCW 40.60.380, the City of Arlington shall honor a request by a blind person
or hearing-impaired person not to be charged a fee to license his or her guide
dog, or a request by a physically disabled person not to be charged a fee to
license his or her service animal.
10.3 All dogs require proof of current Rabies vaccination to be licensed.
Table 10: Dog Licensing Fees
Dog – unaltered (annual tag) 40.00
Dog – altered (lifetime tag) 20.00
Dog – altered (senior citizen owner – lifetime tag) 10.00
Replacement Tag Fee 5.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 19
Section 11: Fees for Police Services. Fees for various services, actions, and permits for
police services shall be as listed in Table 11: Fees for Police Services.
Table 11: Fees for Police Services
Fingerprinting 20.00
Concealed Weapons Permits:
1. New Permit
2. Permit Renewal
3. Lost or Stolen Permit
4. Late Renewal of Permit
All charges per RCW 9.41.070
5.00 Permitium service fee, plus 0.30
per transaction, plus 3.3% of total
transaction
Anti-Harassment Order Service (Includes service, return of
service, mileage & fuel costs) 80.00
Fine for Parking:
1. Fine for parking as described in Arlington Municipal
Code 10.54.160, Prohibited Parking
2. Fine if paid within 24 hours of issuance
3. Fine if not paid within 30 days of issuance, or if notice
of infraction is mailed, 33 days from the date the
50.00
25.00
100.00
Section 12: Fees for Duplication and Redaction of Public Records.
12.1 Fees for various services and actions for duplication and redaction of public
records shall be consistent with the provisions of RCW 42.56.120 and listed in Table
12: Fees for Public Records Services.
12.2 The City of Arlington finds that calculating the actual costs of scanning per page
in order to fulfill a public records request would be unduly burdensome for the
following reasons:
(a) The City employs over 120 employees. Because all City employees contribute
to the production of public records requests and all employees earn different
salaries or rate of pay, the public records officer would have to be privy to
salaries of all employees in order to calculate the invoice;
(b) Employees supplying scanned records to the public records officer would be
required to track time spent, thereby creating a burden for those employees
without workstations as well as additional work not assigned in many
employees’ job descriptions and or union contracts;
(c) The City’s public records officer would be required to maintain a record of all
employees who contribute to each part of a public record request and
potentially charge different amounts for multiple scanned pages;
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 20
(d) The City uses more than seven document scanning machines with different
costs and lease agreement fees which change from time to time. The cost of
supplies for the City’s various scanning machines is subject to change based
on current market rates. Calculating the portion of the machines and supplies
used toward scanning public records would require knowledge of the cost of
supplies and an in-depth analysis of timing and application multiplied by each
contributing employee’s hourly rate of pay; and
(e) The response time to a public records request may be delayed in order to
calculate scanning costs and create an invoice with different rates of scanning
charges.
Table 12: Fees for Public Records Services
In house copying of City documents for the public 0.15 per page
In house copying of City documents to PDF when original
document is not in electronic format 0.10 per page
Provision of files or attachments and provide by electronic
delivery 0.05 per 4 files or attachments
Electronic records transmission 0.10 per gigabyte (GB)
Storage media (USB or CD), container, envelope, and postage
delivery charge Actual cost
Duplication of documents and other media printed by outside Actual cost to produce
Staff redaction time for body-worn camera footage*
* The City will charge all requestor’s requesting body-worn
camera footage except those listed in RCW 42.56.240(e)(i) for
the time it takes the City to redact the footage, see RCW
42.56.240(14)(f)(1). These charges are based on the average
per minute salaries of the City employees responsible for
video redaction
0.98per minute multiplied by the
duration in minutes of the portion of
the video which is redacted
Section 13: Fees for Franchise Applications. Pursuant to AMC Title 21, fees for various
services and actions for franchise applications shall be listed in Table 13: Fees for
Franchise Applications.
Table 13: Fees for Franchise Applications
Franchise Application Fee 1,000.00
Legal Review of Franchise Application Actual costs
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 21
Section 14: Fees for GIS Products. Fees for various services and actions for GIS shall be
listed in Table 14: Fees for GIS Products.
Table 14: Fees for GIS Products
Zoning and Land Use Maps 14.00
11 x 17 8.00
2 x 3 15.00
3 x 3 22.00
3 x 4 28.00
Map CD 29.00
Data CDs / FTP 29.00 per client
Hourly Rate for Custom Work 140.00 per hour, ½ hour minimum
Laminating 4.00 per square foot
Shipping Actual Cost of container and postage
Section 15: Finance Department Services. Fees for various services, actions, and permits
for finance services shall be listed in Table 15: Fees for Finance Department Services.
Table 15: Fees for Finance Services
Non-Sufficient Funds – Dishonored or disallowed draft or check 35.00
Establishing a new utility account 20.00
Reactivating an existing utility account 20.00
Shut off processing fee 50.00
Meter Tampering Fee 200.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2026-
Page 22
Section 16: Repeal of Previous Fee Resolution. Resolution 2026-001 is hereby repealed.
Section 17: Effective Date. This resolution will become effective immediately upon
passage.
PASSED by the City Council and Approved by the Mayor this 26th day of May, 2026.
CITY OF ARLINGTON
__________________________________
Don E. Vanney, Mayor
ATTEST:
__________________________________
Raelynn Jones, City Clerk
APPROVED AS TO FORM:
__________________________________
Oskar Rey, City Attorney
City of Arlington Council Agenda Bill CA #6 Attachment June 1, 2026 Intergovernmental Agreement (IGA) for services between Snohomish County and the City of
IGA-2026-01 FOR SNOHOMISH COUNTY DIVERSION CENTER PARTICIPATION
Police; Chief Jonathan Ventura, 360-403-3400 EXPENDITURES REQUESTED: $0 BUDGET CATEGORY: BUDGETED AMOUNT: $10,000.00 LEGAL REVIEW: DESCRIPTION: Snohomish County and the City of Arlington for Snohomish County Diversion Center participation. There is currently no direct service fee (only incidental costs) to use the center as it is funded by State and County Chemical Dependency and Mental Health tax revenue. The City must contract with a social
The Arlington Police Department launched a Law Enforcement Embedded Social Worker (LEESW) program in 2018, pairing an officer with social worker. This Co-response team are committed to addressing issues affecting our community members, including homelessness, substance addiction, ALTERNATIVES: Take no action. Remand to staff for further review and discussion.
the City of Arlington for Snohomish County Diversion Center participation and authorize the Mayor to sign it pending legal review.
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 1 of 7
INTERGOVERNMENTAL AGREEMENT IGA-2026-01
FOR
SNOHOMISH COUNTY DIVERSION CENTER PARTICIPATION
This intergovernmental agreement for services between Snohomish County and the City of
Arlington (this “Agreement”), is made and entered into this ____ day of , 2026, by and
between Snohomish County, a political subdivision of the State of Washington (the “County”), and the
CITY OF ARLINGTON, a municipal corporation of the State of Washington (the “City”).
In consideration of the mutual promises contained in this Agreement and the mutual benefits to
result therefrom, the parties agree as follows:
1. Purpose of Agreement. The County operates the Snohomish County Diversion Center (the
“Diversion Center”). The Diversion Center is a facility that provides voluntary, temporary shelter and
access to services to unhoused individuals, who may reside there until treatment and/or housing
options are facilitated by social services professionals. The purpose and intent of this Agreement is to
allow the City to refer individuals identified by the City for participation in the Diversion Center Program
in accordance with the rules and conditions set by the County.
2. Effective Date and Duration. This Agreement shall take effect upon execution by both Parties.
This Agreement shall remain in effect through December 31, 2026, unless earlier terminated pursuant to
the provisions of Section 13 below, PROVIDED HOWEVER, that the term of this Agreement may be
extended or renewed for up to three (3) additional one (1) year terms by written notice from the County
to the City, PROVIDED FURTHER that each Party’s obligations after December 31, 2026, are contingent
upon local legislative appropriation of necessary funds for this specific purpose in accordance with
applicable law.
3. Administrators. Each party to this Agreement shall designate an individual (an “Administrator”),
who may be designated by title or position, to oversee and administer such party’s participation in this
Agreement. The parties’ initial Administrators shall be the following individuals:
County Administrator (HS): City Administrator:
Amanda Franke Jonathan Ventura
Behavioral Health Division Manager Police Chief
Snohomish County Human Services Police Department/Arlington
3000 Rockefeller Avenue M/S 305 110 E 3rd Street
Everett, Washington 98201 Arlington, Washington 98223
Either party may change its Administrator at any time by delivering written notice of such party’s new
Administrator to the other party.
4. County Services. As described in this Section 4, and subject to the conditions set forth in
Section 5 below, the County, through a third-party, hereinafter, “Contractor”, will accept eligible
individuals identified by the City (the “participants”) for participation in the Diversion Center program.
The Diversion Center program will provide temporary shelter and access to basic services to eligible
accepted individuals (“participants”). The Contractor will administer the Diversion Center program and
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 2 of 7
provide basic services. Contractor will provide short term shelter, access to services in the community,
access to behavioral health services and/or referrals, access to medication assisted withdrawal
management, and transition planning in collaboration with the social services professional who referred
the individual. In addition, the Contractor will provide participants meals, laundry equipment, storage
for small personal items, and basic hygiene kits during his/her participation in the Diversion Center
program. The length of stay is based on the time it takes social services professionals employed on
behalf of the City to facilitate treatment and housing, typically 2-4 weeks. Stays longer than thirty (30)
days will be monitored by the County and additional information may be requested by the County or
Contractor to justify stays longer than thirty (30) days. City shall respond within three (3) days to any
requests for information from County or its Contractor.
4.1 Eligibility/Acceptance. In order to be eligible for the Diversion Center program, the
Contractor must determine, at a minimum: 1) the City has met its obligations under Section 5 of
this agreement, 2) that the individual has successfully completed medical screening, described
in Section 5.2, 3) the individual is at least 18 years old, 4) the individual is a voluntary program
participant, stating a willingness to participate in services, and 5) the individual is willing to
agree to a Release of Information as necessary to allow the County, the Contractor, the City, and
any referral agencies to coordinate services. The Contractor shall have sole discretion to accept
or decline City referred individuals. The County may change or establish additional criteria for
eligibility at any time. The County will make reasonable effort to provide notice of any changes
in eligibility criteria to the Contractor and City in advance of implementation of any change.
4.2 Denial. If an individual referred by the City is denied participation in the Diversion Center
Program, the Contractor shall notify the referring social services professional or law
enforcement officer of the non-acceptance and the reason for the non-acceptance. Notification
may be made immediately in person to the City representative.
4.3 Diversion Center Limits. The County shall have the right to set the number of City
referred participants in the Diversion Center program. The County’s administrator shall have
the final authority in determining the maximum number of concurrent participants a City may
have.
4.4 Participant Removal. The Contractor reserves the right to remove an accepted
participant at any time. The Contractor will notify the City of its decision to remove the
participant. The City shall facilitate the return/transport of the individual back to his/her
community (jurisdiction).
4.5 Voluntary Participant Exit. If a participant chooses to leave the Diversion Center
independent of a planned program exit or removal, the City shall facilitate the return/transport
of the individual back to his/her community (jurisdiction).
5. City Responsibilities.
5.1 Embedded social services professional. The City shall employ or contract with a law
enforcement embedded social services professional and/or have a program modeled after the
Snohomish County Outreach Team (Scout), a partnership between its Sheriff’s Office and
Human Services Department. Social service professionals shall be assigned to work in the field
with City law enforcement officers to establish contact and relationships with potential
participants prior to transporting to the Diversion Center.
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 3 of 7
5.2 Medical Screening. The City shall facilitate transport of the referred individual to the
Diversion Center. Individuals must successfully complete the Diversion Center’s medical
screening to move forward in the eligibility criteria review. If the referred individual does not
successfully complete the medical screening, the City will return the individual to their
community (jurisdiction) or transport the individual to the hospital or walk-in medical clinic for
further screening, if medically necessary or otherwise indicated. If the individual is medically
cleared at a medical facility and if there is still an available spot at the Diversion Center, the City
may return the individual to the Diversion Center to complete the intake process.
5.3 Participant case management by City. The City will designate at least one social
services professional to remain engaged with each City participant staying at the Diversion
Center and will require the social services professional to contact the City participant no less
frequently than weekly. The social services professional will review the City participant’s
progress in the program. The City social services professional is expected to provide case
management services, monitor participant progress, and while the participant is staying at the
Diversion Center, actively seek out post-Diversion Center services, including but not limited to,
behavioral health treatment and housing.
5.5 Transportation. The City shall pay for transportation for City participants to and from
the Diversion Center. Transportation needs may include but are not limited to treatment,
medical appointments, other services, or court as needed.
5.6 Responsive to third party Contractor. The Contractor responsible for administering the
Diversion Center Program may contact the City to discuss a participant referred by that City.
The City shall respond to any contact from the Contractor about a participant within one (1)
business day.
5.7 City provides discharge items. The City shall provide discharge supplies or items for City
participants, as needed, upon discharge from the Diversion Center. Supplies may include but are
not limited to: a duffel bag or backpack, clothing/footwear, and transportation fare.
6. Cost to City. There is no fee for City use of the Diversion Center, given that the current
operations are fully supported through dedicated Washington State funding and Snohomish County
Chemical Dependency and Mental Health tax revenue. In the event that funding from either source is
reduced to the extent that other local sources of funding are necessary, the parties agree That the
County will give notice the funding source has ended. If that happens, the City may take person out of
programming or pay actual costs of services to the County.
7. Incidental Costs. In the event a City participant needs incidental items or services, including any
associated service fees, the City shall be responsible for coordinating payment for those incidental costs
directly to the provider.
8. Voluntary participation. Participation in the Diversion Center program is voluntary. To maintain
the integrity of the program and the safety of participants, individuals may be removed from the
Diversion Center program at any time, at the discretion of County or Contractor.
9. Indemnification/Hold Harmless.
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 4 of 7
9.1 County Held Harmless. The City agrees to protect, defend and hold harmless the
County, its officers, officials, employees and agents, from and against all claims, demands and
causes of action of any kind or character, including any cost of defense and attorney’s fees,
arising out of any actions, errors or omissions of the City, its officials, employees and agents in
performing this Agreement except for those arising out of the negligence of the County. This
indemnification obligation shall include, but is not limited to, all claims against the County by an
employee or former employee of the City, and the City, by mutual negotiation, expressly waives
all immunity and limitation on liability, as respects the County only, under any industrial
insurance act, including Title 51 RCW, other Worker’s Compensation act, disability benefit act,
or other employee benefit act of any jurisdiction which would otherwise be applicable in the
case of such claim.
In the event that the County incurs any judgment, award and/or cost including reasonable
attorney’s fees arising from the provisions of this subsection, or to enforce the provisions of this
subsection, any such judgment, award, fees, expenses and costs shall be recoverable from the
City. In the event of litigation between the parties to enforce the rights under this subsection,
reasonable attorney fees shall be allowed to the substantially prevailing party.
Nothing contained within this Section shall affect and/or alter the application of any other term
or condition of this Agreement. This hold harmless agreement and waiver of immunity was
mutually and expressly negotiated and agreed between the County and the City. The
indemnification, protection, defense and save harmless obligations contained herein shall
survive the expiration, abandonment or termination of this Agreement.
9.2 Waiver Under Washington Industrial Insurance Act. The foregoing indemnity is
specifically intended to constitute a waiver of each party’s immunity under Washington’s
Industrial Insurance Act, Chapter 51 RCW, as respects the other party only, and only to the
extent necessary to provide the indemnified party with a full and complete indemnity of claims
made by the indemnitor’s employees. The parties acknowledge that these provisions were
specifically negotiated and agreed upon by them.
10. Insurance. Each Party shall maintain its own insurance and/or self-insurance for its liabilities
from damage to property and /or injuries to persons arising out of its activities associated with this
Agreement as it deems reasonably appropriate and prudent. The maintenance of, or lack thereof of
insurance and/or self-insurance shall not limit the liability of the indemnifying part to the indemnified
party(s). Each Party shall provide the other with a certificate of insurance or letter of self-insurance
annually as the case may be.
11. Compliance with Laws. In the performance of its obligations under this Agreement, each party
shall comply with all applicable federal, state, and local laws, rules, and regulations.
12. Default. If either the County or the City fails to perform any act or obligation required to be
performed by it hereunder, the other party shall deliver written notice of such failure to the non-
performing party. The non-performing party shall have fifteen (15) days after its receipt of such notice in
which to correct its failure to perform the act or obligation at issue, after which time it shall be in default
(“Default”) under this Agreement; provided, however, that if the non-performance is of a type that
could not reasonably be cured within said fifteen (15) day period, then the non-performing party shall
not be in Default if it commences cure within said fifteen (15) day period and thereafter diligently
pursues cure to completion.
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 5 of 7
13. Early Termination.
13.1 Termination by the County. Except as provided in Section 13.3 below, the County may
terminate this Agreement at any time, with or without cause, upon not less than thirty (30) days
advance written notice to the City. The termination notice shall specify the date on which the
Agreement shall terminate.
13.2 Termination by the City. The City may terminate this Agreement at any time, with or
without cause, upon not less than thirty (30) days advance written notice to the County. The
termination notice shall specify the date on which the Agreement shall terminate, the grounds
for termination, and the specific plans for accommodating the affected participants.
13.3 Lack of Funding. This Agreement is contingent upon governmental funding and local
legislative appropriations. In the event that funding from any source is withdrawn, reduced,
limited, or not appropriated after the effective date of this Agreement, this Agreement may be
terminated by the County immediately by delivering written notice to the City. The termination
notice shall specify the date on which the Agreement shall terminate.
14. Notices. All notices required to be given by any party to the other party under this Agreement
shall be in writing and shall be delivered either in person, by United States mail, or by electronic mail
(email) to the applicable Administrator or the Administrator’s designee. Notice delivered in person shall
be deemed given when accepted by the recipient. Notice by United States mail shall be deemed given as
of the date the same is deposited in the United States mail, postage prepaid, and addressed to the
Administrator, or their designee, at the addresses set forth in Section 3 of this Agreement. Notice
delivered by email shall be deemed given as of the date and time received by the recipient.
15. Miscellaneous.
15.1 Entire Agreement; Amendment. This Agreement constitutes the entire agreement
between the parties regarding the subject matter hereof, and supersedes any and all prior oral
or written agreements between the parties regarding the subject matter contained herein. This
Agreement may not be modified or amended in any manner except by a written document
executed with the same formalities as required for this Agreement and signed by the party
against whom such modification is sought to be enforced.
15.2 Conflicts between Attachments and Text. Should any conflicts exist between any
attached exhibit or schedule and the text or main body of this Agreement, the text or main body
of this Agreement shall prevail.
15.3 Governing Law and Venue. This Agreement shall be governed by and enforced in
accordance with the laws of the State of Washington. The venue of any action arising out of this
Agreement shall be in the Superior Court of the State of Washington, in and for Snohomish
County. In the event that a lawsuit is instituted to enforce any provision of this Agreement, the
prevailing party shall be entitled to recover all costs of such a lawsuit, including reasonable
attorney’s fees.
15.4 Interpretation. This Agreement and each of the terms and provisions of it are deemed
to have been explicitly negotiated by the parties, and the language in all parts of this Agreement
shall, in all cases, be construed according to its fair meaning and not strictly for or against either
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 6 of 7
of the parties hereto. The captions and headings in this Agreement are used only for
convenience and are not intended to affect the interpretation of the provisions of this
Agreement. This Agreement shall be construed so that wherever applicable the use of the
singular number shall include the plural number, and vice versa, and the use of any gender shall
be applicable to all genders.
15.5 Severability. If any provision of this Agreement or the application thereof to any person
or circumstance shall, for any reason and to any extent, be found invalid or unenforceable, the
remainder of this Agreement and the application of that provision to other persons or
circumstances shall not be affected thereby, but shall instead continue in full force and effect, to
the extent permitted by law.
15.6 No Waiver. A party’s forbearance or delay in exercising any right or remedy with
respect to a Default by the other party under this Agreement shall not constitute a waiver of the
Default at issue. Nor shall a waiver by either party of any particular Default constitute a waiver
of any other Default or any similar future Default.
15.7 No Assignment. This Agreement shall not be assigned, either in whole or in part, by
either party without the express written consent of the other party, which may be granted or
withheld in such party’s sole discretion. Any attempt to assign this Agreement in violation of the
preceding sentence shall be null and void and shall constitute a Default under this Agreement.
15.8 Warranty of Authority. Each of the signatories hereto warrants and represents that he
or she is competent and authorized to enter into this Agreement on behalf of the party for
whom he or she purports to sign this Agreement.
15.9 Independent Contractor. The County will perform all Services under this Agreement as
an independent contractor and not as an agent, employee, or servant of the City. The County
shall be solely responsible for control, supervision, direction and discipline of its personnel, who
shall be employees and agents of the County and not the City. The County has the express right
to direct and control the County’s activities in providing the Services in accordance with the
specifications set out in this Agreement. The City shall only have the right to ensure
performance.
15.10 No Joint Venture. Nothing contained in this Agreement shall be construed as creating
any type or manner of partnership, joint venture or other joint enterprise between the parties.
15.11 No Separate Entity Necessary. The parties agree that no separate legal or
administrative entities are necessary to carry out this Agreement.
15.12 Ownership of Property. Except as expressly provided to the contrary in this Agreement,
any real or personal property used or acquired by either party in connection with its
performance under this Agreement will remain the sole property of such party, and the other
party shall have no interest therein.
15.13 No Third Party Beneficiaries. This Agreement and each and every provision hereof is
for the sole benefit of the City and the County. No other persons or parties shall be deemed to
have any rights in, under or to this Agreement.
15.14 Force Majeure. In the event either party’s performance of any of the provisions of this
Agreement become impossible due to circumstances beyond that party’s control, including
Diversion Center Agreement
City of Arlington
IGA-2026-01
Page 7 of 7
without limitation, force majeure, strikes, embargoes, shortages of labor or materials,
governmental regulations, acts of God, war or other strife, that party will be excused from
performing such obligations until such time as the Force Majeure event has ended and all
facilities and operations have been repaired and/or restored.
15.15 Execution in Counterparts. This Agreement may be executed in two or more
counterparts, each of which shall constitute an original and all of which shall constitute one and
the same agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement as of the date first above written.
SNOHOMISH COUNTY: THE CITY OF ARLINGTON:
Dave Somers Date Don E. Vanney
Mayor, City of Arlington
Date
Snohomish County Executive
Approved as to form only: Approved as to form only:
___________________________________
Deputy Prosecuting Attorney Date City Attorney Date
City of Arlington Council Agenda Bill NB #1 Attachment June 1, 2026 Meeting March and April 2026 Financial Reports
Narrative General Fund Operating Statement Revenue Charts Other Fund Operating Statements
Finance Department; Shelby Burke, Finance Director 360-403-3423 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION:
ALTERNATIVES:
March 2026 Financial Report – Shelby Burke, Finance
Director
1
Sales Tax Revenue:
Represents 27% of the General Funds budgeted revenues.
Sales Tax Revenue Trends (YTD through March)
2026: An 8% increase over 2025.
2025: A 3% increase over 2024.
2026 Budget: A 12% increase over 2025 actuals
To date we are experiencing an 8% increase compared to 2025, but this is only based
on 3 months of the budget to date.
Sales Tax Revenue Trends (March revenue collected in January)
2026: A 2% increase over 2025.
2025: A 6% increase over 2024.
2024: A 7% decline from 2023.
2023: A 18% decline compared to 2022.
2022: Revenues increased steadily by 70% compared to 2021 due to the large
construction project for the Amazon facility.
The chart below presents total sales tax revenues for March across recent years:
Sales Tax
Year-To-Date Mar-26 Feb-26 Jan-26
Actual 579,421.35 735,758.53 641,342.43
Total 1,956,522.31 1,377,100.96 641,342.43
Budget 8,510,606.00 8,510,606.00 8,510,606.00
(over)/under 6,554,083.69 7,133,505.04 7,869,263.57
Percent 22.99% 16.18% 7.54%
GENERAL FUND
2
The three largest sources of sales tax revenue are retail, services, and construction.
Below is a summary of their current performance:
• Retail
o Represents 45% of March’s total sales tax revenue.
o Experiencing a 2% decline from 2025 and overall average decline of 2%
since 2022.
• Services
o Accounts for 22% of March’s total.
o Demonstrates consistent growth, averaging a 7% annual increase since
2022.
• Construction
o Contributes 15% of March’s total.
o Shows a 12% increase compared to March 2025, a significant
improvement following sharp declines of 50% in March 2023 (vs. 2022)
and 39% in February 2024 (vs. 2023). Construction sales tax revenues were
very high in 2022 due to the new Amazon facility that was built.
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
2022 2023 2024 2025 2026
Total Sales Tax Revenue-March
3
245,000.00
250,000.00
255,000.00
260,000.00
265,000.00
270,000.00
275,000.00
280,000.00
285,000.00
2022 2023 2024 2025 2026
Retail Sales Tax-March
-
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
140,000.00
2022 2023 2024 2025 2026
Services Sales Tax-March
4
Utility Tax Revenue:
Utility Tax accounts for approximately 13% of the General Fund’s budgeted revenues.
The tax is assessed on utility providers operating within the City, including water,
sewer, natural gas, solid waste/garbage, cable television, telephone, and electricity
(e.g., the Public Utility District (PUD) for electricity sales). Revenues are received
monthly and fluctuate based on customer usage.
In March, the City received $377k, which is more than the typical monthly average of
$346k. In March of 2025, the City received $473k. While this represents a notable
decline compared with the same period last year, the decrease may be attributable to
warmer-than-usual weather this March, which likely reduced utility usage.
Month-to-month fluctuations in this revenue category are expected, and we anticipate
meeting the budgeted amount by year-end. Utility Tax revenue exceeded the budget
by nearly 5% in 2025, indicating there is still time to recover and potentially meet
current-year projections.
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
2022 2023 2024 2025 2026
Construction Sales Tax-March
5
All other General Fund Revenues:
As of march, year-to-date revenues total approximately 20% of the annual budget—
about 5% below the level that would be expected if revenues were received evenly
throughout the year (i.e., 3 of 12 months, or roughly 25%). However, General Fund
revenues are not received in equal monthly distributions. Many revenue sources are
either collected in non-monthly cycles or generate amounts too small to warrant
detailed month-by-month reporting. For example, property tax is distributed in two
large installments each year, leasehold excise tax is typically received in larger quarterly
distributions, and other sources—such as the affordable housing tax, criminal justice
tax, and natural gas use tax—generally generate smaller monthly amounts.
Revenues are currently below the proportional year-to-date budget benchmark, and
they are lower than the same period in 2025: $4.8 million year-to-date compared to
$4.9 million in 2025.
Expenses:
Expenses total approximately 21% of the year-to-date budget, which is about 4%
below the amount budgeted through February and 3% lower than 2025 spending for
the same period. We will continue to monitor expenditures closely, as inflationary
pressures are driving costs upward faster than revenue growth. Leadership will also
continue to identify and implement cost-saving strategies to reduce the risk that
expenditures exceed revenues by year-end.
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
400,000.00
450,000.00
500,000.00
Utility Tax Revenue by Month
6
Lodging Tax Fund:
The City collects a 2% tax on lodging stays. The money in this fund is used to promote
tourism in and around the city.
As of the end of March, we have collected $32k in revenue so far for 2026. This
represents an almost 2% increase compared to the same period last year.
However, we have received recent feedback from our lodging partners indicating that
overnight stays in the area have declined recently relative to previous years. If this
trend continues, we may see revenue figures stabilize or decline in future periods.
We will keep this in mind when deciding the total amount of LTAC grant awards we can
fund for 2027.
Real Estate Excise Tax (REET) I and II: These funds are used to collect real estate excise
tax on property sales and can be used for capital projects within the City, maintenance
and debt service.
$-
$10,000.00
$20,000.00
$30,000.00
$40,000.00
2021 2022 2023 2024 2025 2026
Lodging Tax YTD
7
As of the end of March, we have collected nearly $130,000 for 2026, representing a
31% increase compared to the same period in 2025. If home sales continue to increase,
it could be an encouraging sign that the economy is improving.
$-
$20,000.00
$40,000.00
$60,000.00
$80,000.00
$100,000.00
$120,000.00
$140,000.00
$160,000.00
$180,000.00
$200,000.00
2021 2022 2023 2024 2025 2026
REET I YTD
$-
$20,000.00
$40,000.00
$60,000.00
$80,000.00
$100,000.00
$120,000.00
$140,000.00
$160,000.00
$180,000.00
$200,000.00
2021 2022 2023 2024 2025 2026
REET II YTD
8
We are finally anticipated to complete our audits with the State Auditor’s Office (SAO).
The process has taken longer than usual due to scheduling constraints with SAO and the
need to finalize one remaining component. We anticipate completing the audit within
the next month. Following this, an exit conference will be scheduled to review the audit
results and discuss any recommendations provided by the auditors.
Approval Date
4/6/2026 IT - Wa Military Grant -
State & Local
cybersecurity Grant
cybersecurity risks and threats.
cyber security tools, to
address cybersecurity
risks and threats.
facility - upgrading for both beginner and more experienced
riders. Original budget $456,600 -
amendment. Funding from the Rotary, Stilly Tribe, Amazon
Truck - Design Phase
Truck Park - Design
GENERAL FUND OPERATING STATEMENT
MARCH
YTD % OF YTD % OF
2026 2026 ANNUAL 2025 2025 TOTAL
ACTUAL BUDGET BUDGET ACTUAL BUDGET ACTUAL
REVENUE SOURCES
TAXES:
-PROPERTY 111,737$ 5,214,703$ 2.14% 110,360$ 5,019,207$ 2.20%
-SALES - 1% City 1,956,522$ 8,510,606$ 22.99% 1,812,566$ 8,105,339$ 22.36%
-SALES - 0.1% SnoCo Crim Just. 145,315$ 555,269$ 26.17% 141,172$ 533,913$ 26.44%
-AFFORDABLE HOUSING - SHB 1406 10,052$ 45,000$ 22.34% 14,050$ 45,000$ 31.22%
-UTILITY 1,095,988$ 4,059,048$ 27.00% 1,200,123$ 3,866,217$ 31.04%
-LEASEHOLD EXCISE 78,708$ 175,298$ 44.90% 86,212$ 166,950$ 51.64%
-GAMBLING 51,126$ 206,300$ 24.78% 62,796$ 200,300$ 31.35%
LICENSES & PERMITS 84,924$ 381,707$ 22.25% 104,873$ 375,207$ 27.95%
INTERGOV REVENUE 225,938$ 763,139$ 29.61% 293,401$ 832,186$ 35.26%
MOBILE INTEGRATED HEALTH GRANT -$ -$ #DIV/0! 87,500$ 287,500$ 30.43%
CHARGES FOR SERVICES 536,246$ 1,985,428$ 27.01% 527,145$ 1,904,020$ 27.69%
FINES & FORFEITURES 11,618$ 131,800$ 8.81% 21,498$ 131,800$ 16.31%
MISC REVENUE 113,856$ 574,142$ 19.83% 96,877$ 568,111$ 17.05%
OTHER FIN SOURCES/TRANSFERS 416,369$ 1,917,970$ 21.71% 345,474$ 1,694,000$ 20.39%
TOTAL REVENUES 4,838,400 24,520,410 19.73% 4,904,048 23,729,750 20.67%
BEGINNING FUND BALANCE 6,951,826$ 6,165,717$ 6,655,471$ 6,800,000$
TOTAL REVENUES + BEG FUND BAL. 11,790,226 30,686,127 11,559,517 30,529,750
EXPENDITURES
LEGISLATIVE 80,217$ 360,892$ 22.23% 92,087$ 336,831$ 27.34%
EXECUTIVE 445,803$ 2,133,381$ 20.90% 503,652$ 2,073,513$ 24.29%
FINANCE 485,923$ 2,112,926$ 23.00% 458,168$ 1,768,907$ 25.90%
LEGAL 18,861$ 150,000$ 12.57% 24,601$ 150,000$ 16.40%
PERSONNEL 54,179$ 233,200$ 23.23% 34,571$ 233,200$ 14.82%
INFORMATION TECHNOLOGY 256,822$ 1,058,541$ 24.26% 242,414$ 975,594$ 24.85%
MEMBERSHIPS 53,881$ 154,978$ 34.77% 61,559$ 151,245$ 40.70%
LAW ENFORCEMENT 2,865,665$ 12,935,735$ 22.15% 2,808,011$ 11,570,120$ 24.27%
FIRE CONTROL 21,627$ 24,369$ 88.75% 21,309$ 19,495$ 109.30%
SHB - 1406 LOW INCOME ASSIST 399$ 50,000$ 0.80% -$ 50,000$ 0.00%
RECYCLING -$ 20,000$ 0.00% -$ 18,000$ 0.00%
COMMUNITY DEVELOPMENT 573,700$ 2,868,011$ 20.00% 520,641$ 2,787,477$ 18.68%
MOBILE INTEGRATED HEALTH -$ -$ #DIV/0! 58,333$ 287,500$ 20.29%
CAPITAL OUTLAY 59,104$ 493,398$ 11.98% 186,661$ 371,498$ 50.25%
NON-EXPENDITURES 16,619$ 7,400$ 224.58% 3,390$ 7,400$ 45.82%
DEBT SERVICE 350$ 1,085,891$ 0.03% -$ 1,081,091$ 0.00%
INTERFUND TRANSACTIONS 602,740$ 3,225,507$ 18.69% 709,148$ 3,032,162$ 23.39%
TOTAL EXPENSES 5,535,891 26,914,229 20.57% 5,724,545 24,914,033 22.98%
Percentage of budget allocated to March 25%
ENDING FUND BALANCE 6,254,335 3,771,898 5,834,972 5,615,717
2 month reserve balance (4,224,141)
2025 debt obligations (1,103,195)
Available Fund Balance 926,999
TOTAL EXPEND + FUND BALANCE 11,790,226$ 30,686,127$ 11,559,517$ 30,529,750$
FUND 004 GENERAL FUND MANDATORY RESERVE
This fund will be used to accumulate a reserve amount for the General Fund in accordance with the City's Financial
Policy.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 2,969,517$ 2,969,517$ 100.0%
YTD Revenues -Transfers-in- GF -$ 280,000$ 0.0%
YTD Expenditures -$ -$ #DIV/0!
End Fund Balance 2,969,517$ 3,249,517$ 91.4%
FUND 005 GENERAL FUND - PROGRAM DEVELOPMENT
This fund will be used for unexpected programs resulting from unanticipated mandates, or to ensure the safety and
well-being of the community.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance -$ 151,240$ 0.0%
Transfer In
YTD Expenditures -$ 151,240$ 0.0%
End Fund Balance -$ -$ #DIV/0!
FUND 006 GENERAL FUND CED PERMITTING
This is an internal managerial fund to account for permit related revenues in accordance with RCW 82.02.020.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 5,174,230$ 3,651,400$ 141.7%
Building Permits 97,748$ 700,000$ 14.0%
ROW/Grading Permits 22,857$ 80,000$ 28.6%
Site Civil Permits 3,000$ 300,000$ 1.0%
Bldg Plan Review Fees 111,525$ 500,000$ 22.3%
Land Use Permit Fees 58,281$ 80,000$ 72.9%
MISC - credit card surcharge 511$ 10,000$ 5.1%
YTD Revenues 293,923$ 1,670,000$ 17.6%
Expense Allocation to GF 416,369$ 1,761,830$ 23.6%
Equipment Replacement 3,681$ 13,500$ 27.3%
Expense Allocation to PW 2,802$ 14,000$ 20.0%For GIS services related to development
End Fund Balance 5,045,300$ 3,532,070$ 142.8%
FUND 008 OPIOID SETTLEMENT FUND
This fund will be used to account for opioid settlements received under the Distributor and Janssen Agreements.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 243,630$ 243,630$ 100.0%
YTD Revenues -$ 84,927$
YTD Expenditures 55,091$ 328,557$
End Fund Balance 188,539$ -$ no planned ues of funding
OTHER FUNDS OPERATING STATEMENT
SPECIAL REVENUE FUNDS (100 - 199)
FUND 101 STREET MAINTENANCE FUND
This fund is responsible for maintaining all public streets and roadways (patching, paving and sealing of roads,
sidewalk repair and maint., and other roadway functions including sweeping and snow removal)
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 5,641$ 246,801$ 2.3%
Intergovernmental Revenues 110,245$ 450,650$ 24.5%
Interfund Transfers 136,360$ 570,000$ 23.9%
Misc. Revenues 23,805$ 66,000$ 36.1%NCTRS Q4 2024 pmt
YTD Revenues 270,410$ 1,086,650$ 24.9%
Supplies 12,366$ 132,500$ 9.3%
Other Services & Charges 60,565$ 407,258$ 14.9%
Interfund Payment for Svcs 100,539$ 486,149$ 20.7%
M&O services - potholes, should maint,
sign maint, holiday and events
Transfers to M&O -$ 11,652$ 0.0%
Transfers to Equip Replace 5,560$ 20,400$ 27.3%
YTD Expenditures 179,030$ 1,057,959$ 16.9%
End Fund Balance 97,020$ 275,492$ 35.2%
FUND 107 GROWTH MANAGEMENT FUND
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 4,025,930$ 3,023,569$ 133.2%
TrafficMitigation Fees 21,248$ 300,000$ 7.1%
Park Mitigation Fees 17,127$ 25,000$ 68.5%
CIC Mitigation 5,871$ 90,000$ 6.5%
Tree Mitigation Fees (23,380)$ 2,500$ -935.2%
Interest Income 23,230$ 40,000$ 58.1%
YTD Revenues 44,097$ 457,500$ 9.6%
YTD Expenditures 611$ 663,407$ 0.1%
End Fund Balance 4,069,415$ 2,817,662$ 144.4%
Approx $1.1 million in park mitigation
obligated
To account for the proceeds of specific revenue sources, other than capital projects that are legally restricted to expenditure
for specified purposes. These funds cannot be used for general fund purposes. The general fund can be reimbursed for
services provided to these funds (i.e. accounting/admin/IT...etc)
This fund is used to track mitigation fees collected for new construction impacts. The funds must be used within 10 years
and expended for infrastructure improvements relating to growth.
FUND 111 PUBLIC ART FUND
The public art fund is established through an ordinance adopted by City Council. Funding is provided from 10% of the
amounts collected by the City for construction related sales tax revenues. Expenditures are to be made on art and
art-related projects approved through the City's budget process.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 138,728$ 74,300$ 187%
Transfer In GF - constr. sales tax -$ 25,000$ 0%
Donations/Interest 797$ 1,000$ 80%
YTD Revenues 797$ 26,000$ 3%
YTD Expenditures 1,571$ 79,000$ 2%
End Fund Balance 137,955$ 21,300$ 648%
FUND 114 LODGING TAX FUND
The City collects a 2% tax on lodging stays. The money in this fund is used to promote tourism in and around
the city. The Lodging Tax Advisory Committee makes a recommendation to the City Council for the distribution of
funds to local non-profit and marketing organizations, following a competitive grant process.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 215,755$ 105,948$ 203.6%
Hotel/Motel Tax 32,222$ 147,000$ 21.9%
Interest Income 1,313$ 3,000$ 43.8%
YTD Revenues 33,535$ 150,000$ 22.4%
YTD Expenditures 13,454$ 197,654$ 6.8%
End Fund Balance 235,836$ 58,294$ 404.6%
FUND 116 CEMETERY OPERATIONS FUND
This Fund provides for the operation and maintenance of the Arlington Cemetery. Services provided include;
internment services, and maintenance of the landscape and the various structures.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 44,135$ 35,108$ 125.7%
Charges for Services 86,874$ 320,845$ 27.1%
Misc -Investment Interest 552$ 515$ 107.1%
Transfer In -$ -$ from general fund
YTD Revenues 87,426$ 321,360$ 27.2%
Salaries & Wages 23,137$ 90,866$ 25.5%
Personnel Benefits 9,314$ 42,927$ 21.7%
Supplies 5,743$ 44,400$ 12.9%
Other Services & Charges 11,107$ 33,051$ 33.6%WCIA paid in Jan
Intergov Serv & Taxes 796$ 3,986$ 20.0%
Interfund Payment for Svcs 10,235$ 65,286$ 15.7%
Transfers to Equip Replace 3,027$ 11,091$ 27.3%
Transfer to Cemetery Capital -$ -$
Transfer to Endowment Fund 6,475$ 23,175$ 27.9%
YTD Expenditures 69,835$ 314,782$ 22.2%
End Fund Balance 61,725$ 41,686$ 148.1%
FUND 180 TRANSPORTATION SALES TAX FUND
This Fund collects 2/10ths of one percent sales tax for the purpose of pavement preservation. This was formerly the
Transportation Benefit District (TBD) Fund, the city absorbed the TBD 1/1/18 and the fund has been renamed.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 2,731,085$ 2,952,921$ 92.5%
Sales Tax 460,358$ 2,060,958$ 22.3%
Grant Income 139,237$ -$
Interest Income 16,644$ 90,000$
YTD Revenues 616,239$ 2,150,958$ 28.6%
YTD Expenditures 80,570$ 4,280,000$ 1.9%
End Fund Balance 3,266,754$ 823,879$ 396.5%
CAPITAL PROJECTS FUNDS (300 - 399)
To account for financial resources to be used for the acquisition or construction of major capital facilities (other than
those financed by proprietary funds and trust funds). These funds cannot be transferred and used for General Fund
purposes.
FUND 303 REAL ESTATE EXCISE TAX 1 FUND (FIRST 1/4% TAX)
This fund is used to collect the first 1/4% of real estate excise tax on property sales and can be used for capital projects
within the City, maintenance and debt service.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 1,140,920$ 1,615,101$ 70.6%
REET 130,126$ 640,000$ 20.3%
Interest Income/Misc 6,901$ 30,000$ 23.0%
YTD Revenues 137,026$ 670,000$ 20.5%
2020 LTGO - Principal/Interest -$ 217,837$ 0.0%
Transfer Out -$ 70,000$ 0.0%
YTD Expenditures -$ 287,837$ 0.0%
End Fund Balance 1,277,946$ 1,997,264$ 64.0%
FUND 304 REAL ESTATE EXCISE TAX 2 FUND (SECOND 1/4% TAX)
This fund is used to collect the second 1/4% of real estate excise tax on property sales and can be used for capital
projects within the City, maintenance and debt service.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 2,879,019$ 2,682,838$ 107.3%
REET 130,126$ 645,000$ 20.2%
Interest Income 16,918$ 30,000$ 56.4%
YTD Revenues 147,043$ 675,000$ 21.8%
2020 LTGO - Principal/Interest -$ 222,300$ 0.0%
Transfer to - Trans Improv -$ -$ #DIV/0!
End Fund Balance 3,026,063$ 3,135,538$ 96.5%
FUND 305 CAPITAL FACILITIES/BUILDING FUND
This fund is used to fund future building needs.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 4,407,455$ 2,698,814$ 163.3%
Investment Interest 25,400$ 25,000$ 101.6%
Transfer in - General Fund -$ 50,000$ 0.0%
YTD Revenues 25,400$ 75,000$ 33.9%
YTD Expenditures 689$ 1,900,000$ 0.0%
End Fund Balance 4,432,166$ 873,814$ 507.2%
FUND 306 BOND CONSTRUCTION FUND
This fund is used to account for the 2020 LTGO bond proceeds - to be used for the construction of Fire Station 48,
a police impound facility and M&O facility.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 502,566$ 400,000$ 125.6%
Interest 2,869$ -$ #DIV/0!
Transfer In - Utilities -$ -$
Transfer In - Capital Facilities -$ -$
YTD Revenues 2,869$ -$ #DIV/0!
YTD Expenditures 80,461$ 550,000$ 14.6%
End Fund Balance 424,974$ (150,000)$
FUND 310 TRANSPORTATION IMPROVEMENT FUND
This fund accounts for all transportation related capital improvements.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 997,922$ 2,066,314$ 48.3%
Grant Receipts 110,575$ 12,633,197$ 0.9%
Interest 5,823$ -$
Transfers-In-Growth -$ 663,407$ 0.0%
Transfers In - REET -$ -$ #DIV/0!
Transfers In - Capital Facilities -$ -$
YTD Revenues 116,398$ 13,296,604$ 0.9%
YTD Expenditures 301,549$ 15,362,918$ 2.0%
End Fund Balance 812,772$ -$ 2.0%
FUND 311 PARKS IMPROVEMENT FUND
This fund is to account for all Parks related capital improvement projects.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 426,922$ 12,700$ 3361.6%
Interest/Donations/Other 4,028$ 359,500$ 1.1%
Grants -$ 763,570$ 0.0%
Transfer In -$ -$
Transfer in - Growth Fund 611$ -$ Smokey Pt Park
Transfer In - Park Miitgation -$ -$ Smokey Pt Park
YTD Revenues 4,639$ 1,123,070$ 0.4%
Pickleball Court -$ -$
Park Improvements - General 2,575$ 1,020,770$ 0.3%
Design for commercial kitchen, pump
track park
Jensen Park Restrooms 48,923$ -$
Park Improvements - Maint Plan -$ 100,000$ 0.0%
Smokey Point Park -$ -$
counc approve ase on .
Amendment will be needed at conclusion
Veteran's Memorial Plaques -$ 500$ 0.0%
YTD Expenditures 51,498$ 1,121,270$ 4.6%
End Fund Balance 380,063$ 14,500$ 2621.1%
FUND 316 CEMETERY CAPITAL IMPROVEMENT FUND
This fund is used to account for any improvements made at the Arlington Cemetery
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 118,777$ 83,408$ 142.4%
Transfer In - Cemetery Ops -$ -$
Cemetery Rehab Grant -$ -$
Interest 685$ 950$ 72.1%
YTD Revenues 685$ 950$ 72.1%
YTD Expenditures -$ 65,500$ 0.0%
End Fund Balance 119,462$ 18,858$ 633.5%
FUND 320 EQUIPMENT RENTAL REPLACEMENT FUND
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 2,864,297$ 2,146,429$ 133.4%
Department Contributions 433,038$ 1,600,317$ 27.1%
DOE Grant -$ -$
Insurance Proceeds 13,912$ -$
Sale of Fixed Assets 6,000$ 2,200$ 272.7%
Program Fees - Field Use 1,020$ 30,000$ 3.4%
Interest Income 15,801$ 26,000$ 60.8%
YTD Revenues 469,770$ 1,658,517$ 28.3%
YTD Expenditures 561,463$ 1,737,496$ 32.3%
End Fund Balance 2,772,605$ 2,067,450$ 134.1%
ENTERPRISE FUNDS (400 - 499)
An enterprise fund may be used to report activity for which a fee is charged to external users for goods or services.
An enterprise fund is also required for any activity whose principal revenue sources meet any of the following criteria;
Debt backed solely by fees and charges, legal requirements to recover costs or policy decisions to recover costs.
This fund is used to account for the accumulation of resources for the future replacement of vehicles and equipment when
the useful lives of those assets are nearing the end.
FUND 402 AIRPORT
The operation of the Airport Fund includes airport land facility management and maintenance; aviation, industrial and
commercial development; security and administrative services and airport planning.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 348,357$ 661,684$ 52.6%
Rental Income 2,093,123$ 4,286,382$ 48.8%
Grant Revenue -$ -$ #DIV/0!
Misc Revenues 13,214$ 50,900$ 26.0%
Non-Revenues 247,458$ 477,436$ 51.8%
Transfers from Cap Fac Fd -$ -$ #DIV/0!
Other Revenues -$ 12,152$ 0.0%
YTD Revenues 2,353,794$ 4,826,870$ 48.8%
Salaries & Wages 169,090$ 697,203$ 24.3%
Personnel Benefits 54,306$ 259,539$ 20.9%
Supplies 17,631$ 66,960$ 26.3%
Other Services & Charges 167,147$ 472,421$ 35.4%WCIA insurance paid in Jan
Non-Expenditures 600$ 495,100$ 0.1%
Capital Outlays 63,990$ 1,315,250$ 4.9%
Debt Service -$ -$
Interfund Payment for Services 445,408$ 1,691,902$ 26.3%
Transfers to Equip Replace 22,202$ 81,410$ 27.3%
Transfer to PW 2,384$ 3,000$ 79.5%
Transfer to Reserve -$ 50,000$ 0.0%
YTD Expenditures 942,759$ 5,132,785$ 18.4%
End Fund Balance 1,759,393$ 355,769$ 494.5%
FUND 403 WATER
The Water Division's responsibility is to provide clean, clear, potable water to utility customers and deliver the product
economically and plentifully to the customers.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance-Water 1,354,486$ 1,079,850$ 125.4%
Charges for Services 1,107,104$ 5,128,400$ 21.6%
Fines & Penalties 7,633$ 24,000$ 31.8%
Grant Income -$ -$ #DIV/0!
Miscellaneous-Int. Income 44,172$ 133,121$ 33.2%
YTD Revenues-Water 1,158,909$ 5,285,521$ 21.9%
Salaries & Wages 410,516$ 1,869,055$ 22.0%
Personnel Benefits 142,600$ 738,132$ 19.3%
Supplies 74,118$ 587,420$ 12.6%
Other Services & Charges 177,795$ 500,784$ 35.5%WCIA insurance paid in Jan
Intergov Serv & Taxes 94,644$ 518,170$ 18.3%
Interfund Payment for Services 72,013$ 258,780$ 27.8%
Transfers to Equip Replace 33,126$ 121,462$ 27.3%
YTD Expenditures-Water 1,004,812$ 4,593,803$ 21.9%
End Fund Balance-Water 1,508,583$ 1,771,568$ 85.2%
FUND 404 WASTEWATER
The Wastewater or Sewer Division is charged with treating industrial and domestic wastes. Sewer maintenance
insures that the system is leak and seepage proof, unblocked by sand, grease, or roots, and properly graded
to move waste efficiently to the treatment plant. The treated water can then be sent back to the Stillaguamish River
cleaner than when it wasoriginally taken out.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance-Sewer 1,348,870$ 1,018,642$ 132.4%
Charges for Services 1,982,659$ 7,869,307$ 25.2%
Fines & Penalties 10,281$ 20,000$ 51.4%
Grant Income -$ -$ #DIV/0!
Miscellaneous-Interest Income 46,771$ 129,021$ 36.3%
YTD Revenues-Sewer 2,039,711$ 8,018,328$ 25.4%
Salaries & Wages 411,171$ 1,864,030$ 22.1%
Personnel Benefits 149,289$ 751,044$ 19.9%
Supplies 67,254$ 311,949$ 21.6%
Other Services & Charges 450,112$ 1,228,187$ 36.6%WCIA insurance paid in Jan
Intergov Serv & Taxes 131,685$ 563,465$ 23.4%
Debt Service -$ 2,008,724$ 0.0%
Interfund Payment for Services 122,368$ 437,297$ 28.0%
Transfers to Equip Replace 34,564$ 126,740$ 27.3%
Transfer to Sewer Reserve -$ 725,000$ 0.0%
Transfer - Cemetery Payroll -$ -$
YTD Expenditures-Sewer 1,366,442$ 8,016,436$ 17.0%
End Fund Balance-Sewer 2,022,139$ 1,020,534$ 198.1%
FUND 405 WATER CAPITAL IMPROVEMENT FUND
This fund is used to account for major capital projects constructed by the Water division. All revenues from new
connection fees are receipted into this fund as well as a small portion of the monthly utility rate.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 5,095,521$ 2,219,460$ 229.6%
Other Funding -$ 8,725,000$ 0.0%
Water Connection Fees -$ 257,920$ 0.0%
Interest Income/Misc 27,683$ 15,000$ 184.6%
Transfer-In-Water Fund -$ 750,000$ 0.0%
YTD Revenues 27,683$ 9,747,920$ 0.3%
YTD Expenditures 264,763$ 11,422,100$ 2.3%
End Fund Balance 4,858,441$ 545,280$ 891.0%
FUND 406 SEWER CAPITAL IMPROVEMENT FUND
This fund is used to account for major capital projects constructed by the Sewer division. All revenues from new
connection fees are receipted into this fund as well as a small portion of the monthly utility rate.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 5,451,500$ 5,211,695$ 104.6%
Sewer Connection Fees -$ 181,495$ 0.0%
Interest Income 30,102$ 10,000$ 301.0%
Grant Income -$ 3,500,000$ 0.0%
Transfer-In-Sewer Fund -$ 725,000$ 0.0%
YTD Revenues 30,102$ 4,416,495$ 0.7%
YTD Expenditures 119,982$ 5,274,000$ 2.3%
End Fund Balance 5,361,620$ 4,354,190$ 123.1%
FUND 409 STORM WATER CAPITAL IMPROVEMENT FUND
This fund is used to fund any major capital projects constructed by the Storm Water Utility.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 1,510,156$ 470,800$ 320.8%
Grants -$ 1,262,000$ 0.0%
Interest Income 8,307$ 4,000$ 207.7%
Transfers-In-Stormwater Fund -$ 220,000$ 0.0%
YTD Revenues 8,307$ 1,486,000$ 0.6%
YTD Expenditures 4,809$ 1,462,000$ 0.3%
End Fund Balance 1,513,654$ 494,800$ 0.3%
FUND 410
This fund is used to fund emergency repairs and large capital projects at the Municipal Airport.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 4,623,742$ 2,071,771$ 223.2%
Interest Income 26,648$ 18,000$ 148.0%
Transfers In -$ 50,000$ 0.0%
YTD Revenues 26,648$ 68,000$ 39.2%
YTD Expenditures (transfer to CIP) -$ 700,000$ 0.0%
End Fund Balance 4,650,390$ 1,439,771$ 323.0%
FUND 411 WATER/SEWER BOND RESERVE FUND
The legal requirements in Bond and Loan documents required the City hold an amount in reserve that totals the
smaller of;
1) the maximum annual debt service of the W/S Revenue Bonds and Loans
2) 125% of the annual debt service of the utility, or
3) 10% of the stated principal amount of the bonds
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 1,022,699$ 1,022,699$ 100.0%
YTD Revenues - - #DIV/0!
YTD Expenditures - - #DIV/0!
End Fund Balance 1,022,699$ 1,022,699$ 100.0%
FUND 412 STORM WATER MANAGEMENT FUND
This fund was created to administer, manage, develop, operate and maintain the City's Storm Water Management Plan.
The Plan includes buildings and maintaining public drainage systems that alleviate local flooding problems, providing
erosion control and creating public awaness programs that help protect our water quality.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 221,239$ 228,810$ 96.7%
AIRPORT RESERVE FUND
Charges for Services 330,744$ 1,330,245$ 24.9%
Grants 13,920$ 25,000$ 55.7%
Misc revenue 19,085$ 65,801$ 29.0%
YTD Revenues 363,749$ 1,421,046$ 25.6%
Salaries & Wages 130,544$ 541,631$ 24.1%
Personnel Benefits 41,886$ 230,442$ 18.2%
Supplies 14,890$ 44,772$ 33.3%
Other Services & Charges 74,814$ 146,579$ 51.0%WCIA insurance paid in Jan
Intergov Serv & Taxes 21,524$ 85,795$ 25.1%
Interfund Payment for Services 33,390$ 115,849$ 28.8%
Transfers to Equip Replace 16,253$ 59,597$ 27.3%
Tranfer to Cemetery Payroll -$ -$
Transfer to Stormwater Reserve -$ 220,000$ 0.0%
YTD Expenditures 333,301$ 1,444,665$ 23.1%
End Fund Balance 251,687$ 205,191$ 122.7%
FUND 413 AIRPORT CAPITAL IMPROVEMENT (FAA) FUND
This fund accounts for capital improvements at the Airport that are eligible for, and receive grant funding, from the
Federal Aviation Administration (FAA).
YTD
March BUDGET
2026 2026 %
Begin Fund Balance -$ 66,000$ 0.0%
Grants 150,217$ 1,677,358$ 9.0%
Interest Income/Misc 619$ -$ #DIV/0!
Interfund Loan Payment 30,000$ 120,000$ 25.0%
Transfer In - Airport Reserve -$ 700,000$ 0.0%
180,836$ 2,497,358$ 7.2%
YTD Expenditures 82,729$ 2,503,000$ 3.3%Taxiway Alpha, RW 11/29 solar lighting
End Fund Balance 98,107$ 60,358$ 162.5%
INTERNAL SERVICE FUNDS (500 - 599)
FUND 504 PUBLIC WORKS GROUNDS & FACILITIES MAINTENANCE
& OPERATIONS FUND
This fund is responsible for the maintenance and operations of the airport, cemetery, parks, public areas and all
City owned facilities.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 326,775$ 128,696$ 253.9%
Other Misc. Revenues - GF Payroll 176,525$ 1,297,989$ 13.6%
Other Misc. Revenues - GF 225,000$ 825,000$ 27.3%
Other Misc. Revenues - Airport 196,889$ 780,671$ 25.2%
Other Misc. Revenues - Storm 18,157$ 60,000$ 30.3%
Other Misc. Revenues - Cemetery 4,221$ 43,240$ 9.8%
Other Misc. Revenues - Streets 81,627$ 416,829$ 19.6%
Other Misc. Revenues - PW 7,125$ 15,604$ 45.7%
Misc Revenues 2,746$ 16,552$ 16.6%
712,290$ 3,455,885$ 20.6%
or agencies of the governmental unit, on a cost-reimbursement basis.
Salaries & Wages 375,058$ 1,757,234$ 21.3%
Personnel Benefits 140,836$ 664,812$ 21.2%
Supplies 30,476$ 188,000$ 16.2%
Other services/Charges 226,275$ 516,794$ 43.8%
Interfund Payment for Services 60,840$ 223,064$ 27.3%
Transfers to Equip Replace 28,291$ 115,724$ 24.4%
YTD Expenditures 861,776$ 3,465,628$ 24.9%
End Fund Balance 177,289$ 118,953$ 149.0%
PRIVATE PURPOSE TRUST FUNDS (620 - 629)
To report all trust arrangements under which principal and interest benefit individuals, private organizations and
other governments.
FUND 622 CEMETERY PRE-NEED TRUST FUND
This funds is used to account for dollars where individuals have pre-paid for their items needed at the time of burial.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 56,428$ 47,437$ 119.0%
Interest -$ -$
Sale of Liner/Vaults 5,367$ 4,475$ 119.9%
YTD Revenues 5,367$ 4,475$ 119.9%
YTD Expenditures -$ 1,000$ 0.0%
End Fund Balance 61,795$ 50,912$ 121.4%
FUND 633 CITY FIDUCIARY FUND
This fund was created in response to GASB 84 which requires fiduciary activities to be recorded in a separate fund.
These are items that are collected on behalf of another government or organization (like the portion of court fees that
are remitted to the state.
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 3,166$ 1,300$ 243.5%
State's portion of Court fees 15,121$ 103,700$ 14.6%
Other Fiduciary Activity 3,905$ 19,850$ 19.7%
19,027$ 123,550$ 15.4%
YTD Expenditures 13,432$ 123,550$ 10.9%
End Fund Balance 8,761$ 1,300$ 673.9%
PERMANENT FUNDS ( 700-799)
To report resources that are restricted to the extent that only earnings (interest), not principal, can be used to support
the local government's applicable program.
FUND 702 CEMETERY ENDOWMENT FUND
YTD
March BUDGET
2026 2026 %
Begin Fund Balance 466,333$ 455,000$ 102.5%
The Cemetery collects a perpetual fee for each plot sold, either at the time of need or on a pre-need basis. Those funds are
held in this fund and the interest earned can be transferred to the Cemetery fund, if needed, to help cover the costs of
maintaining the grounds of the Cemetery into perpetuity.
Transfer In - Endowed Care Funds 6,475$ 23,175$ 27.9%
Interest Income 2,697$ 2,500$ 107.9%
YTD Revenues 9,172$ 25,675$ 35.7%
YTD Expenditures -$ -$
End Fund Balance 475,505$ 480,675$ 98.9%
General Fund Revenue Charts
Curr Month
Property Taxes
2021 2022 2023 2024 2025 2026
Jan 41,555$ 29,459$ 11,306$ 6,218$ 32,838$ 58,245
Feb 7,928 8,898 6,980 7,914 9,862 5,662
March 6,872 46,754 18,801 67,726 67,660 47,830
April 252,433 125,786 140,793 234,038 177,725 -
May 2,432,085 1,230,538 1,324,430 2,186,807 2,277,604 -
June 59,188 87,035 94,507 63,592 122,085 -
July 45,279 9,526 11,517 25,388 24,815 -
Aug 13,814 7,710 7,072 14,772 9,788 -
Sept 18,669 8,423 15,932 11,095 14,526 -
Oct 121,525 39,125 48,393 87,614 70,626 -
Nov 1,804,064 1,138,765 1,217,015 2,032,611 2,139,312 -
Dec 61,416 62,406 89,195 95,676 54,429 -
4,864,827 2,794,425 2,985,940 4,833,451 5,001,270 111,737
2025 Budget 5,019,207
99.64%
Sales Taxes - 1%
2021 2022 2023 2024 2025 2026
Jan 544,104$ 927,175$ 729,063$ 577,449$ 579,161$ 641,342$
Feb 635,175 1,175,116 770,633 643,214 662,580 735,759
March 504,781 714,579 582,901 539,452 570,825 579,421
April 482,578 702,880 696,025 525,671 527,369 -
May 638,956 968,598 745,008 589,855 650,472 -
June 580,544 783,393 635,615 567,690 576,944 -
July 570,537 678,617 685,677 570,633 620,807 -
Aug 639,344 821,240 778,224 615,108 634,416 -
Sept 594,847 793,885 656,163 573,309 605,264 -
Oct 615,558 779,740 634,100 616,950 602,118 -
Nov 1,549,992 778,449 634,195 610,660 789,028 -
Dec 1,018,777 728,293 629,349 582,437 789,506 -
8,375,193 9,851,963 8,176,953 7,012,429 7,608,490 1,956,522
2025 Budget 8,105,339
93.87%
Snoh. Co. Criminal Justice Sales Tax - 0.1%
2021 2022 2023 2024 2025 2026
Jan 34,255$ 40,487$ 42,157$ 42,569$ 44,977$ 45,927$
Feb 42,128 45,702 47,964 49,108 54,014 56,820
March 32,105 34,177 38,392 38,683 42,181 42,568
April 31,369 36,545 37,728 38,994 38,323 -
May 40,027 43,476 43,854 42,745 45,907 -
June 38,155 40,162 40,503 40,943 44,789 -
July 38,630 40,725 43,869 43,558 47,348 -
Aug 41,746 44,218 46,472 46,056 52,033 -
Sept 40,363 43,767 44,749 45,713 48,262 -
Oct 38,172 42,933 44,440 44,917 48,399 -
Nov 42,154 45,176 45,709 45,769 49,452 -
Dec 39,124 43,533 42,524 43,767 48,011 -
458,228 500,901 518,361 522,822 563,696 145,315
2025 Budget 533,913
105.58%
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
2021 2022 2023 2024 2025 2026
Retail Sales Tax - 1% YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
2021 2022 2023 2024 2025 2026
Crim. Justice Sales Tax YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
2021 2022 2023 2024 2025 2026
Property Taxes YTD
Page 1
Utility Tax - Water
2021 2022 2023 2024 2025 2026
Jan 14,589$ 16,370$ 16,218$ 17,385$ 18,126$ 18,659$
Feb 14,742 18,218 17,965 17,800 17,590 18,573
March 15,801 16,522 18,767 17,678 18,241 18,872
April 14,396 16,833 16,405 17,890 18,011 -
May 14,123 16,425 18,393 18,403 18,934 -
June 16,149 17,110 17,330 18,293 19,297 -
July 16,348 16,441 22,069 19,182 22,846 -
Aug 21,023 18,991 23,135 23,168 25,278 -
Sept 22,120 22,835 25,359 22,739 24,820 -
Oct 19,768 24,220 22,995 22,592 27,384 -
Nov 16,463 19,376 20,016 19,156 20,378 -
Dec 15,268 17,594 17,117 18,394 20,323 -
200,792 220,936 235,769 232,681 251,229 56,104
2025 Budget 248,100 Tax is currently at 5% of gross revenues.
101.26%
Utility Tax - Sewer
2021 2022 2023 2024 2025 2026
Jan 24,336$ 26,898$ 26,444$ 30,779$ 31,258$ 34,311$
Feb 23,831 26,890 29,103 30,791 31,258 32,585$
March 25,667 27,089 29,899 29,594 32,217 33,515$
April 24,042 25,704 26,650 30,986 34,040 -$
May 23,725 26,044 29,361 29,844 32,809 -$
June 25,162 26,630 27,103 30,724 31,188 -$
July 25,441 25,770 30,042 30,743 33,059 -$
Aug 25,135 27,348 28,576 31,051 34,364 -$
Sept 26,135 28,393 30,239 29,015 32,554 -$
Oct 26,305 28,140 29,400 31,232 37,639 -$
Nov 25,052 27,084 29,456 31,975 31,364 -$
Dec 24,262 28,321 27,234 30,481 33,414 -$
299,093 324,310 343,506 367,214 395,165 100,411
2025 Budget 357,247 Tax is currently at 5% of gross revenues.
110.61%
Utility Tax - Storm
2021 2022 2023 2024 2025 2026
Jan 4,141$ 4,260$ 4,716$ 5,113$ 5,188$ 5,572$
Feb 3,999$ 4,594$ 5,028 5,110 5,036 5,663$
March 4,235$ 4,811$ 5,233 5,183 5,504 5,542$
April 4,203$ 4,668$ 4,842 5,444 5,216 -$
May 3,990$ 4,508$ 5,079 5,323 5,769 -$
June 4,182$ 4,739$ 4,802 4,953 5,420 -$
July 4,044$ 4,804$ 5,169 5,321 5,389 -$
Aug 4,118$ 4,603$ 5,258 5,373 5,714 -$
Sept 4,277$ 4,898$ 4,965 5,004 5,339 -$
Oct 4,281$ 4,707$ 5,090 5,114 5,407 -$
Nov 4,184$ 5,258$ 5,289 5,189 5,153 -$
Dec 4,423$ 4,776$ 4,948 5,376 5,843 -$
50,076 56,625 60,419 62,503 64,977 16,776
2025 Budget 357,247 Tax is currently at 5% of gross revenues.
110.61%
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
$180,000
$200,000
$220,000
$240,000
2021 2022 2023 2024 2025 2026
Utility Tax - Water YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Utility Tax - Sewer YTD
$0
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
2021 2022 2023 2024 2025 2026
Utility Tax - Storm YTD
Page 2
Utility Tax - Natural Gas
2021 2022 2023 2024 2025 2026
Jan 41,226$ 49,082$ 70,878$ 61,597$ 77,522$ 52,417$
Feb - 63,946 73,860 77,583 84,430 74,360
March 82,611 51,304 58,355 50,526 99,584 58,944
April 48,686 53,010 70,858 63,277 67,198 -
May 34,032 35,896 60,407 44,991 58,848 -
June 17,699 33,650 34,930 34,750 39,123 -
July 16,719 18,374 20,197 28,149 30,206 -
Aug 10,267 12,769 16,396 23,730 23,759 -
Sept 10,560 11,986 16,537 18,429 21,951 -
Oct 10,781 11,370 17,171 20,105 22,927 -
Nov 18,136 14,154 16,019 31,186 36,275 -
Dec 29,944 41,075 42,155 44,661 41,984 -
320,661 396,616 497,763 498,984 603,807 185,720
2025 Budget 537,584 Tax is currently at 6% of gross revenues.
112.32% To raise this tax over 6%, a public vote is needed.
Utility Tax - Cable TV
2021 2022 2023 2024 2025 2026
Jan 32,642$ 33,470$ 31,918$ 28,854$ 51,767$ 21,848$
Feb 29,680 32,333 29,016 26,272 -
March 32,768 66,063 33,246 29,808 25,965 46,320
April 33,450 34,690 32,912 29,487 25,766 -
May 33,442 34,485 32,654 26,601 - -
June 33,054 31,238 32,706 26,435 25,136 -
July 28,995 33,449 - - 49,394 -
Aug 33,121 34,032 62,726 51,132 24,169 -
Sept 33,368 33,287 30,634 26,688 - -
Oct 33,179 33,249 29,988 25,419 46,936 -
Nov 33,750 33,636 29,955 - 22,793 -
Dec 33,931 32,804 28,962 25,379 22,642 -
391,380 400,403 378,034 298,818 320,842 68,168
2025 Budget 380,000 Tax is currently at 8% of gross revenues.
84.43%
Utility Tax - Telephone
2021 2022 2023 2024 2025 2026
Jan 22,712$ 15,738$ 19,283$ 19,839$ 20,835$ 11,010$
Feb 10,756 22,614 2,101 17,921 6,915 14,038
March 27,431 18,919 33,417 9,898 36,094 23,217
April 21,563 19,263 4,185 27,343 16,878 -
May 13,059 17,232 28,420 18,108 14,721 -
June 23,964 17,205 17,183 18,426 21,161 -
July 20,781 18,941 19,652 19,637 17,075 -
Aug 18,654 18,804 17,183 18,219 15,425 -
Sept 16,829 18,948 12,612 14,330 17,465 -
Oct 21,289 19,909 24,846 21,096 15,551 -
Nov 18,695 17,007 17,512 7,738 7,587 -
Dec 18,467 18,880 18,268 32,101 21,790 -
234,198 223,461 214,662 224,656 211,498 48,265
2025 Budget 215,000 Tax currently at 6% of gross revenues.
To raise this tax over 6%, a public vote is needed.
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
2021 2022 2023 2024 2025 2026
Utility Tax - Nat. Gas YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Utility Tax - Cable TV YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
2021 2022 2023 2024 2025 2026
Utility Tax - Telephone YTD
Page 3
Utility Tax - Electricity
2021 2022 2023 2024 2025 2026
Jan 120,964$ 122,385$ 132,832$ 147,297$ 162,971$
Feb 112,408 124,178 139,147 291,754 147,859 146,914
March 107,287 116,350 107,018 134,773 152,205 141,197
April 118,555 118,864 140,813 138,631 142,333 -
May 94,062 98,911 110,933 124,175 128,623 -
June 91,674 100,725 102,346 133,040 124,417 -
July 92,518 95,987 104,449 98,599 128,941 -
Aug 99,282 98,448 107,989 126,643 142,471 -
Sept 91,895 108,264 126,267 127,885 116,583 -
Oct 94,260 107,821 102,382 128,756 139,165 -
Nov 91,554 94,999 121,184 125,569 143,622 -
Dec 100,457 106,211 107,254 123,474 110,443 -
1,214,916 1,293,143 1,402,616 1,553,300 1,623,957 451,082
2025 Budget 1,458,720 Tax is currently at 6% of gross revenues.
111.33% To raise this tax over 6%, a public vote is needed.
Utility Tax - Solid Waste (Garbage)
2021 2022 2023 2024 2025 2026
Jan 33,634$ -$ 44,110$ 49,266$ 51,146$ -$
Feb 32,909 36,532 - 47,894 - 115,003
March 33,807 75,470 88,781 102,867 49,591
April 33,698 37,140 97,607 51,244 -
May 34,750 38,398 44,932 49,216 51,635 -
June 34,503 38,003 89,991 49,813 52,413 -
July 35,887 - 46,448 52,434 -
Aug 35,726 38,461 44,673 97,292 51,972 -
Sept 35,464 76,549 46,232 49,578 52,413 -
Oct 35,520 43,058 47,840 50,731 54,254 -
Nov 36,703 49,024 - - -
Dec 35,987 88,163 48,168 102,527 107,523 -
418,588 471,774 550,199 593,925 627,900 164,594
2025 Budget 588,713 Tax is currently at 8% of gross revenues.
106.66%
Gambling Taxes
2021 2022 2023 2024 2025 2026
Jan 4,774$ 14,106$ 17,199$ 15,782$ 31,957$ 17,547$
Feb 6,634 15,773 12,718 14,349 13,945 15,039
March 11,146 16,194 23,721 16,509 16,895 18,540
April 14,462 18,292 20,016 10,059 10,424 -
May 15,357 17,008 19,241 25,537 24,163 -
June 15,358 17,534 18,252 8,313 16,916 -
July 13,659 16,774 17,566 17,126 11,673 -
Aug 14,866 14,181 18,857 15,973 16,907 -
Sept 14,967 17,192 16,193 9,904 17,582 -
Oct 13,347 16,545 13,924 15,692 16,395 -
Nov 16,335 17,561 13,140 5,702 8,533 -
Dec 14,490 17,161 13,173 26,799 24,243 -
155,394 198,321 204,000 181,746 209,633 51,126
2025 Budget 200,300 Tax on Pull tabs is 5% of gross receipts.
104.66% Tax on card games is 9% in 2014 and will increase 1%
per year and max at 12%.
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
2021 2022 2023 2024 2025 2026
Utility Tax - Electricity YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
2021 2022 2023 2024 2025 2026
Utility Tax - Garbage YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
$180,000
$200,000
2021 2022 2023 2024 2025 2026
Gambling Taxes YTD
Page 4
Cable TV Franchise Fees
2021 2022 2023 2024 2025 2026
Jan 19,153$ 19,634$ 18,343$ 16,523$ 29,806$ 12,518$
Feb 17,439 18,557 16,366 15,116 -
March 19,196 38,366 19,017 17,162 14,896 26,528
April 19,579 19,950 18,816 16,996 - -
May 19,609 19,830 18,685 16,529 14,788 -
June 19,355 19,527 18,709 16,430 14,437 -
July 17,057 19,226 - 16,106 28,364 -
Aug 19,184 19,596 35,878 15,726 - -
Sept 19,816 19,141 17,515 15,344 13,880 -
Oct 19,464 19,132 17,150 26,947 -
Nov 19,823 19,386 17,153 14,568 13,097 -
Dec 19,877 18,882 16,580 14,562 13,020 -
229,551 232,668 216,403 176,312 184,351 39,046
2025 Budget 232,000 Tax is 5% of gross revenues.
79.46%
Building Permits
2021 2022 2023 2024 2025 2026
Jan 13,282$ 21,832$ 27,049$ 41,162$ 31,829$ 26,521$
Feb 97,623 58,481 6,928 70,319 16,321 36,229
March 20,655 189,743 69,563 99,259 9,218 34,998
April 86,686 121,318 41,087 25,690 21,403 -
May 1,942,044 25,424 69,639 36,147 30,388 -
June 116,861 84,294 12,973 22,472 180,719 -
July 41,084 19,142 29,600 40,958 30,076 -
Aug 179,093 104,053 15,440 15,297 57,399 -
Sept 85,973 73,395 21,096 28,023 124,417 -
Oct 50,379 56,957 107,911 9,179 44,577 -
Nov 65,651 31,085 5,845 26,346 60,288 -
Dec 418,443 10,619 110,484 9,930 26,730 -
3,117,774 796,344 517,615 424,780 633,365 97,748
2025 Budget 500,000
126.67%
Liquor Excise Taxes
2021 2022 2023 2024 2025 2026
Jan 32,991$ 34,835$ 35,230$ 36,609$ 36,693$ 34,546$
Feb -
March -
April 37,917 38,740 39,284 39,203 39,139 -
May -
June (9,371) -
July 34,199 33,543 39,466 36,250 43,396 -
Aug - -
Sept - -
Oct 37,306 39,291 35,083 38,992 39,539 -
Nov - -
Dec - -
142,413 146,410 149,064 151,054 149,395 34,546
2025 Budget 150,749
99.10%
$0
$250,000
$500,000
2021 2022 2023 2024 2025 2026
Building Permits YTD
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
$225,000
$250,000
2021 2022 2023 2024 2025 2026
Cable Franchise Fees YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
Li uor Excise Tax YTD
Page 5
Liquor Profits
2021 2022 2023 2024 2025 2026
Jan
Feb
March 40,700 40,121 40,635 41,030 42,830 42,521
April
May
June 40,701 40,120 40,635 41,028 42,831 -
July -
Aug -
Sept 40,684 40,185 40,642 41,029 42,831 -
Oct -
Nov -
Dec 40,672 40,178 40,638 41,027 42,831 -
162,757 160,605 162,550 164,114 171,323 42,521
2025 Budget 164,673
104.04% 4%
4,305 (2,152) 1,945 1,564
3% -1% 1% 1%
Traffic Infractions
2021 2022 2023 2024 2025 2026
Jan 11,073$ 6,119$ 4,895$ 9,773$ 8,296$ 7,744$
Feb 7,119 6,729 5,875 11,571 6,511 600
March 10,855 6,766 5,921 4,904 6,691 3,173
April 13,643 10,550 8,623 4,987 11,473 -
May 11,018 7,220 7,139 4,056 12,834 -
June 12,398 4,533 7,952 6,312 10,234 -
July 9,791 5,304 5,096 4,785 950 -
Aug 7,929 2,696 5,609 7,476 9,266 -
Sept 5,925 6,761 9,100 6,025 5,693 -
Oct 7,539 6,822 5,735 6,645 3,713 -
Nov 8,338 5,074 42,713 6,518 15,129 -
Dec 8,069 5,813 3,065 5,092 1,596 -
113,699 74,387 111,723 78,144 92,388 11,518
2025 Budget 130,000
71.07%
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
2021 2022 2023 2024 2025 2026
Fines & Forfeitures YTD
$0
$50,000
$100,000
$150,000
$200,000
2021 2022 2023 2024 2025 2026
Li uor Profits YTD
Page 6
Other Funds Revenue Charts
Street Fund 101
Motor Vehicle Fuel Taxes
2021 2022 2023 2024 2025 2026
Jan 25,205$ 29,534$ 29,192$ 28,621$ 31,571$ 40,779$
Feb 30,338 32,140 27,589 28,989 29,288 30,297
March 25,834 24,973 27,338 25,890 15,014 25,631
April 24,888 26,765 26,409 26,936 17,335 -
May 29,811 31,757 32,136 30,085 18,463 -
June 31,079 30,029 30,075 30,577 62,728 -
July 33,105 32,263 32,848 30,240 21,090 -
Aug 34,464 37,800 35,745 34,506 47,760 -
Sept 33,155 32,300 33,317 30,496 28,775 -
Oct 34,347 34,340 34,154 32,549 38,830 -
Nov 31,096 28,174 30,320 32,242 27,258 -
Dec 30,355 24,856 30,377 29,285 26,411 -
363,677 364,932 369,500 360,415 364,523 96,707
2025 Budget 392,269
92.93%
Lodging Tax Fund 114
Lodging Tax
2021 2022 2023 2024 2025 2026
Jan 6,390$ 9,482$ 12,502$ 10,988$ 11,945$ 11,686$
Feb 6,474 10,015 6,807 9,250 9,917 11,082.00
March 6,480 8,926 6,349 6,997 9,842 9,453.44
April 6,563 9,531 6,509 8,916 8,764 -
May 8,651 11,367 8,918 11,621 12,045 -
June 11,079 11,725 10,170 10,656 11,767 -
July 11,718 12,974 9,548 12,137 14,088 -
Aug 13,173 13,133 14,385 15,576 16,603 -
Sept 15,717 19,157 10,107 18,945 19,179 -
Oct 14,407 17,807 27,637 19,875 20,119 -
Nov 11,759 14,495 15,164 15,315 14,355 -
Dec 10,743 10,449 10,494 12,522 13,474 -
123,154 149,062 138,588 152,798 162,097 32,222
2025 Budget 140,000
115.78%
Transportation Sales Tax Fund 180
Sales Tax
2021 2022 2023 2024 2025 2026
Jan 127,996$ 219,151$ 171,526$ 135,863$ 136,269$ 150,898$
Feb 149,430 276,472 181,424 151,337 155,889 173,112.83
March 118,749 168,113 137,149 126,936 134,308 136,346.51
April 113,496 165,347 163,760 123,674 124,081 -
May 150,317 227,854 175,292 138,785 153,046 -
June 136,554 184,314 149,550 133,570 135,747 -
July 134,216 159,574 161,324 134,261 146,068 -
Aug 150,380 193,275 183,089 144,727 149,270 -
Sept 139,938 186,733 154,371 134,677 142,396 -
Oct 144,816 183,444 149,160 145,160 141,671 -
Nov 364,684 182,922 149,250 143,666 185,648 -
Dec 239,681 171,358 148,075 137,040 185,760 -
1,970,256 2,318,557 1,923,971 1,649,697 1,790,153 460,358
2025 Budget 1,981,690
90.33%
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Fuel Taxes YTD
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
2021 2022 2023 2024 2025 2026
Lodging Tax YTD
$0
$250,000
$500,000
$750,000
$1,000,000
$1,250,000
$1,500,000
$1,750,000
$2,000,000
$2,250,000
$2,500,000
2021 2022 2023 2024 2025 2026
Transportation Sales Tax YTD
Page 7
April 2026 Financial Report – Shelby Burke, Finance
Director
1
Sales Tax Revenue:
Represents 27% of the General Funds budgeted revenues.
Sales Tax Revenue Trends (YTD through April)
2026: An 9.5% increase over 2025.
2025: A 2% increase over 2024.
2026 Budget: A 12% increase over 2025 actuals
To date we are experiencing a 9.5% increase compared to 2025, but this is only based
on 4 months of the budget to date.
Sales Tax Revenue Trends (April revenue collected in February)
2026: A 15% increase over 2025.
2025: A 0% increase over 2024.
2024: A 24% decline from 2023.
2023: A 1% decline compared to 2022.
The chart below presents total sales tax revenues for April across recent years:
Sales Tax
Year-To-Date Apr-26 Mar-26 Feb-26 Jan-26
Actual 2,562,115.72 1,956,522.31 1,377,100.96 641,342.43
Budget 8,510,606.00 8,510,606.00 8,510,606.00 8,510,606.00
(over)/under 5,948,490.28 6,554,083.69 7,133,505.04 7,869,263.57
Percent 30.10% 22.99% 16.18% 7.54%
GENERAL FUND
2
The three largest sources of sales tax revenue are retail, services, and construction.
Below is a summary of their current performance:
• Retail
o Represents 50% of April’s total sales tax revenue.
o Experiencing a 25% increase from 2025 for April.
• Services
o Accounts for 22% of April’s total.
o Demonstrates consistent growth, experiencing a 19% increase from 2025
for April.
• Construction
o Contributes 13% of April’s total.
o Shows a 0% increase compared to April 2025.
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
2022 2023 2024 2025 2026
Total Sales Tax Revenue-April
3
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
2022 2023 2024 2025 2026
Retail Sales Tax-April
-
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
140,000.00
2022 2023 2024 2025 2026
Services Sales Tax-April
4
Utility Tax Revenue:
Utility Tax accounts for approximately 13% of the General Fund’s budgeted revenues.
The tax is assessed on utility providers operating within the City, including water,
sewer, natural gas, solid waste/garbage, cable television, telephone, and electricity
(e.g., the Public Utility District (PUD) for electricity sales). Revenues are received
monthly and fluctuate based on customer usage.
In April, the City received $366k, which is right on average for this year but is a 6%
decline overall compared to 2025. As of April of 2025, the City had collected over $1.55
million for 2025 and we have only collected $1.45 million so far for 2026. While this
represents a 6% decline compared with the same period last year, the decrease may
be attributable to warmer-than-usual weather this winter, which likely reduced utility
usage. To date sewer, natural gas, telephone, and cable are experiencing declines
compared to last year.
Month-to-month fluctuations in this revenue category are expected, and we anticipate
meeting the budgeted amount by year-end. Utility Tax revenue exceeded the budget
by nearly 5% in 2025, indicating there is still time to recover and potentially meet
current-year projections.
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
2022 2023 2024 2025 2026
Construction Sales Tax-April
5
All other General Fund Revenues:
As of April, year-to-date revenues total approximately 27% of the annual budget, about
6% below the level that would be expected if revenues were received throughout the
year (i.e. 4 of 12 months, or roughly 33%). However, General Fund revenues are not
received in equal monthly distributions. Many revenue sources are either collected in
non-monthly cycles or generate amounts too small to warrant detailed month-by-
month reporting. For example, property tax is distributed in two large installments
each year, leasehold excise tax is typically received in larger quarterly distributions, and
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
400,000.00
450,000.00
500,000.00
Utility Tax Revenue by Month
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
4/30/2022 4/30/2023 4/30/2024 4/30/2025 4/30/2026
YTD Total Utility Tax Actuals
Actual Linear (Actual)
6
other sources—such as the affordable housing tax, criminal justice tax, and natural gas
use tax—generally generate smaller monthly amounts.
Revenues are currently 1% higher than the same period in 2025: $6.6 million year-to-
date compared to $6.5 million in 2025.
Expenses:
Expenses total approximately 27% of the year-to-date budget, which is about 6%
below the amount budgeted through April and 1% lower than 2025 spending for the
same period. We will continue to monitor expenditures closely, as inflationary
pressures are driving costs upward faster than revenue growth. Leadership will also
continue to identify and implement cost-saving strategies to reduce the risk that
expenditures exceed revenues by year-end.
Motor Vehicle Fuel Tax:
Motor Vehicle Fuel Tax (MVFT) revenue, which funds our street maintenance, is
up nearly 4% compared with the same period in 2025. Effective July 1, 2025, SB 5801
increased fuel taxes by $.06 per gallon and special fuel taxes by $.03 per gallon. SB5801
also increases fuel taxes another 2% starting July 1, 2026. In previous months we have
been experiencing double-digit increases in this tax, but it is starting to level off. With
fuel prices increasing recently nationwide, we will see what impact this has if any on
fuel consumption and we will assess whether this category is likely to maintain its
current growth trend.
Real Estate Excise Tax (REET) I and II: These funds are used to collect real estate excise
tax on property sales and can be used for capital projects within the City, maintenance
and debt service.
As of the end of April, we collected a little over $180,000 for 2026, representing a 30%
increase compared to the same period in 2025. If home sales continue to increase, it
could be an encouraging sign that the economy is improving.
OTHER FUNDS
7
We completed the 2024 audits with the WA State Auditor’s Office (SAO) and held our
audit exit conference with SAO in early May. We will be turning in our annual
report/financial statements for 2025 by the end of May and then we will schedule with
SAO in the coming months the 2025 audit. We will have an accountability, federal, and
financial statement audit again.
$-
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
2021 2022 2023 2024 2025 2026
REET I YTD
$-
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
2021 2022 2023 2024 2025 2026
REET II YTD
GENERAL FUND OPERATING STATEMENT
APRIL
YTD % OF YTD % OF
2026 2026 ANNUAL 2025 2025 TOTAL
ACTUAL BUDGET BUDGET ACTUAL BUDGET ACTUAL
REVENUE SOURCES
TAXES:
-PROPERTY 384,455$ 5,214,703$ 7.37%288,085$ 5,019,207$ 5.74%
-SALES - 1% City 2,562,116$ 8,510,606$ 30.10%2,339,935$ 8,105,339$ 28.87%
-SALES - 0.1% SnoCo Crim Just.187,722$ 555,269$ 33.81%179,495$ 533,913$ 33.62%
-AFFORDABLE HOUSING - SHB 1406 10,052$ 45,000$ 22.34%14,050$ 45,000$ 31.22%
-UTILITY 1,463,686$ 4,059,048$ 36.06%1,562,349$ 3,866,217$ 40.41%
-LEASEHOLD EXCISE 78,708$ 175,298$ 44.90%86,212$ 166,950$ 51.64%
-GAMBLING 75,323$ 206,300$ 36.51%73,220$ 200,300$ 36.56%
LICENSES & PERMITS 113,982$ 381,707$ 29.86%120,896$ 375,207$ 32.22%
INTERGOV REVENUE 305,021$ 763,139$ 39.97%364,587$ 832,186$ 43.81%
MOBILE INTEGRATED HEALTH GRANT -$ -$ #DIV/0!175,000$ 287,500$ 60.87%
CHARGES FOR SERVICES 716,782$ 1,985,428$ 36.10%698,165$ 1,904,020$ 36.67%
FINES & FORFEITURES 15,809$ 131,800$ 11.99%33,021$ 131,800$ 25.05%
MISC REVENUE 144,068$ 574,142$ 25.09%129,339$ 568,111$ 22.77%
OTHER FIN SOURCES/TRANSFERS 551,754$ 1,917,970$ 28.77%455,461$ 1,694,000$ 26.89%
TOTAL REVENUES 6,609,476 24,520,410 26.95%6,519,816 23,729,750 27.48%
BEGINNING FUND BALANCE 6,951,826$ 6,165,717$ 6,655,471$ 6,800,000$
TOTAL REVENUES + BEG FUND BAL.13,561,302 30,686,127 13,175,287 30,529,750
EXPENDITURES
LEGISLATIVE 109,079$ 360,892$ 30.22%116,710$ 336,831$ 34.65%
FINANCE 652,909$ 2,112,926$ 30.90%601,839$ 1,768,907$ 34.02%
PERSONNEL 79,083$ 233,200$ 33.91%38,193$ 233,200$ 16.38%
INFORMATION TECHNOLOGY 337,728$ 1,058,541$ 31.91%342,433$ 975,594$ 35.10%
MEMBERSHIPS 58,149$ 154,978$ 37.52%79,935$ 151,245$ 52.85%
LAW ENFORCEMENT 3,851,362$ 12,953,039$ 29.73%3,729,122$ 11,570,120$ 32.23%
FIRE CONTROL 21,681$ 24,369$ 88.97%21,314$ 19,495$ 109.33%
SHB - 1406 LOW INCOME ASSIST 399$ 50,000$ 0.80%5,064$ 50,000$ 10.13%
RECYCLING -$ 20,000$ 0.00%-$ 18,000$ 0.00%
COMMUNITY DEVELOPMENT 735,294$ 2,868,011$ 25.64%694,503$ 2,787,477$ 24.92%
MOBILE INTEGRATED HEALTH -$ -$ #DIV/0!87,500$ 287,500$ 30.43%
CAPITAL OUTLAY 93,370$ 493,398$ 18.92%198,335$ 371,498$ 53.39%
NON-EXPENDITURES 16,626$ 7,400$ 224.68%3,393$ 7,400$ 45.85%
DEBT SERVICE 350$ 1,085,891$ 0.03%-$ 1,081,091$ 0.00%
INTERFUND TRANSACTIONS 814,872$ 3,225,507$ 25.26%909,149$ 3,032,162$ 29.98%
Percentage of budget allocated to April 33%
ENDING FUND BALANCE 6,165,962 3,754,594 5,687,504 5,615,717
2 month reserve balance (4,224,141)
2025 debt obligations (1,103,195)
Available Fund Balance 838,627
TOTAL EXPEND + FUND BALANCE 13,561,302$ 30,686,127$ 13,175,287$ 30,529,750$
FUND 004 GENERAL FUND MANDATORY RESERVE
This fund will be used to accumulate a reserve amount for the General Fund in accordance with the City's Financial
Policy.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 2,969,517$ 2,969,517$ 100.0%
YTD Revenues -Transfers-in- GF -$ 280,000$ 0.0%
YTD Expenditures -$ -$ #DIV/0!
End Fund Balance 2,969,517$ 3,249,517$ 91.4%
FUND 005 GENERAL FUND - PROGRAM DEVELOPMENT
This fund will be used for unexpected programs resulting from unanticipated mandates, or to ensure the safety and
well-being of the community.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance -$ 151,240$ 0.0%
Transfer In
YTD Expenditures -$ 151,240$ 0.0%
End Fund Balance -$ -$ #DIV/0!
FUND 006 GENERAL FUND CED PERMITTING
This is an internal managerial fund to account for permit related revenues in accordance with RCW 82.02.020.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 5,174,230$ 3,651,400$ 141.7%
Building Permits 120,326$ 700,000$ 17.2%
ROW/Grading Permits 29,524$ 80,000$ 36.9%
Site Civil Permits 72,626$ 300,000$ 24.2%
Bldg Plan Review Fees 152,211$ 500,000$ 30.4%
Land Use Permit Fees 65,470$ 80,000$ 81.8%
MISC - credit card surcharge 1,105$ 10,000$ 11.0%
YTD Revenues 441,262$ 1,670,000$ 26.4%
Expense Allocation to GF 551,754$ 1,761,830$ 31.3%
Equipment Replacement 4,908$ 13,500$ 36.4%
Expense Allocation to PW 3,538$ 14,000$ 25.3%
End Fund Balance 5,055,291$ 3,532,070$ 143.1%
FUND 008 OPIOID SETTLEMENT FUND
This fund will be used to account for opioid settlements received under the Distributor and Janssen Agreements.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 243,630$ 243,630$ 100.0%
OTHER FUNDS OPERATING STATEMENTS
YTD Revenues 11,824$ 84,927$
YTD Expenditures 55,091$ 328,557$
End Fund Balance 200,363$ -$
SPECIAL REVENUE FUNDS (100 - 199)
FUND 101 STREET MAINTENANCE FUND
This fund is responsible for maintaining all public streets and roadways (patching, paving and sealing of roads,
sidewalk repair and maint., and other roadway functions including sweeping and snow removal)
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 5,641$ 246,801$ 2.3%
Intergovernmental Revenues 141,812$ 450,650$ 31.5%
Interfund Transfers 181,815$ 570,000$ 31.9%
Misc. Revenues 24,048$ 66,000$ 36.4%
YTD Revenues 347,675$ 1,086,650$ 32.0%
Supplies 16,978$ 132,500$ 12.8%
Other Services & Charges 85,105$ 407,258$ 20.9%
Interfund Payment for Svcs 134,683$ 486,149$ 27.7%
M&O services - potholes, should maint,
Transfers to M&O -$ 11,652$ 0.0%
Transfers to Equip Replace 7,415$ 20,400$ 36.3%
YTD Expenditures 244,181$ 1,057,959$ 23.1%
End Fund Balance 109,135$ 275,492$ 39.6%
FUND 107 GROWTH MANAGEMENT FUND
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 4,025,930$ 3,023,569$ 133.2%
TrafficMitigation Fees 276,541$ 300,000$ 92.2%
Park Mitigation Fees 20,121$ 25,000$ 80.5%
CIC Mitigation -$ 90,000$ 0.0%
Tree Mitigation Fees (23,380)$ 2,500$ -935.2%
Interest Income 30,868$ 40,000$ 77.2%
YTD Revenues 304,149$ 457,500$ 66.5%
YTD Expenditures 611$ 663,407$ 0.1%
End Fund Balance 4,329,468$ 2,817,662$ 153.7%
Approx $1.1 million in park mitigation
obligated
for specified purposes. These funds cannot be used for general fund purposes. The general fund can be reimbursed for
This fund is used to track mitigation fees collected for new construction impacts. The funds must be used within 10 years
FUND 111 PUBLIC ART FUND
The public art fund is established through an ordinance adopted by City Council. Funding is provided from 10% of the
amounts collected by the City for construction related sales tax revenues. Expenditures are to be made on art and
art-related projects approved through the City's budget process.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 138,728$ 74,300$ 187%
Transfer In GF - constr. sales tax -$ 25,000$ 0%
Donations/Interest 1,056$ 1,000$ 106%
YTD Revenues 1,056$ 26,000$ 4%
YTD Expenditures 5,571$ 79,000$ 7%
End Fund Balance 134,214$ 21,300$ 630%
FUND 114 LODGING TAX FUND
The City collects a 2% tax on lodging stays. The money in this fund is used to promote tourism in and around
the city. The Lodging Tax Advisory Committee makes a recommendation to the City Council for the distribution of
funds to local non-profit and marketing organizations, following a competitive grant process.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 215,755$ 105,948$ 203.6%
Hotel/Motel Tax 42,327$ 147,000$ 28.8%
Interest Income 1,738$ 3,000$ 57.9%
YTD Revenues 44,065$ 150,000$ 29.4%
YTD Expenditures 14,604$ 197,654$ 7.4%
End Fund Balance 245,216$ 58,294$ 420.7%
FUND 116 CEMETERY OPERATIONS FUND
This Fund provides for the operation and maintenance of the Arlington Cemetery. Services provided include;
internment services, and maintenance of the landscape and the various structures.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 44,135$ 35,108$ 125.7%
Charges for Services 103,923$ 320,845$ 32.4%
Misc -Investment Interest 775$ 515$ 150.5%
Transfer In -$ -$
YTD Revenues 104,698$ 321,360$ 32.6%
Salaries & Wages 34,355$ 90,866$ 37.8%
Personnel Benefits 13,270$ 42,927$ 30.9%
Supplies 19,546$ 44,400$ 44.0%
Other Services & Charges 12,229$ 33,051$ 37.0%WCIA paid in Jan
Intergov Serv & Taxes 2,005$ 3,986$ 50.3%
Interfund Payment for Svcs 12,742$ 65,286$ 19.5%
Transfers to Equip Replace 4,035$ 11,091$ 36.4%
Transfer to Cemetery Capital -$ -$
Transfer to Endowment Fund 7,774$ 23,175$ 33.5%
YTD Expenditures 105,955$ 314,782$ 33.7%
FUND 180 TRANSPORTATION SALES TAX FUND
This Fund collects 2/10ths of one percent sales tax for the purpose of pavement preservation. This was formerly the
Transportation Benefit District (TBD) Fund, the city absorbed the TBD 1/1/18 and the fund has been renamed.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 2,731,085$ 2,952,921$ 92.5%
Sales Tax 602,845$ 2,060,958$ 29.3%
Grant Income 139,237$ -$
Interest Income 22,258$ 90,000$
YTD Revenues 764,340$ 2,150,958$ 35.5%
YTD Expenditures 94,723$ 4,280,000$ 2.2%
End Fund Balance 3,400,702$ 823,879$ 412.8%
CAPITAL PROJECTS FUNDS (300 - 399)
To account for financial resources to be used for the acquisition or construction of major capital facilities (other than
those financed by proprietary funds and trust funds). These funds cannot be transferred and used for General Fund
purposes.
FUND 303 REAL ESTATE EXCISE TAX 1 FUND (FIRST 1/4% TAX)
This fund is used to collect the first 1/4% of real estate excise tax on property sales and can be used for capital projects
within the City, maintenance and debt service.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 1,140,920$ 1,615,101$ 70.6%
REET 180,589$ 640,000$ 28.2%
Interest Income/Misc 9,299$ 30,000$ 31.0%
YTD Revenues 189,888$ 670,000$ 28.3%
2020 LTGO - Principal/Interest -$ 217,837$ 0.0%
Transfer Out -$ 70,000$ 0.0%
YTD Expenditures -$ 287,837$ 0.0%
End Fund Balance 1,330,808$ 1,997,264$ 66.6%
FUND 304 REAL ESTATE EXCISE TAX 2 FUND (SECOND 1/4% TAX)
This fund is used to collect the second 1/4% of real estate excise tax on property sales and can be used for capital
projects within the City, maintenance and debt service.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 2,879,019$ 2,682,838$ 107.3%
REET 180,589$ 645,000$ 28.0%
Interest Income 22,597$ 30,000$ 75.3%
YTD Revenues 203,186$ 675,000$ 30.1%
Transfer to - Trans Improv -$ -$ #DIV/0!
End Fund Balance 3,082,205$ 3,135,538$ 98.3%
FUND 305 CAPITAL FACILITIES/BUILDING FUND
This fund is used to fund future building needs.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 4,407,455$ 2,698,814$ 163.3%
Investment Interest 33,719$ 25,000$ 134.9%
Transfer in - General Fund -$ 50,000$ 0.0%
YTD Revenues 33,719$ 75,000$ 45.0%
YTD Expenditures 8,828$ 1,900,000$ 0.5%
End Fund Balance 4,432,346$ 873,814$ 507.2%
FUND 306 BOND CONSTRUCTION FUND
This fund is used to account for the 2020 LTGO bond proceeds - to be used for the construction of Fire Station 48,
a police impound facility and M&O facility.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 502,566$ 400,000$ 125.6%
Interest 3,668$ -$ #DIV/0!
Transfer In - Utilities -$ -$
Transfer In - Capital Facilities -$ -$
YTD Revenues 3,668$ -$ #DIV/0!
YTD Expenditures 88,124$ 550,000$ 16.0%
End Fund Balance 418,110$ (150,000)$
FUND 310 TRANSPORTATION IMPROVEMENT FUND
This fund accounts for all transportation related capital improvements.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 997,922$ 2,066,314$ 48.3%
Grant Receipts 110,575$ 12,633,197$ 0.9%
Interest 8,014$ -$
Transfers-In-Growth -$ 663,407$ 0.0%
Transfers In - REET -$ -$ #DIV/0!
Transfers In - Capital Facilities -$ -$
YTD Revenues 118,589$ 13,296,604$ 0.9%
YTD Expenditures 599,031$ 15,362,918$ 3.9%
End Fund Balance 517,481$ -$ 3.9%
FUND 311 PARKS IMPROVEMENT FUND
This fund is to account for all Parks related capital improvement projects.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 426,922$ 12,700$ 3361.6%
Interest/Donations/Other 4,439$ 359,500$ 1.2%
Grants -$ 763,570$ 0.0%
Transfer In -$ -$
Transfer in - Growth Fund 611$ -$
Transfer In - Park Miitgation -$ -$
YTD Revenues 5,050$ 1,123,070$ 0.4%
Pickleball Court 174$ -$
Park Improvements - General 6,674$ 1,020,770$ 0.7%
Jensen Park Restrooms 49,351$ -$
Park Improvements - Maint Plan -$ 100,000$ 0.0%
Smokey Point Park -$ -$
Veteran's Memorial Plaques -$ 500$ 0.0%
YTD Expenditures 56,199$ 1,121,270$ 5.0%
End Fund Balance 375,773$ 14,500$ 2591.5%
FUND 316 CEMETERY CAPITAL IMPROVEMENT FUND
This fund is used to account for any improvements made at the Arlington Cemetery
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 118,777$ 83,408$ 142.4%
Transfer In - Cemetery Ops -$ -$
Cemetery Rehab Grant -$ -$
Interest 909$ 950$ 95.7%
YTD Revenues 909$ 950$ 95.7%
YTD Expenditures -$ 65,500$ 0.0%
End Fund Balance 119,686$ 18,858$ 634.7%
FUND 320 EQUIPMENT RENTAL REPLACEMENT FUND
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 2,864,297$ 2,146,429$ 133.4%
Department Contributions 577,538$ 1,600,317$ 36.1%
DOE Grant -$ -$
Insurance Proceeds 13,912$ -$
Sale of Fixed Assets 6,650$ 2,200$ 302.3%
Program Fees - Field Use 3,940$ 30,000$ 13.1%
Interest Income 21,004$ 26,000$ 80.8%
YTD Revenues 623,044$ 1,658,517$ 37.6%
This fund is used to account for the accumulation of resources for the future replacement of vehicles and equipment when
YTD Expenditures 970,474$ 1,737,496$ 55.9%
End Fund Balance 2,516,867$ 2,067,450$ 121.7%
ENTERPRISE FUNDS (400 - 499)
An enterprise fund may be used to report activity for which a fee is charged to external users for goods or services.
An enterprise fund is also required for any activity whose principal revenue sources meet any of the following criteria;
Debt backed solely by fees and charges, legal requirements to recover costs or policy decisions to recover costs.
FUND 402 AIRPORT
The operation of the Airport Fund includes airport land facility management and maintenance; aviation, industrial and
commercial development; security and administrative services and airport planning.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 348,357$ 661,684$ 52.6%
Rental Income 2,431,791$ 4,286,382$ 56.7%
Grant Revenue -$ -$ #DIV/0!
Misc Revenues 17,078$ 50,900$ 33.6%
Non-Revenues 294,306$ 477,436$ 61.6%
Transfers from Cap Fac Fd -$ -$ #DIV/0!
Other Revenues -$ 12,152$ 0.0%
YTD Revenues 2,743,175$ 4,826,870$ 56.8%
Salaries & Wages 225,620$ 697,203$ 32.4%
Personnel Benefits 72,507$ 259,539$ 27.9%
Supplies 25,456$ 66,960$ 38.0%
Other Services & Charges 198,129$ 472,421$ 41.9%
Non-Expenditures 1,111$ 495,100$ 0.2%
Capital Outlays 75,939$ 1,315,250$ 5.8%
Debt Service -$ -$
Interfund Payment for Services 598,947$ 1,691,902$ 35.4%
Transfers to Equip Replace 29,603$ 81,410$ 36.4%
Transfer to PW 2,838$ 3,000$ 94.6%
Transfer to Reserve -$ 50,000$ 0.0%
YTD Expenditures 1,230,149$ 5,132,785$ 24.0%
End Fund Balance 1,861,383$ 355,769$ 523.2%
FUND 403 WATER
The Water Division's responsibility is to provide clean, clear, potable water to utility customers and deliver the product
economically and plentifully to the customers.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance-Water 1,354,486$ 1,079,850$ 125.4%
Charges for Services 1,479,078$ 5,128,400$ 28.8%
Fines & Penalties 9,747$ 24,000$ 40.6%
Grant Income -$ -$ #DIV/0!
Miscellaneous-Int. Income 58,792$ 133,121$ 44.2%
YTD Revenues-Water 1,547,617$ 5,285,521$ 29.3%
Salaries & Wages 542,454$ 1,869,055$ 29.0%
Personnel Benefits 191,161$ 738,132$ 25.9%
Other Services & Charges 195,860$ 500,784$ 39.1%WCIA insurance paid in Jan
Intergov Serv & Taxes 150,736$ 518,170$ 29.1%
Interfund Payment for Services 94,829$ 258,780$ 36.6%
Transfers to Equip Replace 44,168$ 121,462$ 36.4%
YTD Expenditures-Water 1,354,799$ 4,593,803$ 29.5%
End Fund Balance-Water 1,547,304$ 1,771,568$ 87.3%
FUND 404 WASTEWATER
The Wastewater or Sewer Division is charged with treating industrial and domestic wastes. Sewer maintenance
insures that the system is leak and seepage proof, unblocked by sand, grease, or roots, and properly graded
to move waste efficiently to the treatment plant. The treated water can then be sent back to the Stillaguamish River
cleaner than when it wasoriginally taken out.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance-Sewer 1,348,870$ 1,018,642$ 132.4%
Charges for Services 2,603,112$ 7,869,307$ 33.1%
Fines & Penalties 12,508$ 20,000$ 62.5%
Grant Income -$ -$ #DIV/0!
Miscellaneous-Interest Income 61,990$ 129,021$ 48.0%
YTD Revenues-Sewer 2,677,609$ 8,018,328$ 33.4%
Salaries & Wages 553,202$ 1,864,030$ 29.7%
Personnel Benefits 202,100$ 751,044$ 26.9%
Supplies 124,682$ 311,949$ 40.0%
Other Services & Charges 569,921$ 1,228,187$ 46.4%
Intergov Serv & Taxes 193,663$ 563,465$ 34.4%
Debt Service 511,349$ 2,008,724$ 25.5%
Interfund Payment for Services 161,967$ 437,297$ 37.0%
Transfers to Equip Replace 46,086$ 126,740$ 36.4%
Transfer to Sewer Reserve -$ 725,000$ 0.0%
Transfer - Cemetery Payroll -$ -$
YTD Expenditures-Sewer 2,362,969$ 8,016,436$ 29.5%
End Fund Balance-Sewer 1,663,510$ 1,020,534$ 163.0%
FUND 405 WATER CAPITAL IMPROVEMENT FUND
This fund is used to account for major capital projects constructed by the Water division. All revenues from new
connection fees are receipted into this fund as well as a small portion of the monthly utility rate.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 5,095,521$ 2,219,460$ 229.6%
Other Funding -$ 8,725,000$ 0.0%
Water Connection Fees 116,756$ 257,920$ 45.3%
Interest Income/Misc 36,756$ 15,000$ 245.0%
Transfer-In-Water Fund -$ 750,000$ 0.0%
YTD Revenues 153,512$ 9,747,920$ 1.6%
YTD Expenditures 484,630$ 11,422,100$ 4.2%
End Fund Balance 4,764,402$ 545,280$ 873.8%
FUND 406 SEWER CAPITAL IMPROVEMENT FUND
This fund is used to account for major capital projects constructed by the Sewer division. All revenues from new
connection fees are receipted into this fund as well as a small portion of the monthly utility rate.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 5,451,500$ 5,211,695$ 104.6%
Sewer Connection Fees 91,959$ 181,495$ 50.7%
Interest Income 40,166$ 10,000$ 401.7%
Grant Income -$ 3,500,000$ 0.0%
Transfer-In-Sewer Fund -$ 725,000$ 0.0%
YTD Revenues 132,125$ 4,416,495$ 3.0%
YTD Expenditures 1,111,870$ 5,274,000$ 21.1%
End Fund Balance 4,471,755$ 4,354,190$ 102.7%
FUND 409 STORM WATER CAPITAL IMPROVEMENT FUND
This fund is used to fund any major capital projects constructed by the Storm Water Utility.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 1,510,156$ 470,800$ 320.8%
Grants -$ 1,262,000$ 0.0%
Interest Income 11,148$ 4,000$ 278.7%
Transfers-In-Stormwater Fund -$ 220,000$ 0.0%
YTD Revenues 11,148$ 1,486,000$ 0.8%
YTD Expenditures 5,593$ 1,462,000$ 0.4%
End Fund Balance 1,515,710$ 494,800$ 0.4%
FUND 410
This fund is used to fund emergency repairs and large capital projects at the Municipal Airport.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 4,623,742$ 2,071,771$ 223.2%
Interest Income 35,376$ 18,000$ 196.5%
Transfers In -$ 50,000$ 0.0%
YTD Revenues 35,376$ 68,000$ 52.0%
YTD Expenditures (transfer to CIP) -$ 700,000$ 0.0%
End Fund Balance 4,659,118$ 1,439,771$ 323.6%
FUND 411 WATER/SEWER BOND RESERVE FUND
The legal requirements in Bond and Loan documents required the City hold an amount in reserve that totals the
smaller of;
1) the maximum annual debt service of the W/S Revenue Bonds and Loans
2) 125% of the annual debt service of the utility, or
3) 10% of the stated principal amount of the bonds
YTD
AIRPORT RESERVE FUND
April BUDGET
2026 2026 %
Begin Fund Balance 1,022,699$ 1,022,699$ 100.0%
YTD Revenues - - #DIV/0!
YTD Expenditures - - #DIV/0!
End Fund Balance 1,022,699$ 1,022,699$ 100.0%
FUND 412 STORM WATER MANAGEMENT FUND
This fund was created to administer, manage, develop, operate and maintain the City's Storm Water Management Plan.
The Plan includes buildings and maintaining public drainage systems that alleviate local flooding problems, providing
erosion control and creating public awaness programs that help protect our water quality.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 221,239$ 228,810$ 96.7%
Charges for Services 439,868$ 1,330,245$ 33.1%
Grants 37,817$ 25,000$ 151.3%
Misc revenue 25,069$ 65,801$ 38.1%
YTD Revenues 502,754$ 1,421,046$ 35.4%
Salaries & Wages 172,682$ 541,631$ 31.9%
Personnel Benefits 56,457$ 230,442$ 24.5%
Supplies 17,483$ 44,772$ 39.0%
Other Services & Charges 101,032$ 146,579$ 68.9%
Intergov Serv & Taxes 31,728$ 85,795$ 37.0%
Interfund Payment for Services 44,755$ 115,849$ 38.6%
Transfers to Equip Replace 21,671$ 59,597$ 36.4%
Tranfer to Cemetery Payroll -$ -$
Transfer to Stormwater Reserve -$ 220,000$ 0.0%
YTD Expenditures 445,808$ 1,444,665$ 30.9%
End Fund Balance 278,185$ 205,191$ 135.6%
FUND 413 AIRPORT CAPITAL IMPROVEMENT (FAA) FUND
This fund accounts for capital improvements at the Airport that are eligible for, and receive grant funding, from the
Federal Aviation Administration (FAA).
YTD
April BUDGET
2026 2026 %
Begin Fund Balance -$ 66,000$ 0.0%
Grants 150,217$ 1,677,358$ 9.0%
Interest Income/Misc 803$ -$ #DIV/0!
Interfund Loan Payment 40,000$ 120,000$ 33.3%
Transfer In - Airport Reserve -$ 700,000$ 0.0%
191,020$ 2,497,358$ 7.6%
YTD Expenditures 127,186$ 2,503,000$ 5.1%Taxiway Alpha, RW 11/29 solar lighting
End Fund Balance 63,834$ 60,358$ 105.8%
INTERNAL SERVICE FUNDS (500 - 599)
FUND 504 PUBLIC WORKS GROUNDS & FACILITIES MAINTENANCE
or agencies of the governmental unit, on a cost-reimbursement basis.
This fund is responsible for the maintenance and operations of the airport, cemetery, parks, public areas and all
City owned facilities.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 326,775$ 128,696$ 253.9%
Other Misc. Revenues - GF Payroll 245,670$ 1,297,989$ 18.9%
Other Misc. Revenues - GF 300,000$ 825,000$ 36.4%
Other Misc. Revenues - Airport 267,589$ 780,671$ 34.3%
Other Misc. Revenues - Storm 24,445$ 60,000$ 40.7%
Other Misc. Revenues - Cemetery 4,724$ 43,240$ 10.9%
Other Misc. Revenues - Streets 109,470$ 416,829$ 26.3%
Other Misc. Revenues - PW 7,125$ 15,604$ 45.7%
Misc Revenues 3,308$ 16,552$ 20.0%
962,330$ 3,455,885$ 27.8%
Salaries & Wages 515,780$ 1,757,234$ 29.4%
Personnel Benefits 191,913$ 664,812$ 28.9%
Supplies 38,394$ 188,000$ 20.4%
Other services/Charges 253,660$ 516,794$ 49.1%
Interfund Payment for Services 81,118$ 223,064$ 36.4%
Transfers to Equip Replace 37,720$ 115,724$ 32.6%
YTD Expenditures 1,118,584$ 3,465,628$ 32.3%
End Fund Balance 170,521$ 118,953$ 143.4%
PRIVATE PURPOSE TRUST FUNDS (620 - 629)
To report all trust arrangements under which principal and interest benefit individuals, private organizations and
other governments.
FUND 622 CEMETERY PRE-NEED TRUST FUND
This funds is used to account for dollars where individuals have pre-paid for their items needed at the time of burial.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 56,428$ 47,437$ 119.0%
Interest -$ -$
Sale of Liner/Vaults 3,849$ 4,475$ 86.0%
YTD Revenues 3,849$ 4,475$ 86.0%
YTD Expenditures 3,276$ 1,000$ 327.6%
End Fund Balance 57,001$ 50,912$ 112.0%
FUND 633 CITY FIDUCIARY FUND
This fund was created in response to GASB 84 which requires fiduciary activities to be recorded in a separate fund.
These are items that are collected on behalf of another government or organization (like the portion of court fees that
are remitted to the state.
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 3,166$ 1,300$ 243.5%
Other Fiduciary Activity 4,982$ 19,850$ 25.1%
24,878$ 123,550$ 20.1%
YTD Expenditures 22,089$ 123,550$ 17.9%
End Fund Balance 5,955$ 1,300$ 458.0%
PERMANENT FUNDS ( 700-799)
To report resources that are restricted to the extent that only earnings (interest), not principal, can be used to support
the local government's applicable program.
FUND 702 CEMETERY ENDOWMENT FUND
YTD
April BUDGET
2026 2026 %
Begin Fund Balance 466,333$ 455,000$ 102.5%
Transfer In - Endowed Care Funds 7,774$ 23,175$ 33.5%
Interest Income 3,584$ 2,500$ 143.4%
YTD Revenues 11,358$ 25,675$ 44.2%
YTD Expenditures -$ -$
End Fund Balance 477,691$ 480,675$ 99.4%
The Cemetery collects a perpetual fee for each plot sold, either at the time of need or on a pre-need basis. Those funds are
held in this fund and the interest earned can be transferred to the Cemetery fund, if needed, to help cover the costs of
General Fund Revenue Charts
Curr Month
Property Taxes
2025 Budget 5,019,207
Sales Taxes - 1%
2025 Budget 8,105,339
Snoh. Co. Criminal Justice Sales Tax - 0.1%
2025 Budget 533,913
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
2021 2022 2023 2024 2025 2026
Retail Sales Tax -1% YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
2021 2022 2023 2024 2025 2026
Crim. Justice Sales Tax YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
2021 2022 2023 2024 2025 2026
Property Taxes YTD
Page 1
Utility Tax - Water
2021 2022 2023 2024 2025 2026
Jan 14,589$ 16,370$ 16,218$ 17,385$ 18,126$ 18,659$
Feb 14,742 18,218 17,965 17,800 17,590 18,573
March 15,801 16,522 18,767 17,678 18,241 18,872
April 14,396 16,833 16,405 17,890 18,011 18,817
May 14,123 16,425 18,393 18,403 18,934 -
June 16,149 17,110 17,330 18,293 19,297 -
July 16,348 16,441 22,069 19,182 22,846 -
Aug 21,023 18,991 23,135 23,168 25,278 -
Sept 22,120 22,835 25,359 22,739 24,820 -
Oct 19,768 24,220 22,995 22,592 27,384 -
Nov 16,463 19,376 20,016 19,156 20,378 -
Dec 15,268 17,594 17,117 18,394 20,323 -
200,792 220,936 235,769 232,681 251,229 74,921
2025 Budget 248,100 Tax is currently at 5% of gross revenues.
Utility Tax - Sewer
2025 Budget 357,247 Tax is currently at 5% of gross revenues.
Utility Tax - Storm
2025 Budget 357,247 Tax is currently at 5% of gross revenues.
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
$180,000
$200,000
$220,000
$240,000
2021 2022 2023 2024 2025 2026
Utility Tax -Water YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Utility Tax -Sewer YTD
$0
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
2021 2022 2023 2024 2025 2026
Utility Tax -Storm YTD
Page 2
Utility Tax - Natural Gas
2021 2022 2023 2024 2025 2026
Jan 41,226$ 49,082$ 70,878$ 61,597$ 77,522$ 52,417$
Feb - 63,946 73,860 77,583 84,430 74,360
March 82,611 51,304 58,355 50,526 99,584 58,944
April 48,686 53,010 70,858 63,277 67,198 56,504
May 34,032 35,896 60,407 44,991 58,848 -
June 17,699 33,650 34,930 34,750 39,123 -
July 16,719 18,374 20,197 28,149 30,206 -
Aug 10,267 12,769 16,396 23,730 23,759 -
Sept 10,560 11,986 16,537 18,429 21,951 -
Oct 10,781 11,370 17,171 20,105 22,927 -
Nov 18,136 14,154 16,019 31,186 36,275 -
Dec 29,944 41,075 42,155 44,661 41,984 -
320,661 396,616 497,763 498,984 603,807 242,224
2025 Budget 537,584 Tax is currently at 6% of gross revenues.
Utility Tax - Cable TV
2025 Budget 380,000 Tax is currently at 8% of gross revenues.
Utility Tax - Telephone
2025 Budget 215,000 Tax currently at 6% of gross revenues.
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
2021 2022 2023 2024 2025 2026
Utility Tax -Nat. Gas YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Utility Tax -Cable TV YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
2021 2022 2023 2024 2025 2026
Utility Tax -Telephone YTD
Page 3
Utility Tax - Electricity
2021 2022 2023 2024 2025 2026
Jan 120,964$ 122,385$ 132,832$ 147,297$ 162,971$
Feb 112,408 124,178 139,147 291,754 147,859 146,914
March 107,287 116,350 107,018 134,773 152,205 141,197
April 118,555 118,864 140,813 138,631 142,333 149,082
May 94,062 98,911 110,933 124,175 128,623 -
June 91,674 100,725 102,346 133,040 124,417 -
July 92,518 95,987 104,449 98,599 128,941 -
Aug 99,282 98,448 107,989 126,643 142,471 -
Sept 91,895 108,264 126,267 127,885 116,583 -
Oct 94,260 107,821 102,382 128,756 139,165 -
Nov 91,554 94,999 121,184 125,569 143,622 -
Dec 100,457 106,211 107,254 123,474 110,443 -
1,214,916 1,293,143 1,402,616 1,553,300 1,623,957 600,163
2025 Budget 1,458,720 Tax is currently at 6% of gross revenues.
Utility Tax - Solid Waste (Garbage)
2025 Budget 588,713 Tax is currently at 8% of gross revenues.
Gambling Taxes
2025 Budget 200,300 Tax on Pull tabs is 5% of gross receipts.
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
2021 2022 2023 2024 2025 2026
Utility Tax -Electricity YTD
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
2021 2022 2023 2024 2025 2026
Utility Tax -Garbage YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
$180,000
$200,000
2021 2022 2023 2024 2025 2026
Gambling Taxes YTD
Page 4
Cable TV Franchise Fees
2021 2022 2023 2024 2025 2026
Jan 19,153$ 19,634$ 18,343$ 16,523$ 29,806$ 12,518$
Feb 17,439 18,557 16,366 15,116 -
March 19,196 38,366 19,017 17,162 14,896 26,528
April 19,579 19,950 18,816 16,996 - 12,989
May 19,609 19,830 18,685 16,529 14,788 -
June 19,355 19,527 18,709 16,430 14,437 -
July 17,057 19,226 - 16,106 28,364 -
Aug 19,184 19,596 35,878 15,726 - -
Sept 19,816 19,141 17,515 15,344 13,880 -
Oct 19,464 19,132 17,150 26,947 -
Nov 19,823 19,386 17,153 14,568 13,097 -
Dec 19,877 18,882 16,580 14,562 13,020 -
229,551 232,668 216,403 176,312 184,351 52,034
2025 Budget 232,000 Tax is 5% of gross revenues.
Building Permits
2025 Budget 500,000
Liquor Excise Taxes
2025 Budget 150,749
$0
$250,000
$500,000
2021 2022 2023 2024 2025 2026
Building Permits YTD
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
$225,000
$250,000
2021 2022 2023 2024 2025 2026
Cable Franchise Fees YTD
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
Liquor Excise Tax YTD
Page 5
Liquor Profits
2021 2022 2023 2024 2025 2026
Jan
Feb
March 40,700 40,121 40,635 41,030 42,830 42,521
April
May
June 40,701 40,120 40,635 41,028 42,831 -
July -
Aug -
Sept 40,684 40,185 40,642 41,029 42,831 -
Oct -
Nov -
Dec 40,672 40,178 40,638 41,027 42,831 -
162,757 160,605 162,550 164,114 171,323 42,521
2025 Budget 164,673
4,305 (2,152) 1,945 1,564
3%-1%1%1%
Traffic Infractions
2025 Budget 130,000
71.07%
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
2021 2022 2023 2024 2025 2026
Fines & Forfeitures YTD
$0
$50,000
$100,000
$150,000
$200,000
2021 2022 2023 2024 2025 2026
Liquor Profits YTD
Page 6
Other Funds Revenue Charts
Street Fund 101
2021 2022 2023 2024 2025 2026
Jan 25,205$ 29,534$ 29,192$ 28,621$ 31,571$ 40,779$
Feb 30,338 32,140 27,589 28,989 29,288 30,297
March 25,834 24,973 27,338 25,890 15,014 25,631
April 24,888 26,765 26,409 26,936 17,335 -
May 29,811 31,757 32,136 30,085 18,463 -
June 31,079 30,029 30,075 30,577 62,728 -
July 33,105 32,263 32,848 30,240 21,090 -
Aug 34,464 37,800 35,745 34,506 47,760 -
Sept 33,155 32,300 33,317 30,496 28,775 -
Oct 34,347 34,340 34,154 32,549 38,830 -
Nov 31,096 28,174 30,320 32,242 27,258 -
Dec 30,355 24,856 30,377 29,285 26,411 -
363,677 364,932 369,500 360,415 364,523 96,707
2025 Budget 392,269
Lodging Tax Fund 114
Lodging Tax
2025 Budget 140,000
Transportation Sales Tax Fund 180
Sales Tax
2025 Budget 1,981,690
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
2021 2022 2023 2024 2025 2026
Fuel Taxes YTD
$0
$25,000
$50,000
$75,000
$100,000
$125,000
$150,000
$175,000
$200,000
2021 2022 2023 2024 2025 2026
Lodging Tax YTD
$0
$250,000
$500,000
$750,000
$1,000,000
$1,250,000
$1,500,000
$1,750,000
$2,000,000
$2,250,000
$2,500,000
2021 2022 2023 2024 2025 2026
Transportation Sales Tax YTD
Page 7
City of Arlington Council Agenda Bill NB #2 Attachment June 1, 2026
Low Bid Award for the 67th Avenue Sewer Interceptor Upsizing Project
Certified Bid Tabulation
Public Works Department: Jim Kelly, Public Works Director 360-403-3505 EXPENDITURES REQUESTED: $1,582,000.55 BUDGET CATEGORY: Sewer Improvement Fund BUDGETED AMOUNT: $2,000,000.00 in 2026 Budget LEGAL REVIEW: DESCRIPTION: Low bid award for the 67th Avenue Sewer Interceptor Upsizing Project
In 2022, the City entered into contract with RH2 Consultants for engineering design services for the upsizing of the City’s 67th Avenue interceptor gravity sewer line from 200th Place NE to north of Woodlands Way, approx. 4,835 feet. Due to the length of this project, it was designed in two construction phases. The City publicly bid Phase 1 of the project and bids were opened on May 12, 2026. Reece Construction is the certified low bidder with a bid of $1,582,000.55. Staff recommendation Construction.
ALTERNATIVES: Remand to staff for further consideration.
I move award the 67th Avenue Sewer Interceptor Upsizing project to Reece Construction and authorize the mayor to sign the contract.
City of Arlington Council Agenda Bill NB #3 Attachment June 1, 2026 Emergency Declaration for Repair of Water Treatment Plant (WTP) High Service Pump
DRAFT Resolution 2026-XXX Declaring an Emergency and Waiving Competitive Bidding Requirements
Public Works Department: Jim Kelly, Public Works Director 360-403-3505 EXPENDITURES REQUESTED: $20,000.00 (max estimate) BUDGET CATEGORY: Water Capital Fund BUDGETED AMOUNT: $30,000.00 LEGAL REVIEW: DESCRIPTION:
The Arlington WTP has three (3) high service pumps that are used to pump treated potable water from the WTP into the water distribution system. One of the high service pumps stopped working; the pump motor was running but the pump was not turning. Staff called in PumpTech LLC, the company that rehabilitated the pumps in 2012, to pull the non-functioning pump and assess why it wasn’t working. Preliminary assessment indicates that the pump may have a broken shaft. Because this is the City’s primary drinking water source, having one of its three pumps out of service compromises the WTP’s ability to meet the Arlington community’s water demands. Time is of the essence as we need to have this pump and shaft repaired prior to peak water demand season this summer. These pumps are custom built to fit the current motor and discharge head exactly, they have an extremely long lead time to manufacture. Staff is requesting an emergency declaration to waive state bid requirements in order to get the pump repaired and reinstalled as quickly as possible. ALTERNATIVES: Remand to staff for further consideration. Proceed through bidding process which will result in additional delays as the pump is so specific.
I move to adopt Resolution 2026-XXX declaring an emergency situation exists with the Water Treatment Plant high service pump which authorizes the waiving of competitive bidding requirements necessary for the pump repair.
Phone:
Fax:
Quote Number: 1107611 QUOTE Page:1 of 5
425-644-8501
425-562-9213
Fax:425-562-9213
PumpTech LLC
12020 SE 32nd St Suite 2
Bellevue WA 98005
Quote To:
Zach Resch
Arlington, City Of
238 N Olympic Ave
Arlington WA 98223-1337
USA
Date:5/19/2026
Expires:6/18/2026
Quote Name:City of Arlington Clear Well
Sales Person:
Inside Sales: Tim Long
Email:tim.long@pumptechnw.com
Ronald Basinger
Email:
Est. Lead Time:1-2 weeks
Company TruckShip Via::
FOB: FOB Origin Full Freight Allow
Phone: (360)391-4803
Fax:
zresch@arlingtonwa.gov
Terms: Net 30
USD
Line Part Description Expected Qty Unit Price Ext. PriceRev
1
Labor to Pull Clear Well with a Possible broken shaft
**Onsite Labor is Prevailing Wage **
1.00 4,950.00 4,950.00EA
2
Clear Well Pump Open & Inspect
1.00 1,410.00 1,410.00EA
3
Clear Well Pump Repair
1.00 3,046.05 3,046.05EA
4
Labor to Install Repaired Clear Well Pump**Onsite Labor is Prevailing Wage
1.00 4,950.00 4,950.00EA
Phone:
Fax:
Quote Number: 1107611 QUOTE Page:2 of 5
425-644-8501
425-562-9213
Fax:425-562-9213
PumpTech LLC
12020 SE 32nd St Suite 2
Bellevue WA 98005
Lines Total 14,356.05
Line Miscellaneous Charges 0.00
Total Taxes 1,335.11
Quote Miscellaneous Charges 0.00
Total Taxes %9.30 %
Quote Total (Cash/Check/ACH)15,691.16
Quote Total (Only if Paid by Credit Card)16,201.12
Taxes are estimated upon the current known shipping address
Due to potential tariff impacts and pricing volatility, all prices are subject to change without notice.
NOTICE: ONGOING GLOBAL AND DOMESTIC SUPPLY INSTABILITIES
Due to the global supply chain disruptions, and material shortages, PumpTech, LLC is unable to guarantee any current or
previously quoted lead times. We always work vigorously to fulfill all orders as quickly as possible. Due to the continuous
and ongoing global freight and material price increases, we are strictly following our Quotation Validity Time of 30 days
from the date of the quote. We are doing our best to contain both costs and shipment dates.
Estimated lead times are subject to prior sale, availability and current shop loads. Lead times will be determined, per
order, at the time of receipt of order acknowledgment from our suppliers. Once we have received acknowledgment, we
will alert you to the current lead time. Where applicable, lead times will not begin until: internal engineering review and
approval, 100% signed off approved submittals, and signed off drawings and/or contract approval. Freight is not included
in this quote, unless specifically stated. PumpTech, LLC will not accept any penalties or LD’s for any delays caused by
COVID-19, material shortages, supply chain issues, or transportation delays.
FORMATION OF CONTRACT: These standard terms and conditions of sale (“Terms and Conditions”) together with the
sales covenants, the general specifications, the technical specifications, and any addendum thereto, including any
acknowledgement by PUMPTECH, LLC, comprise the “Proposal” or “Sales Quotation” (collectively the “Quotation”),
which upon acceptance by Purchaser become the “Agreement.” Subject to prior credit approval by PUMPTECH, LLC
(see “Credit Approval and Payment Terms” section below), Purchaser may accept the Quotation through: (i) delivering a
purchase order that incorporates the Quotation by reference and payment of the initial deposit; (ii) other written indication
by Purchaser of its acceptance of the Quotation along with payment of the initial deposit; (iii) delivering a purchase order
or other written indication by Purchaser of its acceptance of the Quotation and agreement by both parties on a standard
progress payment plan that does not require an initial deposit (see “Credit Approval and Payment Terms” section below);
or (iv) receipt by Purchaser of PUMPTECH, LLC’s acknowledgement without notice of rejection. The effective date of the
Agreement shall be the date that PUMPTECH, LLC communicates to Purchaser via PUMPTECH, LLC’s
acknowledgement, in writing. PUMPTECH, LLC’s obligations under the Quotation or the Agreement shall not commence
until the effective date. The scope of work for the Agreement is limited to the equipment, machinery, goods, engineering
services (if applicable) and/or related commissioning services (if applicable) specifically set forth in the Agreement
(“Equipment”). The scope of work does not include installation or any on-site services unless specifically identified as
The above order is subject to Pumptech, LLC's standard terms and conditions and credit approval which are
attached and made part of this agreement. We appreciate your interest in our products and services and if you
have any questions on our offerings please do not hesitate to call.
By signature below, I accept this offering:
Signed ________________________________
Signed by _____________________________ Title ________________________ Date ________________
Phone:
Fax:
Quote Number: 1107611 QUOTE Page:3 of 5
425-644-8501
425-562-9213
Fax:425-562-9213
PumpTech LLC
12020 SE 32nd St Suite 2
Bellevue WA 98005
being included in the price in the Agreement. Any terms and conditions contained in any purchase order, plans and
specifications, correspondence, or accompanying payment for delivery of the Equipment, which are different from or in
addition to the Terms and Conditions herein, shall not be binding on PUMPTECH, LLC, whether or not they would
materially alter the Agreement, and PUMPTECH, LLC hereby objects to and rejects the same unless such terms and
conditions are delivered to PUMPTECH, LLC prior to Quotation and referenced in the Quotation.
CREDIT APPROVAL AND PAYMENT TERMS: Credit approval is required by PUMPTECH, LLC prior to release of order
to manufacturer; however, submittal may begin at the time of receipt of purchase order.
PUMPTECH, LLC’s payment terms are net thirty (30) days from invoice date. In some circumstances PUMPTECH, LLC
may require progress payments. Progress payments are due and payable upon receipt of invoice. PUMPTECH, LLC’s
“Standard Progress Payment Plan” is defined as a payment plan that includes the following terms in the purchase order
or the Agreement: 1st: fifteen percent (15%) upon receipt of approved drawings; 2nd: thirty percent (30%) upon order of
major components; 3rd: twenty percent (20%) upon receipt of major components at PUMPTECH, LLC’s facility; 4th: thirty
percent (30%) upon shipment; and 5th: five percent (5%) on start-up. If not included within the Quotation, all applicable
federal, state and local taxes will be added to each invoice. Time is of the essence with respect to all payments.
Payments that are outstanding more than ten (10) days from their respective due date shall bear an interest rate of one
and one-half percent (1.5%) per month (eighteen percent (18%) annually) until fully paid, including any interest accruing
thereon. If PUMPTECH, LLC chooses to turn any past-due balances over to a collection agency, Purchaser agrees to pay
costs of the collection to the extent that is allowed by law for commercial accounts.
CHANGE ORDERS: Changes to the design, specifications, scope of supply, delivery schedule, Equipment demonstration
site or date, shipping instructions of the Equipment, or any material term of the Agreement, may only be made upon
execution by Purchaser and PUMPTECH, LLC in writing (“Change Order”). Such Change Order shall state the parties’
agreement on (i) change in the specifications, designs, scope of work, delivery schedule or shipping instructions for the
Equipment, (ii) an adjustment to the purchase price, and (iii) an adjustment in the date of shipment of the Equipment
and/or the period of performance. Both parties agree and acknowledge that unless a Change Order is agreed upon in
writing by both parties, the Agreement shall not be modified in any manner. In addition, PUMPTECH, LLC has the right to
suspend performance of its obligations hereunder without liability during the period while the change is being evaluated
and negotiated. In the event Purchaser has communicated proposed changes to PUMPTECH, LLC, PUMPTECH,
LLC, at its sole discretion, shall either: (a) accept the Change Order; (b) reject the Change Order and continue
performance under the existing Agreement; or (c) cancel the Agreement. In the event that PUMPTECH, LLC elects (b)
above, Purchaser shall either (i) agree to continued performance by PUMPTECH, LLC pursuant to the Agreement or (ii)
cancel the Agreement. In the event of (b)(ii), Purchaser shall pay PUMPTECH, LLC for all amounts then due and owing
under the Agreement plus all incurred costs not yet billed (e.g., labor and materials) plus fifteen percent (15%) for profit
on all incurred costs not yet billed.
SHIPMENT: Estimated shipment from manufacturer can proceed as quoted after receipt of approved submittals and
purchase order. Although PUMPTECH, LLC shall use commercially reasonable efforts to have the Equipment delivered
within the time estimated, any quoted shipment time is based on information from suppliers and is not intended to be an
exact date or a guarantee. Any late delivery charges due to shipment
beyond the estimated schedule will not be accepted.
WARRANTY: The only warranty/guarantee implied or applied to this Agreement are those as put forth by the original
manufacturer. New equipment manufactured by PUMPTECH, LLC are warranted to be free from defects in material and
workmanship for a period of one (1) year from the date of shipment (ninety (90) days for repaired equipment) provided
that the Purchaser has timely made all payments due under the Agreement and the product is properly installed,
serviced, and operated under normal conditions. If within one (1) year of installation PUMPTECH, LLC receives written
notice from Purchaser of defective material or workmanship with respect to Equipment, PUMPTECH, LLC’s sole
obligation shall be, at PUMPTECH INC.’s option, either to (i) repair the Equipment, (ii) replace the Equipment, or (iii)
refund the amount paid by Purchaser. PUMPTECH, LLC shall have no other obligation or liability whatsoever with respect
to any defective material(s) or service. Materials to be replaced or items for which services are to be re-performed shall
be shipped by Purchaser to, PUMPTECH, LLC’s shop in Bellevue, Washington or to such location as PUMPTECH, LLC
may designate. Purchaser is responsible for prepayment of freight and insurance of such shipment. Purchaser shall
Phone:
Fax:
Quote Number: 1107611 QUOTE Page:4 of 5
425-644-8501
425-562-9213
Fax:425-562-9213
PumpTech LLC
12020 SE 32nd St Suite 2
Bellevue WA 98005
provide returned items to PUMPTECH, LLC in such a state that PUMPTECH, LLC may inspect the item immediately
upon PUMPTECH, LLC’s receipt thereof. If found to be defective, PUMPTECH, LLC will prepay all freight and insurance
costs of the return shipment of the repaired or replaced item. Any repaired or replaced items shall be warranted only for
the remaining period of the original warranty. Expedited repairs are subject to expediting fees. Products inspected and
proven to be non-defective are subject to service charges and will be returned to Purchaser at Purchaser’s expense.
THIS AGREEMENT DOES NOT GRANT ANY OTHER WARRANTY OR GUARANTEE OR MAKE ANY
REPRESENTATIONS, EITHER EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, IMPLIED WARRANTIES
OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, WHETHER ARISING BY LAW, CUSTOM,
CONDUCT OR USAGE OF TRADE. THE RIGHTS AND REMEDIES PROVIDED HEREIN ARE EXCLUSIVE AND IN
LIEU OF ANY OTHER RIGHTS OR REMEDIES. THIS WARRANTY SHALL NOT BE VALID IF THE ITEMS THAT ARE
THE SUBJECT MATTER OF THIS AGREEMENT HAVE BEEN SUBJECTED TO ABUSE, MISUSE, ACCIDENT,
ALTERATION, MODIFICATION, NEGLECT, UNAUTHORIZED REPAIR, OR EXPOSURE TO CONDITIONS BEYOND
THE APPLICABLE ENVIRONMENT.
THIS WARRANTY SHALL ALSO BE VOID IF THE ITEMS ARE ASSIGNED, SOLD OR TRANSFERRED TO AN ENTITY
OTHER THAN PURCHASER.
LIMITATION OF LIABILITY: PUMPTECH, LLC’s liability on any claim of any kind (excluding bodily injury or death)
whether based on contract, warranty, tort (including negligence), strict liability or otherwise, for any loss or damage arising
out of, connected with, or resulting from this Agreement, or from the performance or breach thereof, or from all services
and Equipment covered by or furnished under this Agreement, shall in no case exceed the price of the specific service or
Equipment which gives rise to the claim.
PURCHASER UNDERSTANDS AND ACKNOWLEDGES THAT IN NO EVENT WILL PUMPTECH, LLC BE LIABLE FOR
SPECIAL, DIRECT, INDIRECT, INCIDENTAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES,
HOWEVER CAUSED, INCLUDING, BUT NOT LIMITED TO, THOSE FOR LABOR, EXPENSES, LOSS OF PROFITS
OR REVENUE, LOST OPPORTUNITIES, OR SIMILAR DAMAGES OF ANY KIND.
INDEMNIFICATION: Purchaser agrees to defend, indemnify and hold harmless PUMPTECH, LLC and its respective
affiliates, officers, directors, employees, shareholders and agents from and against all losses, costs, expenses, damages,
suits or liability of any nature incurred in whole or in part as a result of the conduct, negligence, or willful misconduct of
Purchaser, its agents, servants, employees or customers or caused by Purchaser’s property or property under the
responsibility of Purchaser.
DISPUTE RESOLUTION: All claims, disputes or controversies (whether in contract or tort, pursuant to statute or
regulation, or otherwise, and whether pre-existing, present or future) arising out of or relating to PUMPTECH, LLC’s
services and/or these Terms and Conditions (collectively “Claims”) will be resolved, first, by a formal mediation conducted
by an experienced mediator mutually agreed upon by PUMPTECH, LLC and Purchaser, and, if mediation should fail to
resolve the Claims, secondly, by reference to and determination by binding arbitration governed by the Federal Arbitration
Act and administered by the American Arbitration Association under its rules for resolution of disputes, or under other
mutually agreed procedures. The parties agree that any arbitration proceeding shall be presided over by a neutral
arbitrator selected by the parties who shall have at least twenty (20) years of experience practicing law related to sales
contract disputes. Any such proceedings under mediation or arbitration shall be conducted in Seattle, Washington.
This provision shall survive the termination of the Agreement governed by these Terms and Conditions.
CHOICE OF LAW: This Agreement shall be construed in accordance with the laws of the State of Washington.
ATTORNEY FEES: In any litigation, arbitration, or other proceeding by which one party either seeks to enforce its rights
under this Agreement (whether in contract, tort, or both) or seeks a declaration of any rights or obligations under this
Agreement, the prevailing party shall be awarded its reasonable attorney fees, and costs and expenses incurred.
FINAL AGREEMENT: This Agreement merges all prior discussions, whether written or oral, and is the entire
understanding and agreement of the parties; neither party shall be bound by additional or other representations,
conditions, or promises except as subsequently set forth in writing and signed by the party to be bound.
Phone:
Fax:
Quote Number: 1107611 QUOTE Page:5 of 5
425-644-8501
425-562-9213
Fax:425-562-9213
PumpTech LLC
12020 SE 32nd St Suite 2
Bellevue WA 98005
Turbine Inspection Worksheet
Model:12MB Stages:7 Serial #:
1.5 10 1/8"
3 3/16"
9/16"
Stage 1 5.765
5.755 0.010
Stage 2 5.762
5.75 0.012
Stage 3 5.761
5.753 0.008
Stage 4 1.762
1.754 0.008
Stage 5 5.757
5.753 0.004
Stage 6 5.759
5.751 0.008
Stage 7 5.762
5.753 0.009
Stage 8
0.000
Stage 9
0.000
Stage 10
0.000
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Impeller (E):
Impeller (E):
Impeller (E):
Impeller (E):
Impeller (E):
Impeller (E):
Impeller (E):
Impeller (E):
Bowl (F):
Bowl (F):
Bowl (F):
Bowl (F):
Bowl (F):
Bowl (F):
Impeller (E):
Bowl (F):
Bowl (F):
Bowl (F):
9927131461
Bowl/Impeller Wear Rings:
Shaft:
Nominal Diameter (A):
Impeller (E):
Suction Manifold (D):
Difference:
Thread Pitch:
Step Diameter:
Stick Up (B):
Stick Down (C):
Total Lateral:
Date 4/10/2026
Job #
Customer
Pump ID
116061-2-1
City of Arlington
Peerless
Turbine Inspection Worksheet
1.5 Qty
Stage 1 1.506
0.006
Stage 2 1.508
0.008
Stage 3 1.51
0.010
Stage 4 1.509
0.009
Stage 5 1.51
0.010
Stage 6 1.51
0.010
Stage 7 1.509
0.009
Stage 8
Stage 9
Stage 10
1.509
0.009
Notes
Discharge Manifold (J):
Difference:
Difference:
Difference:
Bowl (I):
Bowl (I):
Bowl (I):
Bowl (I):
Bowl (I):
Discription
Bowl (I):
Bowl (I):
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Difference:
Bowl (I):
Bowl (I):
Suction Manifold (H):
Difference:
Shaft Bearings
Shaft Diameter:
Repair Parts Needed:
Suction Sand Collar to End of Shaft: 2 7/8"
Discharge Sand Collar to End of Shaft 6 5/16
Pump Spins Freely
Sealing Surface Gasket
RESOLUTION NO. 2026- XXX
A RESOLUTION DECLARING AN EMERGENCY AND WAIVING
COMPETITIVE BIDDING REQUIREMENTS DUE TO PENDING PUMP
FAILURE AT THE WATER TREATMENT PLANT
WHEREAS, it was discovered that a high service pump has failed at the Water Treatment
Plant in May, 2026 that has potential to impact the health and safety of citizens; and
WHEREAS, the Water Treatment Plant produces all water within the City of Arlington,
and
WHEREAS, the City’s investigation of the water pump indicates that the cause could be a
cracked shaft, or other long lead repair item; and
WHEREAS, any failure of the high service pump system could cause unsafe and
dangerous conditions, requiring immediate action;
NOW, THEREFORE, the City Council of the City of Arlington Washington does hereby
resolve as follows:
1.The City Council finds an emergency condition exists which may present a real and
immediate threat to the proper performance of essential functions, and potential loss
or damage to property or health and safety of citizens, if immediate action is not
taken. Pursuant to RCW 39.04.280, the City Council waives the competitive bidding
requirements for the work necessary as a result of the emergency.
Approved by the City Council of the City of Arlington this 1st day of June 2026.
CITY OF ARLINGTON
__________________________
Don E. Vanney, Mayor
ATTEST:
______________________________
Raelynn Jones, City Clerk
APPROVED AS TO FORM:
________________________
Oskar Rey, City Attorney