Loading...
HomeMy WebLinkAboutIssued Permit 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Utility Service Permit Parcel:00378800801102 Permit#:26-0216 Permit Address:305 MAPLE ST Permit Expiration: September 27, 2027 Description of Work:Side sewer repair a€o 4x4 hole dug up to 5 feet in depth a€o Install up to 4 feet of new 4 inch Sch 35 A€O Install clean outs OWNER APPLICANT CONTRACTOR Fred Retiguin-Marquina Mr.Rooter Plumbing Mr Rooter Plumbing PO 305 E MAPLE ST ARLINGTON,WA,98223 Box 789 (206)383-1768 206383 Ken.Carnahan@Cal1MrRooter.com ken.carnahan@callmrlmrrooter.com registration_number:604805429 PERMIT APPROVAL I agree to pay in advance and in accordance with existing ordinances and regulations of the city, the below charges, the exact charges will be determined and payable immediately upon completion of installation. I further agree that all rates and charges for water and sewer service to the above property shall be paid in accordance with existing ordinances and regulations of the city, or any such ordinances and regulations passed hereafter. I hereby authorize any tenants, to have all accounts for water kept in his/her name with the understanding that water bills mailed to said tenant shall not relieve the property from liability for water charges incurred. I understand that the city will use all reasonable effort to maintain uninterrupted service, but reserves the right to shut off the water at any time without notice for repairs, extensions, non-payment or rates or any other reason and assumes no liability for any damage as a result of interruption of service from any cause whatsoever. The sewer superintendent may require the permitee to furnish plans pertaining to the application and issuance of permit. Reference; Chapter 13.08, Arlington Municipal Code for rules and regulations governing side sewers and connections to the public sewer system. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. CONDITIONS 1.) Must follow all City of Arlington Public Works Construction Standards and Specifications 2.) Connection to a water or sewer mainline requires 48 hours advance notice, call 360-403-3526 3.) Water Meter Installation or Tail Piece inspection requires 48 hours advance notice, call 360-403-3526 4 ) Well decommissioning requires 24 hour advanced notice, to schedule an inspection call 360-403-3526. City of Arlington recommends a PRV to be installed to avoid water pressure fluctuations. 5.) Side Sewer Inspection requires 24 hours advanced notice, call 360-403-3508. 6.) Monthly Water/Sewer billing begins on date of water meter installation. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance April 22, 2026 Processing/Technology Fee(320.341.43.00.02) $25.00 April 22, 2026 Side Sewer Inspection-Repair Fee (404.343.50.00.02) $75.00 TOTAL: Project Fees $100.00 $100.00 Credit/Debit Card 577 Payment Successful April 22, 2026 $100.00 $0.00