Early Grade Submittal
Complete package constitutes all items. Only complete submittals will be accepted.
Civil-Submittal Requirements,Type I: Electronic files shall be PDF on USB flash-drive,email,or drop-box
Complete Application
Construction Plans including cut/fill quantities
■ 2 full size plan sets 22"x 34"
■ PDF file of the complete plan set
■ 2 full size set of landscape plans 22"x 34"
Marysville Utility plans,if applicable(2 sets)
Department of Ecology General Construction Stormwater Permit(if applicable)
Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file);refer to Stormwater Drainage
Requirements
eGeotechnical Report(2 sets)and(PDF file)
SEPA is required if 250 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit);if
there is not a Land Use Permit associated with the project,Public Notice Materials will be required
Grading cut/fill quantity:
Design Vehicle-demonstrate turning radius include 45' Fire truck,dual axle,256-inch wheelbase
Drafts of easement(s)dedication(s),and/or CAPE(s)for review
Flood Hazard Permit Application and required documentation if project is within 100-year flood plain;refer to Flood
Hazard guidance documents
eConstruction Calculation Worksheet
NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts
eAssurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds)
Permit Fee due at time of permit submittal
Grading Paving Drainage Submittal Requirements,Type II:Electronic files shall be PDF on USB flash-drive,email, or
drop-box
✓e Complete Application
✓ Construction Plans including import/export quantities
■ 2 full size plan sets 22"x 34"
■ PDF file of the complete plan set
✓� Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file);refer to Stormwater Drainage
Requirements
Department of Ecology General Construction Stormwater Permit(if applicable)
✓ Geotechnical Report(2 sets)and(PDF file)
SEPA is required if 250 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit)
SEPA Public Notice Material Requirements:
■ Snohomish County Assessor's Quarter Section Map: 0 Show Subject Property 0 Show 500 ft.Boundary
SEPA provided■ Current Owner List(of properties within 500ft.radius) including the following:
with Land Division 0 Tax Parcel ID Number(s) 0 Owner(s) Full Names) 0 Owner(s)Mailing Address(es)
package 0 Current Resident&Property Address (if property owner doesn't reside at the property)
■ Mailing Material:Provide 0 white,#10 envelopes with the following affixed to the envelopes:
0 Postage 0 Mailing Labels 0 Return Address labels: 18204 591h Ave NE,Arlington WA 98223
✓� Grading cut/fill quantity: ocy cut/8,989cyfill
✓ Construction Calculation Worksheet
NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts
Permit fee due at time of permit submittal
Right of Way Submittal Requirements,Type III: Electronic files shall be PDF on USB flash-drive,email,or drop-box
Complete Application.
Construction Plans.
Traffic Control Plan.
Road Closure Request.
Temporary Erosion&Sediment Control(TESC) Plan.
Certificate of Insurance with the City of Arlington named as Additional Insured.
Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds).
Engineers Estimated Cost of Construction;$ _
Permit fee due at time of permit issuance.