HomeMy WebLinkAboutSubstantial Completion Letter i Arlington0 City of IN ` Community and Economic Development June 11, 2026 Harmony at Arlington LLC Attn: Saeed Abtahi 2033 E Lake Sammamish PL SE Sammamish, WA 98075 RE: Harmony at Arlington PWD3985—Substantial Completion Letter Dear Saeed, The above referenced project was considered Substantially Complete on Thursday,June 11, 2026,with installation of all roadways,water, sewer and drainage infrastructure and Phase 1 landscaping required as part of the referenced Civil Permit.There are a few remaining water utility punch list items to be addressed during building construction, and the final as-builts are under review.As soon as you have completed all items on the punch list a final inspection will be performed. Water Punch list items: • Water services out front will need to be adjusted at time of connection as discussed • We will also need to see final connection of tail piece to service line when plumber connects them. Remember NO SHARK BITES fittings. • BYK will also need to provide the adaptor if the 5/8 meter is going to meet fire flow requirements. Performance bonds for the completed items can be exchanged for warranty bonds according to city procedures/processes. Please reach out to Community and Economic Development to complete this process. If you have any questions, please feel free to reach out as needed. Thad Newport Development Services Engineering Manager Arlington Community&Economic Development 18204 591h Ave NE,Arlington,WA 98223 P.(360)403-3434 1 E.tnewport@arlingtonwa.gov I W.www.arlingtonwa.gov