Loading...
HomeMy WebLinkAboutEmergency contact From: Paul Woodmansee To: Hannah Hardwick Cc: Anna Holleman;Saeed Abtahi; Nima Abtahi;Joe Woodmansee Subject: FW: Harmony at Arlington-Project status Date: Thursday,June 5,2025 11:29:22 AM Attachments: imaae001.ona WAR312318-2023-05-01-CSW G PCoveraaeLtr.odf BYK-Contractor License to 04-02-26.odf BYK-Business License to 03-31-26 v2.ndf Harmony at Arlinaton-COI.odf This message is from an External Sender This message came from outside the City of Arlington Hannah, I was asked to send these to you. The 24 hour construction contact would be me at 360-661-5325. If it is something developer related you would have to find out from the developer who the contact is. Anna will forward her CESCL cert on Monday. ge &?'esse,l �aa��ocl�raasee Pwesic�eKt BYK Construction, Inc. 702A Metcalf Street Sedro-Woolley, WA 98284 Cell - 360-661-5325 Office—360-755-3101 From: saeed abtahi <msabtahi(@outlook.com> Sent: Monday,June 2, 2025 5:07 PM To:Joe Woodmansee <JoeWfbykconstruction.com>; Paul Woodmansee <Pa u I(@ bykconstruction.com> Cc: Nima Abtahi <abtahinl4C@outlook.com>; Craig Marsh <CraigMC@bykconstruction.com> Subject: FW: Harmony at Arlington-Project status Team, See below regarding status of review and the green highlighted for early grading. let's get on a zoom call this week to get update on your schedule and pricing for early grading, if you are ready to start that. Generally, mid-morning works for Nima and I. Saeed Abtahi Office (425)869-1212 Mobile (206)484-0028 From: Hannah Hardwick<hhardwickParlingtonwa.gov> Sent: Monday,June 2, 2025 4:16 PM To:Adele Ash <adelel@landtechway.com> Cc: Merle Ash <Merle(@landtechway.com>; Tyler Foster<T)1ler(@landtechway.com> Subject: RE: Project status online? Hello Adele, There is not a way to look it up online unfortunately.There is a way to look up the permit number online, but the permissions are so locked down,that you cannot see anything other than the permit number and the submittal date. I am always happy to help with the inquiry.This application is still under review. I am waiting on public works to complete their reviews, and then I will send out a review comment form. Thad let me know that Merle just inquired about the early grading permit for Harmony as well.Ameresia sent Tyler a preconstruction letter last August when I was on maternity leave regarding this project. It is ready to go pending some preconstruction items. Her letter mentioned bonding, material submittals,special testing. at is inaccurate.All we need is the contractor information (License number, 24-hour emergency contact information, proof of City of Arlington endorsement on UBI, proof of insurance with the City of Arlington as additional insured), CESCL certificate, and copy of your Department of Ecology Construction Stormwater General Permit. Once that information is received,we can schedule a job start meeting to release the permit and approved plans for the early grading. Sincerely, Hannah Hardwick Arlington Community&Economic Development, Permit Technician 1 18204 59th Ave NE,Arlington,WA 98223 O:360.403.3549 hhardwickParlin tonwa.goy I www.arlin tog nwa.gov Note: Emails and attachments sent to and from the City of Arlington are public records and may be subject to disclosure pursuant to the Public Records Act. From: Adele Ash <adelePlandtechway.com> Sent: Monday,June 2, 2025 3:51 PM To: Hannah Hardwick<hhardwick(@arlingtonwa.gov> Subject: Project status online? This message is from an External Sender This message came from outside the City of Arlington Hi Hannah, Can we check the review status of Arlington projects online? Saeed, Harmony at Arlington PLN1234, is asking us for status of his Civil Plan Review. Is there a place I can check without having to bother you? Thankyou Ade&ASk Land Technologies, Inc. 18820 3rd Ave NE Arlington, INA 98223 360.652.9727 adele(aWancitech wa y.com