Loading...
HomeMy WebLinkAbout20250826 Construction Calculation Worksheet Y � CONTRUCTION PLAN REVIEW & INSPECTION FEE WORKSHEET LINGt Community&Economic Development Department City of Arlington . 18204 59th Avenue NE . Arlington WA 98223 . (360)403-3551 This form is to be completed and submitted with Type I , Type 11 Type III Construction Permit Application. 1) Based on permit type requested (Type I, Type II or Type III), complete the form as follows: . Type I permits complete all sections. . Type II permits complete as follows: - Grading Only-Complete Temporary Erosion and Sediment Control (TESC). - Stormwater Drainage Only-Complete the Temporary Erosion and Sediment Control and Stormwater Drainage Section for Public or Private . Type III permits complete the Temporary Erosion and Sediment Control (TESC). 2) The developer shall enter the quantities shown on the construction drawings into the Construction Calculation Worksheet.This document is used to determine the amount of plan reivew and inspection fees due to the city. 3) Excel will auto-calculate the relevant fields and subtotals throughout the document. Only the'Quantity'columns( blue cells)should be completed. 4) The summary page calculates the fees due at intake for Civil and Stormwater Drainage construction permits only. This does not include fees for Grading or those required by other departments or agencies. Grading fees are based on Cubic Yard Quantity and shall be calculated at time of permit submittal. Grading fees shall be paid at permit submittal. 5) If an item that is part of your project does not exist in the spreadsheet complete the Write-In-Items section with the item, quantity and associated unit cost.There are a few unit prices that are blank, please complete them accordingly. 6) Inspection fees shall be calculated for Private Development during the review process and shall be paid upon permit issuance. PROJECT COSTS PUBLIC TOTAL PRIVATE TOTAL TOTAL PROJECT COST $ 261,396.00 $ 572,457.75 $ 833,853.75 VerifV formula totals do not match PLAN REVIEW& INSPECTION FEES PLAN REVIEW&INSPECTION FEE(6%of Project Value) $ 50,031.23 GRADING FEE(4)(Gross Cubic Yards) 0 ICY $ - Review fees due at time of submittal Total Review Fees Due $ 50,031.23 An Assurance Device such as a Performance Bond or Assignment of Funds needs to be on file with the City of Arlington prior to permit issuance.The Assurance Device shall be 150% of the Construction Calculation Worksheet which are as follows: Road and Alley (Public) Stormwater Drainage and Grading (Public) Utilities (Public) Temporary Erosion and Sediment Control (Public and Private) Landscaping and Vegitation (Public and Private) ASSURANCE DEVICE Base Calculation of Performance Device $ 261,396.00 PERFORMANCE DEVICE 150% Amount Due $ 392,094.00 Base Calculation of Maintenance Device $ 572,457.75 MAINTENANCE DEVICE 20% Amount Due $ 114,491.55 1 Rev 7/2017