HomeMy WebLinkAbout20250430_PWD3985_Geotech Addendum iIrth December 10, 2024 Earth Solutions NW LLC Updated December 16, 2024 ES-10152 Ceotechnical Engineering, Construction Observation/Testing and Environmental Services Harmony at Arlington, LLC 2033 East Lake Sammamish Place Southeast Sammamish, Washington 98075 Attention: Saeed Abtahi Subject: Geotechnical Addendum Harmony at Arlington 7417 — 204t" Street Northeast Arlington, Washington Dear Saeed: As requested, Earth Solutions NW, LLC (ESNW) has prepared this report and geotechnical addendum for the proposed residential development. In preparing this addendum, an earlier May 2024 geotechnical study prepared by PBS (Project No. 73672.000) was reviewed. Based on our review, we are in general agreement with the findings of the PBS report. However, for design purposes, the recommendations provided in this addendum report should be assumed for the project civil, structural, and geotechnical design documents. In this respect, and in accordance with your request, ESNW is assuming the role of geotechnical engineer of record for the project. Project Description The subject property is roughly 4.38 acres and abuts the west side of State Route 9 (see attached Plate 1 — Vicinity Map). Access to the development will be established off of 204t" Street NE, located just south of the subject property. The site is largely devoid of vegetation, and overall topography throughout the planned development area is relatively flat. We understand current plans propose construction of a 60-unit townhome complex with related site infrastructure improvements. Building structures to accommodate the townhome units are expected to be 3- stories and constructed of relatively lightly loaded wood framing. Grading activities propose fill placement of roughly 4-feet across the site to establish future road grade and building pad elevations. Geologic mapping of the area (Minard 1985) identifies Marysville Sand (Qvrm) deposits throughout the site and surrounding areas. Subsurface data previously acquired at the site (by others) generally confirms the presence of sands and gravels at-depth across the site. The Subsurface Exploration Plan (Plate 2) provided as an attachment to this report illustrates the approximate locations of the test sites where borings and test pits were conducted by PBS. For reference, the boring and test pit logs completed by PBS are also provided as attachments to this report. With respect to stormwater, infiltration is currently proposed. As such, stormwater designs currently propose a series of rock filled galleries positioned throughout the site and designed to infiltrate collected stormwater into the native sand deposits at-depth. 15365 NE 9011 Street, Suite 100 Redmond,WA 98052 • (425)449-4704 3130 Varney Lane, Suite 105 Pasco,WA 99301 • (509)905-0275 esnw.com Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 2 Updated December 16, 2024 Site Preparation Initial earthwork will primarily involve site stripping and subsequent filling of the site to establish finish subgrade elevations. Based on current plans, we expect fill placement of up to roughly two feet above current grades will be necessary to achieve design grades. Temporary Erosion Control Temporary construction entrances and drive lanes should consist of at least 6 to 12 inches of quarry spalls underlain by a non-woven filter fabric. Silt fencing should be installed as appropriate along the site perimeter. Soil stockpiles and exposed earth surfaces should be covered or otherwise protected to reduce soil erosion. Temporary approaches for controlling surface water runoff should be established prior to beginning earthwork activities. Additional Best Management Practices (BMPs), as specified by the project civil engineer and indicated on the plans, should be incorporated into construction activities. BMPs will likely require upkeep and/or modification during construction and should be coordinated with the site erosion control lead, where applicable. Excavations and Slopes Based on the identified subsurface condition, the following allowable temporary slope inclinations as a function of horizontal to vertical (H:V), are recommended for the project. The applicable Federal Occupation Safety and Health Administration and Washington Industrial Safety and Health Act soil classifications are also provided: • Native sand and gravel deposits 1.5H:1V (Type C)* • New structural fill 1.5H:1V (or flatter) It should be noted that steeper temporary excavations may be feasible based on the excavation depth and exposed soil condition. In any case, the engineer must confirm acceptability prior to proceeding with excavations that exceed the state and federal standards for temporary slope layback. In-situ and Imported Soil The near surface in-situ sand and gravel outwash deposits possess a varying degree of fines, and may be characterized as possessing a moderate sensitivity to moisture. Overall, however, the native soils are expected to becomes increasingly"clean"with depth. As such, the native soils are generally expected to be suitable for use as structural fill throughout the site. Imported soil intended for use as structural fill should be evaluated by ESNW during construction. The imported soil must be workable to the optimum moisture content, as determined by the Modified Proctor Method (ASTM D1557), at the time of placement and compaction. During wet weather conditions, imported soil intended for use as structural fill should consist of a well-graded, granular soil with a fines content of 5 percent or less (where the fines content is defined as the percent passing the Number 200 sieve, based on the minus three-quarter-inch fraction). Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 3 Updated December 16, 2024 Structural Fill Structural fill is defined as compacted soil placed in foundation, slab-on-grade, roadway, permanent slope, retaining wall, and utility trench backfill areas. Structural fill placed and compacted during site grading activities should meet the following specifications and guidelines: • Structural fill material Granular soil • Moisture content At or slightly above optimum • Relative compaction (minimum) 95 percent (Modified Proctor) • Loose lift thickness (maximum) 12 inches Foundations It should be noted that standard conventional foundations are considered acceptable for support of the new building structures. As such, special consideration with respect to foundation support for this project (i.e. mat foundations) are deemed unnecessary for the development. Based on current plans, up to roughly 4-feet of fill will be placed across the site to establish design subgrade elevations. As such, subgrade exposed at foundation grade for the new buildings is expected to consist of compacted structural fill. In any case, subgrade surfaces for support of future foundations must exhibit a well compacted and "dense" condition. The engineer (or his representative) should observe and confirm acceptability of subgrade surfaces along future foundation alignments during the course of foundation work for the project. As necessary, supplement recommendations may be provided by the engineer to ensure a "dense" and suitable foundation subgrade is established below future building foundations. Assuming the above, the following recommendations are provided for foundation design: • Allowable soil bearing capacity 2,500 psf • Footing Embedment 18 inches (min.) • Passive earth pressure 350 pcf (equivalent fluid) • Coefficient of friction 0.40 A one-third increase in the allowable soil bearing capacity may be assumed for short-term wind and seismic loading conditions. The above passive pressure and friction values include a factor- of-safety of 1.5. With structural loading as expected, total settlement in the range of one inch and differential settlement of about one-half inch is anticipated. Most settlement should occur during construction when dead loads are applied. Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 4 Updated December 16, 2024 As emphasized above, an ESNW representative should be present onsite at the time of foundation subgrade preparation to confirm acceptability of the bearing surface. If necessary, supplement recommendations may be provided by the engineer to ensure a suitable bearing surface is established at the building foundation subgrade. Slab-on-Grade Floors Slab-on-grade floors for the proposed structures should be supported on well-compacted, firm, and unyielding subgrades. Unstable or yielding areas of the subgrade should be recompacted or overexcavated and replaced with suitable structural fill prior to slab construction. An ESNW representative should be requested to observe slab-on-grade subgrade conditions prior to placement of capillary break sections and concrete slab formwork. A capillary break consisting of a minimum of four inches of free-draining crushed rock or gravel should be placed below the slab. The free-draining crushed rock or gravel material should have a fines content of 5 percent or less (defined as the percent passing the No. 200 sieve, based on the minus three-quarter-inch fraction). In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. If used, the vapor barrier should consist of a material specifically designed to function as a vapor barrier and should be installed in accordance with the manufacturer's specifications. Retaining Walls Where applicable, building and site retaining walls accommodating grade transitions must be designed to resist earth pressures and applicable surcharge loads. The following values may be used for retaining wall design: • Active earth pressure (unrestrained condition) 35 pcf (equivalent fluid) • At-rest earth pressure (restrained condition) 55 pcf • Traffic surcharge* (passenger vehicles) 70 psf (rectangular distribution) • Passive earth pressure 350 pcf (equivalent fluid) • Coefficient of friction 0.40 • Seismic surcharge 8H psf** Where applicable. ** Where H equals the retained height(in feet). Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 5 Updated December 16, 2024 The above design parameters are based on a level backfill condition and level grade at the wall toe. Revised design values will be necessary if sloping grades are to be used above or below retaining walls. Additional surcharge loading from adjacent foundations, sloped backfill, or other loads should be included in the retaining wall design. Retaining walls should be backfilled with a free-draining material that extends along the height of the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall backfill may consist of a less permeable soil, if desired. Drainage should be provided behind retaining walls such that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic pressures should be included in the wall design. A perforated drainpipe should be placed along the base of the wall and connected to an appropriate discharge location. A typical retaining wall drainage detail is provided on Plate 3 (Retaining Wall Drainage Detail). Seismic Design The 2021 International Building Code (2021 IBC) recognizes ASCE 7-16 (formally known as the Minimum Design Loads for Buildings and Other Structures manual) for seismic design, specifically with respect to earthquake loads. Based on the soil conditions identified at the test locations, the parameters and values provided below are recommended for seismic design per the 2018 IBC. Parameter Value Site Class D* Mapped short period spectral response acceleration, Ss (g) 1.039 Mapped 1-second period spectral response acceleration, S1 (g) 0.371 Short period site coefficient, Fa 1.084 Long period site coefficient, Fv 1.929 Adjusted short period spectral response acceleration, SMs (g) 1.127 Adjusted 1-second period spectral response acceleration, Smi (g) 0.716 Design short period spectral response acceleration, SDS (g) 0.751 Design 1-second period spectral response acceleration, SD1 (g) 0.477 The liquefaction susceptibility of the site is characterized as low. In any case, the proposed building structures are expected to have a fundamental period of less than 0.5 sec. As such, even under a Site Class F characterization (liquefiable), the site structures could still be designed using a Site Class D classification per the exceptions provided in ASCE 7-16. Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 6 Updated December 16, 2024 Based on the identified subsurface soil and groundwater condition, site susceptibility to liquefaction (post-construction) is characterized as low. A non-liquefiable "crust" exists across the site to depths of roughly 25 to 35 feet. Although liquefaction of the soil units located within the groundwater table environment below these depths is possible, settlements induced by liquefaction within these deeper units are not expected to impact foundation support of throughout the future building sites. In any case, differential settlement induced as a result of a liquefaction event at-depth would be expected to be less than one-inch over a distance of roughly 30 feet. As such, provided the recommendations of this addendum report as they pertain to foundation subgrade preparation are adhered to during construction, additional measures to mitigate liquefaction induced settlements at the site are deemed unnecessary for the project. Drainage Finish grades should be designed to direct surface water away from structures and slopes. Grades adjacent to buildings should be sloped away from the building exterior at a gradient of 2 percent for a horizontal distance of at least 10 feet. Where pavement areas are present at the building exteriors, the slope may be reduced to 1 percent. In our opinion, foundation drains should be installed along building perimeter footings (see Plate 4 — Footing Drain Detail). Infiltration Evaluation As previously established, outwash sands and gravels reside at-depth throughout the site and surrounding areas. Based on the subsurface data collected at the test sites, these outwash deposits become increasingly "clean" with depth. Given the relative absence of groundwater, such conditions present a favorable environment for stormwater infiltration. Current plans propose infiltration of the site stormwater through the use of rock-filled galleries positioned throughout the site. Infiltration testing conducted by PBS confirmed generally good rates of infiltration at depths of roughly 5-feet below current grades. Based on the results of the PBS testing, allowable rates of ranging between 10.5 and 12.0 inches per hour were recommended for design. Based on discussions with the civil design team, an allowable infiltration rate of 12 inches per hour was assumed for the current design. As such, and based on our review, the following recommendations are provided for infiltration design purposes, and are considered acceptable from a geotechnical standpoint: • Design Infiltration Rate 12 in./hr. • Receptor Soil Clean Outwash The geotechnical engineer (or his representative) should observe and document excavation and related construction of the proposed infiltration galleries. Specifically, suitability of the receptor soils at the base of the proposed facilities should be confirmed by our staff. If necessary, supplement recommendations may be provided by the engineer at the time of construction to ensure that the facilities are positioned within the clean outwash deposits. Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 7 Updated December 16, 2024 Utility Support and Trench Backfill The soils observed at the subsurface locations are generally suitable for support of utilities. In general, the onsite soils are expected to be suitable for reuse as backfill over future utility alignments. Given the sand and gravel nature of the native soil deposits, moisture conditioning of the backfill through the addition of water will likely be necessary during placement and compaction. Such efforts to moisture condition the backfill will help mitigate future settlement of the backfill zone. The utility trench backfill should be placed and compacted to the specifications of structural fill provided in this report, or to the applicable requirements of presiding jurisdiction. It should also be noted that the presiding jurisdiction may require use of"select" backfill materials within their right-of-way alignments. Preliminary Pavement Sections The performance of site pavements is largely related to the condition of the underlying subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in pavement areas should be compacted to the specifications detailed in the Site Preparation and Earthwork section of this report. Soft, wet, or otherwise unsuitable subgrade areas may still exist after base grading activities. Areas of unsuitable or yielding subgrade conditions may require remedial measures, such as overexcavation and replacement with structural fill or thicker crushed rock sections, prior to pavement. For relatively lightly loaded pavements subjected to automobiles and occasional truck traffic, the following sections may be considered for preliminary design: • Two inches of hot-mix asphalt (HMA) placed over four inches of crushed rock base (CRIB), or; • Two inches of HMA placed over three inches of asphalt-treated base (ATB). Heavier traffic areas generally require thicker pavement sections depending on site usage, pavement life expectancy, and site traffic. For preliminary design purposes, the following pavement sections for occasional truck traffic and access roadways may be considered: • Three inches of HMA placed over six inches of CRIB, or; • Three inches of HMA placed over four and one-half inches of ATB. A representative of ESNW should be requested to observe subgrade conditions prior to placement of CRIB or ATB. As necessary, supplemental recommendations for achieving subgrade stability and drainage can be provided. If on-site roads will be constructed with an inverted crown, additional drainage measures may be recommended to assist in maintaining road subgrade and pavement stability. Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 8 Updated December 16, 2024 Final pavement design recommendations, including recommendations for heavy traffic areas, access roads, and frontage improvement areas, can be provided once final traffic loading has been determined. Road standards utilized by the governing jurisdiction may supersede the recommendations provided in this report. The HMA, ATB, and CRB materials should conform to WSDOT specifications. All soil base material should be compacted to a relative compaction of 95 percent, based on the laboratory maximum dry density as determined by ASTM D1557. Limitations This addendum report has been prepared for the exclusive use of Harmony at Arlington, LLC and their representatives. The recommendations and conclusions provided in this addendum report are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. A warranty is not expressed or implied. Variations in the soil and groundwater conditions observed at the test locations may exist, and may not become evident until construction. ESNW should reevaluate the conclusions in this addendum report if variations are encountered. Additional Services ESNW should have an opportunity to review the final design with respect to the geotechnical recommendations provided in this report. ESNW should also be retained to provide testing and consultation services during construction. Earth Solutions NW, LLC Harmony at Arlington, LLC ES-10152 December 10, 2024 Page 9 Updated December 16, 2024 We trust this addendum report meets your current needs. If you have any questions regarding the content of this report, or if additional information is required, please call. Sincerely, EARTH SOLUTIONS NW, LLC A' CO W Cn �r 36018 -ISTVE S�ONA.�- 12/16/2024 Raymond A. Coglas, P.E. Senior Principal Engineer Attachments: Plate 1 —Vicinity Map Plate 2 — Subsurface Exploration Plan Plate 3 — Retaining Wall Drainage Detail Plate 4 — Footing Drain Detail Subsurface Exploration Logs (by Others) cc: Land Technologies, Inc. Attention: Merle Ash Earth Solutions NW, LLC Par Z East 5th Streets Post Presidents z So 220m Street Northeast Z E t Elementary East 4rh Street E School sa A WA 5300 o sEast 3rd Street D z z Eag East 2nd Street Ele S WA _ I East 1 st Street yxN Haller Middle 01 8%rin9'er X. a v School a' Farm w E ¢ EEast Maple street a°r a _a O o sMedl,al Co, /0" I " 0 0 0 0- a -211[h prd�—._.�._._._4�✓y rO" LL East Highland Drive r �No hea� D'COD - v o 0I Z c t M—on street� V-U rage Creek da0 ago" a' im -boDT- c iD _ /o estlensen street vl a`a Portage Street lease - — to ro Rivercres[ �c x vl o °a�� ay��sNortheast Estates �P' le u I N q ' No� aec DSweet Water � Corroge Cl' ,� @ o � I ge `�, •--, i :�\!off`` �� V I T E P Portage Creek Camelot r� I X _ ildlife --Arlington Terre 204th Street Northeast — ve �o �EW I I P a old pea[ .. z J o. ------ bog10 C—s Arbngtoni °,� Cemetery 6.e�c 'n4- ■:I j j A � o � U Creek c: •• 7P Cep r�I � X Arlington 0 i 197th Street Northeast p e o s95eh 5«eec No(�'easc Z. p i 196th Stre Z I`o gird Place Northeast I� O 192nd Street Northeast .. `O ° X 191 st Place Northeast o �I Pare Northeast Ill i 0 9nLl�nqton NORTHr:Earth Reference: Snohomish County, Washington OpenStreetMap.org Vicinity Map Harmony at Arlington Arlington, Washington NOTE:This plate maycontain areas ofcolor.ESNWcannotbe Drawn MRS Date 12/09/2024 PrOj. No. 10152 responsible for any subsequent misinterpretation of the information resulting from black&White reproductions of this plate. Checked RAC Date Dec. 2024 Plate 1 I I I I I I I I I I I I � I I I I � B-4T-- I I I I � I II I B-3 TP-2 I B-1 I � II � ' I I _B-21• — — DTP-1 L---------------I-------' I I I � I I x ' I ' I I II I I I I \ I I I I I I I I I I I I / 204TH STREET N.E. LEGEND NORTH TP-1 I Approximate Location of ■ — PBS Test Pit, Proj. No. 73672.000, Feb. 2019 B-1 Approximate Location of — • — PBS Boring, Proj. No. ;4 Ii 73672.000, Feb. 2019 NOT-TO - SCALE Subject Site Existing Building 117'�Earth Solutions NOTE:The graphics shown on this plate are not intended for design Geotechnical Firgineering,Construction proposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and/or proposed site features.The infomuationillustrated Subsurface Exploration Plan is largely based on data provided by the client at the timeofour Harmony at Arlington study.ESNWcannotbe responsible for subsequent design changes Arlington, Washington or interpretation ofthe data by others. NOTE:This plate may contain areas of color.ESNWcannotbe Drawn MRS Date 12/09/2024 Proj. No. 10152 responsible for any subsequent misinterpretation of theinfomration Checked RAC Date Dec. 2024 Plate 2 resulting from black&white reproductions of this plate. 18" Min. o 0 o 0 o o 0 0o o o �O- 0 - .0o 0 0� ° o ��� ° B 0 00 P. ° oo o 0 0`0o oo �o 0 o o o 0 0 0�0oo o 0 o 0 0 6 a 0 0 0 0 0 0 0 � 0 oo % Oo0oo oo o o �0 ° 00 oo o o o 0 00 00000 o ° o o 0 o Structural o °o o o o 0 o 0 00000 ° ��� Fill 00 0o o o g 8 o oo o oo 00000 o o o po 0oo0 ° o o0 o 0 0 o O o 0 00 0 0 00 0 0 8 o0 a o 0 0 Ooo. 0 0 �o o o 0 o 0 •r.f• •r .r ti• .ti.ti. Perforated Rigid Drain Pipe NOTES: (Surround in Drain Rock) • Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No. 4 sieve should be 25 to 75 percent. • Sheet Drain may be feasible in lieu SCHEMATIC ONLY- NOT TO SCALE of Free-draining Backfill, per ESNW NOT A CONSTRUCTION DRAWING recommendations. • Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Y po Solutions oo O 0 00 0o Free-draining Structural Backfill eotechnicaIFngineering,Construction �. servation/Testing and Fnvironmental Services •s•r•r•r• .r:}}0202 1-inch Drain Rock Retaining Wall Drainage Detail ti•ti•ti•ti Harmony at Arlington Arlington, Washington Drawn MRS Date 12/10/2024 Proj. No. 10152 Checked RAC Date Dec. 2024 Plate 3 Slope ► 18" Miri. f•R f•f•f•f•f•. rtirti}ti}tirtirti} rti•ti•t•ti•ti•ti• •r•r•r•r•r• rti1�• ~•tiJ� •tif of Perforated Rigid Drain Pipe (Surround in Drain Rock) NOTES: • Do NOT tie roof downspouts to Footing Drain. SCHEMATIC ONLY- NOT TO SCALE • Surface Seal to consist of NOT A CONSTRUCTION DRAWING 12" of less permeable, suitable soil. Slope away from building. LEGEND: V Surface Seal: native soil or other low-permeability material. • ' • I J _ a ti 1.tif~r. 1-inch Drain Rock Footing Drain Detail Harmony at Arlington Arlington, Washington Drawn MRS Date 12/10/2024 Proj. No. 10152 Checked RAC Date Dec. 2024 Plate 4 Table A-2 Imo. Key To Test Pit and Boring Log Symbols 111111111111111111L P BS SAMPLING DESCRIPTIONS o m mF _o J, O (311 L` 'u o o •�`' m �°' �`a Coo � i i qj ok LOG GRAPHICS Soil and Rock Sampling Symbols Instrumentation Detail Lithology Boundary: "- - - "'Ground Surface • : / separates distinct units (i.e., Fill,Alluvium, Sample Well CaD Bedrock)at Recovery Sample Well Seal approximate depths Interval Well PiDe o°c inciated Piezometer O Soil-type or Material-type o -- Change Boundary: separates soil 4 Well Screen v' '- Sampler and material changes within the Type Piezometer _-_-_ same lithographic unit at approximate depth indicated Bottom of Hole Geotechnical Testing Acronym Explanations PP Pocket Penetrometer HYD Hydrometer Gradation TOR Torvane SIEV Sieve Gradation DCP Dynamic Cone Penetrometer DS Direct Shear ATT Atterberg Limits DD Dry Density PL Plasticity Limit CBR California Bearing Ratio LL Liquid Limit RES Resilient Modulus PI Plasticity Index VS Vane Shear P200 Percent Passing US Standard No. 200 Sieve bgs Below ground surface OC Organic Content MSL Mean Sea Level CON Consolidation HCL Hydrochloric Acid UC Unconfined Compressive Strength Details of soil and rock classification systems are available on request. Rev.oz/zoi7 HARMONY AT ARLINGTON BORING B-1 ARLINGTON,WASHINGTON PBS PBS PROJECT NUMBER: APPROX.BORING B-1 LOCATION: TAN APEX COMPANY 73672.000 (See Site Plan) Lat:--- Long:--- a p A UNCORRECTED N-VALUE v MATERIAL DESCRIPTION x z w 4-DYNAMIC CONE INSTALLATION AND DEPTH c9 w a PENETROMETER COMMENTS FEET NOTE: Lines representing the interface between soil/rock units of w w a 2 •MOISTURE CONTENT% C7 differing description are appropmate only,inferred where p H Q uai ®RQD% ®CORE REC% Surface Conditions:Gravel between samples,and may indicate gradual transition. cn 0 50 100 0.0 :. Very dense, brown,silty GRAVEL(GM)with sand; low plasticity;fine to coarse sand;fine to coarse,subrounded gravel; moist a 54 �� 5.0 a 0 : �U) Medium dense, brown,silty SAND (SM); 75 �M zs non-plastic;fine to medium sand;trace,fine U) ' gravel; moist 10.0 v 29 15.0 Dense, brown,well-graded SAND(SW-SM) 50 ;33; with silt; non-plastic;fine to coarse sand;trace, to fine gravel; moist 20.0 18 becomes medium dense �19 to 25'0 Medium dense,dark brown, poorly graded ZS.o 19 SAND(SP-SM)with silt; non-plastic;fine sand; rn 4 a moist w 0 Z a a 30.0 P200 17 P200=8% o becomes wet w U) : 4 •: 31.5 Final depth 31.5 feet bgs; boring backfilled with bentonite. Groundwater not measured at time of exploration due to mud rotary drilling. N a 35.0 S a v m c� 2 40.0 c9 o so 100 DRILLING METHOD:Mud Rotary-Tricone BIT DIAMETER:3 7/8 inches FIGURE Al m DRILLED BY:Holt Services,Inc. HAMMER EFFICIENCY PERCENT:90 LOGGED BY:M.Bagley LOGGING COMPLETED:2/2 612 0 1 9 Page 1 of 1 HARMONY AT ARLINGTON BORING B-2 ARLINGTON,WASHINGTON PBS PBS PROJECT NUMBER: APPROX.BORING B-2 LOCATION: TAN APEX COMPANY 73672.000 (See Site Plan) Lat:--- Long:--- a p A UNCORRECTED N-VALUE v MATERIAL DESCRIPTION x z W 4-DYNAMIC CONE DEPTH x C0 W CL o o- PENETROMETER INSTALLATION AND FEET NOTE: Lines representing the interface between soil/rock units of W(L w J a •MOISTURE CONTENT% COMMENTS C7 differing description are appropmate only,inferred where p H Q U)i ®RQD% ®CORE REC% Surface Conditions:Gravel between samples,and may indicate gradual transition. < 0 50 100 0.0 Dense, brown,clayey SAND(SC); medium Flush monument plasticity;fine to coarse sand; moist FILL A2 0 2-inch diameter Dense,gray-brown,well-graded SAND �� PVC pipe (SW-SC)with clay and gravel; non-plastic;fine 5.0 to coarse sand;fine to coarse,subrounded so 64 Bentonite gravel; moist �N Dense, brown with gray mottles,well-graded P�.. 9 Y 9 p° SAND(SW-SM)with silt and gravel; non-plastic;fine to coarse sand;fine to coarse, 36 P�. subrounded gravel; moist �� 10.0 'V becomes medium dense ;23; to '6f Filter sand q q 15.0 — -- ———— -- -- 1s.o 2-inch diameter Medium dense, light brown, poorly graded 49 slotted PVC screen SAND(SP-SM)with silt; non-plastic;fine to medium sand;trace,fine gravel; moist `: 03i01/19 20.0 becomes dark brown;wet P200 : 15 P200=7% Bentonite 25.0 a 14 N �U) N W F Q F Z a 0 30.o becomes olive-brown � 23: W �(n • Final depth 31.5 feet bgs. Piezometer installed 31.5 to 20 feet bgs; boring backfilled with bentonite from 20 to 31.5 feet bgs. Groundwater not measured at time of exploration due to mud rotary drilling. 35.0 S a v m c� 0 40.0 1 0 50 100 c� DRILLING METHOD:Mud Rotary-Tricone BIT DIAMETER:3 7/8 inches FIGUREA2 Om DRILLEDBY:Holt Services,Inc. HAMMER EFFICIENCY PERCENT:90 LOGGED BY:M.Bagley LOGGING COMPLETED:2/25/2019 Page 1 of 1 HARMONY AT ARLINGTON BORING B-3 ARLINGTON,WASHINGTON PBS PBS PROJECT NUMBER: APPROX.BORING B-3 LOCATION: BAN APEX COMPANY 73672.000 (See Site Plan) Lat:--- Long:--- a p A UNCORRECTED N-VALUE v MATERIAL DESCRIPTION x z w O DYNAMIC CONE INSTALLATION AND DEPTH a(9 w a PENETROMETER COMMENTS FEET a- FNOTE: Lines representing the interface between soil/rock units of w w a 2 •MOISTURE CONTENT% 0 differing description are approximate only,inferred where p H U) ®RQD% ®CORE REC% Surface Conditions:Gravel between samples,and may indicate gradual transition. < 0 50 100 0.0 GRAVEL FILL(-6 inches) 0.5 Dense, brown,silty SAND(SM); non-plastic; fine to medium sand; moist 3.5 8 Dense,gray, poorly graded SAND(SP-SM) d • with silt and gravel; non-plastic;fine to coarse 5.0 sand;fine to coarse, rounded gravel; moist N 27 becomes medium dense, brown-gray;fine toA. o medium sand .v • 19 P rn ——— 9.5 10.0 Very dense, brown poorly graded SAND (SP-SM)with silt; non-plastic;fine to medium I 10.5 �� A5 Isand_moist________________1 o Very dense, brown-gray, poorly graded GRAVEL(GP-GM)with silt and sand; non-plastic;fine to medium sand;fine to I 13.3 Ico_arse, rounded gravel; moist to wet 15.0 Medium dense, brown,well-graded SAND P200 21 : P200=a°io (SW-SM)with silt; non-plastic;fine to coarse A sand; moist 20.0 Medium dense, brown, poorly graded SAND zo.o ��0 19 O (SP-SM)with silt and gravel;fine to medium sand;fine, rounded gravel; moist to wet :v • wW 25.0 — P200 20 P200=7% Medium dense, brown poorly graded SAND (SP-SM)with silt; non-plastic;fine to medium �� Ae sand;wet w 0 Z a a 30.0 24 d °' 0 �: a a 0 m a q 35.0 P200 1 s P200=8% �U) • m cD 0 40.0 0 50 100 DRILLING METHOD:Mud Rotary-Tricone BIT DIAMETER:3 7/8 inches °m DRILLED BY:Holt Services,Inc. HAMMER EFFICIENCY PERCENT:90 FIGURE A3 LOGGED BY:D.Eibert LOGGING COMPLETED:2/25/2019 Pagel oft HARMONY AT ARLINGTON BORING B-3 ARLINGTON,WASHINGTON P 135 (continued) PBS PROJECT NUMBER: APPROX.BORING B-3 LOCATION: TAN APEX COMPANY 73672.000 (See Site Plan) Lat:--- Long:--- a p A UNCORRECTED N-VALUE v MATERIAL DESCRIPTION x z w 4-DYNAMIC CONE INSTALLATION AND DEPTH c9 w a PENETROMETER COMMENTS FEET NOTE: Lines representing the interface between soil/rock units of w w a 2 •MOISTURE CONTENT% C7 differing description are appropmate only,inferred where p H Q uai ®RQD% ®CORE REC% Surface Conditions:Gravel between samples,and may indicate gradual transition. v 0 50 100 40.0Medium dense, brown poorly graded SAND 1s (SP-SM)with silt; non-plastic;fine to medium A: sand;wet 45.0 P200 19 : P200=11 �� L becomes gray 50.0 N 18 �c 55.0 P200 co :21: P200=9% 60.0 26 tu) :•: 65.0 P200 22: P200=8% N F Rig chatter a 0 z a 0 70.o becomes dense •32: 0 71.5 [U) Final depth 71.5 feet bgs; boring backfilled with bentonite. Groundwater not measured at time of exploration due to mud rotary drilling. N a �? 75.0 v Y m t7 OJ 80.0 1 0 50 100 C7 DRILLING METHOD:Mud Rotary-Tricone BIT DIAMETER:3 7/8 inches FIGUREA3 m DRILLED BY:Holt Services,Inc. HAMMER EFFICIENCY PERCENT:90 LOGGED BY:D.Eibert LOGGING COMPLETED:2/25/2019 Page 2 of 2 HARMONY AT ARLINGTON BORING B-4 ARLINGTON,WASHINGTON PBS PBS PROJECT NUMBER: APPROX.BORING B-4 LOCATION: TAN APEX COMPANY 73672.000 (See Site Plan) Lat:--- Long:--- a p A UNCORRECTED N-VALUE v MATERIAL DESCRIPTION x z W 4-DYNAMIC CONE DEPTH x C0 W CL PENETROMETER INSTALLATION AND FEET NOTE: Lines representing the interface between soil/rock units of W(L w J a a •MOISTURE CONTENT% COMMENTS C7 differing description are appropmate only,inferred where p H Q U)i ®RQD% ®CORE REC% Surface Conditions:Gravel between samples,and may indicate gradual transition. < 0 50 100 0.0 ; Dense,dark brown,silty SAND(SM)with Flush monument gravel; low plasticity;fine to coarse sand;fine to coarse,subrounded gravel; moist 33; 2-inch diameter v) PVC pipe Bentonite 5.0 — —— ——— —— —— 5° 2 : : = Medium dense, brown,well-graded SAND P200 20 P200 7% �N ;� P�. (SW-SM)with silt and gravel; non-plastic to low rn plasticity;fine to coarse sand;fine,subrounded gravel; moist a6p I? 28 4 U) 1 03/26/24 10.0 Medium dense, brown, poorly graded SAND o.o 19 (SP-SM)with silt; non-plastic;fine to medium 4 sand; moist Filter sand 15.0 2-inch diameter becomes dark brown 21: slotted PVC screen v) t 03/01/19 20.0 �� 15 to Bentonite 25.0 P2oo 18 P200=8% becomes moist to wet N W F Q Z !r a 30.0 24 d °O 31.5 Final depth 31.5 feet bgs; boring backfilled with bentonite. Piezometer installed to 20 feet bgs; boring backfilled with bentonite from 20 to 31.5 feet bgs. Groundwater not measured at time of exploration due to mud rotary drilling. 35.0 S a v m 0 0 40.0 1 0 50 100 c� DRILLING METHOD:Mud Rotary-Tricone BIT DIAMETER:3 7/8 inches FIGUREA4 m DRILLED BY:Holt Services,Inc. HAMMER EFFICIENCY PERCENT:90 LOGGED BY: Bagley LOGGING COMPLETED:2/2 612 0 1 9 Page 1 of 1 HARMONY AT ARLINGTON ARLINGTON,WASHINGTON TEST PITS PBS _ PBS PROJECT NUMBER: TEST PIT LOCATION: BAN APEX COMPANY 73672.000 (See Site Plan) U w p -0- DYNAMIC CONE DEPTH 2 0 MATERIAL DESCRIPTION 7 z a s m STATICROMETER COMMENTS IN Q O NOTE: Lines representing the interface between soil/rock units of w U) Q 2i PENETROMETER FEET 0Y J differing description are approximate only,inferred where 0 H U) < 0 MOISTURE C7 between samples,and may indicate gradual transition. CONTENT% TP-1 0 25 50 o.o ; Brown,silty SAND(SM)with gravel and o:o cobbles; low plasticity; medium sand;coarse, subrounded gravel; moist 2.0 ———— -- — 2=0 Light brown, poorly graded SAND(SP)with 2 0 gravel and cobbles;fine to medium sand; coarse,subrounded gravel; moist Infiltration testing 4.0 ———— — — —— 4_0 completed at 5 feet Light brown,well-graded SAND(SW)with 4.0 bgs cobbles;fine to coarse sand; moist P200 ®� P200=1% W 6.0 8.0 10.0 10.0 Final depth 10.0 feet bgs;test pit backfilled with 10.0 excavated material to existing ground surface.Groundwater not encountered at time 12.0 of exploration. 14.0 Date Completed:2/27/2019 Elevation:--- Final Depth: 10 feet bgs Latitude:--- Longitude:--- TP.o 0 25 50 Brown,silty SAND(SM)with gravel, cobbles, u0.0 .0 and roots; non-plastic;fine to medium sand; coarse,subrounded gravel; moist 2.0 ————————————————————— 2— Light brown, poorly graded SAND(SP)with 2.s gravel and cobbles;fine to medium sand; Infiltration testing 4,0 coarse,subrounded gravel; moist completed at 5 feet ____ ________________ 4_5 bgs Brown to light brown,well-graded SAND(SW) 4.5 P200 P200=1% with cobbles;fine to coarse sand; moist ®� • 0 6.0 0 a a Q 8.0 0 m a 10.0 10.0 Final depth 10.0 feet bgs;test pit backfilled with 10.0 excavated material to existing ground ? surface.Groundwater not encountered at time 12.0 of exploration. w a 14.0 w a °o Date Completed:2/27/2019 Elevation:--- Final Depth: 10 feet bgs Latitude:--- Longitude:--- EXCAVATION METHOD:Komatsu 170LC with 36"Bucket LOGGED BY:M. Bagley FIGURE A5 w EXCAVATED BY:Taylor's Excavators Inc. Pagel of