Loading...
HomeMy WebLinkAbout20240819_PWD3796_PreConRequirementLetter City of Arlington Community & Economic Development August 19, 2024 Tyler Foster Land Technologies 4012 1481h St NE PMB#30 Mill Creek,WA 98012 RE: Pre-Construction Requirements Project Name: Harmony at Arlington- Early Grading Project Address: 7417 2041h St NE,Arlington,WA 98223 Project No.: PWD-3796 Dear Mr. Foster, In order for work to commence at the Harmony at Arlington project site,the following items need to be submitted to the City of Arlington. 1. A performance bond will need to be on file with the City of Arlington.The City of Arlington Performance Bond form is included.We will require submittal of the original document. This bond is to ensure completion of the following and shall be indicated on the security: All included infrastructure relating to water,sanitary sewer, and stormwater drainage systems, any right of way improvements along with any private and public landscaping. Performance Bond Estimated Cost of Construction is $40,416.56 x 150% _ $60,624.84 2. Contractor Information: a. License No.and 24 hour emergency contact information b. Contractor must obtain a City of Arlington Business License c. Contractor Proof of Insurance with the City of Arlington named as Additional Insured 3. Project CESCL with current certificate 4. Project Testing Company with contact information S. Department of Ecology Construction Stormwater General Permit (1 acre or more): It is advised to apply for this permit with Department of Ecology as soon as possible due to the delays in DOE processing and permit issuance caused by changes in how DOE is functioning during COVID. 6. Material submittals for all proposed water,sewer and stormwater infrastructure shall be approved.Allow one (1)weeks'time for review of material submittals. Once the items above have been received and approved,a pre-construction meeting will be scheduled. Project closeout information The performance bond shall be released when inspection and approval of all work has been completed, as-built plans, easements, dedications, and bills of sale have been approved and a two- year, 20% maintenance bond is on file with the City of Arlington.The City does not have a template for the maintenance bond; however Surety's standard form is acceptable and shall consist of following of which shall be indicated on the security. "All included infrastructure relating to the public water, and sanitary sewer systems, right of way improvements along with any private and public landscaping." "The bond shall not be released without written discharge from the City of Arlington" Maintenance Bond Estimated Cost of Construction$60,624.84 x 20% _ $12,124.97 Should you have any questions or require additional information,please contact me at 360.403.3548 or alawlis@arlingtonwa.gov Sincerely, Ameresia Lawlis Asst. Planner I Community&Economic Development