HomeMy WebLinkAbout29289352-20251104_PWD4094_ ROW_ForSig_ CITY OF ARLINGTON
` 18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551
RIGHT OF WAY PERMIT
Address: 16512 51STAVE NE Permit#: 4094
Project Name: Comcast Parcel#: 31052800101000
Project#:JB0002361022 Expires: 90 days after issuance
OWNER APPLICANT CONTRACTOR
RG NORTHSOUND LOGISTICS LLC Comcast Ceejay D Gusman
400 UNIVERSITY ST STE 300 16512 51stAve NE
SEATTLE,WA 98101 Arlington,WA 98223
360 965 5085
JOB DESCRIPTION
STARTING WITH VAULT 1,UNDEROUND OVERPULL 40' SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF
AND PULL 479'S TO VAULT JB0002361022. 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30' S TO
POLE 2.PLACE NEW POWER SUPPLY ON POLE 3. SPLICE PER DESIGN.
CONDITIONS
Traffic Control must comply with the current version of MUTCD.Work Hours are 7 am to 7 pm Monday-Saturday(no work on
Sundays or City Recognized Holidays).Inspections are not available on Saturday or Sunday.Non-motorized traffic control must
be provided if any part of the work impacts existing non-motorized facilities.Non-motorized traffic control measures shall provide
a level of accessibility that are,at minimum,equal to the existing conditions of the site.Two days before starting work,the
applicant must have all utilities located. One Call,is a public utility locating service(#811 or 1-800-424-5555).Privately installed
facilities must also be located using a private utility locating service.Private property owners which may be affected by the
proposed work must be notified in advance of potential disruptions in access or utility services.
INSPECTIONS
The applicant is required to notify the City for inspections.Failure to give notice will result in violation of AMC Chapter
12.40.240 and may result in additional inspection fees.To request an inspection call 360-403-3417 by 3:30 for next day
inspection.Applicant must comply with all applicable City of Arlington,state and federal laws,ordinances,code and regulation in
performing the work authorized by this permit.
PERMIT APPROVAL
Work to be performed as described and/or shown in the approved plans and/or application for the above named project is approved
for construction by the City of Arlington Public Works Department. All work is subject to field inspection.
11/04/2025
Development Services Engineering Manager or Designee Date of Issuance
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined
to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,
regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
The above named contractor/property owner is hereby authorized to perform the above work within City Right-Of-Way in
accordance with the terms of this permit and as shown on the attached drawing and subject to all applicable State,county and/or
municipal laws and/or codes.
All work shall be in accordance with the"standard Specifications for Road,Bridge and Municipal Construction,"exept where
modified by City of Arlington Public Works Standards or conditions herein. The contractor shall hold the City of Arlington
harmless from any loss or damage to any person or property in the performance of said work.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington 43 10 1.
Applicant Signature Print Name Date
PERMIT FEES
Date Name Description Fee Amount
11/04/2025 Processing/Technology $25.00
11/04/2025 Right of Way $300.00
Total Due: $325.00
Total Payment: $0.00
Balance Due: $325.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon