Loading...
HomeMy WebLinkAbout29268122-JB0002361022 SOW Completed By: O.Villanueva AS 6 U I LT COVER Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: 48.14556838 Tie-In Latitude: 48.14556838 v Irk Job Subtype: Reimbursable Site Longitude: -122.1618422 Tie-in Longitude: -122.1618422 .. /'.. Survey Scope: Post-Sale COMICAST Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are Project Manager: summarized on Survey Rollup tab. ' ti P2 ID: JB0002361022 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3. Underground Route SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' 150'OL Arlington Aerial Overlash Overpull Conduit 150'oP Interior Footage Conduit Tic Support Pedestal ❑ P1 fit Vault v❑ Manhole MH Hand Hole HH Lockbox/Dmark Telco/Cable Pole O Joint Use Pole Joint Transformer Pole Power Pole X Pole Tag PT-123 Riser 0 Power Supply LLS Addresses Address Number 1234 Vacant Lot VL Fiber Splice Case Slack Callouts Callout Arrow Completed By: O.Villanueva Route Overview Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: Tie-In Latitude: J\r Job Subtype: Reimbursable Site Longitude: Tie-In Longitude: Survey Scope: Post-Sale W "' E COMICAST Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are '� /.Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002361022 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3. Underground Route SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash - � U FED 1 40'OP ._.i tbAmesswo Footages - ,+.• y - Aerial UG Footage Aerial Overlash 150'OL Overpull Conduit 150'oP Interior Footage 150'IN Conduit Tic Support Pedestal ❑ ♦ 479'UG Vault v❑ Manhole r,H . r Hand Hole ■ r R Lockbox/Dmark - Telco/Cable Pole 1 � V Joint Use Pole � �� r� '� - '► W - ® r Joint Transformer Pole � � J Power Pole Pole Tag PT-123 �► ,. �� ' ` Riser Power Supply JIM, PIED 3 Addresses 5Address Number POLE 1I Vacant Lot , :� 30 I ( � POLE 2 Fiber Splice Case d Slack Callouts A ~ Callout Arrow "' ' , ,., ;. I '► Psi Place new PS on this pole j ? FT �.� , Completed By: O.Villanueva Route Overview Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: Tie-In Latitude: J\r SHIPSJob Subtype: Reimbursable Site Longitude: Tie-In Longitude: Survey Scope: Post-Sale W "' E COMICAST Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are '� /.Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002361022 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3. Underground Route SPLICE PER DESIGN. Aerial Route Underground Overpull - - .` MA -i - - Aerial Overlash r Footages �'- Aerial UG Footage Aerial Overlash 150'OL - Overpull Conduit Interior Footage - - Conduit Tic - Support Pedestal El Vault v❑ wreckout existing coax and reroute Manhole El new mainline UG Hand Hole HH r t sMi � r t IH Lockbox/Dmark :' • Pik, Telco/Cable Pole r Joint Use Pole ® � s.� _ • • �'' cut back existing fiber and use as Joint Transformer Pole ® •�' :. * 133'OL , storage for new case. Power Pole X /rl 40 Pole Tag PT-123 �I► , P1 '�1. - Riser ® �• �1: �� .`�J � , r 'rr"T ^` '., r Power Supply rs ++ter•: r. j(S Addresses ��,wnl�1►1,y�M�W�.�wa�,Mh�11•�d►►,V ��� wreckout existing power supply Address Number 1234 �• - Vacant Lot VIL f � T Fiber } Splice Case Slack r Callouts A � p Callout Arrow Right of Way Completed By: O.Villanueva Address: 16512 51STAVE NE ARLINGTON WA 98223 Completion Date: 9/22/2025 Right of Way Footages: ��. Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 504 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 504 Existing UG Coax: 0 COM C A S (T Project Manager: P2 ID: JB0002361022 Are Additional Pages Needed: No *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* CALL OUT IF IT IS COAX OR FIBER. NEED TO KNOW WHAT ADJACENT STRUCTURE IS IMPACTED/REMOVED AND WHERE IT IS LOCATED. NOTATE THE NUMBER AND SIZE OF NEW STRUCTURE(IE.;CONDUIT) NOTE ALL FUTURE PEDESTAL/VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES(COAX/FIBER/CASE LOCATIONS/SHEATHS PER CASE/SLACK LOCATIONS AND FOOTAGE/STRUCTURE)SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. Legend Provide Clear Right of Way Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL • • 1 1 • • 1 1. .•1. •. - 16469-16605 51 st • - Overpull Conduit 150 OP ••• ,•. Adington A 98223 Interior Footage 150'IN _• United States Conduit Tic / Support Pedestal ` 479' Vault v❑ i, Manhole Ali". Hand Hole - Lockbox/Dmark Telco/Cable Pole O 40'OP Joint Use Pole ® Joint Transformer Pole ® Power Pole X Pole Tag PT-123 wreckout existing coax Riser Power Supply Rs Addresses Address Number 1234 Vacant Lot VL Fiber marysv-• 1 / • 1• 1 1 Splice Case •.•• ••1 Slack Marysville WA 98223 fMarysville WA 98223 Callouts United States United States Callouts " l cut back existing fiber and use as storage for new case. wreckout existing Right of Way Completed By: O.Villanueva Address: 16512 51ST AVE NE ARLINGTON WA 98223 Completion Date: 9/22/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 443 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 COMICAST Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 443 Existing UG Coax: 0 IProject Manager: P2 ID: JB0002361022 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150 OL • • 1 1• • • 1 1• a see 00 so Overpull Conduit 150 OP Interior Footage 150'IN -• _• Conduit Tic / Su ort Pedestal Vault V❑ Manhole r,H n Hand Hole HH ■ 479' � - --- - Lockbox/Dmark _ Telco/Cable Pole 40'OP Joint Use Pole Joint Transformer Pole ® `" Power Pole X existing 36x48 vault will house any (479') Pole Tag PT-123 extra storage for fiber Riser Power Supply Ps Addresses May be able to place existing cases on Address Number 1234 new pole if there is enough storage. If Vacant Lot VL not then cases must be relocated to UG Fiber _• 1 ,; • 1• Splice Case •• • IRSAMEM2 • Slack TA ' •' Marysville WA • Callouts OI '• States Callouts p 9 -- Transfer coax and fiber to new oles _ R 25' Will, — _ V - S (479') place new 36x48 vault at base of new pole. Place new case and storage Right of Way Completed By: O.Villanueva Address: 16512 51ST AVE NE ARLINGTON WA 98223 Completion Date: 9/22/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 COAACAST Project Manager: P2 ID: JB0002361022 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage f SFCONOAF Aerial Overlash — • • i • .,RJNS : ig CRC)RLN5 Overpull Conduit 150 OP • . • A (2)r1_N5 Interior Footage Conduit Tic / _ _ i�I C146L • A-51126 FROM A-` Support A EXISTING FROM A- Pedestal 1 % c TOTAL °u ❑ A-SA t29 4 EXISTING �UC T Vault �. Jf // O 25'OF EXISTING 11)6"PVC Manhole MH -' -- __ r EXISTING CABLES h 6.OF EXISTING 11>6"PVC TO BE REMOVED �A t1T Hand Hole HH - -- - 4` PL1292464 OB 330' Lockbox/Dmark � \� - _- --- _ I O 433 �- Telco/Cable Pole IJI Joint Use PoleA-58515Joint Transformer Pole ® O i* 3O•PUGE SCXPOWER y '. LIGHT 6„ II s PIPELINE EASEMENT Power Pole X IM, _Q ----- Pole ._ r-• "• I Tag PT-123 Place new PS on this pole fib' �� I w 4 e- Riser Power Supply _ 4 0 _ � I • 4791 Ps �► -- Addresses G o I I Address Number 1234 Vacant Lot VL o I c b I Fiber Splice Case 6 Slack Callouts 4 a a I a Callouts ¢ A Lj Z ._ a• I a I • d...Co--I I N _ b I ------w-- --• I CEEA-16X woc w aN