HomeMy WebLinkAbout29268122-JB0002361022 SOW Completed By: O.Villanueva
AS 6 U I LT COVER
Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223
Job Type: Forced Relocates Site Latitude: 48.14556838 Tie-In Latitude: 48.14556838 v
Irk Job Subtype: Reimbursable Site Longitude: -122.1618422 Tie-in Longitude: -122.1618422 .. /'..
Survey Scope: Post-Sale
COMICAST
Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are
Project Manager: summarized on Survey Rollup tab. '
ti
P2 ID: JB0002361022 Are Additional Pages Needed: No
Legend Provide Clear Route Overview Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.
Underground Route SPLICE PER DESIGN.
Aerial Route
Underground Overpull
Aerial Overlash
Footages
Aerial UG Footage 150'
150'OL Arlington
Aerial Overlash
Overpull Conduit 150'oP
Interior Footage
Conduit Tic
Support
Pedestal ❑ P1 fit
Vault v❑
Manhole MH
Hand Hole HH
Lockbox/Dmark
Telco/Cable Pole O
Joint Use Pole
Joint Transformer Pole
Power Pole X
Pole Tag PT-123
Riser 0
Power Supply LLS
Addresses
Address Number 1234
Vacant Lot VL
Fiber
Splice Case
Slack
Callouts
Callout Arrow
Completed By: O.Villanueva
Route Overview Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223
Job Type: Forced Relocates Site Latitude: Tie-In Latitude: J\r
Job Subtype: Reimbursable Site Longitude: Tie-In Longitude:
Survey Scope: Post-Sale W "' E
COMICAST
Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are '� /.Project Manager: summarized on Survey Rollup tab.
s
P2 ID: JB0002361022 Are Additional Pages Needed: No
Legend Provide Clear Route Overview Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.
Underground Route SPLICE PER DESIGN.
Aerial Route
Underground Overpull
Aerial Overlash - � U FED 1 40'OP ._.i tbAmesswo
Footages -
,+.• y -
Aerial UG Footage
Aerial Overlash 150'OL
Overpull Conduit 150'oP
Interior Footage 150'IN
Conduit Tic
Support
Pedestal ❑ ♦ 479'UG
Vault v❑
Manhole r,H .
r
Hand Hole
■ r R
Lockbox/Dmark -
Telco/Cable Pole
1 � V Joint Use Pole � �� r� '� - '► W -
® r
Joint Transformer Pole � � J
Power Pole
Pole Tag PT-123 �► ,. �� ' `
Riser
Power Supply JIM,
PIED 3
Addresses 5Address Number POLE 1I
Vacant Lot , :� 30
I ( � POLE 2
Fiber
Splice Case d
Slack
Callouts A ~
Callout Arrow
"' ' , ,., ;. I '► Psi Place new PS on this pole
j ? FT �.� ,
Completed By: O.Villanueva
Route Overview Completion Date: 9/22/2025 Address: 16512 51ST AVE NE ARLINGTON WA 98223
Job Type: Forced Relocates Site Latitude: Tie-In Latitude: J\r
SHIPSJob Subtype: Reimbursable Site Longitude: Tie-In Longitude:
Survey Scope: Post-Sale W "' E
COMICAST
Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are '� /.Project Manager: summarized on Survey Rollup tab.
s
P2 ID: JB0002361022 Are Additional Pages Needed: No
Legend Provide Clear Route Overview Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.
Underground Route SPLICE PER DESIGN.
Aerial Route
Underground Overpull - - .` MA -i - -
Aerial Overlash r
Footages �'-
Aerial UG Footage
Aerial Overlash 150'OL -
Overpull Conduit
Interior Footage - -
Conduit Tic -
Support
Pedestal El
Vault v❑ wreckout existing coax and reroute
Manhole El new mainline UG
Hand Hole HH r t sMi �
r t IH
Lockbox/Dmark :' • Pik,
Telco/Cable Pole r
Joint Use Pole
® � s.� _ • • �'' cut back existing fiber and use as
Joint Transformer Pole
® •�' :. * 133'OL , storage for new case.
Power Pole X /rl 40
Pole Tag PT-123 �I► , P1 '�1. -
Riser ® �• �1: �� .`�J � , r 'rr"T ^` '., r
Power Supply rs ++ter•: r. j(S
Addresses ��,wnl�1►1,y�M�W�.�wa�,Mh�11•�d►►,V ��� wreckout existing power supply
Address Number 1234 �• -
Vacant Lot VIL
f � T
Fiber
}
Splice Case
Slack r
Callouts A � p
Callout Arrow
Right of Way Completed By: O.Villanueva Address: 16512 51STAVE NE ARLINGTON WA 98223
Completion Date: 9/22/2025 Right of Way Footages:
��. Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 504
Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 504 Existing UG Coax: 0
COM C A S (T Project Manager:
P2 ID: JB0002361022 Are Additional Pages Needed: No
*IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION*
CALL OUT IF IT IS COAX OR FIBER.
NEED TO KNOW WHAT ADJACENT STRUCTURE IS IMPACTED/REMOVED AND WHERE IT IS LOCATED.
NOTATE THE NUMBER AND SIZE OF NEW STRUCTURE(IE.;CONDUIT)
NOTE ALL FUTURE PEDESTAL/VAULT LOCATIONS
ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES(COAX/FIBER/CASE LOCATIONS/SHEATHS PER CASE/SLACK LOCATIONS AND FOOTAGE/STRUCTURE)SHOWN ON THE FACILITY SEARCH MAP
WITHIN THE CONSTRUCTION AREA.
Legend Provide Clear Right of Way Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN.
Underground Route
Aerial Route
Underground Overpull
Aerial Overlash
Footages
Aerial UG Footage 150'
Aerial Overlash 150'OL • • 1 1 • • 1 1.
.•1. •. - 16469-16605 51 st • -
Overpull Conduit 150 OP ••• ,•. Adington A
98223
Interior Footage 150'IN _• United States
Conduit Tic /
Support
Pedestal ` 479'
Vault v❑ i,
Manhole Ali".
Hand Hole
-
Lockbox/Dmark
Telco/Cable Pole O 40'OP
Joint Use Pole ®
Joint Transformer Pole ®
Power Pole X
Pole Tag PT-123 wreckout existing coax
Riser
Power Supply Rs
Addresses
Address Number 1234
Vacant Lot VL
Fiber marysv-• 1 / • 1• 1 1
Splice Case •.•• ••1
Slack Marysville WA 98223 fMarysville WA 98223
Callouts United States United States
Callouts
" l
cut back existing fiber and use as
storage for new case. wreckout existing
Right of Way Completed By: O.Villanueva Address: 16512 51ST AVE NE ARLINGTON WA 98223
Completion Date: 9/22/2025 Right of Way Footages:
Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 443
Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
COMICAST Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 443 Existing UG Coax: 0
IProject Manager:
P2 ID: JB0002361022 Are Additional Pages Needed: No
Legend Provide Clear Right of Way Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN.
Underground Route
Aerial Route
Underground Overpull
Aerial Overlash
Footages
Aerial UG Footage 150'
Aerial Overlash 150 OL • • 1 1• • • 1 1•
a see 00 so
Overpull Conduit 150 OP
Interior Footage 150'IN -• _•
Conduit Tic /
Su ort
Pedestal
Vault V❑
Manhole r,H n
Hand Hole HH
■ 479' � - --- -
Lockbox/Dmark _
Telco/Cable Pole 40'OP
Joint Use Pole
Joint Transformer Pole ® `"
Power Pole X existing 36x48 vault will house any (479')
Pole Tag PT-123 extra storage for fiber
Riser
Power Supply Ps
Addresses May be able to place existing cases on
Address Number 1234 new pole if there is enough storage. If
Vacant Lot VL not then cases must be relocated to UG
Fiber _• 1 ,; • 1•
Splice Case •• • IRSAMEM2 •
Slack TA ' •' Marysville WA •
Callouts OI '• States
Callouts
p 9
-- Transfer coax and fiber to new oles
_ R 25'
Will, —
_ V -
S (479')
place new 36x48 vault at base of new
pole. Place new case and storage
Right of Way Completed By: O.Villanueva Address: 16512 51ST AVE NE ARLINGTON WA 98223
Completion Date: 9/22/2025 Right of Way Footages:
Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0
Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0
COAACAST
Project Manager:
P2 ID: JB0002361022 Are Additional Pages Needed: No
Legend Provide Clear Right of Way Construction Details
Route STARTING WITH VAULT 1,UNDEROUND OVERPULL 40'SE TO VAULT 2.FROM VAULT 2,UNDERGROUND PROOF AND PULL 479'S TO VAULT 3.FROM VAULT 3,5'RISER UP TO POLE 1 AERIAL OVERLASH 30'S TO POLE 2.PLACE NEW POWER SUPPLY ON POLE 3.SPLICE PER DESIGN.
Underground Route
Aerial Route
Underground Overpull
Aerial Overlash
Footages
Aerial UG Footage f
SFCONOAF
Aerial Overlash — • • i • .,RJNS
: ig
CRC)RLN5
Overpull Conduit 150 OP • . • A (2)r1_N5
Interior Footage
Conduit Tic / _ _ i�I C146L
• A-51126 FROM A-`
Support A EXISTING FROM A-
Pedestal 1 % c TOTAL °u
❑ A-SA t29 4
EXISTING �UC T
Vault �. Jf // O 25'OF EXISTING 11)6"PVC
Manhole MH -' -- __ r EXISTING CABLES
h
6.OF EXISTING 11>6"PVC
TO BE REMOVED �A t1T
Hand Hole HH - -- - 4` PL1292464 OB 330'
Lockbox/Dmark � \� - _- --- _ I O 433
�-
Telco/Cable Pole IJI
Joint Use PoleA-58515Joint Transformer Pole ® O i* 3O•PUGE SCXPOWER
y
'. LIGHT 6„ II
s PIPELINE EASEMENT
Power Pole X IM, _Q -----
Pole ._ r-• "• I
Tag PT-123 Place new PS on this pole fib' �� I
w 4 e-
Riser Power Supply _ 4 0 _ � I • 4791
Ps �► --
Addresses G o I I
Address Number 1234
Vacant Lot VL o I c b I
Fiber
Splice Case 6
Slack
Callouts 4 a a I
a
Callouts ¢
A
Lj
Z
._ a• I a I
• d...Co--I I N
_ b I
------w-- --• I
CEEA-16X
woc w aN