Loading...
HomeMy WebLinkAbout20260730_PWD4165_Water Sewer Availability Signed WATER AND SEWER AVAILABILITY REQUEST Community and Economic Development _ City of Arlington• 18204 5911,Avenue NE•Arlington,WA 98223 • Phone(360)403-3551 Submittal Requirements: 1 Complete Application 2. 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: ❑✓ Water Only ❑ Sewer Only ❑ Water and Sewer Location/Legal Property Address: xxx 196th Place NE Lot#: Tract 999 Parcel ID Nos): 01052300099900 Sub Ai 1Si0 :Quail Ridge Project Scope of Work: 2 Siagleafaa i44ot6-ePr44,O8asFeS s oft Owner Name: KJR Family LLC Office No.: Email Address: Cell No.: Mailing Address: 1831 Colby Avenue city: Everett State: WA zip:98201 Owners Agent: Ry McDuffy- Land Resolutions Office No.: 425-258-4438 Email Address: ry@orcalandsurveying.com Cell No.: Mailing Address: 3605 Colby Avenue City: Everett State: WA zip: 98201 RESIDENTIAL INFORMATION ❑✓ Proposed Single Family Residence ❑Existing Single Family Residence ❑Accessory Dwelling Unit ❑Proposed Multi-Family Residence: #of Units #of Buildings ❑Residential Plat: #of Lots COMMERCIAL INFORMATION ❑Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage TYPE OF COMMERCIAL USE ❑Hotel/Motel ❑Food Service ❑ Medical/Dental ❑ Office ❑Retail ❑Vehicle Service ❑Warehouse/Storage ❑ Industrial ❑ Other(specify): Commercial Water Usage: Monthly Estimation: Gallons WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? Yes ❑✓ No Is there an existing Septic System on-site? Yes R No Water Meter Size Requested? ❑ 5/8" ❑ 1" ❑ 1.5" ❑ 2" ❑ 3" ❑4" ❑ 6" Type of Fire Protection Requested? ❑ Fire Sprinkler System ❑Fire Hydrant ❑✓ Unknown 1,the undersigned,request City ofArlington Utilities Division to certify willingness to provide water and/or sewer as indicated. The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above information must be reported immediately to the City ofArlington Utilities Division as a condition of Utility Availability approval. 6� Ry McDuffy 1/3/26 Signature weer/agent) Print Name Date Pagel of 2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION / CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. N/A A water main or other capital facility improvement ❑ is required; ❑ is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and YES specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate: STATIC PRESSURE 105 PSI RESIDUAL PRESSURE 87 PSI FLOW 936 GPM N/A A sanitary sewer main or other capital facility improvement ❑ is required; ❑ is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced N/A property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Other: Water service is available at this location per the below conditions. Approved By: CADate: i071JOLeVZ6 EXPIRES 18 MON HS F OM DATE OF ISSUE COMMENTS: 1. Water service is available for this project. Please coordinate with the Arlington City Engineer for water service line connection, meter locations, backflow protection, utility easements, on- site water main alignment, and any other City of Arlington water supply requirements. 2. Due to the size of the property that is being short platted and potential development locations, a water man extension may be required. 3. Any wells on the development property are to be abandoned per Arlington Municipal Codes 13.04.140 and 13.08.160 as a condition of service. 4. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards. 5. Fire flow data is from water model node 2025-J-789 located at the north end of 196th Place. Water Availability Map East Hill — —�- —) i I N ' r- --�-ZU0 Ll i li I i �LEI r. l rl on High i chool 7/30/2026, 1:04:13 PM 1:14,095 • � 0 0-07 0.15 0.3 mi Water Hydrants Water Mains 0 0.13 0.25 0.5 km Active Esn,NASA,NGA,USGS.FEMA,Esri Community Maps Contributors.City of Arlington, WA, WA State Parks GIS. Esn. TomTom, Gannin, SafeGraph, Parcels GeoTechnologies. Inc. METIINASA, USGS, Bureau of Land Management. EPA,NPS,US Census Bureau,USDA,USFWS