Loading...
HomeMy WebLinkAbout157_1026511_JB0002479337_Right-of-Way-Closure-Request ROAM LOSUREREQUIST C om m Lnity & Econom is Developm ent City of Arlington • 18204 591h Avenue NE • Arlington, WA 98223 • Phone (360)403-3551 Name/Company: Waeco Construction - Corn cast Street: 204th St NE Date: 2/9/26-2/13/26 Time: 9a-3p Purpose: RO WUtility work O Corn plete Closure O Partial Closure 0 Diversion Closure (i.e. no access) (i.e.one lane of traffic) (i.e. to turn lane) Describe what section of the road will be closed using cross streets or a street address with the total linear footage of closure. The lane closure will take place on the north side of 204th St Ne/Cem etery Rd between Lantern Ln and just east of 64th dr ne. Please briefly explain your traffic control plan and/or detour route, including safety precautions that will be taken in the evenings for m ultiple day closures. Attach a traffic control plan in necessary. The closure will be a one lane road closure for vehicle staging during the RO Wutility work. Traffic Control Plan is attached. Revised 10/2013