Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
157_1026511_JB0002479337_Plans_20260112
JB0002479337 7 } • .Ketchum CONTACTS� • � �-� �, — _, i • . ` , . COMCAST Pitrnuck • MATTHEW SWAFFORD 1 r - REGIONAL MANAGER s am T on �ji MATTHEW SWAFFORD@COMCAST.COM Surltlay ke � - i �� ,� i ' •� (425)319-4927 Silvana Arlington t+eignts WAECO ENGINEERING 15 ' �/ j - JOSEPH PARKER ctl Snok Point i �~ 1 - ENGINEERING MANAGER _ JPARKER@WAECOENG.COM �' : (253)315-3326 Lake Goodwin 7 Canyon creek Sd1tL • �, j f SHEET INDEX ,,= toe- 1 COVER SHEET Grande Falls Z _• -- - 2 LEGEND VICINITY MAP 3 GENERAL NOTES •NOT TO SCALE Lochs 4 UNDERGROUND PLAN VIEW - - � 1 _ � p 5 RESTORATION PLAN VIEW OW —� r 6 SITE PHOTOGRAPHS • T SHEET 4 _ .•--� op SCOPE OF WORK • •40W.- PROJECT CONSISTS OF DIRECTIONAL DRILLING TO INSTALL(1)2"CONDUIT AND(1)0.625 CABLE p' f _ - • — BETWEEN AN EXISTING PEDESTAL AND EXISTING DOGHOUSE. BOTH THE EXISTING PEDESTAL AND y _ _ +• • DOGHOUSE TO BE REPLACED. lips Ilu 1 'jiggill } • ► 4� 1 • • • �• •• • O i�1 • 1 • • • Im• C� • i • S/TE L OCA T/ON NOT TO SCALE WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 JOSEPH PARKER MATTHEW SWAFFORD COVER SHEET (2 31 (425) 27 PERMIT NUMBER: JB0002479337 JPARKER@WAECOECOENG.COM MATTHEW SWAFFORD@ORD@COMCAST.COM DATE TECH ENG ORIGINAL 1112126 TJB JJP ENG#10T 511 co m ca st REVIEWED 1/12/26 SHEET# PROPRIETARY— NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Know what's below. REV#I 1 OF 6 v s AS-BUILT ---- ---- ---- Call before you dig. L/NETYPELEGEND /DENT/F/CAT/ON LABELS DRAWING SYMBOL LEGEND PROPOSED LINETYPES CONSTRUCTION/RESTORATION CALLOUT PROPOSED SYMBOLS EXISTING SYMBOLS AERIAL FIBER W/STRAND • — AERIAL FIBER(ADSS) R 1 UTILITY RISER ® UTILITY RISER XXX AERIAL FIBER W/OVERLASH UTILITY POLE SEQUENCE CALLOUT ——— —— ——— UTILITY POLE UTILITY POLE FIBER THROUGH EXISTING CONDUIT —— —— ——— CONDUIT PHOTO MARKER i> ——————————— STRAND — POLE ANCHOR/DOWN GUY — POLE ANCHOR/DOWN GUY EXISTING LINETYPES XXX O FIBER STORAGE LOOP — AERIAL FIBER �� MH MANHOLE MH MANHOLE —— —— ——— CONDUIT STRAND XXX XO FIBER STORAGE LOOP HH HANDHOLE HH HANDHOLE WITH SPLICE POINT RIGHT OF WAY PARCEL BOUNDARY XXX XO EXISTING SPLICE POINT © PEDESTAL © PEDESTAL CURB ®® WITH NEW TAIL '° A, EDGE OF PAVEMENT-ROAD PB PULLBOX PB PULLBOX x x x FENCE WOOD/METAL G G GAS PIPE F D P1 FIBER DISTRIBUTION PANEL F D P1 FIBER DISTRIBUTION PANEL s W W WATER PIPE (XXX) FIBER LENGTH ON SHEET T T TELEPHONE LINE (XXX'STR-STR)— FIBER LENGTH STRUCTURE TO STRUCTURE — DOWN GUY ON EXISTING ANCHOR GROUND BOND E E ELECTRICAL LINE MST MULTIPORT SERVICE TERMINAL UTILITY BREAK/CONTINUATION ss ss SANITARY SEWER(SS) 14PORT so so STORM DRAIN PIPE HA TCH PA TTERN LEGEND Tv Tv CABLE TV LINE ® UTILITY POTHOLE UTILITY END sTM—sTM STEAM PIPE EXISTING SIDEWALK —OIL—OIL— OIL PIPE BORE PIT OU MISCELLANEOUS UTILITY XF/0UNKNOWN UTILITY F/0 FIBER OPTIC LINE CONCRETE RESTORATION UTILITY STRUCTURE TEL TEL TELECOMMUNICATIONS 1+00 FET CATCH BASIN — STATIONING LINE ASPHALT RESTORATION \Py FIRE HYDRANT / ASPHALT OVER PCC RESTORATION \1 1 1/ STREET LIGHT POST V —— LANDSCAPE RESTORATION [��i� STREET LIGHT C)=— TRAFFIC ARM/STOP LIGHT ABBREVIA TONS EHS EXTRA HIGH STRENGTH MP MILE POST STR STRUCTURE TREE HDPE HIGH DENSITY POLYETHYLENE MST MULTIPORT SERVICE TERMINAL (V) VERTICAL (H) HORIZONTAL PVC POLY VINYL CHLORIDE PD-## PEDESTAL NUMBER HEDGE HH HANDHOLE (REF) REFERENCE DIMENSION VT-## VAULT NUMBER JB JUNCTION BOX ROW RIGHT OF WAY UP-## UTILITY POLE NUMBER MH MANHOLE STA. STATION ###F FIBER CABLE THREAD COUNT WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 JOSEPH PARKER MATTHEW SWAFFORD LEGEND (2@ 31 COE (425)ORD@C PERMIT NUMBER: JB0002479337 JPARKER@WAECOENG.COM MATTHEW SWAFFORD@COMCAST.COM DATE TECH ENG ORIGINAL 1112126 TJB JJP ENG#10T 511 Ccomcast REVIEWED 1/---- SHEET# PROPRIETARY- NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Know woreyoelow. REV#I 2 OF 6 v s AS-BUILT ---- ---- ---- E N G I N E E R I N G Call before you di GENERAL NOTES: THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLYAPPROXIMATE. WAECO ENGINEERING HEREBY DISCLAIMS ANY RESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION.PERSONS WORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THE LOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION. 1. ALL MATERIALS, WORKMANSHIP,AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE JURISDICTION REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY.ALL WORK WITHIN THE PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTION AND APPROVAL BY THE JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES,AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVAT/ON TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCA TIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALL NOTIFY THE JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED. 4. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE JURISDICTION AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION,AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE. 5. THE CONTRACTOR SHALL HAVE ONE(1)SIGNED COPY OF THE APPROVED PLANS, ONE(1)COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS,AND ONE(1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING,BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL,AND SECURITY. 7. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR,HIS SUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. 8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 9. FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE JURISDICTION, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D.FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAYBE REQUIRED BY SAID PLANS.PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH JURISDICTION. 10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED,REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE. 11. PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE JURISDICTION INSPECTOR AT ALL TIMES. 13. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS. 14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL(T.E.S.C.)MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY.ALL T.E.S.C.MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING. 15. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE JURISDICTION ENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS. 16. ALL CONSTRUCTION OPERATIONS,INCLUDING THE WARMING UP, REPAIR,ARRIVAL,DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE JURISDICTION. WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 JOSEPH PARKER MATTHEW SWAFFORD GENERAL NOTES (2@ 31 COE (425)ORD@C PERMIT NUMBER: JBOOO2479337 JPARKER@WAECOENG.COM MATTHEW SWAFFORD@COMCAST.COM DATE TECH ENG ORIGINAL 1112126 TJB JJP ENG#10T 511 Ccomcast REVIEWED 1/---- SHEET# PROPRIETARY- NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Know woreyo dig. REV#I 3 OF 6 v s AS-BUILT E N G I N E E R I N G Call before you di iCONSTRUCTION NOTES D TAP LOCATION:REPLACE EXISTING DOGHOUSE, ICONNECT(1)0.625 CABLE TO NEW TAP. O OPEN TRENCH TO PLACE(1)2"CONDUIT(1)0.625 ICABLE. O PLACE(2'x 2)BORE PIT. IO4 DIRECTIONAL DRILL TO PLACE(1)2"CONDUIT _ AND(1)0.625 CABLE. PARCEL#31051000403000 I 6411 CEMETERY RD O TAP LOCATION:REPLACE EXISTING PEDESTAL, CONNECT(1)0.625 CABLE TO EXISTING TAP. PARCEL#00746500000900 I 20403 LANTERN LN ( ) SYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION. � y 3 I h I PARCEL#00381200003000 6415 204TH ST NE Ll � I a a I I / PARCEL#00381200000100 3 I I 5 20409 64TH DR NE I 1 3 4 a MI —R/W --R/W / R/W 2 I R W R/W (5) R/ (243) R/W R/W R/W CFI"''. 1 /W, R/W R/W I BIZ) N 0 1 2 � \ o _ CEMETERY RD U o 0 204TH ST NE N O N ZI -- O m — _R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W_ —R/W R/W R/W PARCEL#00378900000000 20310 67TH AVE NE PLAN VIEW SCALE 1"=30' 0 10, 20, 30' SCALE:1"=30' WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 UNDERGROUND PLAN VIEW JOSEPH PARKER MATTHEW SWAFFORD (2@ 31 COE (425)ORD@C PERMIT NUMBER: JBOOO2479337 JPARKER@WAECOENG.COM MATTHEW SWAFFORD@COMCASTCOM � DATE TECH ENG ORIGINAL 1/12/26 TJB JJP ENG#1026511 co m ca st REVIEWED 1112126 SHEET# PROPRIETARY- NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Know what's below. REV#O 4 OF 6 you dig.Call before y e AS-BUILT ---- ---- ---- RESTORATION NOTES AO RESTORE SOFT SURFACE TO PRIOR CONDITION � I II PARCEL#31051000403000 6411 CEMETERY RD PARCEL#00746500000900 20403 LANTERN LN I I I I I I PARCEL#00381200003000 I6415 204TH ST NE a I I 0 z a- R/W a R/W R/W j R/W R/W R/W R/W 6' R/W R/W R/W R W R/W R/w R/W --I� L N 2 _ - ' A o Q - U 0 z CEMETERY RD z_ — 204TH ST NE ----------------- 0 m PARCEL#00378900000000 20310 67TH AVE NE F R R/w � R/W R/W h U R/W R/W O U h W g 0 U z RESTORA TION PLAN VIEW 010, 20' SCALE.-1"=20' z SCALE:1"=20' z w WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 JOSEPH PARKER MATTHEWSWAFFORD RESTORATION PLAN VIEW (2 31 (425) 27 PERMIT NUMBER: JBOOO2479337 JPARKER@WAECOECOENG.COM MATTHEW SWAFFORD@ORD@COMCASTCOM � DATE TECH ENG ORIGINAL 1112126 TJB JJP ENG#1026511 7NUY:�(�T:D Ccomcastwhat's REVIEWED 1/---- _ SHEET# PROPRIETARY- NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Know woreyo dlg- REV#O 5 OF 6 ENGINEERING Call before you dig. AS-BUILT ---- ---- ---- CONSTRUCTION NOTES J O TAP LOCATION:REPLACE EXISTING DOGHOUSE, CONNECT(1)0.625 CABLE TO NEW TAP. OPEN TRENCH TO PLACE(1)2"CONDUIT(1)0.625 i ^ CABLE. p �'a O3 PLACE(2'x 2)BORE PIT. SRI e°oO 1Jd - /3 O4 DIRECTIONAL DRILL TO PLACE(1)2"CONDUIT , y AND(1)0.625 CABLE. t 1' °, 4 O TAP LOCATION:REPLACE EXISTING PEDESTAL, 5 CONNECT(1)0.625 CABLE TO EXISTING TAP. - ,^� -ate. � •�: Ap 1� FACING EAST, ON CEMETERY RD 2> FACING WEST, ON 204TH ST NE WAECO ENGINEER COMCAST ENGINEER PROJECT NUMBER:JB0002479337 JOSEPH PARKER MATTHEW SWAFFORD SITE PHOTOGRAPHS (2@ 31 COE (425)ORD@C PERMIT NUMBER: JB0002479337 JPARKER@WAECOENG.COM MATTHEW SWAFFORD@COMCAST.COM � DATE TECH ENG ORIGINAL 1112126 TJB JJP--- ENG#10T 511 Ccomcast REVIEWED 1/12/26 SHEET# PROPRIETARY— NOT FOR DISTRIBUTION PROJECT ADDRESS: 6415 204TH ST NE, ARLINGTON, WA 98223 Knowwhat'sbelow. REV#O 6 OF 6 y e AS-BUILT ---- --- ---- Call before ou di.