Loading...
HomeMy WebLinkAbout20260417_PJA25-0143_Response Letter GLENN WELLS , AIA Ameresia Lawlis, Associate Planner City of Arlington 238 N Olympic Ave Arlington WA 98223 RE: Holman Recovery Center 2 Dear Ms. Lawlis, The applicant would like to request flexibility per 20.72.020 in the design of the Holman Recovery Center 2 project by allowing the ADA parking stalls to be counted in the calculation of required stalls.This request is based on the fact that Health Care Centers have a much greater need for ADA parking stalls than other uses, such as residential projects. DSHS facilities that I have designed for the State of Washington frequently require double the number of ADA parking stalls required by Table 1106.2 of the 2021 IBC, because they have a greater number of clients and employees that need ADA parking facilities. The Holman Recovery Center 1 consistently uses their ADA parking facilities daily, and we anticipate that Holman 2 will be the same. 20.72.020 allows the permit-issuing authority to permit deviations from the presumptive requirements of the municipal code. If this deviation is allowed, the project would have 69 parking stalls (55 standard and 14 compact stalls) with 2 bonus compact stalls.Technically, the city could require the two extra compact stalls to be eliminated,.but we'd prefer to keep them. See enclosed letter from Edmund Smith, Executive Director of the facility. Please feel free to contact me with any questions or comments. QGI ereln Wells Principal 3423 29TH AVE NE, OLYMPIA, WA 98506 360-239-5971 glennwellsarchitect@gmail.com