Loading...
HomeMy WebLinkAbout20260317_PLN1395_PLN1421_Review Comments 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 02/11/2026 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 3ra Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City Sp ec.Ref. Ref. Approved 1 AL Site Due to the need for parking to be located in front of the structure,a screening wall Screening wall has been added to O1/05/2026 Plan/Design at least 2" feet high made of durable and attractive material shall be provided. plan set Please update plans and provide materials for this. 2 AL Clarification Some documents state halfway house,some say medical facility and some say All Documents now call out 01/05/2026 both.Please update all documents for consistency. "health care facility" Health Care Facility • An institution providing health care services.This can include hospital or other licensed inpatient center;an ambulatory surgical or treatment center;a skilled nursing center;a diagnostic,laboratory,or imaging center;and a rehabilitation or other therapeutic health setting. Halfway houses are not permissible in this zone. 3 AL SEPA This proposal is located within the Cascade Industrial Center,please provide the CIC Modified SEPA Checklist 2/11/2026 Checklist CIC Modified SEPA Checklist added to submittal The information provided on this states 156 new PM Peak Hour Weekday trips. Please update or clarify. No signature was provided.Please add. 4 AL Lighting Please provide lighting plans for the site. The lighting plans are shown on 2/11/2026 Plans For design review and civil,full lighting plans will be required to show the site plan. illumination areas. 5 AL Site Plan Please show the easement on the northeastern portion of the property that is not Easement has been added to the 2/11/2026 allowing for the building to be against the roadway. plans I do not see this on any of the plans provided.Please add or clarify where this is identified. 6 AL Site Plan Fencing is shown on renderings,but not on the site plans.Please provide on site Fence callout has been added to the 2/11/2026 plan,showing the setbacks and provide material type. Landscape Plan and the detail is on Please clarify which areas are proposed with Cedar Fence vs Chain Link LLI Please note—screening is required any area that is adjacent to residential 7 AL/TN Site Plan Your proposal states this is a Health Care Facility,however the parking Parking calculations are now calculations call it a halfway house.Please update the use for the parking updated for health care facility calculations and update the calculations as necessary. Page 1 of 4 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 02/11/2026 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 3ra Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City Sp ec.Ref. Ref. Approved 1 space per 400 square feet of gross floor area Site Plan only shows 66 parking stalls(including EV,but not ADA). 68 are required for this development. It appears that there are only 66 stalls on the plans we received still. I have sent you a scanned plan with a physical count to show you which stalls have been counted. Per Engineering Standards,up to 20%of parking stalls can be compact.This would be 10 compact stalls,but 16 are shown. 8 AL Site Plan Please show bicycle parking as required on plans. Bicycle parking is now on the plan 01/05/2025 sheets 9 AL Site Plan Please show required EV parking stalls EV parking is shown on the plans 01/05/2025 1 AL Landscape Please provide parking shade tree calculations.Update plans as necessary to Shade Tree calculations have been 01/05/2025 Plans ensure 20 percent of the vehicle accommodation area will be shaded. added to L1.0 1 AL/TN Landscape Type C landscape screening is required around the property.Please show Type C landscaping screen has Plans screening types on plans and update as necessary. been added L1.0 My apologies,I did not see that there was residential abutting the southern side. Type A—All Neighboring Residential I believe this may just be a oversite—It appears that different plans show different amounts of landscaping and distances along Airport Blvd including the landscape plan showing plantings over the trail.Please ensure that all plans have the same distance and keep the plantings within the planting areas. Page 2 of 4 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 02/11/2026 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 3rd Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City Sp ec.Ref. Ref. Approved GL v c .gym. �s \ \ amA a rmrmv oswme n !• — o- i 1 AL Resubmittal Please submit all requested updated documents and plans by the 60-day Noted resubmittal deadline of Monday,May 18,2026 to ced@arlingtonwa.gov. 1 AL FYI Additional comments may be provided after resubmittal due to the request for Noted more information. 1 AL/TN Prelim It appears that full improvements of 431d Ave NE have not been provided.Please Civil/ update plans with appropriate improvements for this roadway(i.e. curb,gutter, Landscape sidewalk,landscape strip,street trees,ect.).If you have questions regarding this Plans design,please contact Thad Newport at tnewportgarlin tog nwa.go Not all improvements were provided.Please ensure to show street lighting,trees, etc. 1 AL FYI Per AMC 20.16.270(d),if the applicant informs the city,in writing,that the Noted N/A applicant would like to temporarily suspend the review of the project for more than 60 days,or if an applicant is nonresponsive for more than 60 consecutive days after the city has notified the applicant,an additional 30 days may be added to the time periods for the city to issue a final decision for each type of permit that is subject to this chapter. 1 AL FYI Any written notice from the city to the applicant that additional information is Noted N/A required to further process the application must include a notice that Page 3 of 4 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 02/11/2026 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 3ra Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City Sp ec.Ref. Ref. Approved nonresponsiveness for 60 consecutive days may result in 30 days being added to the time for review. 1 TN Civil Plans FYI Watermain will need to loop through site per standard 4-1.03 to prevent dead ends (To be that create a water quality issue due to stagnant water.Maintain minimum 10-ft addressed offset from building per 4-1.07. with civil permit Driveway entrance at south of property should be revised for civil permit submittal submittal) to be standard driveway apron. Can be widened for commercial access. 1 TN Drainage FYI Design should be based off 2024 Ecology SWMMWW.Update references from Report Skagit County to City of Arlington. (To be addressed with civil permit submittal) 1 SG— Civil Plans FYI Hammerhead to be adjusted to meet Acceptable Alternative to 120'Hammerhead NCRFA (To be shown in IFC.Demonstrate through turn-analysis that NRCFA truck can addressed maneuver through site. Contact CED for vehicle specifics. with civil permit EV Chargers need to be separated from the hydrant over here.If there was an EV submittal) fire,we would need that hydrant. Page 4 of 4