HomeMy WebLinkAboutReview Comments Template 18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name: Permit No.: Review Date:
Contact: Phone No.: Land Use Review Phase: Report Date:
Email: Reviewing Dept.: CED Applicant: DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
1. AL Payment Payment of the application fee has not been made and is
required prior to review of any resubmittals.
2. AL Application Property Owner's signature is required.Please reach out to
the Airport Office.
3. AL Complete 1. Please provide Average Daily Trips and current image
Streets or typical existing cross section of street in project
Checklist area.
4. AL Complete 8. This is located within the Cascade Industrial Center.
Streets Please update this section to reflect that and any relevant
Checklist information.
5. AL Modified 6. Describe source runoff.
SEPA
Checklist
6. AL Modified 7. This site is located within a wellhead protection area and
SEPA located near an aquifer.Please update information
Checklist accordingly.
7. AL Modified 24. Identify public streets serving the site—please update
SEPA
Checklist
8. AL Modified 48—55 This section was not filled out.Please complete.
SEPA
Checklist
9. AL Driveway width 38' acceptable?
10. AL Site Plan Use Please clarify use type as listed in AMC 20.40 Permissible
Cover Page Classification Uses
11. Site Plan A1.0 Please show bike stalls
12. Landscape ALL 2.4.3.1 All parking lots and storage,loading,or
Plan maintenance areas within visual proximity of the public
sidewalk shall be screened from the sidewalk by one of
these two methods:
Pagel of 3
18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name: Permit No.: Review Date:
Contact: Phone No.: Land Use Review Phase: Report Date:
Email: Reviewing Dept.: CED Applicant: DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
2.4.3.1(a)Provide a screen wall at least 2-1/2 feet high,of
durable and attractive materials.Incorporate a continuous
trellis of grillwork with climbing plants.
2.4.3.1(b)Provide an opaque landscaped perimeter bed or
hedge at least 2-1/2 feet high,as shown.
In addition to frontage screening,heavier screening is
required due to the location of the parking lot.
13. AL In order to meet the Development Design Standards,a
break in materials/color is required on the side facing the
public road.It does not need to match this,however,
below is an example of this change:
a
14. AL FYI Any chain-link fencing shall be black vinyl.
15. AL FYI With the number of requested updates and changes to
documents and site plans,there may be new comments
after the resubmittal.
16. AL Resubmittal Please submit all requested updated documents and plans
by the 60-day resubmittal deadline of Tuesday,April 1,
2025 to ced@arlingtonwa.gov.
17. AL FYI Per AMC 20.16.270(d),if the applicant informs the city,in
writing,that the applicant would like to temporarily
suspend the review of the project for more than 60 days,or
if an applicant is nonresponsive for more than 60
Page 2 of 3
18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name: Permit No.: Review Date:
Contact: Phone No.: Land Use Review Phase: Report Date:
Email: Reviewing Dept.: CED Applicant: DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
consecutive days after the city has notified the applicant,
an additional 30 days may be added to the time periods for
the city to issue a final decision for each type of permit
that is subject to this chapter.
18. AL FYI Any written notice from the city to the applicant that
additional information is required to further process the
application must include a notice that nonresponsiveness
for 60 consecutive days may result in 30 days being added
to the time for review.
19.
20.
21.
22.
23.
24.
Page 3 of 3