Loading...
HomeMy WebLinkAbout20260205_PJA25-0144, 0143_Responses i 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 11/18/2025 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 1st Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant: Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City S ec.Ref. Ref. F A roved 1. AL Site Due to the need for parking to be located in front of the Screening wall has been added to plan set Plan/Design structure,a screening wall at least 2" feet high made of durable and attractive material shall be provided.Please update plans and provide materials for this. 2. AL Clarification Some documents state halfway house,some say medical All Documents now call out"health care facility" facility and some say both.Please update all documents for consistency. Health Care Facility • An institution providing health care services. This can include hospital or other licensed inpatient center;an ambulatory surgical or treatment center;a skilled nursing center;a diagnostic,laboratory,or imaging center;and a rehabilitation or other therapeutic health setting. Halfway houses are not permissible in this zone. 3. AL SEPA This proposal is located within the Cascade Industrial CIC Modified SEPA Checklist added to Checklist Center,please provide the CIC Modified SEPA Checklist submittal 4. AL Lighting Please provide lighting plans for the site. The lighting plans are shown on the site plan. Plans 5. AL Site Plan Please show the easement on the northeastern portion of Easement has been added to the plans the property that is not allowing for the building to be against the roadway. 6. AL Site Plan Fencing is shown on renderings,but not on the site plans. Fence callout has been added to the Landscape Please provide on site plan,showing the setbacks and Plan and the detail is on L1.1 provide material type. 7. AL Site Plan Your proposal states this is a Health Care Facility, Parking calculations are now updated for health however the parking calculations call it a halfway house. care facility Please update the use for the parking calculations and update the calculations as necessary. 1 space per 400 square feet of gross floor area 8. AL Site Plan Please show bicycle parking as required on plans. Bicycle parking is now on the plan sheets Pagel of 2 i 18204 591h Avenue NE REVIEW COMMENT FORM Arlington,WA98223 360-403-3551 Project Name: Holman Recovery II Permit No.: Review Date: 11/18/2025 Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 1st Comments Report Date: Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant: Scott Wammack DWG Issue Date: # Rev. Dwg.or Add'1 Comment Response/Resolution City S ec.Ref. Ref. F A roved 9. AL Site Plan Please show required EV parking stalls EV parking is shown on the plans 10. AL Landscape Please provide parking shade tree calculations.Update Shade Tree calculations have been added to L1.0 Plans plans as necessary to ensure 20 percent of the vehicle accommodation area will be shaded. 11. AL Landscape Type C landscape screening is required around the Type C landscaping screen has been added L1.0 Plans property.Please show screening types on plans and update as necessary. 12. AL Resubmittal Please submit all requested updated documents and plans Noted by the 60-day resubmittal deadline of Monday,January 19,2026 to ced@arlingtonwa.gov. 13. AL FYI Additional comments may be provided after resubmittal Noted due to the request for more information. 14. AL FYI Per AMC 20.16.270(d),if the applicant informs the city, Noted in writing,that the applicant would like to temporarily suspend the review of the project for more than 60 days,or if an applicant is nonresponsive for more than 60 consecutive days after the city has notified the applicant, an additional 30 days may be added to the time periods for the city to issue a final decision for each type of permit that is subject to this chapter. 15. AL FYI Any written notice from the city to the applicant that Noted additional information is required to further process the application must include a notice that nonresponsiveness for 60 consecutive days may result in 30 days being added to the time for review. 16. Page 2 of 2