HomeMy WebLinkAbout20251231_PJA25-0144_Applicant Responses 18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name: Holman Recovery II Permit No.: Review Date: 11/18/2025
Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 1St Comments Report Date:
Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
1. AL Site Due to the need for parking to be located in front of the Screening wall has been added to plan set
Plan/Design structure,a screening wall at least 2" feet high made of
durable and attractive material shall be provided.Please
update plans and provide materials for this.
2. AL Clarification Some documents state halfway house,some say medical All Documents now call out"health care
facility and some say both.Please update all documents facility"
for consistency.
Health Care Facility
• An institution providing health care services.
This can include hospital or other licensed
inpatient center;an ambulatory surgical or
treatment center;a skilled nursing center;a
diagnostic,laboratory,or imaging center;and a
rehabilitation or other therapeutic health setting.
Halfway houses are not permissible in this zone.
3. AL SEPA This proposal is located within the Cascade Industrial CIC Modified SEPA Checklist added to
Checklist Center,please provide the CIC Modified SEPA Checklist submittal
4. AL Lighting Please provide lighting plans for the site. The lighting plans are shown on the site plan.
Plans
5. AL Site Plan Please show the easement on the northeastern portion of Easement has been added to the plans
the property that is not allowing for the building to be
against the roadway.
6. AL Site Plan Fencing is shown on renderings,but not on the site plans. Fence callout has been added to the Landscape
Please provide on site plan, showing the setbacks and Plan and the detail is on L1.1
provide material type.
7. AL Site Plan Your proposal states this is a Health Care Facility, Parking calculations are now updated for health
however the parking calculations call it a halfway house. care facility
Please update the use for the parking calculations and
update the calculations as necessary.
1 space per 400 square feet of gross floor area
8. AL Site Plan Please show bicycle parking as required on plans. Bicycle parking is now on the plan sheets
Page 1 of 2
18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name: Holman Recovery II Permit No.: Review Date: 11/18/2025
Contact: Scott Wammack Phone No.: 360-435-7171 Land Use Review Phase: 1St Comments Report Date:
Email:gv@grandviewinc.net Reviewing Dept.: CED Applicant:Scott Wammack DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
9. AL Site Plan Please show required EV parking stalls EV parking is shown on the plans
10. AL Landscape Please provide parking shade tree calculations.Update Shade Tree calculations have been added to L1.0
Plans plans as necessary to ensure 20 percent of the vehicle
accommodation area will be shaded.
11. AL Landscape Type C landscape screening is required around the Type C landscaping screen has been added L1.0
Plans property.Please show screening types on plans and update
as necessary.
12. AL Resubmittal Please submit all requested updated documents and plans Noted
by the 60-day resubmittal deadline of Monday,January
19,2026 to ced@arlingtonwa.gov.
13. AL FYI Additional comments may be provided after resubmittal Noted
due to the request for more information.
14. AL FYI Per AMC 20.16.270(d),if the applicant informs the city, Noted
in writing,that the applicant would like to temporarily
suspend the review of the project for more than 60 days,or
if an applicant is nonresponsive for more than 60
consecutive days after the city has notified the applicant,
an additional 30 days may be added to the time periods for
the city to issue a final decision for each type of permit
that is subject to this chapter.
15. AL FYI Any written notice from the city to the applicant that Noted
additional information is required to further process the
application must include a notice that nonresponsiveness
for 60 consecutive days may result in 30 days being added
to the time for review.
16.
Page 2 of 2