Loading...
HomeMy WebLinkAboutIssued Permit op City of Arlington • ' • 14 18204 59th Avenue NE, Arlington, to Washington 98223 Phone: 360-403-3551 W A S H I N G T O N CjNG� Civil Permit Parcel:31052200103100 3-0056 Description of Work:New sprinkler room for the Permit#: AVE N Arlington Boys&Girls Club Permit Address: 18513 59TH AVE NE Permit Type:Civil Use-Utility Service Permit Expiration: June 12,2027 OWNER APPLICANT CONTRACTOR Lydia Hansen Gaffney Construction Boys&Girls Club 2812 8105 Broadway Ave,Everett,WA 98208 18204 59TH DRIVE NE ARLINGTON,WA,98223 4252522153 4253555500 lydia@2812architecture.com info@gaffneyconstruction.com registration-number:GAFFNCI104K3 PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS 1.) Replace 90-degree bends on fire service line with 45-degree bends to increase water-flow. 2.) Note 0.5' minimum vertical separation between ex. storm and water lines. It is the responsibility of the Owner, Developer and Contractor to adhere to the approved plans, verify compliance with the City of Arlington Municipal Code, Public Works Design and Construction Standards, 3•) International Code Council (ICC), applicable local, state and federal requirements or any order, proclamation, guidance or decision of the Governor INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 12, ProcessingfIechnology Fee(320.341.43.00.02) $25.00 2025 December 12, Civil Permit(006.341.82.00.02) $1,900.80 2025 TOTAL: Project Fees $1,925.80 $1,925.80 Credit/Debit Card 96 Payment Successful December 12, 2025 $1,925.80 $0.00