Loading...
HomeMy WebLinkAbout20251107_PJA25-0056_Applicant Responses City of • Public • Memo To: Thad Newport(CED) From: Krista Stwart(PW),Gus Tararan (PW-Water),Joe Wilson (PW-Sewer) CC: Jim Kelly(PW Director), Katy Shores(PW), Linda Taylor(PW),Amy Rusko(CED) Date: September 29,2025 Re: B&G Club Sprinkler Room-Permit#6715 Water Comments-Gus Tararan(gtararan@arlingtonwa.gov): 1. Show existing and proposed 20'easement,centered on watermain,including fire hydrants. (4.1- 22) Parcel is City land and an easement is not required. 2. Revise and dimension the separation between the proposed fire main and FDC main line shall be a minimum separation of 3-feet from inside edge of pipes. Adjusted for 3 ft separation. 3. Provide adequate separation between the proposed thrust blocking at the 90-degree bend and the parallel line. The lines are now separated. 4. Replace Sta/Offset with Northings/Eastings. There are no associated bearings on alignment shown on plans. Updated. Add d water line and crossing depth. 5. Note/show the depth of the proposed water lines(4-1.12). Additionally,veri vertical separation between proposed water lines at existing storm crossing. Minimum is 0.5'from storm. (4-1.06) 6. Minimum horizontal separation between water and storm is 5-feet. Revise plans and dimensions separation. (4-1.05) Adjusted to the west to also avoid the power lines. 7. Underground power shall maintain a minimum 5-foot horizontal clearance and a minimum 1-foot vertical clearance. Revise plans as necessary. Adjusted to the west. 8. Dimension width of proposed sawcut. Added 9. Note fire main hot tap at point of connection shall be the epoxy coated tapping sleeves. Added 10. Add note to locate all underground utilities(4.3-14) Added 11. Enlarger scale of plans for clarity(1,,=10'). Resized 12. Add Standard Water Notes to Plans(1-3.11). Added to Cover 13. Show existingwater service line from meter. Added the approximate line and noted it as such. Sewer Comments—Joe Wilson Qwilson@arlingtonwa.gov): 14. No sewer comments. Page 1 of 1