Loading...
HomeMy WebLinkAbout11-28-2011_Council Workshop Packet SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER / PLEDGE OF ALLEGIANCE/ROLL CALL APPROVAL OF THE AGENDA WORKSHOP ITEMS ~ NO FINAL ACTION WILL BE TAKEN 1. (5 min) Interlocal Agreement with Stillaguamish Tribe of Indians ATTACHMENT A adopting a framework for a government-to-government relationship 2. (5 min) TIB Grant Award for 67th Ave NE Phase III Project ATTACHMENT B 3. (5 min) 67th ROW, Package #3 ATTACHMENT C 4. (5 min) 2011 AC Water Main Project Closeout ATTACHMENT D 5. (5 min) Stillaguamish Overlay Project Closeout ATTACHMENT E 6. (5 min) 2011 Centennial Trail Project Closeout ATTACHMENT F 7. (20 min) Manufacturing/Industrial Center (MIC) Comprehensive ATTACHMENT G Plan Amendments 8. (10 min) Advanced Arlington Manufacturing Center Binding Site Plan ATTACHMENT H 9. (10 min) Sublease with Arlington Food Bank ATTACHMENT I 10. (5 min) Request for Authorization to apply for tourism grant funds ATTACHMENT J 11. (45 min) 2012 Budget 12. Miscellaneous Council items ADJOURNMENT To open all attachments, click here Arlington City Council Workshop November 28, 2011 – 7 PM City Council Chambers ~ 110 E. Third City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #1 ATTACHMENT A COUNCIL MEETING DATE: November 28, 2011 SUBJECT: Interlocal Agreement between the City of Arlington and the Stillaguamish Tribe of Indians adopting a framework for a government-to-government relationship DEPARTMENT OF ORIGIN: Executive Contact: Allen Johnson, City Administrator 360-403-3441 ATTACHMENTS: - Proposed Interlocal Agreement between the City of Arlington and the Stillaguamish Tribe of Indians adopting a framework for a government-to-government relationship EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: -0- LEGAL REVIEW: City Attorney’s review is pending DESCRIPTION: The City and the Stillaguamish Tribe have developed a strong working relationship that both parties would like to memorialize in a formal Interlocal Agreement between the two governments. The ILA seeks to provide the two governments with a framework to discuss issues of common concern and seek solutions to these common concerns. HISTORY: The Stillaguamish Tribe of Indians and the City of Arlington have partnered on a number of projects and activities over the years. Recent cooperative efforts have included the repaving of Stillaguamish Avenue and Smokey Point Blvd. ALTERNATIVES: RECOMMENDED ACTION: Review proposed Interlocal Agreement and recommend placement on the December 5, 2011 Council Agenda for formal action. INTERGOVERNMENTAL AGREEMENT Between THE STILLAGUAMISH TRIBE OF INDIANS And the CITY OF ARLINGTON l. PREAMBLE AND GUIDING PRINCIPLES This intergovernmental agreement is made between the Stillaguamish Tribe of Indians ("the Tribe"), and the City of Arlington (“City") to provide a framework for a government-to- government relationship between two Parties. The Parties acknowledge that the Tribe has been in this territory since Time Immemorial; and, that the City was incorporated in 1903, but was populated by settlers well before Treaty-times; and, that the site of the City, the confluence of the North and South Forks of the Stillaguamish River was an historic trading site. The City of Arlington is a political subdivision of the State of Washington exercising the authorities and responsibilities identified in the Washington Constitution and provided for under state law and city ordinance. The Stillaguamish Tribe of Indians is a federally recognized Indian Tribe exercising its authorities and responsibilities identified in the Constitution and Bylaws of the Stillaguamish Tribe of Indians and provided for under federal law. II. PURPOSE AND OBJECTIVES The purpose of this Agreement is to establish a government-to-government forum for authorized representatives from each participating governmental body to discuss issues of common concern and to seek solutions to these common concerns. To this end the following objectives have been defined: l) To conduct discussions in a government-to-government setting in which issues, problems and other subjects may be freely addressed without either party making commitments or agreeing to take actions outside of the formal and legal processes defined for each Party by applicable law; 2) To share information in a consultative and deliberative process through the exchange of communications (written, verbal, visual and electronic) as they pertain to issues, problems or other subjects mutually agreed to between the Parties; 3) To gain knowledge within each Party’s organization about how the other organization functions, including familiarity with organizational structure, roles and responsibilities, staff and legal authorities. III. IMPLEMENTATION PROCESS AND RESPONSIBILITIES Each Party will prepare a list of topics, including issues, problems and other subjects it proposes to discuss in accordance with the objectives of this agreement. Both Parties will then meet to set an agenda, schedule, ground rules, and goals for further discussion. At any point in such discussions either Party may withdraw or otherwise terminate discussions with or without explanation. When discussions require policy decisions by the respective Parties a request shall be made by one governing body to the other which includes the reasons policy decisions are sought and a suggested schedule form making those decisions. Each Party then will follow its legal process tor decision—making. Policy decisions shall be communicated in a timely fashion. At least once per year the Parties shall meet for the purpose of reviewing progress in implementation of this agreement. At such meetings, or at such other times as are appropriate, recommendations for changes to this Agreement may be discussed and implemented. Each Party to this Agreement will designate an individual responsible for facilitating the implementation of this agreement. The Tribe designates its Executive Director. The City designates its Administrator. IV LEGAL STATUS AND DISCLAIMERS ln executing this agreement, neither Party waives any rights, including treaty rights, sovereign immunity, and jurisdiction. Nor does this Agreement diminish any rights or protections under federal and state law; nor does this Agreement create any rights which could be construed as enforceable. Through this Agreement the Parties to the Agreement strengthen their collective ability to successfully resolve issues of mutual concern. [signature blocks] City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #2 ATTACHMENT B COUNCIL MEETING DATE: November 28 , 2011 SUBJECT: Washington State Transportation Improvement Board (TIB) Grant Award Notification – 67th Ave PH III DEPARTMENT OF ORIGIN: Public Works – Utilities Division James Kelly ATTACHMENTS: • Notification Letter • List of TIB awardees EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: Transportation Improvement – 310 Water/Sewer Capital Contribution LEGAL REVIEW: Pending Final Review by City Attorney DESCRIPTION – Grant award notification letter from the Washington State Transportation Improvement Board informing the City that it has been awarded a grant funding in the amount of $6,049,731 to fund construction of the 67th Avenue Project. HISTORY: In continuation of the 67th Ave, Phase 3 project, staff has been soliciting funding for construction of the 67th Ave, Phase 3 road improvements. Earlier this year staff submitted a grant application to the Washington State Transportation Improvement Board for $6,049,731 under their corridor program. ALTERNATIVES: Do not accept the grant. RECOMMENDED ACTION: Informational only, no action requested. Page 1 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost ABERDEEN EPP FY 2013 Expanded Preservation Project Multiple Locations $307,150 $440,850 ABERDEEN EPP FY 2013 Expanded Preservation Project Multiple Locations $177,900 $251,800 ALMIRA SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $79,000 $79,000 ARLINGTON UCP 67th Avenue NE/E Maple Street 204th St to Olympic Ave $6,049,731 $8,981,447 ASOTIN SCAP Second Street Cleveland St to Memorial Bridge $271,509 $285,798 AUBURN Rapid Action M Street SE 3rd St SE to 8th St SE $3,000,000 $16,984,800 BATTLE GROUND Rapid Action SE Grace Avenue Phase 1 SE Rasmussen Blvd to Eaton Blvd $3,359,791 $5,289,791 BELLEVUE UCP NE 4th Street 116th Ave NE to 120th Ave NE $3,000,000 $31,791,047 BELLEVUE SP NE 8th Street Frontage of 11839 NE 8th St $124,465 $165,996 BELLINGHAM UCP West Bakerview Road Pacific Hwy to Bennett Dr $1,500,000 $3,200,000 BRIDGEPORT SCPP FY 2013 Overlay Project Multiple Locations $89,800 $89,800 CAMAS UCP NW 38th Avenue/SE 20th Street SE Armstrong St to 500' e/o 192nd Ave $1,750,000 $3,512,500 CHEHALIS EPP FY 2013 Expanded Preservation Project Multiple Locations $282,741 $314,157 CHELAN COUNTY SP Penny Road Easy St to Euclid Ave $330,902 $413,628 CHENEY EPP FY 2013 Expanded Preservation Project Multiple Locations $115,715 $128,572 CLARK COUNTY UAP NE 10th Avenue NE 141st St to NE 149th St $2,000,000 $5,146,250 CLARKSTON UAP 12th Street Chestnut St to Highland Ave $500,000 $555,556 CLYDE HILL SCSP NE 24th Street 92nd Ave NE to 98th Ave NE $125,000 $310,000 COLLEGE PLACE UAP College Avenue & Rose Street Myra Rd to Whitman Dr $900,000 $4,947,000 COLLEGE PLACE EPP FY 2013 Expanded Preservation Project Multiple Locations $324,397 $360,441 COLTON SCAP Rimrock Street Broadway (SR 195) to McKinley St $680,000 $690,000 CONCRETE SCAP Main Street Superior Ave to Cupples Alley $963,410 $1,014,747 CONCRETE SCSP Superior Avenue Airport W to north 350' on Superior Ave $381,135 $401,196 COUPEVILLE SCAP Madrona Way Broadway Ave to Town Limits $454,195 $493,105 Transportation Improvement Board FY 2013 Funded Applications Page 2 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost Transportation Improvement Board FY 2013 Funded Applications DARRINGTON SCAP Sauk Avenue SR 530 to Riddle and Darrington to Fir St $743,568 $782,703 DAVENPORT SCSP Third Street Morgan St (SR 2) to Lincoln Hospital $129,529 $136,348 DAYTON SCPP FY 2013 Seal Coat Project Multiple Locations $69,621 $73,285 DES MOINES UAP South 216th Street 18th Ave S to 24th Ave S $4,000,000 $7,479,699 DUVALL EPP FY 2013 Expanded Preservation Project Multiple Locations $260,667 $289,630 EAST WENATCHEE UAP Eastmont Avenue 3rd St NE to 9th St NE $3,825,000 $4,500,000 ELECTRIC CITY SCPP FY 2013 Seal Coat Project Multiple Locations $50,302 $50,302 EPHRATA EPP FY 2013 Expanded Preservation Project Multiple Locations $234,289 $246,620 EVERSON SCPP FY 2013 Seal Coat Project Multiple Locations $35,308 $37,166 EVERSON SCAP North Washington Street Main St to 3rd St $535,515 $563,700 GARFIELD SCPP FY 2013 Overlay Project Multiple Locations $57,131 $57,131 GIG HARBOR Rapid Action Point Fosdick Drive NW & 56th Street NW Olympic Dr NW to 56th NW to Olympic Dr NW $2,590,717 $4,213,787 GOLDENDALE SCAP East Collins Drive South Roosevelt Ave to Allison Way $450,000 $500,000 GOLDENDALE SCPP FY 2013 Seal Coat Project Multiple Locations $46,546 $48,996 GRAND COULEE SCSP Spokane Way SR 155 to Federal Ave $204,250 $215,000 GRANDVIEW EPP FY 2013 Expanded Preservation Project Multiple Locations $200,146 $210,680 GRANITE FALLS SCAP South Granite Avenue Wallace St to City Limits $757,873 $797,762 HAMILTON SCPP FY 2013 Overlay Project Multiple Locations $109,650 $109,650 HOQUIAM EPP FY 2013 Expanded Preservation Project Multiple Locations $227,638 $239,619 ILWACO SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $57,902 $60,950 IONE SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $49,500 $49,500 IONE SCAP Houghton Street Railroad Crossing to SR 31 $508,875 $508,875 KAHLOTUS SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $71,000 $89,838 KALAMA SCPP FY 2013 Seal Coat Project Multiple Locations $67,735 $71,300 Page 3 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost Transportation Improvement Board FY 2013 Funded Applications KALAMA SCAP North 4th Street Geranium St to High School $748,933 $788,350 KENNEWICK Rapid Action Steptoe Street (Phase 2) West 4th Ave to Center Parkway $2,561,640 $4,269,400 KENT UAP 72nd Avenue S South 196th St to South 200th St $1,182,420 $1,970,700 KIRKLAND UCP NE 120th Street Slater Ave NE to NE 124th Ave $800,000 $5,700,000 KITSAP COUNTY Rapid Action Newberry Hill Road/Silverdale Way/Chico Way Roundabout $1,258,321 $1,572,902 LA CENTER SCPP FY 2013 Overlay Project Multiple Locations $125,000 $685,174 LACEY SP Yelm Highway SE Ruddell Rd to Titleist Lane SE $187,023 $295,802 LACROSSE SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $36,136 $36,136 LAKEWOOD Rapid Action Murray Road SW and 150th Street SW 146th St SW to Spring St SW $750,000 $1,350,000 LANGLEY SCPP FY 2013 Overlay Project Multiple Locations $99,068 $104,282 LATAH SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $10,731 $10,731 LATAH SCAP Main Street SR 27 to Anderson $497,300 $497,300 MAPLE VALLEY Rapid Action Maple Valley Highway (SR 169) Witte Rd to 228th Ave SE $1,083,018 $1,870,080 MESA SCAP May Avenue Pepiot Rd to Manton Way $694,815 $729,815 MILTON EPP FY 2013 Expanded Preservation Project Multiple Locations $363,521 $403,912 MONTESANO SCAP Main Street Wynoochee Ave to Marcy Ave $750,000 $1,285,775 MORTON SCPP FY 2013 Overlay Project Multiple Locations $89,520 $100,520 NOOKSACK SCPP FY 2013 Overlay Project Multiple Locations $122,936 $122,936 NORTH BEND EPP FY 2013 Expanded Preservation Project Multiple Locations $250,000 $277,778 NORTH BEND SP North Bend Way Downing Ave to Orchard St (north side only)$156,430 $208,574 OAKESDALE SCAP Front Street Steptoe St to McCoy St $496,250 $496,250 OLYMPIA UCP Boulevard Road 22nd Ave Roundabout $1,000,000 $4,880,500 OROVILLE SCPP FY 2013 Overlay Project Multiple Locations $81,011 $85,275 ORTING EPP FY 2013 Expanded Preservation Project Multiple Locations $222,993 $294,868 Page 4 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost Transportation Improvement Board FY 2013 Funded Applications OTHELLO EPP FY 2013 Expanded Preservation Project Multiple Locations $199,464 $209,962 PACIFIC EPP FY 2013 Expanded Preservation Project Multiple Locations $125,996 $139,996 PACIFIC UAP Stewart Road Thornton Ave to Valentine Ave $2,962,732 $3,291,925 PALOUSE SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $88,000 $93,000 PASCO UCP 4th Avenue Court St to Sylvester St $700,000 $1,200,000 PATEROS SCPP FY 2013 Seal Coat Project Multiple Locations $71,000 $71,000 PIERCE COUNTY Rapid Action Pioneer Way E Waller Road E Intersection $814,000 $1,809,000 PIERCE COUNTY Rapid Action Wollochet Drive NW 600' n/o East Bay Dr NW to 400' n/o Fillmore Dr $2,150,000 $4,740,000 PROSSER EPP FY 2013 Expanded Preservation Project Multiple Locations $230,000 $242,105 PROSSER UAP Sheridan Avenue 6th St to Wine Country Rd $834,885 $927,650 PUYALLUP UAP 39th Avenue SW 11th St SW to 17th St SW $3,179,916 $3,974,896 REARDAN SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $93,632 $93,632 REDMOND UCP NE Union Hill Road 188th Ave NE to 192nd Ave NE $3,183,000 $3,979,257 RENTON Rapid Action S Lake Washington Road and I/S Improvements Garden Ave N, Logan Ave N, Lake Washington Blvd I/S $1,755,496 $2,194,370 RENTON Rapid Action Strander Boulevard Extension Naches Ave SW to Sounder Commuter Station $1,650,000 $17,702,557 ROSALIA SCPP FY 2013 Overlay Project Multiple Locations $81,250 $81,250 SAMMAMISH Rapid Action 244th Avenue NE NE 11th St to NE 20th St $1,107,000 $1,845,000 SEATTLE UCP 5th Avenue N (Mercer Corridor West project) Roy St to Thomas St $5,000,000 $9,930,000 SEATTLE SP Ravenna Avenue NE NE 82nd St to Lake City Way NE $300,000 $1,294,972 SEDRO WOOLLEY EPP FY 2013 Expanded Preservation Project Multiple Locations $163,825 $182,028 SELAH EPP FY 2013 Expanded Preservation Project Multiple Locations $200,000 $222,222 SEQUIM EPP FY 2013 Expanded Preservation Project Multiple Locations $261,115 $290,128 SHORELINE UCP Aurora Avenue N (SR 99) N 192nd St to N 200th St $6,000,000 $19,334,210 SKAGIT COUNTY Rapid Action Anderson/LaVenture Road Cedardale Rd to Blackburn Rd $5,500,000 $10,000,000 Page 5 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost Transportation Improvement Board FY 2013 Funded Applications SNOHOMISH Rapid Action Avenue D First St Intersection $657,900 $774,000 SOAP LAKE SCAP Main Avenue Daisy St to Aster St $611,000 $650,000 SOUTH BEND SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $47,060 $47,060 SOUTH PRAIRIE SCAP Emery Ave/3rd St/Tubbs Rd Pioneer Way to Town Limits $292,085 $292,085 SPANGLE SCPP FY 2013 Overlay Project Multiple Locations $98,819 $98,819 SPOKANE UCP Martin Luther King Jr Way Phase 2 Sherman Ave to Perry St $2,700,000 $10,247,800 SPOKANE COUNTY Rapid Action Wall Street/Waikiki Road/Mill Road Country Homes Blvd to Hastings Rd $1,476,999 $2,257,025 SPOKANE VALLEY UCP Mansfield Avenue Pines Rd (SR 27) to 200' e/o Houk Rd $792,700 $1,976,800 SPOKANE VALLEY Rapid Action Sprague Avenue Evergreen Rd to Sullivan Rd $3,091,900 $3,864,900 SPRAGUE SCPP FY 2013 Overlay Project Multiple Locations $155,250 $155,250 ST. JOHN SCAP Park Avenue Nob Hill St to Park St Bridge $589,000 $620,000 STANWOOD EPP FY 2013 Expanded Preservation Project Multiple Locations $77,117 $85,685 STEILACOOM EPP FY 2013 Expanded Preservation Project Multiple Locations $125,000 $278,012 STEILACOOM Rapid Action Sequalish Street/Lexington Street Main St to Roe St $1,152,278 $2,057,325 THURSTON COUNTY UCP Steilacoom Road SE Pacific Ave SE to Marvin Rd SE $2,360,062 $3,371,522 TONASKET SCAP 3rd Street, 5th Street, 6th Street, Western Avenue Western Ave to Whitcomb Ave (SR 97)$361,871 $380,917 TOPPENISH EPP FY 2013 Expanded Preservation Project Multiple Locations $190,000 $200,000 TUKWILA UCP Andover Park W Tukwila Pkwy to Strander Blvd $1,420,000 $2,580,000 TUMWATER UCP Capitol Boulevard (Old Hwy 99) Tumwater Blvd to 300' s/o 73rd Ave $1,444,661 $2,252,556 TUMWATER UCP Trosper Road I-5 to Capitol Blvd $745,475 $1,146,885 UNION GAP EPP FY 2013 Expanded Preservation Project Multiple Locations $396,000 $440,000 WAPATO SCPP FY 2013 Overlay Project Multiple Locations $270,000 $284,211 WARDEN SCPP FY 2013 Sidewalk Maintenance Project Multiple Locations $100,000 $105,263 WASHTUCNA SCSP Main Street (SR 260) Spring Ave to May Ave $335,350 $360,350 Page 6 of 6 November 18, 2011 Agency Program Project TIB Funds Project Cost Transportation Improvement Board FY 2013 Funded Applications WATERVILLE SCPP FY 2013 Overlay Project Multiple Locations $124,649 $124,649 WENATCHEE UCP Worthen Street and Orondo Avenue Columbia St to 800' n/o and 300' s/o Orondo Ave $846,732 $1,187,873 WINLOCK SCPP FY 2013 Overlay Project Multiple Locations $76,056 $76,056 WINTHROP SCAP Castle Avenue Center St to Roses Hill Intersection $612,750 $645,000 WOODINVILLE UAP NE Woodinville-Duvall Road 400' w/o 156th Ave NE to 30' e/o 171st Pl NE $4,500,000 $8,004,000 YAKIMA UCP West Nob Hill Boulevard 49th Ave to 64th Ave $2,400,000 $3,217,128 YELM EPP FY 2013 Expanded Preservation Project Multiple Locations $180,641 $200,712 YELM UAP Mosman Avenue SW Railroad St to SE 2nd St $990,501 $1,312,040 Total $121,489,836 $268,360,165 City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #3 ATTACHMENT C COUNCIL WORKSHOP DATE: November 28, 2011 SUBJECT: 67th Avenue – ROW Easements & Dedications DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: • Handout Packages at Council Workshop EXPENDITURES REQUESTED: $59,130.00 BUDGET CATEGORY: Transportation Improvement Fund (13.5%) and STP Grant (86.5%) LEGAL REVIEW: Pending final review by City Attorney DESCRIPTION: Council will be presented with information on the easement and dedication Package #3 for the 67th Ave Phase III project. HISTORY: As part of the 67th Ave, Ph III project, the City needs to acquire additional permanent right of way and easements for road and sidewalk construction and staging. The ROW procurement must follow WSDOT guidelines; in order to accomplish this by an independent third party facilitated discussions with property owners for the necessary ROW procurements. We have the below ROW agreements that are ready to have these signed by the mayor and appropriate payments made. Property Amount Alspach, James $ 1,500.00 Stillaguamish Valley Assn $ 55,230.00 Kjolso, Larry & Pamela $ 2,400.00 TOTAL $ 59,130.00 ALTERNATIVES: • Remand to staff for additional information • Table pending additional discussion RECOMMENDED ACTION: No Action at this time – discussion only. At the December 5, 2011 Council meeting it will be recommended that Council pass a motion approving, and authorizing the mayor to sign, the 67th Ave Phase 3 project Right-of-Way, Easement, and Real Estate transactions negotiated by the City of Arlington and their real estate transaction agent, HDR, Inc., for the Alspach, Stillaguamish Valley Assn., and Kjolso properties, pending final review by the City Attorney. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #4 ATTACHMENT D COUNCIL WORKSHOP DATE: November 28, 2011 SUBJECT: 2011 AC Water Main Replacement Project Construction Acceptance DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: • Handout at workshop (draft Construction Acceptance Letter) EXPENDITURES REQUESTED: None BUDGET CATEGORY: 405 – Water CIP Fund LEGAL REVIEW: Pending Final review by City Attorney DESCRIPTION: Project acceptance letter for the 2011 AC Water Main Replacement Project that was completed by Welch Brothers Excavation . HISTORY: Following a competitive bid, Welch Brothers Excavation was award the 2011 AC Water Main Replacement Project. The project has been completed to the terms of the contract and to the satisfaction of the City. A summary of the construction costs is as follows: 2011 Project Funding $ 400,000.00 Engineer’s Estimate $ 361,986.80 Final Construction Cost $ 357,339.08 ALTERNATIVES: • Remand to staff for additional information • Table pending further discussion RECOMMENDED ACTION: No action is requested at this time. Approval and authority for the Mayor to sign the Construction Acceptance Letter for the 2011 AC Water Main Replacement Project is scheduled for the December 5th, 2011 Council meeting. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #5 ATTACHMENT E COUNCIL WORKSHOP DATE: November 28, 2011 SUBJECT: Stillaguamish Avenue Overlay Project Construction Acceptance DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: • Handout at workshop (draft Construction Acceptance Letter) EXPENDITURES REQUESTED: None BUDGET CATEGORY: Transportation Improvement Fund LEGAL REVIEW: Pending Final review by City Attorney DESCRIPTION: Project acceptance letter for the Stillaguamish Avenue Overlay Project that was completed by Lakeside Paving . HISTORY: Following a competitive bid, Lakeside Paving was award the Stillaguamish Avenue Overlay Project. The project has been completed to the terms of the contract and to the satisfaction of the City. A summary of the construction costs is as follows: City Funding $ 225,000.00 (2011 Overlay Budget) Stilly Tribe Funding $ 100,000.00 (IRR Funding from FHWA) Engineer’s Estimate $ 277,777.25 Final Construction Cost $ 242,212.50 ALTERNATIVES: • Remand to staff for additional information • Table pending further discussion RECOMMENDED ACTION: No action is requested at this time. Approval and authority for the Mayor to sign the Construction Acceptance Letter for the Stillaguamish Avenue Overlay Project is scheduled for the December 5th, 2011 Council meeting. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #6 ATTACHMENT F COUNCIL WORKSHOP DATE: November 28, 2011 SUBJECT: 2011 Centennial Trail Project Acceptance DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: • Handout at workshop (draft Construction Acceptance Letter) EXPENDITURES REQUESTED: None BUDGET CATEGORY: Transportation Improvement Fund LEGAL REVIEW: Pending Final review by City Attorney DESCRIPTION: Project acceptance letter for the 2011 Centennial Trail Project that was completed by E&D Excavating . HISTORY: Following a competitive bid off of the small work roster, E&D Excavating was award the 2011 Centennial Trail Project. This project entailed construction of two missing trail sections; one section was between 172nd St and 168th St. and the other section was between 3rd St and 4th St. The project has been completed to the terms of the contract and to the satisfaction of the City. A summary of the construction costs is as follows: Engineer’s Estimate $ 119,567 Final Construction Cost $ 114,097 ALTERNATIVES: • Remand to staff for additional information • Table pending further discussion RECOMMENDED ACTION: No action is requested at this time. Approval and authority for the Mayor to sign the Construction Acceptance Letter for the 2011 Centennial Trail Project is scheduled for the December 5th, 2011 Council meeting. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #7 ATTACHMENT G COUNCIL MEETING DATE: November 28, 2011 SUBJECT: Manufacturing/Industrial Center (MIC) Comprehensive Plan Amendments (PLN20110007) DEPARTMENT OF ORIGIN: Community Development Contact: David Kuhl, Todd Hall ATTACHMENTS: 1. City Council Workshop Memo 2. Draft Amendments to Ch. 3: Goals & Policies (Land Use, Economic Development, Transportation) 3. Draft Amendments to Ch. 7: Land Use Element 4. Draft Figure 2-21: MIC Boundary 5. Draft Arlington-Smokey Point Manufacturing/Industrial Center Existing Conditions Report EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: N/A DESCRIPTION: Draft Comprehensive Plan Amendments to Chapters 3, 7 and addition of Figure 2-21, adopting the designation of a Manufacturing/Industrial Center. The Existing Conditions Report is not included in the amendments. It provides background information regarding the MIC and is a ‘snapshot’ of current conditions in the industrial area. HISTORY: Planning staff discussed the Comp Plan Amendments at the November 15, 2011 Planning Commission meeting. Previous discussions regarding the MIC were held on at both Planning Commission and City Council in August 2011. ALTERNATIVES: No action. RECOMMENDED MOTION: None proposed at this time. Planning Commission will hold a public hearing regarding the amendments on December 6, 2011. City Council will hold a public hearing and adopt the amendments on December 19, 2011. 11/21/2011 1 ArlingtonArlington--Smokey Point Smokey Point Manufacturing/Industrial CenterManufacturing/Industrial Center What is the MIC? •The designated area where the City identifies existing or expected intensive and concentrated •Includes all of the City’s GI (General Industrial), LI (Light Industrial), BP (Business Park) and AF (Aviation Flightline) zones, with some areas of HC (Highway Commercial) and GC (General Commercial) •The MIC area (shared with Marysville) has the potential to be Snohomish County’s 2nd largest manufacturing/industrial employment center (Paine Field #1) 11/21/2011 2 11/21/2011 3 Why create an MIC? •To receive potential funding from the Infrastructure Coordinatin Committee ICC •In order to be eligible for potential funding, the MIC must be identified in the Comprehensive Plan •Future collaboration between cities of Arlington and Marysville for regional MIC designation by Puget Sound Regional Council What is the ICC? •The Infrastructure Coordinating Committee is comprised of public works representatives of cities, SnoCo, Tulalip Tribes, PUD and WSDOT. The ICC coordinates planning, funding, and implementation of infrastructure and transportation systems in Snohomish County. What is PSRC? •Puget Sound Regional Council is the regional transportation, economic development and rowth management planning organization for the Puget Sound Region. They administer VISION 2040 and regional and manufacturing growth centers, as well as distribute funding by FHA and FTA. 11/21/2011 4 Comprehensive Plan Amendments Staff has drafted amendments to the Comp Plan •• identifying MIC •Chapter 3: Goals & Policies – New goals/policies for land use, economic development,and transportation •Chapter 7: Land Use Element – brief mention of the new MIC designation Land Use Policies •Pursue regional designation •Su ort concentrated manufacturin /industrial uses within the boundary •Mitigate impacts to residential uses through the use of design review and landscaping •80% of property within MIC shall be planned and zoned fo industrial 11/21/2011 5 Economic Development Goals & Policies •Pursue regional designation jointly with Marysville (goal) •Provide adequate infrastructure, support existing facilities and protect against incompatible uses •Policies and regulations that are coordinated with economic development strategies •Up-front information and streamline permitting to encourage new manufacturing and industrial growth Transportation Policies •Identify/implement short and long-term infrastructure improvements in MIC •Work collaboratively with Marysville •Use of low-impact development standards •Non-motorized network in MIC for access to adjoining neighborhoods •Landscaping to minimize noise and visual impacts •Regional designation with PSRC to access state/federal funding •Identify deficient areas for circulation •Encourage greater use of BNSF railroad 11/21/2011 6 Existing Conditions Report •Snapshot of existing conditions within the MIC designated area. •Report covers land use, zoning, development patterns, employment, transportation, and environmental conditions •Recommendations for goals and policies, as well as recommended amendments o land use regulations •Supporting background information only and not included in the amendments 11/21/2011 7 11/21/2011 8 •Current employment within the MIC is 3,427 • Employment / Residential • categorized as those found in industrial areas •Approximately 20% retail-oriented •Other 10% are services and government •Estimated 487 residents within the boundary (based on 2.87 persons/household). No permits for housing have been issued since 2005. 11/21/2011 9 Land Use/Transportation •Most of the area is underdeveloped and has over 1,200 acres that is likely to redevelop over the next 20 •Along with Marysville’s vacant land, the MIC- designated area has the capacity to handle the minimum employment target of 20,000 jobs •The MIC is ideall situated between ma o transportation corridors (SR 530/31, SR9, I-5), the airport is a major benefit, and the BNSF railway to serve existing and future business Regional Criteria •Minimum of 10,000 existing jobs ••, •Compatibility with VISION 2040 & planned land use/zoning for manufacturing /industrial uses •Sub area plan and revised land use regulations to eliminate incom atible uses •Inclusion of MIC into Snohomish County CPPs. Recommendation to PSRC from Snohomish CountyTomorrow 11/21/2011 10 Next Steps •Planning Commission Dec.6 (public hearing) •City Council Nov. 28 (workshop) . •Proposed adoption by Council – January 3, 2012 Future Work (tentative) •Collaboration with Marysville •Land Use Code RevisionsLandUseCodeRevisions •Economic/Market Analysis •Council recommendation for regional designation •Meeting with PAC and SCT to gain support for PSRC Executive Board approval •SubArea Plan (within 2 years of regional designation City Council Workshop Memo Date: November 28, 2011 To: City Council From: David Kuhl, AICP, Community Development Director Todd Hall, Associate Planner Re: Arlington – Smokey Point Manufacturing/Industrial Center (MIC) – Comprehensive Plan Amendments (PLN20110007) & Existing Conditions Report INTRODUCTION The City is proposing to adopt the newly-designated Arlington-Smokey Point Manufacturing/Industrial Center (MIC), which identifies existing or expected intensive, concentrated manufacturing and industrial land uses. MIC’s are intended to accommodate a significant amount of regional employment. By locally designating the MIC, the City will be eligible for future Infrastructure Coordinating Committee (ICC)1 funding. To support the MIC designation, Planning staff has drafted amendments to the Comprehensive Plan. These include amendments to Chapter 3: Goals and Policies, Chapter 7: Land Use Element, and a new map (Figure 2-21) identifying the boundaries of the MIC. Planning staff has also drafted an Existing Conditions Report, which discusses the existing conditions within the proposed designated area including land use, zoning, development patterns, employment, transportation, and environmental conditions. The report is provided as background information only, and is not included in the amendments. The MIC Comprehensive Plan Amendment is listed on the 2011 Comprehensive Plan docket which was adopted by City Council in March 2011. 1 ICC is a standing committee comprised of public works representatives of the cities, the County and the Tulalip Tribes. Representatives from PUD and WSDOT also serve on the committee. The mission of the ICC is to coordinate the planning, funding and implementation of infrastructure and transportation systems in Snohomish County. Community Development Planning Division November 28, 2011 City Council Workshop FUTURE PSRC and SCT DESIGNATION CRITERIA Locally designating the MIC in the City’s Comprehensive Plan is the first step in a multi -step process. During the upcoming year, the City will collaborate with the City of Marysville in order to apply for a regional MIC designation by the Puget Sound Regional Council. The Puget Sound Regional Council (PSRC) administers the designation of both Regional Growth Centers (areas of concentrated housing and employment) and Manufacturing/Industrial Centers (areas of intensive commercial and industrial activity). Centers are identified in VISION 2040, which is the planning document published by PSRC that establishes an integrated, long range vision for growth in the Puget Sound region. To be eligible for consideration as a regionally-designated MIC by PSRC, an area must meet specific criteria. Criteria include compatibility with VISION 2040 2, planned land use and zoning for manufacturing and industrial uses, commitment to center planning, and employment thresholds. The employment threshold for PSRC designation is a minimum of 10,000 existing jobs and a minimum employment target of 20,000 jobs. Currently, the proposed MIC area does not meet the threshold for existing jobs. However, the City is negotiating with PSRC to explore some flexibility of this requirement. Snohomish County Tomorrow (SCT), a collaborative public inter-jurisdictional forum, reviews and recommends proposed MICs for approval to PSRC. County centers are identified in the Countywide Planning Policies (CPP) and the Snohomish County Comprehensive Plan. To be recognized as a County MIC, the area must meet requirements, although less restrictive than PSRC, as outlined in the Economic Development and Employment chapter of the CPPs. Once the designated area receives a recommendation by SCT, the MIC proposal would move forward to PSRC to be considered for regional designation. NEXT STEPS Planning staff will hold a public hearing at the Planning Commission meeting on December 6th concerning the proposed Comprehensive Plan amendments. City Council will hold a public hearing to consider public comment on December 19th. The amendments will be presented to City Council for consideration of adoption on January 3, 2012. 2 According to PSRC’s website, ‘VISION 2040 is a regional strategy for accommodating the additional 1 .7 million people and 1.2 million new jobs expected to be in the region by the year 2040.VISION 2040 is an integrated, long- range vision for maintaining a healthy region – promoting the well-being of people and communities, economic vitality, and a healthy environment. It contains an environmental framework, a numeric regional growth strategy, six policy sections guided by overarching goals as well as implementation actions and measures to monitor progress.’ November 28, 2011 City Council Workshop Attachments: A. Staff Memorandum B. DRAFT Amendments to Chapter 3: Goals and Policies (Land Use, Economic Development, Transportation) C. DRAFT Amendments to Chapter 7: Land Use Element D. DRAFT Figure 2-21: MIC Boundary E. DRAFT Arlington-Smokey Point Manufacturing/Industrial Center Existing Conditions Report (background information only, not part of amendments) 12/5/05 Land Use Page 9 Goal/Policy PN D SR R- L M D R- M D R- H D OT OT B D - 1 OT B D - 2 OT B D - 3 NC GC HC BP LI GI MS AF P/ S P Applicable Land Use Designations PL-10.1 Other than Neighborhood Commercial or in new UGA expansion areas,all new commercial land use designations shall be placed on land adjacent to existing commercially designated land in order to prevent a "leap-frog" or strip development. X X X X X PL-10.2 Discourage strip development and encourage nodal development.X X X X X X GL-11 PL-11.1 Allow the redesignation and rezoning of appropriate property to the neighborhood commercial zone when a proposal meets all of the following criteria and any others as listed in the Zoning Code: X Neighborhood Commercial zones shall be located on an intersection of two public rights-of- way, one of which must have a roadway classification of Arterial or greater. No property may be zoned Neighborhood Commercial if there is at least one other property with a similar zone allowing comparable services within a radius of one-half mile. No more than one acre of land may be zoned for Neighborhood Commercial at any intersection. PL-11.2 Neighborhood Commercial is not a euphemism for "convenience store commercial," and it is the intent of this policy to promote pedestrian-oriented commercial uses catering to a neighborhood, not commuters. Proposed uses shall clearly reflect this intent. X Industrial Land Use GL-12 PL-12.1 Locate and develop industrial land uses in the vicinity of Arlington Airport to take advantage of existing and anticipated transportation systems.X X X PL-12.2 The amount of land planned and allocated for industrial use should be reasonably scaled to meet the demonstrated demand. Population and employment projections in the land use element clearly define land supply necessary to satisfy industrial growth over the next 20 years. X X X PL-12.3 Encourage industrial uses to share facilities such as internal roadways, parking facilities,and rail access.X X X PL-12.4 Encourage industries with high job numbers that support the local resource processing needs.X X X Promote Neighborhood Commercial uses in appropriate places. Maintain an sufficient industrial land base and continue the high ratio of jobs to households. 12/5/05 Land Use Page 10 Goal/Policy PN D SR R- L M D R- M D R- H D OT OT B D - 1 OT B D - 2 OT B D - 3 NC GC HC BP LI GI MS AF P/ S P Applicable Land Use Designations PL-12.5 Pursue the designation of the Arlington-Smokey Point Manufacturing Industrial Center (MIC)in the Snohomish County Countywide Planning Policies and regional designation by Puget Sound Regional Council (PSRC). X X X X X X X PL-12.6 Support the development and growth of the Arlington-Smokey Point MIC by supporting a concentrated manufacturing and industrial base and by planning for future growth and infrastructure improvements. X X X X X X X PL-12.7 Develop appropriate zoning, design review and landscaping regulations so that manufacturing uses within the MIC are buffered from the impacts to residential uses.X X X X X X X PL-12.8 Ensure at least a minimum of 80% of the property within the MIC is planned and zoned for industrial and manufacturing uses. Compatible non-industrial uses shall be conditioned to mitigate for potential conflicts with current and future industrial uses. X X X X X X X GL-13 PL-13.1 Explore and use economic or other incentive programs that would encourage appropriate industrial development.X X X PL-13.2 Encourage the development of planned industrial parks.X X X Promote an active and diverse industrial district in order to promote economic growth. 12/5/05 Econonomic Development Page 4 PE-5.9 Promote the merchants’ involvement in ongoing economic development strategies.X X X PE-5.10 The City should also become an active sponsor and promoter of new retail businesses that offer a mix of goods and services that people in the area want and need, focusing on the balance of factors that will result in an economically successful retail center with the prospects for long-term economic health. X X X Smokey Point/SR-531 Corridor PE-5.11 Work towards Smokey Point becoming a Subregional Center pursuant to PSRC's designation.X X PE-5.12 We ought to do everything possible to get the SR-531 x I-5 interchange built so as to be able to attract and handle the commercial capacity of the Smokey Point/SR-531 Commercial Corridor. X X X X X Airport/Industrial Area PE-5.13 Remember that the industrial zoning and uses were here long before most of the residential areas were built around it.We need to protect the GI district from encroaching residential uses and the complaints that follow.Embrace General Industrial uses within the existing GI district as long as impacts are mitigated and performance standards adhered to. X PE-5.14 Accept the fact that GI uses are generally not always pretty.However,this doesn’t mean the public views from rights-of-way (entrances and perimeters) can’t be spruced up and aesthetically pleasing. X PE-5.15 As for our Light Industrial and Business Park areas,which tend to provide higher wage jobs and higher number of jobs per acre,this district can be used as buffer between GI or airport and residential districts where feasible.We should aim for cleaner uses than in the GI district and all uses should be indoors. X X PE-5.16 Continue to diversify the City’s industrial base and protect our General Industrial area from becoming so restrictive that traditional industrial businesses find it undesirable. X X PE-5.17 Capitalize on the availability of rail transportation and the airport as a draw for high-wage paying industrial businesses.X XPE-5.18 Seek a PSRC designation of Manufacturing/Industrial Center,perhaps jointlywiththeCityofMarysville,which is planning for additional industrial/businessparklandusedesignationsfortheareaofitsUGAthatabutsourindustrialarea.Such a designation would open up additional funding opportunities forinfrastructure.X X X Kent Prairie PE-5.19 Work with property owners to develop a plan,the goal of which would be to reduce the standard ESA-buffers on some of the developable lands through which diked streams run in exchange for larger buffers and improved habitat on parcels that are less developable 12/5/05 Econonomic Development Page 5 West Bluff Industrial Area PE-5.20 The City should encourage and facilitate the annexation of the West Bluff subarea.X Hilltop Neighborhood PE-5.21 In the future, as the City grows,the properties around the SR-9 x SR-531 intersection will become centralized around many residential neighborhoods. Commercial uses at this intersection will become essential to serving these neighborhoods, and the commercial designations should maintained, even if commercial development is not imminent. X Airport GE-6 PE-6.1 Encourage the growth of the airport as an employment center by considering innovative public/private partnerships,tax incentives, and economic development planning to promote this growth. X X X PE-6.2 Promote Arlington Municipal Airport as Washington’s Premier General Aviation Airport. Encourage development of the Flight Line property X X X PE-6.3 Develop a strategy to market the Airport along with the rest of the City.X X X PE-6.4 Bring recognition to Arlington by encouraging special events such as the NWEAA Fly-In and others.X X X Tourism GE-7 PE-7.1 Encourage the development of the County trail system to Darrington and the Skagit County line and promote Arlington as the hub for trail users. X X X X X X X X X X X X X X X X X X PE-7.2 Capitalize on our riverfront, riverfront parks (existing and potential), and trail systems and develop and promote Arlington as an outdoor recreation area.X X X X PE-7.3 Implement other action items in the Economic Development plan aimed at achieving this goal.X X X X X X X X X X X X X X X X X X Manufacturing/Industrial Center (MIC) GE-8 Seek regional PSRC designation of the 'Arlington-Smokey Point Manufacturing/Industrial Center (MIC), jointly with the City of Marysville, which is planning for additional manufacturing and industrial land uses south of the City of Arlington that abuts our industrial area. Such a designation would open up additional funding opportunities for infrastructure. As one of our economic development strategies, aim to increase the number of people coming to Arlington to contribute to the local economy. Ensure that the airport remains a viable employment and economic engine for the City of Arlington. 12/5/05 Econonomic Development Page 6 PE-8.1 Provide adequate infrastruture, support existing facilities and services and protect the MIC area against incompatible uses in order to maintain and attract new manufacturing and industrial businesses and will help Arlington continue to be a place to live, work and play. X X X X X X X PE-8.2 Develop policies and regulations that are coordinated with economic development strategies to encourage growth and sustain manufacturing and industrial businesses in Arlington. X X X X X X X PE-8.3 The City should make every effort to provide up-front economic information, site development data, and streamline permit processing in order to assist existing and help develop new manufacturing and industrial businesses in the MIC. X X X X X X X 12/5/05 Transportation Page 8 Goal/Policy PN D SR R- L M D R- M D R- H D OT OT B D - 1 OT B D - 2 OT B D - 3 NC GC HC BP LI GI MS AF P/ S P Applicable Land Use Designations PT-12.5 If funding is unavailable, or if development is progressing beyond the ability to provide sufficient transportation facilities, the City should consider development moratoriums, as necessary, until the transportation facilities can be brought into alignment with approved LOS. X X X X X X X X X X X X X X X X X X PT-12.6 Direct resources to ensure that existing transportation system is maintained adequately.X X X X X X X X X X X X X X X X X X Air Quality GL-13 PT-13.1 The quality of air in and around the Puget Sound region is an important factor in the high quality of life enjoyed by residents living in our community. To help enhance and maintain high air quality standards, Arlington commits to meeting federal and state air quality requirements and will work with the state, region and local agencies or jurisdictions to develop transportation control measures and/or similar mobile source emission reduction programs that may be warranted to attain or maintain air quality requirements. X X X X X X X X X X X X X X X X X X PT-13.2 The City's transportation system shall conform to the federal and state Clear Air Acts by maintaining its conformity with the Metropolitan Transportation Plan of the Puget Sound Regional Council and by following the requirements of Chapter 173-420 of the Washington Administrative Code, which may include development of transportation control measures and air quality programs. X X X X X X X X X X X X X X X X X X Manufacturing/Industrial Center (MIC) GL-14 PT-14.1 Identify and implement short-term and long-range infrastructure improvements that supports existing and helps stimulate the development of new manufacturing and industrial uses in the MIC. X X X X X X X PT-14.2 Work collaboratively with the City of Marysville to develop a seamless and compatible road network in order to efficiently move goods and services within and outside the MIC.X X X X X X X PT-14.3 Develop a street design that incorporates low-impact development standards which reduces surfacewater and enhances aesthetics of the area.X X X X X X X PT-14.4 Implement a non-motorized network throughout the area that allows pedestiran and cyclists to access adjoining businesses and neighborhoods.X X X X X X X PT-14.5 Require landscaping along roadways and between properties that are adjacent to neigbhoroods to reduce noise and visual impacts.X X X X X X X PT-14.6 Achieve regional MIC designation with PSRC to allow access to state and federal transportation infrastructure funding.X X X X X X X Ensure that development of the MIC supports the movement of goods is compatible with adjacent neighborhoods and promotes a multi-modal transportation Minimize air quality impacts caused by the transportation system. 12/5/05 Transportation Page 9 Goal/Policy PN D SR R- L M D R- M D R- H D OT OT B D - 1 OT B D - 2 OT B D - 3 NC GC HC BP LI GI MS AF P/ S P Applicable Land Use Designations PL-14.7 Ensure that future roadway development allows for the movement of large trucks. Identify and address areas that are deficient in design or hinders circulation and access.X X X X X X X PL-14.8 Encourage existing and new businesses to utilize the BNSF railroad spur as useful resource to move goods and services within and outside the MIC. X X X X X X X PT-14.9 Design both motorized and non-motorized facilities in a manner that allows for the safe and efficient movement of freight and people, while minimizing conflicts with railroad crossings.X X X X X X X Chapter 7: Land Use Element 7.1 PURPOSE OF THIS CHAPTER ........................................................................................ 7-1 7.2 MAJOR LAND USE CONSIDERATIONS ........................................................................... 7-1 7.3 EXISTING CONDITIONS ................................................................................................. 7-2 7.3.1 Land Use Designations .......................................................................................... 7-2 7.3.2 Residential Land Capacity Analysis (Buildable Lands) ......................................... 7-8 7.3.3 Residential Density .............................................................................................. 7-10 7.3.4 Household Size .................................................................................................... 7-10 7.3.5 Employment Land Capacity Analysis (Buildable Lands) .................................... 7-10 7.3.6 Jobs/Housing Ratio .............................................................................................. 7-10 7.4 PROJECTED NEEDS ................................................................................................... 7-10 7.4.1 2025 Population Target ....................................................................................... 7-10 7.4.2 Residential Land .................................................................................................. 7-10 7.4.3 Employment Land ................................................................................................ 7-11 7.4.4 Public Land .......................................................................................................... 7-12 7.5 W HAT W E W OULD LIKE TO ACHIEVE .......................................................................... 7-13 7.5.1 UGA Expansion ................................................................................................... 7-13 7.5.2 Revised Land Use Map ................................................................................... 7-1918 7.5.3 Protection of the Stillaguamish River Valley ....................................................... 7-19 7.5.4 Subarea Plans ..................................................................................................... 7-20 7.5.5 Manufacturing/Industrial Center ……………………………………………………7-25 City of Arlington Comprehensive Plan Land Use Element Background Materials 7 - 25 5 December 2005 7.1.1.337.5.4.12 Island Crossing Subarea The Council has long supported Island Crossing being drawn into the UGA and an- nexed to the City, and it is still their intent. The plan has been, and remains, for it to be designated and zoned as Highway Com- mercial. It is recognized that there are development hurdles to overcome, most notably the fact that much of the area is within the 100-year floodplain. However, the City has adopted FEMA‘s model flood ordinance and believes we could better manage development of this area than other agencies. There would also have to be substantial infrastructure im- provements made; but under the City‘s rules these must be borne by the developers. It should be noted that it is believed that if Island Crossing does not become part of the City, the Stillaguamish Tribe of Indians could purchase it and lease it back to the same people who are currently trying to de- velop it. If it were placed in trust there would be no local zoning, building, or other envi- ronmental regulations with which the devel- opment would have to adhere. 7.5.5 Manufacturing/Industrial Center Designation The Arlington-Smokey Point Manufactur- ing/Industrial Center (MIC) is a locally- designated area with which includes all in- dustrially-zoned land, the Arlington Munici- pal Airport, Airport Business Park, and some limited areas of commercial along 172nd St. NE (SR 531). The boundaries of this area are shown in Figure 2-21 of the Comprehensive Plan. The area encompasses approximately 2,291 acres, most of which is either zoned General Industrial or Aviation Flightline. The designation of this area as a MIC sup- ports concentrated uses for high intensity light and heavy manufacturing, while limiting large areas of retail and residential. MIC‘s are intended to accommodate a significant amount of regional employment and should be protected from incompatible uses. By locally designating the area as a MIC, the City will have access to Infrastructure Coor- dinating Committee (ICC) funding, which provides planning, funding and implementa- tion of infrastructure and transportation sys- tems. A joint-MIC, including industrial areas within the cities of Arlington and Marysville, may be considered in the future for County and regional designation once specific criteria established by Puget Sound Regional Council (PSRC) are met. City of Arlington Comprehensive Plan Figures & Maps 2 - 22 January 2012 Figure 2-21: Arlington-Smokey Point Manufacturing/Industrial Center (MIC) (Arlington boundary only) DRAFT ARLINGTON – SMOKEY POINT MANUFACTURING/INDUSTRIAL CENTER EXISTING CONDITIONS REPORT NOVEMBER 15, 2011 Arlington City Council / Planning Commission Arlington – Smokey Point MIC Existing Conditions Report 2 Arlington – Smokey Point MIC Existing Conditions Report 3 Table of Contents Introduction ............................................................................................................................................ 7 Regional MIC Designation Criteria & Process ............................................................................. 7 Future Snohomish County Recommendation ......................................................................................................... 8 Future PSRC Designation ................................................................................................................................................. 8 MIC Location and Description ........................................................................................................... 9 Topography ......................................................................................................................................................................... 13 History of Area ................................................................................................................................................................... 13 Current Land Uses ............................................................................................................................................................ 13 Transportation Facilities ............................................................................................................................................... 17 Arlington Municipal Airport ......................................................................................................................................... 17 Relationship to VISION 2040 ....................................................................................................................................... 17 Land Use / Zoning Analysis .............................................................................................................. 18 Land Use ............................................................................................................................................................................... 18 Historic Properties ........................................................................................................................................................... 19 Zoning .................................................................................................................................................................................... 19 Future Land Use ................................................................................................................................................................ 23 Contiguous Land Uses and Zoning ............................................................................................................................. 27 Development Patterns ....................................................................................................................... 28 Parcel Sizes .......................................................................................................................................................................... 28 Development Concentrations ...................................................................................................................................... 29 Commercial Activity ........................................................................................................................................................ 35 Assessed Value ................................................................................................................................................................... 35 Vacant Parcels .................................................................................................................................................................... 36 Parcels for Future Manufacturing/Industrial Uses ............................................................................................ 37 Population and Employment .......................................................................................................... 41 Existing Population .......................................................................................................................................................... 41 Employment ........................................................................................................................................................................ 41 Economic Activity Potential ......................................................................................................................................... 42 Transportation Facilities .................................................................................................................. 43 Existing Facilities .............................................................................................................................................................. 43 Arlington – Smokey Point MIC Existing Conditions Report 4 Current Conditions ........................................................................................................................................................... 49 Planned Road Improvements ...................................................................................................................................... 50 Capital Facilities & Utilities ............................................................................................................. 52 Environmental Conditions ............................................................................................................... 53 Contaminated Sites .......................................................................................................................................................... 53 Critical Areas ...................................................................................................................................................................... 53 Correlation to Comprehensive Plan ............................................................................................. 57 Land Use ............................................................................................................................................................................... 57 Transportation ................................................................................................................................................................... 58 Capital Facilities ................................................................................................................................................................ 59 Economic Development ................................................................................................................................................. 59 MIC Growth Targets ......................................................................................................................................................... 61 Correlation to Land Use Code ......................................................................................................... 62 Land Use Regulations ...................................................................................................................................................... 62 Additional Regulations ................................................................................................................................................... 63 Regulations Consistent with Future MIC Designation ....................................................................................... 64 Amendments to Regulations ........................................................................................................................................ 64 Summary ................................................................................................................................................ 67 Regional MIC Compliance .............................................................................................................................................. 67 Recommendations ............................................................................................................................................................ 67 Figures Figure 1: Arlington-Smokey Point MIC Boundary……………………………………………………………………… 11 Figure 2: Existing Land Uses …………………………………………………………………………………………………… 15 Figure 3: Current Zoning ………………………………………………………………………………………………………… 21 Figure 4: Future Land Uses ……………………………………………………………………………………………………... 25 Figure 5: Building Size Within MIC ………………………………………………………………………………………….. 31 Figure 6: Floor Area Ratios (FARs) ………………………………………………………………………………………….. 33 Figure 7: Redevelopment Potential …………………………………………………………………………………………. 39 Figure 8: Roadway Classifications …………………………………………………………………………………………… 45 Figure 9: Critical Areas …………………………………………………………………………………………………………… 55 Tables Table 1: Existing Land Uses Within MIC …………………………………………………………………………………... 19 Table 2: Zoning Districts Within MIC ……………………………………………………………………………………….. 23 Table 3: Future Land Uses Within MIC ……………………………………………………………………………………. 24 Arlington – Smokey Point MIC Existing Conditions Report 5 Table 4: Parcel Sizes Within MIC ……………………………………………………………………………………………... 28 Table 5: Vacant Parcel Sizes Within MIC ………………………………………………………………………………….. 29 Table 6: Building Density ………………………………………………………………………………………………………... 29 Table 7: Recent Commercial/Industrial Building Activity, 2005-2011 ………………………………………. 35 Table 8: Redevelopment Potential Based on Assessed Values …………………………………………………… 36 Table 9: Estimated Total Jobs in 2011 ……………………………………………………………………………………… 41 Table 10: Truck Routes …………………………………………………………………………………………………………… 47 Table 11: Existing 2011 Peak Hour Traffic Volumes …………………………………………………………………. 50 Table 12: Long Term Roadway Improvements ………………………………………………………………………… 50 Table 13: 2012 – 2017 TIP Projects Within MIC Area ……………………………………………………………….. 51 Appendices Appendix A – Puget Sound Regional Council Designation Procedures for New Manufacturing/ Industrial Centers (September 2011) Appendix B – PSRC Regional Centers Plan Checklist Appendix C – Snohomish Countywide Planning Policies (applicable pages, June 2011) Appendix D – Existing 2011 PM Peak Hour Traffic Volumes Arlington – Smokey Point MIC Existing Conditions Report 6 Arlington – Smokey Point MIC Existing Conditions Report 7 Introduction The purpose of this report is to evaluate current conditions of the City of Arlington portion of the Arlington – Smokey Point Manufacturing/Industrial Center (MIC). The MIC is a future joint effort between the cities of Arlington and Marysville. The report evaluates the following topics:  Land uses/zoning  Developable lands  Existing and future transportation conditions/needs  Current employment and future growth targets  Environmental issues/concerns Existing City of Arlington Comprehensive Plan goals and policies and land use regulations (AMC Title 20) will be amended to support a local MIC designation. The Puget Sound Regional Council (PSRC) and Snohomish County Tomorrow (SCT) have established designation criteria for regional manufacturing industrial centers (MIC). At this time, the City is identifying a local MIC designation and will pursue a County and regional designation in coordination with Marysville once the PSRC designation criteria are met. Regional MIC Designation Criteria & Process To be eligible for consideration as a regionally-designated MIC by PSRC, an area must meet specific criteria, one of which is employment. The employment threshold for PSRC designation is a minimum of 10,000 existing jobs and a minimum employment target of 20,000 jobs. Currently, the MIC area does not meet the threshold for existing jobs. Therefore, the MIC will not be designated by PSRC until this benchmark is met. Snohomish County does not require a MIC proposal to be officially recognized in order to qualify for Infrastructure Coordinating Committee (ICC)1 funding. A detailed analysis is not necessary until such time when the proposal would qualify as a regional center. Once the two cities are ready to apply for designation, the application would have to meet the requirements as outlined in the Economic Development and Employment chapter of the 1 ICC is a standing committee comprised of public works representatives of the cities, the County and the Tulalip Tribes. Representatives from PUD and WSDOT also serve on the committee. The mission of the ICC is to coordinate the planning, funding and implementation of infrastructure and transportation systems in Snohomish County. Arlington – Smokey Point MIC Existing Conditions Report 8 Countywide Planning Policies (CPPs). The employment threshold for SCT is a capacity and planning for a minimum of 20,000 jobs. Future Snohomish County Recommendation In order to achieve a recommendation from SCT, the cities of Arlington and Marysville would each complete the following process: 1. Amended Comprehensive Plans and land use regulations to meet designation criteria. 2. Develop a report, including summaries and maps, requesting County MIC designation which demonstrates the proposed center meets the County’s criteria for designation and is consistent with CPPs. 3. Council adopts amendments, regulations and ordinances supporting the formation of a MIC. Upon review and approval, the SCT Executive Committee would make the official recommendation to PSRC to designate the Arlington – Smokey Point MIC as a regional manufacturing industrial center. Future PSRC Designation As noted previously, the City would need to achieve a minimum of 10,000 jobs within the MIC area. Once this threshold is achieved, future planning activities will need to be completed, which include: 1. In-depth data gathering/general analysis (history/background, existing employment & future target, developable land & capacity, zoning/land use, business types, transportation infrastructure) 2. Economic/Market Analysis (assessment of current conditions and market potential) (economic consultant expertise required) 3. A report demonstrating the center meets PSRC designation criteria for MIC’s and that is consistent with VISION 2040. 4. Council adopts ordinances supporting MIC and recommending approval to PSRC. The PSRC Executive Board makes the final decision for MIC designation based on the recommendation given by the Growth Management Policy Board. Arlington – Smokey Point MIC Existing Conditions Report 9 MIC Location and Description The Arlington – Smokey Point MIC is located entirely within the cities of Arlington and Marysville. The MIC is located within Snohomish County halfway between the cities of Everett and Mt. Vernon. If designated, the MIC would become the northernmost MIC designated by PSRC. The nearest designated MIC is the Paine Field/Boeing Everett MIC located approximately 20 miles to the south in the City of Everett. For the purpose of this report, the City of Arlington’s MIC boundary is shown. This area encompasses approximately 2,291 acres. See Figure 1: Arlington-Smokey Point MIC Boundary. Arlington – Smokey Point MIC Existing Conditions Report 10 ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of ArlingtonFigure 1:Arlington-Smokey Point Manufacturing/Industrial Center (MIC) Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. 9/21/2011 kdk Date:Cartographer: ProposedMIC_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Rail line CityParks Parcels City Limits UGA Marysville Proposed MIC Buildings Arlington – Smokey Point MIC Existing Conditions Report 12 Arlington – Smokey Point MIC Existing Conditions Report 13 Topography The entire Arlington-Smokey Point MIC area is located in a flat plain with very little to no topographic relief. The area is located within two drainage basins and there are some minor creeks flowing through the southern portion of the area. None of the properties within the MIC are located within a floodplain. History of Area The City of Arlington was founded in 1903 after the merging of two communities, Arlington and Haller City, dating back to the late 1800s. The community of Smokey Point, which got its name from a restaurant of the same name in the 1950s, was annexed into the cities of Arlington and Marysville in the late 1990s. Up until the opening of the Arlington Airport in 1934, a majority of the land within the MIC was utilized for agriculture and lumber production. Once the airport opened, for the first several years the airport was initially used by the Forest Service as well as local fliers. In 1940, the airport became an auxiliary air station for the U.S. Navy and in 1942 became a strategic base during World War II. In 1946, the military allowed the City to once again use the airport for commercial and civilian flying. In 1959, the military ceased all operations and the airport was given to the City. Current Land Uses Over the course of the last several decades, lands immediate adjacent to the airport have been used for aviation-related or supporting business. Many industrial and manufacturing facilities have sprouted east of the airport, including warehousing, processing, transportation, technology, maintenance, distribution, and timber processing. With the BNSF railroad spur serving many properties in this area, it has become an important transportation corridor that allows the movement of goods and services to other communities. A few commercial businesses are also located within the MIC. Figure 2: Existing Land Uses, shows existing land uses within the MIC. Arlington – Smokey Point MIC Existing Conditions Report 14 ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 2:Existing Land Uses Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. Existing Uses Agriculture Airport Commercial Government Industrial/Manufacturing Recreation Religious Residential Vacant Parcels City Limits UGA Marysville Rail line 10/10/2011 kdk Date:Cartographer: ProposedMIC_bldg_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC Arlington – Smokey Point MIC Existing Conditions Report 16 Arlington – Smokey Point MIC Existing Conditions Report 17 Transportation Facilities The Arlington – Smokey Point MIC is served by one major state highway (SR 531) with two highways located a short distance both east and west of the MIC (I-5 and SR 9). There is one Burlington Northern Santa Fe (BNSF) line that is maintained in the Arlington MIC. This line is a 6.9-mile freight-only spur line that begins at 118th Place NE and Smokey Point Boulevard in the City of Marysville and ends north in Arlington just southwest of Arlington City Hall & Police Station. The railway is fronted primarily by manufacturing and light industrial uses through Arlington while most of the line through Marysville is lined by vacant and/or industrial uses to the west and residential uses to the east. There are 11 railroad crossings along the line. Arlington Municipal Airport The Arlington Municipal Airport, which covers approximately 1,189 acres, is a vital part of the national system of airports and the transportation infrastructure that supports the City of Arlington and northern Snohomish County. The airport consists of two runways (5,333 feet and 3,500 feet) and associated taxiways which are all zoned Aviation Flightline. Other properties immediately adjacent to the airport include industrial, business park and commercial uses. Relationship to VISION 2040 VISION 2040 is a regional strategy adopted by PSRC to accommodate the additional 1.7 million people and 1.2 million new jobs expected to be in the region by 2040. VISION 2040 calls for the preservation of existing centers of intensive manufacturing and industrial activity and the provision of infrastructure and services to support these areas. VISION 2040 currently contains eight officially recognized Manufacturing and Industrial Centers (MIC): Paine Field/Boeing Everett, Ballard/Interbay, Duwamish, North Tukwila, Kent, Port of Tacoma, Fredrickson and South Kitsap. Arlington – Smokey Point MIC Existing Conditions Report 18 Land Use / Zoning Analysis Land Use A majority of the properties within the Arlington – Smokey Point MIC area are used for manufacturing and light industrial, with a large portion dedicated to the Arlington Municipal Airport and supporting businesses. Approximately 12 percent of the MIC is currently used as manufacturing/industrial, 39 percent is used as airport/aviation uses, and approximately 28 percent is identified as non- manufacturing/industrial use. Approximately 21 percent of the area is currently undeveloped or agriculture use. The majority of industrial land used for manufacturing or processing is located north of 172nd St. NE (SR 531) and between 59th Ave. NE and 67th Ave NE. Stella Jones Company (processes timber for utility poles), MidNite Solar (makes renewable energy electrical devices), Vesper (makes wind turbine measurement tools) and Pick ‘N Pull (car part salvage yard) are all located in this area. Another area of manufacturing, primarily related to timber processing, is located betw een 188th St. NE and 204th St. NE and east of 67th Ave. NE. A large portion of this area is a saw mill owned and operated by Weyerhaeuser Company, as well as Hampton Lumber. Microgreen Polymers, which makes a variety of products with recycled plastics, is located in this area. A majority of the AF zone is made up of the Arlington Municipal Airport. Surrounding the airport, there are several aerospace businesses, such as Aerospace Manufacturing Technologies (AMT), ABW Technologies, Glasair Aviation and Universal Aerospace. West of the airport lies the Arlington Airport Business Park, which is approximately 147 acres. The City approved the Arlington Airport Business Park binding site plan, which includes the subdivision of approximately 147 acres of property on the west side of the airport. Future plans calls for a 124 acre business park and 23 acres of “flightline” area to be constructed in three phases and will comprise a total of approximately 1.3 million square feet of business space, including office, research, light manufacturing, and airport- related uses. South of 172nd St. NE (SR 531) is an area of processing and distributing. National Food and Crown Distributing are both located in this area. Arlington – Smokey Point MIC Existing Conditions Report 19 Table 1: Existing Land Uses Within MIC Existing Land Use Type Acres Percent Airport 1,070.18 39.8 Residential 632.63 22.95 Vacant 392.58 14.24 Manufacturing/Industrial 351.27 12.74 Agriculture 180.52 6.55 Government 37.12 1.36 Recreation 26.64 .97 Religious 1.13 .04 TOTAL 2,7562 100 Source: City of Arlington GIS Department Historic Properties There is one historic property located within the MIC area. The Airfield and Hangar Complex at Naval Auxiliary Air Station – Arlington, now known as the Arlington Municipal Airport, is listed on both the Washington Historic Register and the National Register of Historic Places. The site was designated as historic in 1995. Zoning One of PSRC’s designation criteria for proposed manufacturing industrial centers is at least 80% of property within the proposed new regional manufacturing industrial center boundaries must have planned future land use and current zoning designations for industrial and manufacturing uses. Additionally, VISION 2040 discourages non-supportive land uses in regional manufacturing industrial centers, which include large retail uses, non- 2 This number is higher than the 2,291 acres as noted previously because this accounts for parcels that are located both within and outside the MIC boundary. Arlington – Smokey Point MIC Existing Conditions Report 20 related offices or housing. MICs are expected to accommodate a significant share of the region’s manufacturing industrial employment growth. Within the Arlington portion of the Arlington – Smokey Point MIC, over 48 percent is zoned for industrial uses, which includes the General Industrial (GI) and Light Industrial (LI). Approximately 32 percent is zoned as Aviation Flightline (AF), which includes the airport and other aviation-related uses. Approximately 7 percent is zoned for office park uses, which would be located in the Business Park (BP) zoning district. The remaining zoning within the MIC is zoned General Commercial (GC), Highway Commercial (HC) or Public/Semi-Public (P/SP) uses. These areas make up approximately 13 percent of the MIC area. Figure 3 shows current zoning within the MIC area. Table 2 below shows the percentages of each zoning district within the MIC. ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 3:Current Zoning Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. Proposed MIC Parcels City Limits UGA Marysville 10/10/2011 kdk Date:Cartographer: ProposedMIC_z_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Zoning SR = Suburban Residential RLMD = Low to Moderate Density Residential RMD = Moderate Density Residential RHD = High Density Residential OTRD = Old Town Residential District NC = Neighborhood Commercial OTBD - 1 = Old Town Business District 1 OTBD - 2 = Old Town Business District 2 OTBD - 3 = Old Town Business District 3 GC = General Commercial HC = Highway Commercial BP = Business Park LI = Light Industrial GI = General Industrial P/SP = Public/Semi-Public MS = Medical Services AF = Aviation Flightline Arlington – Smokey Point MIC Existing Conditions Report 22 Arlington – Smokey Point MIC Existing Conditions Report 23 Table 2: Zoning Districts Within MIC Zoning District Acres Percent General Industrial 871 38 Aviation Flightline 737 32 Light Industrial 237 10 Business Park 165 7 General Commercial 156 7 Highway Commercial 85 4 Public/Semi-Public 40 2 TOTAL 2,291 100 Source: City of Arlington GIS Department Future Land Use As previously stated, one of PSRC’s designation criteria for proposed manufacturing industrial centers is at least 80% of property within the proposed new regional manufacturing industrial center boundaries must have planned future land use for industrial and manufacturing uses. Approximately 48 percent is designated for these uses. The area is primarily made up of light industrial uses, with approximately 10 percent dedicated as light industrial. Approximately 32 percent is designated as aviation/airport uses. Those uses that are classified as heavy industrial or manufacturing make up approximately 38 percent of land uses. Figure 4 graphically shows the future land uses within the MIC, while Table 3 shows percentages of future land uses within the MIC. Arlington – Smokey Point MIC Existing Conditions Report 24 Table 3: Future Land Uses Within MIC Future Land Use Designation Acres Percent General Industrial 871 38 Aviation Flightline 737 32 Light Industrial 237 10 Business Park 165 7 General Commercial 156 7 Highway Commercial 85 4 Public/Semi-Public 40 2 TOTAL 2,291 100 Source: City of Arlington GIS Department ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 4:Future Land Uses Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. Proposed MIC Parcels City Limits UGA Marysville 10/10/2011 kdk Date:Cartographer: ProposedMIC_flu_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Future Land Use SR = Surburban Residential RLMD = Low to Moderate Density Residential RMD = Moderate Density Residential RHD = High Density Residential OTRD = Old Town Residential District NC = Neighborhood Commercial OTBD - 1 = Old Town Business District 1 OTBD - 2 = Old Town Business District 2 OTBD - 3 = Old Town Business District 3 GC = General Commercial HC = Highway Commercial BP = Business Park LI = Light Industrial GI = General Industrial P/SP = Public/Semi-Public MS = Medical Services AF = Aviation Flightline Arlington – Smokey Point MIC Existing Conditions Report 26 Arlington – Smokey Point MIC Existing Conditions Report 27 As previously noted, PSRC’s designation criteria discourages land uses that are incompatible with manufacturing and industrial uses, such as large retail and housing areas or non-related office uses. Office and retail uses would only be encouraged if they are limited as an accessory use to manufacturing and industrial uses. Areas currently designated as Highway Commercial (HC) and General Commercial (GC) within the MIC may be reconsidered as Light Industrial (LI) or General Industrial (GI). Amendments to the Comprehensive Plan would be necessary to modify these changes of use. Contiguous Land Uses and Zoning A majority of the land uses adjacent to the MIC are designated low to moderate density residential (RLMD and RMD). There are some areas of commercial uses to the northeast of the area (204th St. NE & SR 9 commercial area) and to the southwest (Smokey Point commercial area along 172nd St. NE/West Arlington Sub Area). To alleviate the impacts from industrial uses, PSRC criteria call for incorporation of urban design standards that are used to mitigate aesthetic and other impacts of manufacturing and industrial activities both within the center and on adjacent areas. Depending on the success of the form-based codes (FBC) for the West Arlington Sub Area, the City may consider implementing FBC’s for the industrial areas in the future. The City of Marysville regulates industrially zoned properties within its Smokey Point Master Plan area. The Design Guidelines of the Smokey Point Master Plan includes detailed screening/landscaping, design guidelines for buildings, and streetscape landscaping requirements. The City of Arlington currently has limited regulations within industrial areas. The Land Use Code requires street frontage landscaping in all Light Industrial (LI) zones, full screen landscaping in areas abutting residential zones and parking lot landscaping. All zones identified within the MIC require design review, with the exception of General Industrial uses not visible from public streets. For future PSRC designation, the City of Arlington will need to adopt a sub area plan similar to Marysville that addresses all of these issues and those identified in PSRC’s Regional Manufacturing Industrial Center Plan Checklist. Arlington – Smokey Point MIC Existing Conditions Report 28 Development Patterns Parcel Sizes One of PSRC’s criteria for MIC’s is for jurisdictions to develop regulations that preserve vacant, underdeveloped or redevelopable parcels of reasonable size to allow for the expansion of existing or new manufacturing and industrial uses. Many manufacturing uses require larger parcels in order to conduct their business, so it is of great importance that the City focus on maintaining these blocks of parcels to allow for these activities. Within the MIC area, approximately 17% of the parcels are less than 5 acres. Those parcels that are over 10 acres make up approximately 8% of the area. The average size parcel in the area is 8.72 acres. Table 4 shows parcel sizes within the MIC area. Table 4: Parcel Sizes Within MIC Parcel Size (acres) # of Parcels Total Acres Percent Area Percent Parcels <= 0.5 54 15.57 .56 17.09 >0.5 to 1.0 34 28.00 1.02 10.76 <1.0 to 5.0 98 219.34 7.96 31.01 >5.0 to 10.0 94 785.42 28.50 29.75 >10 to 20 16 222.65 8.08 5.06 >20 20 1,485.29 53.89 6.33 TOTAL 316 2,756.30 100 100 Source: City of Arlington GIS Department Most of the larger vacant parcels are located in the either the agricultural areas south of 172nd St. NE (SR 531) or within the airport, which are currently zoned GC, LI and AF. The largest land owner of vacant property is Washington Federal Savings (agricultural land south of 172nd St NE), currently zoned commercial, with approximately 87.74 acres. Other large vacant property holdings include the King property (along 59th Ave. NE) with 25.66 acres, the Rengen property (east of 67th Ave. NE) with 16.18 acres, and City-owned property (north of the airport and south of Cemetery Rd.) with 12.21 acres. Table 5 shows vacant parcel sizes within the MIC area. Arlington – Smokey Point MIC Existing Conditions Report 29 Table 5: Vacant Parcel Sizes Within MIC Parcel Size (acres) # of Parcels Total Acres Percent Area Percent Parcels <= 0.5 19 4.58 1.17 21.34 >0.5 to 1.0 11 9.44 2.40 12.35 <1.0 to 5.0 33 67.78 17.26 37.07 >5.0 to 10.0 17 115.27 29.36 19.10 >10 to 20 7 82.12 20.92 7.86 >20 2 113.40 28.89 2.24 TOTAL 89 392.59 100 100 Source: City of Arlington GIS Department Development Concentrations Per VISION 2040 and the Snohomish CPPs, MICs shall serve as primary concentrations of manufacturing and industrial related jobs in the Puget Sound region. In addition, adequate public facilities, including good access to the regional transportation system, is key to future growth within the MIC area. Currently, the most intensely developed parcels include the area just south of 204th St. NE. The other area is located along the BNSF railroad spur and 67th Ave. NE between approximately 196th St. NE and 184th St. NE. Most of this area includes aerospace industries, warehousing, manufacturing/fabrication, and lumber processing. Table 6 identifies building densities within the MIC area. Table 6: Building Density Total Land Area (net acres)* Avg. Parcel Size (SF)1 Median Parcel Size (SF)1 Total Built Commercial Space (SF)1 Avg. Building Size (SF)1 Median Bldg. Size (SF)2 Avg. FAR** Median FAR** 2,291 455,697 105,413 5,383,843 50,316 18,011 0.21 0.18 Source: City of Arlington GIS Department 1 Includes all buildings and parcels except residential 2 Median Building Size and FAR is only based on those parcels that have buildings Arlington – Smokey Point MIC Existing Conditions Report 30 Figure 5 shows locations of buildings by building size (SF of floor space) for all parcels in the study area, except for those used as residential. The darker parcels have a greater square footage of building space than the lighter parcels. The parcels with the greatest square footage of building space are located just south of 204th St. NE along 71st Ave. NE and 201st St. NE. Figure 6 maps the floor area ratios3 (FARs) for parcels within the MIC, with the highest development density located in the northeast part of the MIC, in the same location as previously mentioned just south of 204th St. NE. Note that this map excludes those areas that are currently utilized as residential. 3 Floor area ratio (FAR) is the ratio of the total floor area of buildings on a certain location to the size of the property of that location. For instance, floor area ratio = (total covered area on all floors of all buildings/area of land). Thus, an FAR of 2.0 means that the total floor area of a building is two times the gross area of the land on which it’s built. ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 5:Building Size Within MIC Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. Average Building Size <7,000 sq ft 7,000 - 14,000 sq ft 14,000 - 28,000 sq ft 28,000 - 56,000 sq ft >56,000 sq ft Parcels City Limits UGA Marysville Rail line 10/10/2011 kdk Date:Cartographer: ProposedMIC_bldg_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC Arlington – Smokey Point MIC Existing Conditions Report 32 ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 6:Floor Area Ratios (FARs) Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. FAR < 0.06 0.06 - 0.15 0.15 - 0.28 0.28 - 0.50 > 0.50 Parcels City Limits UGA Marysville Rail line 10/10/2011 kdk Date:Cartographer: ProposedMIC_bldg_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC Arlington – Smokey Point MIC Existing Conditions Report 34 Arlington – Smokey Point MIC Existing Conditions Report 35 Commercial Activity Commercial development activity in the Arlington industrial areas, specifically manufacturing and industrial, has been slow to moderate. According to the City, approximately 24 building permits accommodating 285,808 square feet were issued since 2006 within the MIC boundary, as shown in Table 7. A majority of the permits during this timeframe were for manufacturing/industrial buildings used for fabrication. Table 7: Recent Commercial/Industrial Building Activity, 2005 – 2011. Year Built # of Buildings Total Square Feet 2011 0 0 2010 2 6,080 2009 4 40,930 2008 7 109,703 2007 11 129,095 2006 0 0 TOTAL 24 285,808 Source: City of Arlington, Construction Monitor Assessed Value Several parcels in the MIC have low improvement values compared to the land values. This analysis indicates the feasibility and potential interest in redeveloping properties by comparing assessed values for building improvements on the land to assessed values for the land. Using this analysis tool determines the redevelopment potential of a certain piece of property. The following ratios of improvement values to assessed values were used to determine redevelopment potential.  Unlikely redevelopable – Improvement value equals more than 3.0 times the value of land value  Possibly redevelopable – Improvement value equals between 1.0 and times the value of land (inclusive of the upper and lower bounds) Arlington – Smokey Point MIC Existing Conditions Report 36  Likely redevelopable – Improvement value equals less than 0.75 times the assessed value of the land (includes vacant land) Approximately 786 acres out of the total 2,124 commercial/industrial acres within the MIC area are considered vacant. Many of these areas area either used as agriculture, storage or as parking areas, but has the potential to be redeveloped. Along with 1,069 acres of likely redevelopable land, a total of 1,855 acres (87%) of the MIC has the possibility of redevelopment over the next 20 years. Table 8 below shows the details of this analysis. Note that some vacant lands include Arlington Airport property that will likely not redevelop in the future. Table 8: Redevelopment Potential Based on Assessed Values. Parcels1 Area (Acres)1 Unlikely Redevelopable 22 55.72 Possibly Redevelopable 30 212.42 Likely Redevelopable 45 1,069.38 Vacant2 106 786.14 TOTAL 203 2,123 Source: Snohomish County Assessor’s Office, City of Arlington GIS Department. 1 Totals exclude residential properties 2 Some of the vacant property includes the Arlington Airport. Figure 7 shows the redevelopment potential of parcels in the MIC area, excluding those areas that are residential. Note that many of the Arlington Airport parcels are shown as likely redevelopable due to the low improvement value to land value. However, the Airport will not be redeveloped because this is considered an essential public facility. Vacant Parcels There are several areas of vacant parcels in the MIC area, mostly concentrated in the southern part of Arlington boundary. Most of these vacant parcels are active agricultural farms with the exception of the Copart Salvage Auto Auctions yard and the National Food Corporation. Arlington – Smokey Point MIC Existing Conditions Report 37 Parcels for Future Manufacturing/Industrial Uses In order to create lots that are large enough to accommodate manufacturing and industrial uses, PSRC recommends that cities should develop regulations and plans that encourage the combination of vacant parcels. Large parcels are common throughout the MIC area. As previously stated, many of the vacant parcels are located in the southern part of Arlington, although there are some larger lots located between 59th and 67th Avenues north of 172nd St. NE. While a majority of the vacant properties are privately owned, the Arlington Airport owns a significant amount of occupied or underutilized properties in MIC that are possibly available for future use, especially along 59th Avenue NE. Arlington – Smokey Point MIC Existing Conditions Report 38 ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 7:Redevelopment Potential Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. Redevelopment Potential No Improvement 0.0 to 1.0 1.01 to 3.0 3.01 to 5.0 >5.0 10/13/2011 kdk Date:Cartographer: ProposedMIC_redev_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC Parcels City Limits UGA Marysville Rail line Arlington – Smokey Point MIC Existing Conditions Report 40 Arlington – Smokey Point MIC Existing Conditions Report 41 Population and Employment Existing Population Because the majority of the area is zoned for industrial and commercial uses, there is limited residential within the MIC area. The 2010 residential population within the MIC area in 2010 was approximately 487 (based on 2.79 people per household, 2010 U.S. Census). No residential building permits were issued within the MIC area between 2005 and 2011. During this time period, all residential permits were issued outside the MIC. Employment The Arlington-Smokey Point MIC has approximately 3,427 jobs as of 2011. In order to be designated as a regional MIC by PSRC, jurisdictions must show that there are a minimum of 10,000 existing jobs within the MIC area. While currently the minimum jobs threshold has not been met, the City will recognize the area as a local MIC in the Comprehensive Plan. Approximately 70 percent of the jobs within the MIC are jobs that may be typically categorized and found within industrial areas. The Manufacturing sector makes up the majority of jobs in the MIC, with approximately 1,818 jobs, or 53 percent of the total. Retail related jobs represent 20 percent of the total, with approximately 671 jobs. Wholesaling, Transportation and Utilities jobs account for 554 jobs, or approximately 16 percent. The remaining jobs in the MIC consist of small numbers of government, education and health, service sector jobs, along with a few construction and resource jobs. Table 9 provides details on the different categories within the MIC. Table 9: Estimated Total Jobs in 2011. # of Jobs % of Total Workplaces Construction & Resource 36 1% 5 Manufacturing 1,818 53% 74 Wholesale,Transp./Util. 554 16% 40 Retail 671 20% 64 Services 69 2% 15 Government/Edu./Health 279 8% 11 TOTAL 3,427 100% 209 Source: City of Arlington Arlington – Smokey Point MIC Existing Conditions Report 42 On average the Manufacturing, Wholesale, Transportation and Utilities, and Retail employers in the MIC have the most employees. Some of the larger companies in the MIC area include AMT, Universal Aerospace, Smokey Point Distributing, and ABW Technologies. Economic Activity Potential In addition to the existing jobs threshold, jurisdictions must demonstrate that the proposed MIC has a minimum employment target of 20,000 jobs. With the majority of the designated MIC area zoned as industrial-type land uses (i.e. General Industrial, Light Industrial, Business Park and Airport Flightline), the area is positioned to provide the necessary manufacturing and industrial sector jobs in order to achieve the future employment target. Based on existing economic conditions of the area, the following observations may be made for future consideration:  Many of the existing businesses within the area support the aerospace industry, whether directly or indirectly. While the City of Arlington does maintain a number of existing businesses in this sector, there is significant potential to expand these jobs in the future.  With the potential of future economic expansion and growth of the MIC, the possibility of more high-paying and family-wage jobs will occur. As the area becomes more attractive for businesses to locate, new jobs will be created in sectors that traditionally attract skilled workforces.  The City of Arlington’s Airport Business Park has the potential to be developed into an attractive location for new light industrial businesses, with a focus on green technology. The City may consider partnering with a developer to help construct and market the area into a new flex-tech location. The business park is ideally-situated along a busy east-west highway (SR 531) and between two major north-south corridors (I-5 and SR 9). With future public and private investments in the area, and future retail development along 172nd, the park will be highly attractive for businesses to develop and transport goods locally and regionally.  Heavy industrial employers (i.e. Weyerhaeuser, Stella Jones) still find Arlington attractive because of their close proximity to natural resources located outside of the city limits. While market conditions will dictate whether these businesses will continue to remain in the area, the jobs these and other similar businesses offer provide economic incentive for the local economy.  The Arlington Airport Business Park incorporates recreational uses within or adjacent to these planned areas. While consideration should be made to ensure that recreational uses are compatible and do not interfere with existing and/or future industrial uses, recreational opportunities within close proximity is a key Arlington – Smokey Point MIC Existing Conditions Report 43 benefit to both the employee base and general public. Passive recreational amenities, such pedestrian/bicycle trails, open spaces, and small pocket parks integrated within industrial developments. In addition to outdoor recreational options, indoor facilities could be sited within the MIC as well. These may include go-kart tracks, indoor gymnasiums, soccer/lacrosse, among others. The most significant impact these uses would create is traffic. Therefore, they would need to be sited appropriately so that traffic does not adversely impact industrial activity. Transportation Facilities In order to be considered for regional MIC designation, there should be a variety of transportation modes within MICs which support local businesses such as surface streets, state highways, bus transit, and rail. Puget Sound Regional Council MIC designation criteria require that proposed centers identify and address deficiencies in street, sidewalk, and trail/bicycle networks. Local transportation plans should assess existing conditions and availability of transportation facilities and services that support manufacturing and industrial uses, as well as what measures will be taken to mitigate deficiencies within the surrounding community. Existing Facilities The existing transportation network serving the cities of Arlington and Marysville include three major state highways (I-5, SR 9, and SR 531), Arlington Municipal Airport, rail lines (BNSF), arterials, collectors, and local streets. State highways and principal arterials serve the truck traffic within the MIC, as well as serving private vehicles and public transit. Key transportation routes within the MIC are described in further detail. State Roadways I-5 Interstate 5 (I-5) is the primary north-south transportation corridor in western Washington and the Pacific coast. I-5 connects communities in King County and south Snohomish County, as well as Skagit and Whatcom counties to the north. An estimated 240,000 motorists use the road daily throughout the state. Arlington – Smokey Point MIC Existing Conditions Report 44 SR 9 State Route 9 (SR 9) is a primary north-south highway located east and parallels I-5, connecting the communities of Woodinville, Snohomish, Lake Stevens, and Marysville to the south and several small communities in Skagit and Whatcom counties to the north toward the Canadian border. SR 530 State Route 530 (SR 530), is the primary east-west highway serving the Island Crossing area of Arlington and communities to the east of the City, including Darrington. This highway provides another east-west alternative between downtown Arlington and I-5. SR 531 State Route 531 (SR 531), also known locally at 172nd Street NE, is the primary east- west highway connecting Arlington and the Lake Goodwin area of Snohomish County. The highway begins at Wenberg County Park, intersects I-5, passes the Arlington Airport and terminates at SR 9. With the exception of stretch within the Smokey Point area, the road is primarily a 2-lane highway. Local Roadways A number of roadways provide access within and around the MIC. The following list shows the existing key roadways with the Arlington MIC boundary: North-South East-West 67th Avenue NE 188th Street NE 63rd Avenue NE 192nd Street NE 59th Avenue NE 197th Street NE 51st Avenue NE/Airport Blvd. Cemetery Road 43rd Avenue NE 204th Street NE Figure 8 shows the roadway network serving the MIC. ?| !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 8:Roadway Classifications Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. State Route Arterial Collector Streets Parcels City Limits UGA Marysville Rail line 10/13/2011 kdk Date:Cartographer: ProposedMIC_rdway_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC Arlington – Smokey Point MIC Existing Conditions Report 46 Arlington – Smokey Point MIC Existing Conditions Report 47 Truck Routes The City of Arlington has identified truck routes within the City as part of the Comprehensive Plan (Table 8-9 of the Transportation Element). The truck route system consists of both principal and minor arterials. Collectors and local streets in the industrial areas also serve as truck routes. Table 10 below includes information regarding key truck routes within or near the MIC. Table 10: Truck Routes. Roadway Segment/Description # of Lanes SR 9 Within city limits 2 (1NB, 1SB) SR 531 (172nd St. NE) Between 43rd Ave NE & SR 9 2 (1WB, 1EB) SR 531 (172nd St. NE) Between I-5 & 43rd Ave NE 2-3 (2-3 WB, 2-3 EB) SR 530 Within city limits 2 (1WB, 1EB) 51st Avenue NE Between 172nd St. NE & southern city limits 2 (1NB, 1SB) 59th Avenue NE Within city limits 2 (1NB, 1SB) 63rd Avenue NE Between 195th St.NE & 197th St. NE 2 (1NB, 1SB) 67th Avenue NE Within city limits 2 (1NB, 1SB) 195th Street NE Between 59th Ave NE & 67th Ave NE 2 (1WB, 1EB) 197th Street NE Between 63rd Ave NE & 67th Ave NE 2 (1WB, 1EB) 188th Street NE Between SP Blvd & 47th Ave NE 2 (1WB, 1EB) 47th Avenue NE Between 188th & 198th St. NE (Cemetery Rd.) 2 (1WB, 1EB) 198th Street NE (Cemetery Rd.) Between 47th Ave NE & 67th Ave NE 2 (1WB, 1EB) 204th Street NE Between 67th Ave NE & SR 9 2 (1WB, 1EB) Source: City of Arlington Arlington – Smokey Point MIC Existing Conditions Report 48 Railways BNSF Railway PSRC designation criteria state that MICs must have direct access to regional highway, rail, air and/or waterway system for the movement of goods, and that the transportation network within MICs should provide for the needs of freight movement and employees by ensuring a variety of transportation modes such as public transit, rail and trucking facilities. Burlington Northern Santa Fe (BNSF) is one of the largest railroad networks in North America, which currently operates in 28 states. Routes in the Pacific Northwest include Portland to the Canadian border, a route between Burlington and Sumas in Skagit County, and two east-west routes that cross the Cascades to eastern Washington. There are two Burlington Northern Santa Fe (BNSF) lines that are maintained near the MIC. A 6.9-mile freight-only spur line that begins at 118th Place NE and Smokey Point Boulevard in the City of Marysville and ends north in Arlington just southwest of Arlington City Hall & Police Station. The railway is lined primarily by manufacturing and light industrial uses through Arlington while most of the line through Marysville is lined by vacant and/or industrial uses to the west and residential uses to the east. There are 11 railroad crossings along the line. The principle north-south BNSF rail line is located along State Avenue and traverses underneath I-5 to the west as it heads northward. This line is shared by both freight and passenger rail (Amtrak) and connects between Everett to the south and communities to the north up to the Canadian border. Public Transit Community Transit is the sole provider for public transit within the City of Arlington. Routes 230 and 240 serve the Arlington area, both which travel between Smokey Point and downtown Arlington. Route 230 is the only route that directly serves the MIC area and also travels east to Darrington. The route has 4 westbound and 3 eastbound trips per day. Route 240 travels north of the MIC area (Cemetery Rd.) and has multiple trips per day between downtown Arlington, Lakewood, Warm Beach and Stanwood. The Sound Transit “Sounder” commuter train is available to commuters between Everett and Seattle. The train has 4 southbound and 4 northbound weekday trains Arlington – Smokey Point MIC Existing Conditions Report 49 between Everett Station to King Street Station in Seattle, with stops in Mukilteo and Edmonds. Trails PSRC designation criteria state that all proposed centers shall have a plan to identify and address deficiencies in street, sidewalk, and trail/bicycle path networks. Cities should describe how transportation plans assess the current adequacy and availability of transportation facilities and services necessary to support industrial and manufacturing uses, and how the city plans to provide adequate capacity and to remediate deficiencies. The City of Arlington has two major trails within the MIC. The Centennial Trail is a major regional trail which begins in Snohomish and ends in north of Arlington, and when completed, will be 44 miles long. There are currently gaps within the city limits that will be completed within the next few years. The trail uses much of the right-of-way formerly used by BNSF. The Airport Trail is another major trail which circles around the Arlington Airport. The trail is a 6-mile loop that is loose gravel. The City has plans to expand the trail network in the future, some of which will be located within the MIC. Current Conditions PM Peak Hour Trips As part of the 2035 City of Arlington Transportation Comprehensive Plan update, traffic counts were performed at several locations. Table 11 below shows average PM Peak Trip counts for locations within the MIC area as of September 2011. Arlington – Smokey Point MIC Existing Conditions Report 50 Table 11: Existing 2011 Peak Hour Traffic Volumes. Eastbound /Westbound* Northbound / Southbound* Intersection Total PM Peak Total PM Peak 172nd St. NE at 43rd Ave. NE 915/920 56/20 172nd St. NE at 59th Ave. NE 800/880 136/25 172nd St. NE at 67th Ave. NE 600/610 465/330 188th St. NE at 67th Ave. NE 21/100 490/430 204th St. NE at 67th Ave. NE 390/230 445/395 Source: City of Arlington 2035 Transportation Comprehensive Plan *All volumes include both through traffic and turning movements. Planned Road Improvements The City of Arlington’s 2035 Transportation Plan identifies roadway improvement plans throughout the city. There are a number of long-term improvements identified within the MIC area, which are summarized in Table 12 below. Many projects will address deficiencies and improve capacity for routes to/from the MIC. Other projects, such as SR 531 (172nd St. NE) will be funded by WSDOT. Table 13 lists projects in the 6-Year Transportation Improvement Program (TIP) for 2012 – 2017 that are located within the MIC area. Table 12: Long-Term Roadway Improvements. Roadway Segment Description SR 531 (172nd) – 43rd Ave. NE to SR-9 43rd to 67th Phase A – Widen from 2-lane to 5-lane 67th Ave. NE Phase 3 204th St. NE to Lebanon St. Widen roadway to 3 lanes, include trail and sidewalks Airport Blvd. 51st Ave. NE. extension from SR 531 to 188th St. NE 3-lane road extension Arlington Valley Rd. 67th Ave. NE to 204th St. NE 3-lane connection Arlington – Smokey Point MIC Existing Conditions Report 51 Cemetery Rd./47th Ave. NE/188th St. NE 67th Ave. NE to 47th Ave. NE Phase A: Widen roadway to 3 lanes, perform frontage improvements, add channelization 47th Ave. NE from Cemetery Rd. to 188th St. NE Phase B: Widen roadway to 3 lanes. Airport to install frontage on east side, add channelization 188th St. NE from 47th Ave. NE to SP Blvd. Phase C: Widen roadway to 3 lanes, install frontage improvements, add channelization 51st Ave. NE SR 531 (172nd) to 164th St. NE 3-lane road, to be coordinated with City of Marysville 63rd Ave. NE 186th St.NE to SR 531 (172nd) New north-south roadway, property acquisition required 180th St. NE 59th Ave. NE to 67th Ave. NE Phase A: 59th to BNSF ROW, rehab and expand existing roadway, need dedication from private properties Phase B: BNSF ROW to 67th, rehab and expand 43rd Ave. NE SR 531(172nd) to 164th St. NE 3-lane road, to be coordinated with City of Marysville 47th Ave. NE SR 531(172nd) to 164th St. NE 3-lane road, to be coordinated with City of Marysville Source: City of Arlington 2035 Transportation Comprehensive Plan Table 13: 2012-2017 TIP Projects within MIC Area. Roadway Segment Description SR 531 43rd Ave to 67th Ave Design of roadway (WSDOT) Airport Blvd. Extension to 188th St. Phase 1 funding received in 2011 for construction in 2012. Seeking funding for Phase 2. New arterial extending from SR531 north to 188th St. 67th Ave. 204th St. to Lebanon St. Widening and rehabilitation of existing roadway with addition of pedestrian trail and sidewalks. Arlington – Smokey Point MIC Existing Conditions Report 52 Arlington Valley Rd. 67th Ave to 204th St. New 3-lane industrial standard road connecting 67th Ave. to 204th St. 173rd St. 43rd Ave to Smokey Pt. Blvd. New 3 lane roadway between 43rd and Smokey Pt. Blvd. Source: City of Arlington 2012-2017 TIP Capital Facilities & Utilities PSRC designation criteria require cities to document plans and capital programs for the provision of infrastructure, services, and amenities to support planned growth within the center. According to the City’s Comprehensive Plan, there are no significant deficiencies identified for the contracted services, including solid waste/recycling (Waste Management), natural gas (PSE/Cascade), and electricity (Snohomish County PUD). PSE future projects include system reinforcement projects (i.e. new 6-inch gas main along 172nd between Smokey Point Blvd. and 51st Ave. and from 59th Ave. to SR 9), main replacements, public improvement relocation, and provision of new service. Snohomish County PUD plans to build a new substation to serve new growth in the Edgecomb area (67th Ave. & 172nd. St.). For the City’s utilities, including water, wastewater, and stormwater, there are a number of deficiencies identified for each service. Projected water system improvements within the MIC area include refurbishing the Airport well and construct an Airport treatment facility to maximize production and remove manganese, replacement of mains and maintenance of existing mains and valves. Projected wastewater system improvement affecting the MIC area include rehabilitation or replacement of existing pump stations and new lift stations in the area when required. Stormwater system projects affecting the MIC area in the future include replacement of culverts on Prairie Creek and Portage Creek at BNSF RR and 69th Avenue, and replacement of culverts at Edgecomb Creek and 67th Avenue, as well as programmatic efforts required under the National Pollution Discharge Elimination System (NPDES) II permit. These efforts include:  Water quality monitoring;  Development and administration of a Stormwater Management Program;  Public education and outreach;  Detection, removal, and prevention of illicit connections, discharges and improper disposal;  Develop, implement and enforce a pollution reduction program; and, Arlington – Smokey Point MIC Existing Conditions Report 53  Develop and implement an operation and maintenance (O&M) program The Arlington Airport, which is significant operation within the MIC area, also has a number of planned projects in the future. These include expansion of the runway to 6,000 feet in total length and improved lighting for Runway 16/39, new lighting improved taxiways for Runway 11/29, extended taxiways for Runway 16/34, and new taxiway connectors, and commercial fueling facility. Environmental Conditions Contaminated Sites Currently, there is only site within the MIC that is designated as a contaminated site according to the Department of Ecology’s Hazardous Sites List published in March 2011. Stella Jones, located at 6520 188th St. NE, operates a pressure-treated wood facility on a 39- acre property located in the General Industrial zoning district. The former Bayliner site has recently undergone Phase 1 monitoring and measures are being taken for clean up the site for future redevelopment. Other sites within the City’s jurisdiction, including two sites located on the airport, have since been cleaned up and the files are now closed. There are other sites located outside the MIC. Critical Areas The land area within the MIC boundary is relatively flat, with very little topographical relief. There are some steep slopes that flank the eastern boundary of the General Industrial area north of 188th St. that are approximately 15-30% slope, although none of the properties within the MIC have steep slopes on-site. No property within the MIC is located within flood zone hazard areas. There are very few wetlands located in the MIC area. According to the City’s critical area map, there are three areas of wetlands identified within the area.  7-acre wetland north of 204th St. NE between BNSF RR and SR 9;  7.5-acre wetland east of 67th Ave. NE at the end of 191st Place NE;  21-acre complex south of 172nd St. NE between 59th Ave. NE and 67th Ave. NE; and,  7.6-acres wetland south of 172nd St. NE between 51st Ave. NE and 59th Ave. NE Arlington – Smokey Point MIC Existing Conditions Report 54 There are three creeks located in the MIC area. Edgecomb Creek is located in the far southeastern part of the MIC, near the intersection of 67th Ave. NE and 172nd St. NE. Prairie and Portage Creeks are located in the northeastern portion of the area crossing 67th Ave. NE between 204th St. NE and 211th Pl. NE. All three creeks are considered salmon-bearing. Figure 9 shows all critical areas located within the MIC. ?| ?Ó !"`$ ?Ô Arlington Airport Proposed Manufacturing/Industrial Center Overlay 2009 aerial photo City of Arlington Figure 9:Critical Areas Legend ± Maps and GIS data are distributed “AS-IS” without warranties of any kind,either express or implied, including but not limited to warranties of suitabilityfor a particular purpose or use. Map data are compiled from a variety ofsources which may contain errors and users who rely upon the information doso at their own risk. Users agree to indemnify, defend, and hold harmless theCity of Arlington for any and all liability of any nature arising out of or resultingfrom the lack of accuracy or correctness of the data, or the use of the datapresented in the maps. 10/10/2011 kdk Date:Cartographer: ProposedMIC_ca_11x17_11.mxd Scale:File:1 inch = 1,600 feet Parcels downloaded from Snohomish County Assessor's FTP site, March 2011. Proposed MIC City mapped streams CAPE & NGPA Easements Nat'l Wetland Inventory City mapped wetlands Percent Slope <15% 15 - 33% >33% Parcels City Limits UGA Marysville Rail line Arlington – Smokey Point MIC Existing Conditions Report 56 Arlington – Smokey Point MIC Existing Conditions Report 57 Correlation to Comprehensive Plan Land Use In order to be designated as a regional MIC, a jurisdiction must discourage land uses that are incompatible with manufacturing and industrial, such as large retail areas, concentrated housing areas, and other uses not affiliated to those typically found in industrial zones. Any retail or office uses should only be considered accessory to the primary use. In addition, design standards shall be incorporated to mitigate impacts of manufacturing and industrial uses, as well as providing buffers to adjacent land uses. This can be achieved by incorporating standards which focus on improved building design, as well as site improvements such as substantial landscape screening. Existing Comprehensive Plan land use policies supporting and MIC and future designation criteria include:  Encourage industrial uses to share facilities such as internal roadways, parking facilities, and rail access (PL-12.3); .  Encourage industries with high job numbers that support the local resource processing needs (PL-12.4);  Explore and use economic or other incentive programs that would encourage appropriate industrial development (PL-13.1);  Encourage the development of planned industrial parks (PL-13.2);  Require adequate installation of landscape or structural buffers to separate differing land uses from the adverse impacts of industrial development (PL- 14.2);  Require that landscaped buffers are installed and maintained between uses and along roadways (PL-15.2);  Landscaping shall include the use (retention and/or replanting) of trees adequate to serve as visual and noise buffers (PL-15.3);  Develop and adopt Development Design Guidelines for all Industrial zones (PL- 15.5), and;  Incorporate open space and recreation opportunities such as linear parks and pedestrian/bicycle trails in industrial developments. Arlington – Smokey Point MIC Existing Conditions Report 58 Additional policies should be added to the Comprehensive Plan to support MIC designation, both locally and regionally. These include, but are not limited to:  Policy identifying the center as a local MIC and a future candidate for a regional MIC designation;  Policy limiting office and retail uses, while specifying industrial use thresholds needed to meet designation criteria;  Policy encouraging aggregating parcels to allow for additional industrial uses;  Policy that supports multi-modal transportation options, as well as highlighting the airport and rail as critical elements for industrial use support and development;  Policy specifying number of jobs required and target jobs within the MIC for regional designation;  Policy specifying transportation modes needed within industrial areas to move freight, workers and customers within the MIC;  Policy stating that existing residential units within the MIC shall convert to industrial uses over time. Transportation The Transportation Element of the City of Arlington Comprehensive Plan is supportive of MIC designation criteria in that it:  Identifies a number of road improvement projects, including widening, within the MIC;  Highlights trucking routes within the MIC that are critical links for manufacturing and industrial uses; and  Identifies non-motorized transportation facilities within the MIC, including trails (walking and biking) and sidewalks. Two key transportation features in the MIC include the Airport Trail and the Centennial Trail. To be more consistent with PSRC criteria for future MIC designation, more specific policy language should be added including:  Truck route improvements throughout the MIC to allow for future growth; Arlington – Smokey Point MIC Existing Conditions Report 59  Increased roadway and pedestrian connections within existing manufacturing and industrial areas of the MIC;  Greater focus on freight movement within and outside of the MIC;  More specific non-motorized policies as they relate to the MIC;  Stronger policies regarding multi-modal options, including use of transit and commute-trip reduction in the MIC; and,  Financing and prioritization of transportation improvements within the MIC. Capital Facilities For future regional MIC designation, PSRC requires that cities document plans and capital facilities for infrastructure and other amenities to support future planned industrial growth. In order to be more consistent with PSRC criteria, specific policies should be included within the Public Services and Capital Facilities Element that support wastewater and water utility services for industrial uses within the MIC. Additionally, if future planned industrial uses are expected to be larger than what current infrastructure can support, new policies should be included to support future expansion of these facilities. Maintaining existing level-of-service and allowing expansions will benefit industrial and manufacturing uses that will provide jobs, increase sales, and the local tax base. Economic Development Economic development policies supporting MIC designation currently listed in the Plan include:  Maintain and, where possible, enhance the favorable business climate that currently exists while protecting the City's residential areas from the impacts of incompatible uses (PE-1.2);  Identify sectors of the economy within Arlington where opportunity might exist to create additional jobs and identify potential strategies for attracting employment. In particular, provide a supportive business environment for start- up, light manufacturing and assembly businesses in the airport/industrial area (PE-2.3);  Ensure that new commercial development incorporates site and building design features that promote commuting by foot, bicycle, carpool, and/or transit. Such Arlington – Smokey Point MIC Existing Conditions Report 60 features include, but are not limited to, shower facilities, bicycle lockers, convenient carpool parking, and shelters at transit stops (PE-4.3);  Promote transportation system improvements that ensure efficient transport of goods and convenient access for employees and customers to and from places of business. Such system improvements shall include transit facilities and services, and pedestrian and bicycle facilities (PE-4.5);  Promote the growth of a diversified industrial base by insuring that the City has a variety of parcel sizes and types available to satisfy demand (PE-4.11);  Continue to diversify the City’s industrial base and protect [the] General Industrial area …. (PE-5.16);  Capitalize on the availability of rail transportation and the airport as a draw for high-wage paying industrial businesses (PE-5.17);  Seek a PSRC designation of “Manufacturing/Industrial Center,” perhaps jointly with the City of Marysville, which is planning for additional industrial/business park land use designations for the area of its UGA that abuts our industrial area. Such a designation would open up additional funding opportunities for infrastructure (PE-5.18); and,  Encourage the growth of the airport as an employment center by considering innovative public/private partnerships, tax incentives, and economic development planning to promote this growth (PE-6.1). To help strengthen goals and policies and to be consistent with PSRC criteria for future MIC designation, more specific policy language should be added including, but not limited to:  Develop and adopt Development Design Guidelines for all industrial zones (PL- 15.5), including the Arlington-Smokey Point Manufacturing/Industrial Center;  Develop and adopt Development Design Guidelines that address environmental impact mitigation, such as landscaping, noise reduction, and Low Impact Development (LID) techniques;  Enhance pedestrian facilities and amenities throughout the MIC and incorporate transit where feasible; and,  Provide or enhance pedestrian connections between industrial areas and the City’s trail network. Arlington – Smokey Point MIC Existing Conditions Report 61 MIC Growth Targets As stated previously, in order to be regionally designated as an MIC by PSRC, cities must show how they will be able to accommodate a minimum employment target of 20,000 jobs. Employment estimates are provided by Snohomish County thru the Buildable Lands Report (BLR). Under the Growth Management Act (GMA), all cities within Snohomish County are required to review and evaluate the amount of suitable residential, commercial and industrial lands within the Urban Growth Area (UGA) for accommodating projected population and employment growth during the remaining portion of the current 20-year GMA planning horizon. BLR’s are conducted every five years, as required by GMA. The County is currently undergoing an update to the BLR in 2012. The report will provide updated employment targets, as well as give employment estimates within the City by zoning district. This will allow staff to determine the approximate employment within the proposed MIC. The 2007 report stated that there was capacity for 11,447 jobs city-wide (including the UGA), with an employment density of 12.94 jobs per acre. With some changes to the zoning boundaries, capacities for the 2012 report may change. With higher densities proposed within the MIC for industrial and manufacturing jobs, as well as the incorporation of the Marysville MIC area, the two cities should be able to achieve the 20,000 employment target. Arlington – Smokey Point MIC Existing Conditions Report 62 Correlation to Land Use Code Land Use Regulations There are seven zoning districts within the zoning boundary. These include:  Aviation Flightline (AF)  Business Park (BP)  General Commercial (GC)  General Industrial (GI)  Highway Commercial (HC)  Light Industrial (LI)  Public/Semi-Public (P/SP) In the paragraphs below, discussion is divided by land use categories rather than by the above zoning districts. Industrial PSRC MIC designation criteria state that jurisdictions should discourage land uses that are incompatible with industrial, manufacturing and other like uses, such as large retail and housing developments or non-related office uses. Within the General Industrial and Light Industrial zones, a variety of industrial and manufacturing uses are permitted, such as manufacturing of goods, fabrications, construction services, and warehousing. Residential Housing is permitted within HC and GC zones only above non-residential uses, such as mixed-use (retail lower-level, housing above). No residential is permitted within the AF, BP, GI and LI zones. There are, however, a few existing homes located within these zones. Although not permanent housing, hotels/motels are permitted within BP, GC, and HC. Per PSRC MIC designation criteria, residential is not a compatible use with industrial and manufacturing. Therefore, the City may have to modify its zoning regulations to eliminate housing out of zones within the MIC where industrial would be allowed. Arlington – Smokey Point MIC Existing Conditions Report 63 Commercial Commercial uses, such as retail sales and restaurants, are primarily allowed outright within the HC and GC zoning districts. Within BP, GI, LI and AF, sales are limited to those uses that see limited or no traffic, such as wholesale sales. Mobile sales are also permitted, except within the AF zone. Motor vehicle sales and repair is permitted within GC and HC zones, and longer-term storage of vehicles is permitted within GI zones. Per PSRC MIC designation criteria, commercial uses within the MIC area should be limited and should only serve those uses that are primary to the MIC area. Inconsistencies should be removed in order to meet criteria for future regional designation. Limiting sizes of retail and commercial uses would be one method to achieve this goal. Office Office uses, such as professional, administrative and business services (i.e. doctors, dentists, attorneys) are generally permitted in all zones within the MIC. However, this is inconsistent with Snohomish County CPPs and PSRC designation criteria and should be modified. These uses may continue within the HC and GC zones, at a limited scale, but should not be permitted within all other districts unless the office use does not attract customers and is only associated with the principle use. Size limits should be imposed, similar to commercial uses, in order to comply with designation criteria. Other Uses GC, HC, BP, GI, LI and AF zones allow trade or vocational schools. GC, HC, BP, GL and LI zones also allow for recreational uses, as well as daycares, hospitals, medical clinics. Agricultural uses are also permitted within LI and GI zones. All of these uses may be considered inconsistent with MIC designation criteria. Therefore, the City may consider limiting these uses through conditional use permits. Additional Regulations PSRC criteria calls for jurisdictions to incorporate design standards to mitigate aesthetic and other impacts of manufacturing and industrial activities both within the center and on Arlington – Smokey Point MIC Existing Conditions Report 64 adjacent areas. The incorporation of landscaping regulations is one way to mitigate undesirable activities from adjacent uses. Existing landscaping regulations require street trees along all new streets and existing streets when redevelopment occurs. A landscaped screen of 30-feet is required for all uses along SR 531 and for non-residential uses that abut residential uses. Various buffer screening is also required along street frontages and between uses. In the case where abutting uses are different (i.e. industrial vs. residential), a substantial opaque screen is required, while uses that are alike require less or no screening. Landscaping regulations also require parking areas to be screened and internally shaded. The City shall consider developing design and development guidelines for the MIC that are consistent with the Comprehensive Plan, the Airport Master Plan and are complementary to the City of Marysville Smokey Point Master Plan. Because this is a joint planning effort, it is important to develop regulations that provide a seamless transition between the two communities. Regulations Consistent with Future MIC Designation Existing regulations that are consistent with future regional MIC designation include:  Exclusion of residential uses from the AF, BP, GI and LI zones (Table 20.40-1);  Street tree and parking lot screening requirements (AMC 20.76);  Joint use of parking spaces and satellite parking (AMC 20.72);  Reductions in parking space requirements (for businesses with transit options close-by, carpooling/vanpooling program, shuttle service) (AMC 20.72);  General design guidelines for GC, HC, BP, LI and GI zones (Development Design Guidelines); and,  Allowance of electric vehicle charging stations within industrial zones (alternative transportation) (AMC 20.44). Amendments to Regulations In order to pursue future regional MIC designation, the City should consider the following amendments:  Limit residential in all zones within the MIC boundary. Allow hotels/motels in GC, HC and BP by conditional use only. Temporary, emergency and repair of Arlington – Smokey Point MIC Existing Conditions Report 65 existing residential would still be permitted. Existing residential within the boundary would be considered legal-nonconforming uses;  Offices, such as professional, administrative or business services should not be limited within all industrial districts within the MIC. They may be permitted in HC and GC unless the office use does not attract customers and is only associated with the principle use;  Limit retail/commercial uses within industrial zones, while only allowing limited uses within the HC and GC zones. Additionally, they should be supportive of industrial uses that are primary to the MIC and shall be limited in size;  Limit (through conditional use permit) agricultural, hospitals, medical clinics, commercial recreational uses, and daycares;  Adopt design and development guidelines which incorporates improved landscaping requirements, incorporates low-impact-development (LID) guidelines, includes architectural standards, addresses critical areas, and details infrastructure and drainage improvements. These guidelines would be consistent with the Comprehensive Plan, Airport Master Plan and City of Marysville Smokey Point Master Plan; and,  Upon designation by the PSRC Executive board as a “provisional MIC”, adopt a center subarea plan (joint-effort with City of Marysville) as part of the Comprehensive Plan no later than two years after designation. Required topics shall follow PSRC’s Manufacturing Industrial Center Plan Checklist. Arlington – Smokey Point MIC Existing Conditions Report 66 Arlington – Smokey Point MIC Existing Conditions Report 67 Summary Regional MIC Compliance As previously discussed, the PSRC Manufacturing/Industrial Center Designation Criteria require that jurisdictions achieve a minimum of 10,000 existing jobs within the MIC boundary. As of 2011, the existing job total within the City of Arlington’s portion of Arlington-Smokey Point MIC boundary is just over 3,400. The City of Marysville’s identified industrial area is primarily vacant, and therefore will take many years until this are a reaches the required job totals to achieve regional status along with the City of Arlington. In order to provide additional employment needed to meet the minimum jobs threshold, the City of Marysville has discussed expanding their portion of the MIC to encompass commercial areas along Smokey Point Blvd. and Interstate 5. However, this area is primarily zoned for commercial uses and including it would be inconsistent with the designation criteria. Due to existing market conditions, there are no near-term expectations to achieve regional MIC status. However, with future development on vacant lands and the return of businesses to existing vacant manufacturing and industrial buildings, there is significant potential for job growth. Until then, the City will identify the area in local plans and regulations. Recommendations In addition to land use regulation amendments identified in the previous section, specific policy language related to the MIC need to be developed as part of the Comprehensive Plan. Further discussions with the City of Marysville and PSRC should also be conducted to ensure that efforts to achieve future regional designation are moving forward (i.e. proper zoning and land use designations, economic development growth within the MIC boundary, transportation management, etc.). Arlington – Smokey Point MIC Existing Conditions Report 68 Appendix A –Puget Sound Regional Council Designation Procedures for New Manufacturing/Industrial Centers (September 2011) Puget Sound Regional Council MIC-1 September 22, 2011 Designation Procedures for New Regional Manufacturing/Industrial Centers The Designation Procedures address the following: Purpose and Objective; Eligibility and Designation Process; and Designation Criteria. For a jurisdiction(s) seeking regional designation, a separate Regional Center Designation Application Form is available. PART 1. Purpose and Objective. The regional manufacturing industrial centers designation procedures are designed to: a. Document that the proposed center has the desire, capacity, and development potential to play a regional role in attracting and accommodating a significant share of the jurisdiction’s employment growth. b. Limit the number and geographic distribution of regional manufacturing industrial centers. The region needs to maintain a reasonable number and distribution in order for manufacturing industrial centers to: i. Serve as an organizing framework for the Freight and Goods component of the region’s Metropolitan Transportation System. ii. Serve as the primary concentrations of industrial and manufacturing related jobs that are important to the region. iii. Have the potential to generate sufficient market demand to make centers successful. c. Provide regional consistency regarding the type, location, distribution, and development potential of new manufacturing industrial centers. d. Ensure that regional manufacturing industrial centers meet the goals and expectations established in VISION 2040, as described below. PART 2. Eligibility and Designation Process. a. To be eligible for consideration as a designated regional manufacturing industrial center, the jurisdiction1 must: 1 In cases where an application for a MIC crosses a jurisdiction's boundaries the application must describe the manner and structure (e.g., an interlocal agreement or memorandum of understanding), within which the parties will plan together over the long-term. Puget Sound Regional Council MIC-2 September 22, 2011 Regional Manufacturing Industrial Center Designation Procedures i. Demonstrate that the proposed center is located within an urban growth area. Although preferred, it is not required that proposed manufacturing industrial centers be located in a city. 2 ii. Identify the center as a candidate for a regional manufacturing industrial center designation in the local jurisdiction’s comprehensive plan. iii. Identify the center as a candidate for a regional manufacturing industrial center in the countywide planning policies. iv. The jurisdiction must adopt an ordinance or resolution requesting the PSRC to designate it as a regional manufacturing industrial center and authorizing the staff of the jurisdiction to submit an application. b. Applications submitted to PSRC will be reviewed to ensure they meet eligibility and minimum requirements, including required activity level thresholds, before the application and staff report are provided to the Growth Management Policy Board. c. Designation of regional manufacturing industrial centers will be made by the Executive Board based on the recommendation of the Growth Management Policy Board, the jurisdiction's application and presentation, and a report prepared by PSRC staff. d. Once designated by PSRC’s Executive Board, the center will receive "provisional" status. This status will exist until the jurisdiction has adopted a center subarea plan into their comprehensive plan and it has been certified by PSRC's Executive Board. 3 i. Subarea Plan Expectations: Jurisdictions with regional manufacturing industrial centers are required to adopt a center subarea plan as part of their comprehensive plan no later than two years after designation. a. The required topics to be addressed in the center subarea plan are described in the Manufacturing Industrial Center Plan Checklist in PSRC's Plan Review Manual (see Part 3 below). b. Center subarea plans will be reviewed for certification as part of the comprehensive plan. If the subarea plan does not meet certification requirements, PSRC staff will work with the Growth Management Policy Board to determine whether or not the regional designation is to be retained. 2 Designation of centers outside of cities may occur, but only in limited circumstances. Applications for a center outside of a city will need to demonstrate a history of, and collaborative agreement regarding, joint planning and service provision, as well as joint plans for annexation or incorporation. VISION 2040 states that annexation is preferred to incorporation and that unincorporated urban area growth should occur in areas that can be annexed. 3 If a jurisdiction has completed a center subarea plan and submits it at the time of application, once the plan is certified the provisional status will be removed. Puget Sound Regional Council MIC-3 September 22, 2011 Regional Manufacturing Industrial Center Designation Procedures c. Either at initial adoption or through subsequent updates, the planning horizon and update cycle for the center subarea is to be concurrent with the jurisdiction's comprehensive plan. d. Any changes to the center subarea plan – including boundaries, growth targets, zoning, etc. – are to be incorporated in the plan and submitted to PSRC for review and, as necessary, certification. ii. During the "provisional" status period, the newly designated center will have equal status to existing designated regional centers. iii. To ensure that new regional centers are taking on the responsibility of a regionally designated center at the onset of its designation (during the time period of the "provisional" status), jurisdictions are expected to commit, to the extent practicable, to the planning expectations defined in the designation procedures and the jurisdiction's application. e. After two years, if the center subarea plan has not been adopted and submitted for review and certification, a "provisional" center will lose its status as a regional center. At the discretion of the Growth Management Policy Board, however, the jurisdiction may be given additional time to work with PSRC staff to address outstanding issues and meet the planning expectations. If expectations cannot be met, the center will lose its regional designation. PART 3. Designation Criteria. Proposed regional manufacturing industrial centers must demonstrate and document the following: a. Compatibility with VISION 2040. The jurisdiction’s vision for the proposed regional manufacturing industrial center must reinforce the centers concept within the VISION 2040 regional growth strategy and multicounty planning policies. b. Required Activity Levels - Employment Thresholds. i. Must have a minimum existing employment level of at least 10,000 jobs. The required existing activity level must be met before regional designation can be pursued. ii. Must have a minimum target employment level of at least 20,000 jobs. The required target activity level is based on the jurisdiction's adopted growth target4 that guides the center subarea plan. 4 Growth Targets are the amount of growth a jurisdiction has agreed, through the countywide process, to plan for throughout its comprehensive plan elements over the 20-year horizon of the comprehensive plan. The targets include both the baseline density (current) plus the 20-year growth. Puget Sound Regional Council MIC-4 September 22, 2011 Regional Manufacturing Industrial Center Designation Procedures iii. Must have sufficient zoned development capacity5 to adequately accommodate targeted levels of growth. Because it is not time-bound, zoned capacity can allow higher levels of development and a more compact and mature urban form in regional centers. c. Planned Land Use and Zoning. At least 80% of property within the proposed new regional manufacturing industrial center boundaries must have planned future land use and current zoning designations for industrial and manufacturing uses. d. Commitment to Center Planning Expectations. The jurisdiction must address each topic listed in the Manufacturing Industrial Center Plan Checklist in PSRC's Plan Review Manual in their subarea plan. It is expected that significant planning will have occurred prior to application for regional designation. At the time of application, the jurisdiction will describe the current status of planning and implementation efforts for each of these topics. Where planning and implementation gaps exist, describe how these will be addressed in the subarea planning process. A summary of the topics in the Checklist is as follows: i. Center Plan Concept or vision (including including commitment to preservation of the urban industrial land base, center relationships and context, and development potential). ii. Environment (including critical areas, stormwater, air pollution, and greenhouse gas emissions). iii. Land Use (including defined boundaries with appropriate size and shape, employment growth targets and zoned capacity, discouraging incompatible uses, and urban design). iv. Economy (including economic role in city and region, manufacturing industrial supportive strategies, and industry clusters). v. Public Services (including capital facility plans and financing that are consistent with growth targets). vi. Transportation (including transportation networks, planned improvements, capacity for freight movement, employee commuting, and mode split goals). 5 Zoned Development Capacity is the amount of development allowed under adopted zoning based on parameters in the zoning regulations such as allowed heights and densities, lot coverages and setbacks, floor area ratios, etc. Zoned Development Capacity is not bound to a specific planning horizon. Jurisdictions must have adequate zoned capacity to accommodate their Growth Target, and this is evaluated under Buildable Lands. Arlington – Smokey Point MIC Existing Conditions Report 69 Appendix B – PSRC Regional Centers Plan Checklist Puget Sound Regional Council—Center Plan Reporting Tool 3 Regional Growth Center Regional Growth Center Regional Growth Center Regional Growth Center PlanPlanPlanPlan ChecklistChecklistChecklistChecklist Additional Transportation IssuesAdditional Transportation IssuesAdditional Transportation IssuesAdditional Transportation Issues  Develop an integrated multimodal transportation network, including pedestrian and bicycle facilities, as well as linkages to adjacent neighborhoods and districts  Include detailed design criteria that advances transit-supportive land uses  Address relationships to regional high-capacity transit (including bus rapid transit, commuter rail, light rail, and express bus) and local transit by working with transit agencies  Include provisions for full standards for streets and urban roadways that serve all users, including pedestrians, bicyclists, transit, vehicles, and – where appropriate – freight (see “complete streets” description in VISION 2040)  Include provisions context-sensitive design of transportation facilities  Include provisions for environmentally friendly street (“green street”) treatments  Tailor level-of-service standards and concurrency provisions for the center to encourage transit  Include a parking management strategy  Develop mode-split goals RRRRegional Manufacturing Industrial Center egional Manufacturing Industrial Center egional Manufacturing Industrial Center egional Manufacturing Industrial Center PlanPlanPlanPlan ChecklistChecklistChecklistChecklist Center Plan Concept (or "Vision")  Include a vision for the center. This should include a commitment to preservation of an urban industrial land base  Include an overview of the relationship of the center plan to the city’s comprehensive plan, as well as VISION 2040 and countywide planning policies  Include a market analysis of the center’s development potential Environment  Identify and develop provision to protect critical/environmentally sensitive areas  Include policies and programs for innovative treatment of stormwater and drainage (related to Public Services)  Include strategies and programs to reduce air pollution and greenhouse gas emissions Puget Sound Regional Council—Center Plan Reporting Tool 4 RRRRegional Manufacturing Industrial Center egional Manufacturing Industrial Center egional Manufacturing Industrial Center egional Manufacturing Industrial Center PlanPlanPlanPlan ChecklistChecklistChecklistChecklist Land Use  Demonstrate and explain the defined boundaries and shape for the center  Establish employment growth targets that accommodate a significant share of the jurisdiction’s manufacturing/industrial employment growth, and demonstrate capacity to accommodate these levels of growth (note that targets are aspirational and state the minimum number of jobs that a jurisdiction must be zoned to accommodate and will strive to absorb by the planning horizon year. Targets are distinct from zoned development capacity)  Describe the percentage of planned land use and zoning in the center for industrial and manufacturing uses  Describe strategies to avoid land uses that are incompatible with manufacturing, industrial uses, such as large retail uses, high concentrations of housing, or non-related office uses (other than as an accessory use)  Include design standards that help mitigate aesthetic and other impacts of manufacturing and industrial activities both within the center and on adjacent areas Economy  Describe the economic role of the center within the city and the region  Describe strategies to support or maintain manufacturing industrial industries (i.e., workforce, apprenticeships, land value policies, parcel aggregation, etc.)  Describe key sectors and industry clusters in the center Public Services  Describe local capital plans for infrastructure, as well as their financing (such as sewer, water, gas, electric, telecommunications). Explain strategies to ensure facilities are provided consistent with targeted growth Transportation  Describe the transportation networks to and within the manufacturing industrial center, and plans to identify and address deficiencies  Describe strategies that address freight movement, including local and regional distribution  Describe strategies that address freight movement and employee commuting (such as by encouraging modes such as fixed-route and high-capacity transit, rail, trucking facilities, or waterway, as appropriate)  Address relationships to regional high-capacity transit (including bus rapid transit, commuter rail, light rail, and express bus) and local transit by working with transit agencies  Develop mode split goals Arlington – Smokey Point MIC Existing Conditions Report 70 Appendix C – Snohomish Countywide Planning Policies (applicable pages, June 2011) Economic Development and Employment Page 40 Countywide Planning Policies: Eff. June 24, 2011 a. Aerospace; b. Technology; c. Life sciences and healthcare; d. International trade; e. Military; f. Tourism; g. Agriculture; and h. Education ED-2 The County and cities should encourage the establishment and growth of locally owned, small businesses through comprehensive plan policies, infrastructure investments, and fair and appropriate land use regulations in all communities. ED-3 Jurisdictions should prioritize multi-modal transportation system linkages between growth centers, manufacturing and industrial centers, and supporting residential areas containing an adequate supply of affordable housing (as appropriate). ED-4 State and federal economic development and transportation funding should be prioritized to regionally designated centers and sub-centers as well as transportation system linkages between regional growth centers, manufacturing industrial centers, and supporting residential areas containing an adequate supply of affordable housing. ED-5 The process for designating Manufacturing/Industrial Centers (MICs) shall be as follows: a. A local jurisdiction may nominate an MIC; b. An economic development subcommittee of Snohomish County Tomorrow (SCT) reviews the proposal for conformity with the criteria in ED-6; c. If the MIC proposal is found to be appropriate, the SCT Steering Committee recommends the MIC for designation; and d. The County Council holds a public hearing and makes the decision to seek designation of the MIC as a candidate center to be forwarded to the Puget Sound Regional Council for consideration. ED-6 Manufacturing/Industrial Centers (MICs) designated through the process in ED-5 shall be located in Urban Growth Areas (UGAs). MICs should have clearly defined geographic boundaries and develop in accordance with the general guidelines established in the VISION 2040 Regional Growth Strategy. Specifically, an MIC should meet the following criteria, it: a. Consists of major, existing regional employment areas of intensive, concentrated manufacturing, industrial and high technology land uses, including – but not limited to – aviation facilities and services; b. Provides capacity and planning for a minimum of 20,000 jobs; c. Is located outside other designated centers but in a UGA; Economic Development and Employment Page 41 Countywide Planning Policies: Eff. June 24, 2011 d. Includes land uses that cannot easily be mixed at higher densities with other uses; e. Is supported by adequate public facilities and service, including good access to the regional transportation system; and f. Discourages retail and office uses unless they are supportive of the preferred uses in (a.). ED-7 The County and adjacent cities shall protect the Paine Field-Boeing area as a Manufacturing Industrial Center (MIC), recognizing that it is a major, existing regional employment area of intensive, concentrated manufacturing and industrial land uses, including aerospace, aircraft manufacturing and high- technology uses. Notwithstanding the VISION 2040 guidelines for MIC designation, land uses and zoning of Paine Field continue to be governed by the Snohomish County Airport Paine Field Master Plan and Snohomish County Zoning Code consistent with federal aviation policies and grant obligations. This MIC should: a. Accommodate aerospace related employment and associated activities; b. Accommodate employment which requires a high floor area to employee ratio but strive to increase the overall employment density in the manufacturing and industrial center; c. Encourage a mix of uses which support and enhance manufacturing, aerospace and industrial centers; and d. Be supported by adequate public facilities and services, including good access to the region's transportation system, which are essential to the success of the MIC. ED-8 Jurisdictions are encouraged to work with businesses and organizations to develop economic development plan elements and analyze the land use designations, infrastructure and services needed by business uses. ED-9 As appropriate, the County and cities should adopt plans, policies, and regulations that preserve designated industrial, commercial, agricultural, and resource land base for long-term regional economic benefit. ED-10 In their local comprehensive plans, jurisdictions shall include economic development policies consistent with existing or planned capital and utility facilities. These plans should identify and implement strategies to ensure timely development of needed facilities. ED-11 In cooperation with school districts, other education providers, and each other, jurisdictions should ensure the availability of sufficient land and services for future K-20 school needs, and support improved education and job training resources for all citizens, such as a 4-year university or technical college in Snohomish County. Arlington – Smokey Point MIC Existing Conditions Report 71 Appendix D – Existing 2011 PM Peak Hour Traffic Volumes City of Arlington 2035 Transportation Plan 204th St 27 t h A v e Burke Ave 59 t h A v e Sm o k e y P o i n t B l v d 67 t h A v e 172nd St INTERSTATE 5 INTERSTATE 5 43 r d A v e 530 5309 9 531 531 188th St Highland Dr Ol y m p i c A v e 51 s t A v e 186th St 47 t h A v e 211th P l 47 t h A v e Bu r n R d 3rd St 95 t h A v e Cemetery Rd 5th St 1st St Tveit Rd 83 r d A v e Old B u r n R d 182nd St Eagle f i e l d D r 188th St 168th St Sm o k e y P o i n t B l v d 204th St 59 t h A v e 26 25 23 1719 910 11 4 2 1 71312 3 6 16 22 14 24 8 18 15 5 20 XX PM PEAK HOUR TRAFFIC VOLUMES Existing 2011 PM Peak Hour Traffic Volumes Figure 7 22) 172nd St NE at 43rd Ave NE 19) 172nd St NE at 67th Ave NE 24) Smokey Point Dr at Smokey Point Blvd 55 1 95 10 0 0 03050 0 1590 65 5 26) 172nd St NE at I-5 SB Ramps 8) 211th Pl NE at 67th Ave NE 7) E Highland Dr at S Stillaguamish Ave 50 60 75 5 65 5 108575 156580 6) Lebanon St at 67th Ave NE 5) E Maple St at S Olympic Ave 4) W Division St at Hazel St 3) E Division St at N Olympic Ave 0 305 90 0 200 90 050 13 0952 2) W Burke Ave at Hazel St 75 235 6024 5 43 5 38 0 1) E Burke Ave at N Manhattan Ave 9) 204th St NE at SR-9 175 245 155 150 220 160 7015 5 25 5 11 580 29 5 20) 172nd St NE at 59th Ave NE 18) 172nd St NE at Gleneagle Blvd 23) 172nd St NE at Smokey Point Blvd 330 805 340 125 755 155 21 5 24 0 21 0 18 0 55 5 35 5 25) 172nd St NE at I-5 NB Ramps 14) Crown Ridge Blvd at SR-9 16) 188th St NE at Smokey Point Blvd 100 760 15 35 570 5 3528 5 5 5251 130 435 15 255 1565 13) SR-530 at I-5 SB Ramps 12) SR-530 at I-5 NB Ramps 11) 211th Pl NE at SR-530 10) 204th St NE at 67th Ave NE 15) 188th St NE at 67th Ave NE 17) 172nd St NE at SR-9 40 895 10 15 880 10 10150 10251 260 455 95 45 305 40 8023 0 19 5 6575 16 0 685 15 400 20 655 340 250 175 140 160 70 8018 0 23 0 40 18 0 35 5 125 5 35 2 2 0 213 0 10 5 525 11 5 45 140 30 20 5 11 0 25 5 90 1 75 10 0 15 57534 0 1525 39 0 55 30 25 105 20 80 10 5 80 45 0 11 035 32 5 105 85 245 325 35 5 50 1 30 390 440 425 63 5 13 5 5 65 90 25 105 130 190 11 5 70 18 0 18 530 27 5 5 5 25 10 10 190 15015 0 23 020 20 0 21) 172nd St NE at 51st Ave NE 15 805 140 90 850 15 303520 85 15 5 5 5 0 5 15 0 135 10116 0 14 5 5 25 0 660 225 485 5 5 17 0 120 85 210 15 30 5 2010 5 32 5 2 14 5 24 5 220 795 420 1230 77 5 57 5 0 775 450 560 1245 24 0 21 5 0 LEGEND City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #8 ATTACHMENT H COUNCIL MEETING DATE: November 28, 2011 SUBJECT: Arlington Advanced Manufacturing Park (aka Former Bayliner Site) – Binding Site Plan Dedications and Easements DEPARTMENT OF ORIGIN: Community Development Contact: David Kuhl, Todd Hall ATTACHMENTS: 1. Draft Binding Site Plan - Dedications and Easements EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: N/A DESCRIPTION: The applicant requests a binding site plan to subdivide a 24-lot binding site plan with 4 tracts, located at 17825 59th Ave. NE. There are 16 existing buildings located on site, as well as additional outbuildings/sheds and on-site landscaping and trees. The applicant proposes to keep all larger existing buildings for future tenant use and may be updated depending on specific tenant needs. All vacant lots will require land use permits upon future development. A 60-foot right-of-way will be dedicated along 180th St. NE and 63rd Ave. NE, as well as on-site utility easements. HISTORY: The Binding Site Plan (BSP) application was received by the City on September 22, 2011. A Mitigated Determination of Nonsignificance for the BSP was issued on October 13, 2011. The BSP is expected to be administratively approved by Staff in early December. ALTERNATIVES: No action. RECOMMENDED MOTION: No action at this time. Council will be asked to accept the dedications and easements as shown on the draft binding site plan, subject to minor changes in descriptive language and closures on the binding site plan at the December 5, 2011 Council meeting. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #9 ATTACHMENT I COUNCIL MEETING DATE: November 28, 2011 SUBJECT: Sub-lease Agreement with the Arlington Food Bank DEPARTMENT OF ORIGIN: Executive/ Paul Ellis 4603 ATTACHMENTS: Sublease agreement with the Arlington Food Bank, with Airport General Lease Conditions attached Map of property EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: Legal review has been completed DESCRIPTION: The new Food Bank facility is being proposed for construction at the site of the old animal shelter. This site is leased to the City by the Airport with only a portion of the property being used for the Police Impound facility. The concept is to continue holding the primary lease on the property to maintain the use of the Police impound facility and sub-lease a portion of the property to the Arlington Food Bank as the site for their new facility. The proposed sub-lease with the Arlington Food Bank would be for 25 years. The Police Impound function would remain on site and the Food Bank would be constructed in an open unused area. The Food Bank would be responsible for all site improvements and construction of the new facility. HISTORY: The Food Bank is in need of a new facility. They are currently housed in an old house on W. Cox St. adjacent to Haller Park. The facility is too small to meet the growing needs of the Food Bank and is in danger of flooding during the flood season. In 2010, the Food Bank applied for CDBG funding to construct a new facility. They received $255,000 and have been planning a new facility while working on a community capital campaign to rise additional funding. ALTERNATIVES: RECOMMENDED ACTION: Review and discuss the sub-lease agreement with the Arlington Food Bank so it can be placed on the December 5, 2011 Council agenda for formal action. City of Arlington Council Agenda Bill AGENDA ITEM: WORKSHOP #10 ATTACHMENT J COUNCIL MEETING DATE: November 28, 2011 SUBJECT: Request for Authorization to apply for tourism grant funds DEPARTMENT OF ORIGIN: Executive Contact: Sarah Lopez, 360-403-3448 ATTACHMENTS: EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: LEGAL REVIEW: no DESCRIPTION: Requesting approval to apply for the following grants: • Snohomish County Tourism Promotion Area grant $17,000 for entryway signs • Snohomish County Tourism Promotion Projects Assistance Program $46,000 for improvements to Country Charm Park • City of Arlington Tourism Economic Development Grant 1. $46,000 for Country Charm Park Improvements 2. $5,200 for Eagle Festival Event 3. $8,500 for summer outdoor events (Music in the Park, Shakespeare, Outdoor Movies) 4. $6,300 for video equipment for promotions of Arlington 5. $9,456 for artistic banners for Arlington 6. $17,000 for entryway signs HISTORY: ALTERNATIVES: Do not authorize, or authorize partially. RECOMMENDED ACTION: Authorize the City to apply for these grants.