Loading...
HomeMy WebLinkAbout03-28-2011_Council Workshop Packet SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER / PLEDGE OF ALLEGIANCE/ROLL CALL APPROVAL OF THE AGENDA WORKSHOP ITEMS ~ NO FINAL ACTION WILL BE TAKEN 1. (10 min) Slurry Seal Project – Authority to Bid using the Small Works Roster ATTACHMENT A 2. (5 min) Confidentiality Agreement ATTACHMENT B 3. (10 min) 67th Ave Supplement 5 - supplement to HDR Contract ATTACHMENT C 4. (5 min) Public Art Acceptance – Carved Eagle ATTACHMENT D 5. (10 min) Road closure request – Olympic Ave between 4th & 5th ATTACHMENT E 6. (10 min) Acceptance of Vista Final Short Plat ATTACHMENT F 7. (10 min) Acceptance of Draco Final Short Plat ATTACHMENT G 8. (5 min) Shoreline Master Plan Update ATTACHMENT H 9. (5 min) Country Charm Conservation Area Update ATTACHMENT I 10. (5 min) Grants Report ATTACHMENT J 11. Miscellaneous Council items ADJOURNMENT To open all attachments, click here Arlington City Council Workshop March 28, 2011 – 7 PM City Council Chambers ~ 110 E. Third City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT A COUNCIL WORKSHOP DATE: March 28, 2011 SUBJECT: Slurry Seal Pavement Preservation Project DEPARTMENT OF ORIGIN: Public Works – Engineering ATTACHMENTS: • None (Engineer’s estimate to be a handout at workshop) EXPENDITURES REQUESTED: $70.000.00 (a 2011 budgeted item) BUDGET CATEGORY: Transportation Improvement Fund 310 LEGAL REVIEW: City Attorney will review all documents prior to Bid Advertisement. DESCRIPTION: The City’s 2011 approved budget includes funds for a Slurry Seal Pavement Project, this agenda bill requests authorization to bid the project from the City’s Small Works Roster. HISTORY: A Slurry Seal is a cold mixed asphalt that consists of a graded aggregate, a binder, fines and additives. It produces a hard wearing surfacing for overlaying existing pavement and road maintenance. Slurry Seal is the most versatile and cost effective way to preserve and protect road surfaces. The application of slurry seal will significantly extend the life of existing pavements by protecting the undersurface from the effects of aging and the environment. The City will be using a Type II Slurry Seal. This consists of general aggregates that are the most commonly used and are widely employed where moderate-to-heavy traffic is found. The process will seal, correct moderate-to-severe raveling, oxidation and loss of matrix, and improve skid resistance. This will be the first case of using Slurry Seal in the City – we will be monitoring its effectiveness over the following 12 months. ALTERNATIVES: Defer to staff for additional design/planning. RECOMMENDED ACTION: Discussion only – no action is being requested at this time. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT B COUNCIL WORKSHOP DATE: March 28, 2011 SUBJECT: Confidentiality Agreements DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: • PSRC Agreement to Release Information • WA State Employment Security Department Notice of Non Disclosure EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: Approved by City Attorney DESCRIPTION: Confidentiality Agreements are required to allow the City of Marysville and the Puget Sound Regional Council to share confidential employment data with the City for preparation of the City’s Transportation Comp Plan. HISTORY: City of Arlington entered into contract with Shea-Carr-Jewell to complete the Transportation Comprehensive Plan (Transportation Element) which is a required element of City’s General Comprehensive Plan. The Puget Sound Regional Council (PSRC) requires every municipality to prepare a Transportation Comprehensive Plan, in accordance with PSRC requirements, in order to be eligible for transportation funding. As part of completing the plan, confidentiality agreements are required in order to allow the City of Marysville and the PSRC to share employment data to aid in preparation of the transportation model. PSRC member jurisdictions can sign appropriate agreements in order to obtain access to confidential estimates; these are intended only as model inputs, and are not to be published or distributed to anyone except authorized personnel and agents of the requesting jurisdiction. ALTERNATIVES: - Do not sign agreement RECOMMENDED ACTION: - Discussion only – no action is being requested. ESD Agreement No. 06-453-DS EXHIBIT B WASHINGTON STATE EMPLOYMENT SECURITY DEPARTMENT NOTICE OF NONDISCLOSURE As a non-Employment Security Department (ESD) employee, you may be given access to records or information that is deemed private and confidential by statute. You may not make any unauthorized disclosure of private or confidential information about employers, clients/claimants or employees to any person or entity. Confidential information includes but is not limited to employee’s wages or hours, unemployment insurance benefit records, and standard industrial classification (SIC) codes or North American Industry Coding System (NAICS) of individual employers. The unauthorized disclosure or abuse of information deemed private and confidential may subject you to a civil penalty of Five Thousand dollars ($5,000) and other applicable sanctions under state and federal law. (RCW 50.13) I have read and understand the above Notice of Nondisclosure. _____________________________________________ Printed Name _____________________________________________ Signature Date The above individual has been informed of the obligations of the above referenced agreement and Statement of Work including any limitations, use or publishing of Confidential Data. _____________________________________________ Printed Name _____________________________________________ Signature Date (An original of this notice must be returned to the Employment Security Department.) Puget Sound Regional Council Agreement to Release Information 1) The undersigned Requesting Entity has requested information or records that are deemed private and confidential by the Washington State Employment Security Department (ESD). 2) In order to receive such information, Requesting Entity agrees that certain safeguards must be followed in order to maintain the confidentiality of the data. Access to the information must be restricted to only those authorized personnel or agents. By signing this document, you, the Requesting Entity, agree that you shall take precautions to ensure that only authorized personnel or agents are given access to the data set provided. The information must be stored in an area that is safe from access by unauthorized persons during duty hours as well as non-duty hours, or when not in use and has to be protected in a manner, which prevents unauthorized persons from retrieving the information by computer, remote terminal or other means. 3) The Requesting Entity agrees to only use the data for authorized purposes. These purposes include verification of the point level data and activities required under mandated growth management requirements, including economic impact analysis and transportation impacts on employment trends. 4) The information provided will remain the property of ESD and will not be duplicated or disclosed without the written authority of ESD. The Requesting Entity shall protect the confidentiality of the information. 5) The Requesting Entity agrees to and shall indemnify, hold harmless and defend PSRC, its members, officers, agents and employees from and against all claims, losses or liability of whatever nature related to any unauthorized disclosure or abuse of information by Requesting Entity under t his agreement. 6) The Requesting Entity agrees to notify the PSRC in writing within five (5) working days of becoming aware of any unauthorized access, use, or disclosure of the information. I have read, understand, and agree to this Agreement to Release Information: Requesting Entity Printed Name Authorized Signature Date City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT C COUNCIL WORKSHOP DATE: March 28, 2011 SUBJECT: HDR Engineering Contract for 67th Avenue Reconstruction Project Phase III Final Design Contract Supplement #5 DEPARTMENT OF ORIGIN: Public Works Administration ATTACHMENTS: • Scope of Work and Fee estimate EXPENDITURES REQUESTED: $45,773.21 BUDGET CATEGORY: Transportation Improvement and STP Grant LEGAL REVIEW: Pending City Attorney review DESCRIPTION: The City has contracted with HDR Engineering for design for Phase III reconstruction of 67th Avenue. There are nine additional Right-of Way parcels than what was estimated in the original scope and fee estimate. HISTORY: In May of 2009 Council authorized staff to contract with HDR Engineering for Completion of a 30% design for Phase III reconstruction of 67th Avenue NE from 204th Street NE to Olympic Avenue and West Avenue; after the completion of the 30% design, the City extended the contract to include final design (100%) in September of 2010. As part of the final design, the City has to prepare a Right-of-Way acquisition program in accordance with WSDOT regulations. The original proposal for final design estimated acquisition of ROW from 10 parcels – final design has ROW required from 19 parcels. Supplement #5 provides a scope and fee for needed to accommodate the extra nine parcels. ALTERNATIVES: • Remand to staff for additional information • Table pending further discussion RECOMMENDED ACTION: Presentation only, no action will be taken. Attachment A, Scope of Services SUMMARY Supplement 5 Page 1 SUMMARY 67th Avenue Phase III Reconstruction Supplement 5 Scope of Services – Right of Way, Constructability Review Task A - Project Management • Basic project management for added subconsultant, added deliverables Task G - Right of Way • Additional effort for 9 new parcel transactions, includes: o Task Management and Pre-Acquisition services o Additional work on PFE o Additional Negotiation and Acquisition time o Assemble certification package Task W - Constructability Review • Constructability review by Kevin Sakai of William P Ott Construction o ¾ of his time on 60%, ¼ on 90% Attachment A, Scope of Services Supplement 5 Page 1 Attachment A 67th Avenue Phase III Reconstruction City of Arlington, Washington Supplement 5 Scope of Services – Right of Way, Constructability Review Introduction During the term of this Agreement, HDR Engineering, Inc., (CONSULTANT) will perform professional services for the City of Arlington (CITY) in connection with the 67th Avenue Phase III Reconstruction Project (PROJECT). This Scope of Services will be used to plan, conduct, and complete the work on the PROJECT as described herein or as amended by written Agreement between the CONSULTANT and CITY. This supplement addresses the need for additional right of way services, phasing of construction plans, a constructability review, and a shift in the project alignment to avoid property impacts to BNSF. Task A - Project Management 3. Sub-Consultant Management It is the responsibility of CONSULTANT to manage the consultant team. Subconsultants will report directly to CONSULTANT for PROJECT direction and management. CONSULTANT will: • Establish, maintain, and administer agreements with subconsultants, and ensure contractual requirements are met. • Provide regular direction to CONSULTANT team. • Conduct internal coordination meetings between PROJECT team members as appropriate to control the work. • Monitor the planned versus actual rate of expenditure for each Task and take corrective actions, if and when necessary. • Monitor the planned versus actual rate of progress for each Task and take corrective actions, if and when necessary. • Inform the PROJECT team of issues to be resolved, the schedule for resolution, and the potential impacts to the successful completion of the PROJECT. • Monitor in-house and subconsultant work for adherence to scope, schedule, budget, and quality standards. • Manage integration of the Subconsultant’s work. • Monitor and confirm that PROJECT work is being performed and prepared in compliance with the stated PROJECT standards. • Verify that the documents and electronic files generated for the PROJECT are being documented and retained in PROJECT files consistent with CITY and CONSULTANT requirements. Attachment A, Scope of Services Supplement 5 Page 2 Task G - Right of Way This task supplement addresses the increase in the number of parcels requiring a transaction from 10 to 19. General Right of Way Assumptions: • CONSULTANT will follow the Uniform Relocation Act, WSDOT LAG manual guidelines, all applicable State and local laws and CITY administrative rules for right of way acquisition and all real estate services provided for this project. • CITY will provide pre-approve real estate forms to be used for this project for CONSULTANT’S use or approve use of standard WSDOT LAG manual ROW forms. • CITY agrees to provide CONSULTANT with all available project information such as but not limited to the CITY’s State approved right of way procedures, environmental documentation and any pre-approved City right of way forms. • There are a maximum of nine (9) additional parcels to be acquired compared to the original scope for this project for a new total of nineteen acquisition parcels. The new parcels are three (3) driveway reconstruction parcels and six (6) Administrative Offer Summary (AOS) parcels. 1. Task Management and Pre-Acquisition Services. The scope for this work element will remain the same as the original scope except as identified below. Assumptions: • Consultant will order and prepare a review memo for a maximum of six (6) additional title reports with the fees for each report being invoiced to the City as a direct expense. • A hard copy and electronic file and diary will be prepared for a maximum of nine (9) additional parcels. Deliverables: • Up to six (6) additional title review memos and title reports (1 hard copy and 1 electronic PDF copy) • Up to nine (9) additional hard copy and electronic files and diaries. 2. Project Funding Estimates and Administrative Offer Summaries. The scope for this work element will remain the same as the original scope except as identified below. Assumptions: • A maximum of six (6) additional PFE worksheets will be prepared. • A maximum of six (6) additional AOS reports will be prepared. Deliverables: Attachment A, Scope of Services Supplement 5 Page 3 • A maximum of six (6) additional PFE worksheets. • A maximum of six (6) additional AOS reports. 4. ROW Acquisitions and Negotiations. The scope for this work element will remain the same as the original scope except as identified below. Assumptions: • It is assumed that a maximum of nine (9) additional acquisitions with three (3) of the acquisitions being driveway reconstruction parcels and six (6) of the parcels being administrative summary acquisitions will be added to the current scope. • The City does not plan to use its condemnation authority and acknowledges that some acquisitions could become protracted and require additional hours that are not currently budgeted for in the nineteen (19) acquisitions scheduled for this project. • The City and HDR agree to renegotiate the level of effort and budget for acquisition services should negotiations on any parcel reach impasse or exceeds ninety (90) days of negotiations calculated from the initial date of the offer letter. Deliverables: • Completed acquisition documents (1 hard copy and 1 electronic PDF copy) for a maximum of nine (9) additional parcels. • Review of survey legal descriptions and exhibits for nine (9) additional parcels. • Negotiation services for a maximum of nine (9) additional parcels. • Administrative Settlement Memos (1 hard copy and 1 electronic PDF copy). • Completed acquisitions packages (1 hard copy and 1 electronic PDF copy) for a maximum of nine (9) additional parcels. • Escrow management for a maximum of six (6) additional parcels. • Completed files (1 hard copy) for a maximum of nine (9) additional parcels. 5. Prepare ROW Certification Package The scope for this work element will remain the same as the original scope except as identified below. Assumptions: • A maximum of nine (9) additional acquisition files will be prepared for certification. Deliverables: • A maximum of nine (9) additional Certification files. Task W - Constructability Review Attachment A, Scope of Services Supplement 5 Page 4 The City would like to add a constructability review for the 60% PS&E and the phased 90% PS&E. Assumptions: • Approximately 3/4 of the budgeted time will be spent on the 60% PS&E, and the remaining 1/4 of the budgeted time will be spent on the phased 90% PS&E. • CONSULTANT will offer phasing suggestions to break the contract into two construction phases 1. Trail only 2. All remaining work Deliverables: • Constructability comments on the 60% Plans, Contract Specifications, and Estimate tabulated in the standard comment form used on the PROJECT. (1 WORD electronic copy and 1 hard copy of redlined plans as necessary) • Constructability comments on the phased 90% Plans, Contract Specifications, and Estimate tabulated in the standard comment form used on the PROJECT. (1 WORD electronic copy and 1 hard copy of redlined plans as necessary) Project Estimate Spreadsheet Project Name City of Arlington 67th Ave. Phase III Reconstruction Supplement 5 Firm:HDR OH Rate:164.22% Fee Rate:30.0% Fee Estimate Labor Category (Hours)65.97 44.75 32 40.5 60.35 61.71 35.82 67.12 38.47 26.39 26.25 35.25 36.9 Rob Gorman Eric Dawson Brian Gardner Todd Livingston Rob Richardson Jeff Hamlin Jonathan Brown Jim Prossick Teresa Weaver Carleen Bruner Jeff Buchanan Landen Grant Liya Huang- Bardley Work Element Title Pr i n c i p a l Pr o j e c t Ma n a g e r Ro a d w a y De s i g n e r Ro a d w a y En g i n e e r Sr . Pr o j e c t En g i n e e r Sr . Pr o j e c t En g i n e e r Pr o j e c t En g i n e e r RO W Ma n a g e r Sr . R O W A g e n t RO W Te c h n i c i a n CA D D Tr a f f i c En g i n e e r Se n i o r Ad m i n i s t r at o r To t a l s SCOPE OF SERVICES Task A Project Management 3 Sub-Consultant Management 4 4 8 Total Task A hrs 0 4 0 0 0 0 0 0 0 0 0 0 4 8 amount 0.00 179.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.60 327 Task G Right of Way 1 Task Management and Pre-Acquisition Services 4 9 12 2 27 2 Project Funding Estimates and Administrative Offer Summaries 3 8 18 29 4 ROW Acquisitions and Negotiations 12 196 208 5 Prepare ROW Certification Package 2 8 20 30 0 Total Task G hrs 0 0 0 0 0 0 0 21 221 50 0 0 2 294 amount 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,409.52 8,501.87 1,319.50 0.00 0.00 73.80 11,305 Task W Constructability Review 1 Constructability Review 2 2 4 Total Task W hrs 0 2 2 0 0 0 0 0 0 0 0 0 0 4 amount 0.00 89.50 64.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154 Grand Total Project Hrs 0 6 2 0 0 0 0 21 221 50 0 0 6 306 Grand Total Project Amount 0 268.5 64 0 0 0 0 1409.52 8501.87 1319.5 0 0 221.4 11784.79 overhead 18,266.42 Total direct labor 11,784.79 Overhead Rate 164.22%19,352.98 direct exp. 1,132.20 Total Direct labor and overhead 31,137.77 1,100.00 Fee Rate on Direct labor 30%3,535.44 32,283.41 Total HDR 34,673.21 HDR fee 35,773.21 Direct Expenses:profit 3,489.79 Printing cost 250.00 9.76% Postage 200.00 Mileage 0.51 per mile 450.00 Misc.200.00 Expense Subtotal 1,100.00 Subconsultants William P Ott Construction Consultants 10,000.00 4% Markup 0.00 Subconsultant Subtotal 10,000.00 Project Grand Total 45,773.21 #REF! #REF! 0.00 total exp City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT D COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Public Art Donation-Wood Carved Eagle- 10’ DEPARTMENT OF ORIGIN: Recreation Contact: Sarah Higgins, 360-403-3448 ATTACHMENTS: Photo of wood eagle. EXPENDITURES REQUESTED: Cost of concrete footing (approximately $200) BUDGET CATEGORY: LEGAL REVIEW: N/A DESCRIPTION: Donated to the City by Debbie Anderson, Country Carver, presented at the Eagle Festival. Requested installation location: west round-about on Division Street. Value of artwork $1500. HISTORY: Eagle has been reviewed at the February 22 PARC meeting. PARC has recommended acceptance of donation. ALTERNATIVES: Deny the entire request, or part of the request. RECOMMENDED ACTION: There is no action requested at this time. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT E COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Downtown Arlington Business Association request for street closure for May Hunt event DEPARTMENT OF ORIGIN: Recreation Contact: Sarah Higgins, 360-403-3448 ATTACHMENTS: - Special Event Permit application for May Hunt from Debbie Whitis EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: N/A DESCRIPTION: The Downtown Arlington Business Association (DABA) has submitted a request for a street closure for May Hunt event May 14, 2011. Street closure request is for Olympic Avenue between 4th and 5th Streets. Debbie Whitis intends on attending the April 4 Council meeting to comment on behalf of DABA. HISTORY: This event has been held on Olympic Avenue in the past, but for the past several years it has been held in a parking lot. ALTERNATIVES: Deny any or all of the request. RECOMMENDED ACTION: There is no action requested at this time. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT F COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Vista Final Short Plat (PLN20110016) DEPARTMENT OF ORIGIN: Community Development – David Kuhl, Todd Hall ATTACHMENTS: 1. Final Plat Map received by the City on March 10, 2011. EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: N/A DESCRIPTION: Vista Properties NW, LLC, requests final short plat approval of the Plat of Vista Townhomes for development of a 6-lot subdivision (3 duplexes, zero lot line single-family residences). The plat is located on approximately .32 acres. Access will be from Division Street. HISTORY: The subject final short plat application was received by the City of Arlington on February 17, 2011, and was deemed complete on February 23, 2011. A revision was submitted to the City on March 10, 2011. The Vista Properties Northwest LLC Preliminary Short Plat (PLN20100023) for 6 lots received a zoning permit on January 3, 2011. ALTERNATIVES: N/A RECOMMENDED ACTION: None at this time. Staff will request City Council’s acceptance of dedication of utility easements as shown on Vista Final Short Plat (PLN20110016) at the next meeting on April 4, 2011. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT G COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Draco Final Short Plat (PLN20110015) DEPARTMENT OF ORIGIN: Community Development – David Kuhl, Todd Hall ATTACHMENTS: 1. Final Plat Map received by the City on March 10, 2011. EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: N/A DESCRIPTION: Draco Northwest, LLC, requests final short plat approval of the Plat of Draco Townhomes for development of a 6-lot subdivision (3 duplexes, zero lot line single-family residences). The plat is located on approximately .34 acres. Access will be from Division Street. HISTORY: The subject final short plat application was received by the City of Arlington on February 17, 2011, and was deemed complete on February 23, 2011. A revision was submitted to the City on March 10, 2011. The Draco Northwest LLC Preliminary Short Plat (PLN20100024) for 6 lots received a zoning permit on January 3, 2011. ALTERNATIVES: N/A RECOMMENDED ACTION: None at this time. Staff will request City Council’s acceptance of dedication of utility easements as shown on Draco Final Short Plat (PLN20110015) at the next meeting on April 4, 2011. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT H COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Shoreline Master Plan Update Status DEPARTMENT OF ORIGIN: Community Development – Bill Blake ATTACHMENTS: None, to be distributed at later date EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: Not completed DESCRIPTION: Provide the Council a status report of where the Shoreline Master plan update is in the process. Intention is rather than wait for Ecology we go ahead and have City Attorney and Council review the submitted materials, and respond to changes or requested edits once Ecology completes their review. HISTORY: The City was on schedule with submitting a draft Master Plan to Ecology on January 31, 2011. The Ecology project manager retired, and they have not replaced him yet so review has not begun. The intention was to provide the document to Council for review following Ecology’s comments. The City was ahead of the process, but funding for the 3rd year work was tied to the 2011-2012 biennium and with budget constraints at the state grant funding won’t be available until June to finish the final phase of the update. ALTERNATIVES: No action. RECOMMENDED MOTION: No action City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT I COUNCIL MEETING DATE: March 28, 2011 SUBJECT: Country Charm Conservation Area Update DEPARTMENT OF ORIGIN: Community Development – Bill Blake ATTACHMENTS: None EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: Not completed DESCRIPTION: Provide the Council an update on activities, partnerships and contributions towards the development of Country Charm. Promote April 9, Arbor day celebration. If time allows we will also have a short discussion on efforts to annex the property. HISTORY: The City completed the purchase of Country Charm almost one-year ago to the date. The park vision has been presented to a number of service clubs and we continue to see a growing interest in participating in the development of the individual amenities. ALTERNATIVES: No action. RECOMMENDED MOTION: No action March 2011 Grants Report 1 The following summarizes grant and loan application activity from October 2010 to March 2011. City staff has been extremely busy making application for grants as well as implementing programs from grant funds received. Over $1,000,000 in grant funds have been awarded to the City since October 2010. Grants & loans applied for and received award (as of 3/20/11) • Airport – In March 2011the Airport submitted for reimbursement in the amount of $12,734 from WSDOT for the Runway 11/29 slurry seal project. In May 2010 the Airport originally submitted for a WSDOT grant for $62,371 to slurry seal Runway 11/29. The grant was awarded, and in October 2010, we received $48,858 as our first reimbursement. There will be a small amount outstanding until the contractor comes back and does some touch-ups. He has to wait until the temperature warms up. After this work is completed, we will file the final reimbursement request and close out the grant. • Airport – The Airport also received an AIP grant award from the FAA for $1.3 million for the Cornehl property. The City will receive approximately $650,000 in July 2011 and the balance in 2012. • Executive – Received a $48,000 grant from the City of Arlington Hotel-Motel tax fund to construct the Legion Park Visitors Information Center and Trailhead facility. • Fire – The department received a $2,500 grant for public education materials from Walmart. The grant was received at the Walmart Grand Opening Ceremony. • Police – The department submitted a $2,500 grant for traffic safety, personal safety promotional items, and the Shop with a Cop Program from Walmart. The grant was received at the Walmart Grand Opening Ceremony. • Police – The department received $10,000 from the Washington State Traffic Safety Commission to reimburse the agency for overtime salary and benefits for Target Zero Campaigns such as the Impaired Driver Campaign, the Speeding Campaign, and the Seat Belt Campaign. • Public Works Utilities – The City was awarded a grant under the FY2012 Stormwater Retrofit and LID Competitive Grants Program for the Stormwater Wetland Project for $195,000. • Recreation – Received a $7,300 grant from the City of Arlington Hotel-Motel tax fund to promote 2011 summer recreation events. • Recreation – Received a $5,000 grant from the City of Arlington Hotel-Motel tax fund to install visitor kiosks on the Centennial Trail to provide information to travelers on the location of food and other services in Arlington. • Recreation / Natural Resources – Received a $20,000 “grant” for park improvements at Graafstra – Country Charm Conservation and Recreation area from Williams Pipeline. The 2 March 23, 2011 primary use of the funds will be a “fruit tree boulevard” to identify the pipeline easement boundary as well as picnic tables, fire pits, and some road repair/creation. • Recreation / Natural Resources – Received a $1,000 donation for park improvements at Graafstra – Country Charm Conservation and Recreation area from the Stilly/Snohomish Task force. The funding will be used for fencing and signage in the off-leash pet area. Grants applied for and awaiting response (as of 3/20/11) • Recreation - The City applied for $110,000 direct funding award from the State Capital Budget to construct the Legion Park Visitors Information Center and Trailhead facility. This request was made in response to the WWRP grant program being eliminated due to the state’s budget difficulties. • Airport / Public Works Engineering – The City has applied for $3.4 million to construct Airport Blvd under the PSRC-STP Grant program. The project is on the contingency list, ranking #8. • Public Works Engineering – The City applied for a STP grant for the construction of the 67th Phase IIIA Reconstruction Project – Centennial Trail in the amount of $2 million. The project is on the contingency list. Grants applied for and did not receive (as of 3/20/11) • Public Works Engineering – The City applied for a TIB(Transportation Improvement Board) grant for the construction of the 67th Phase III Reconstruction Project in the amount of $5.75 million. • Public Works Engineering – Applied for and did not receive funding from the PSRC Transportation Enhancement Grant fund. City asked for funding for the Visitors Information Center and Trailhead facility at Legion Park. • Public Works Utilities – The City applied for and did not receive funding from the State DOE for Prairie Creek Wetland improvements for $387,700. This was applied for under the FY2012 Stormwater Retrofit and LID Competitive Grants Program.