Loading...
HomeMy WebLinkAbout04-27-26 Council Workshop PacketSPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER Mayor Don Vanney PLEDGE OF ALLEGIANCE ROLL CALL Mayor Don Vanney APPROVAL OF THE AGENDA Mayor Pro Tem Michele Blythe INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN 1. Condemnation Ordinance for the 180th St and Smokey Pt Blvd ATTACHMENT A Roundabout Project Staff Presentation: Jim Kelly Council Liaison: Heather Watland 2. Position Request for Water Treatment Plant Operator ATTACHMENT B Staff Presentation: Jim Kelly Council Liaison: Rob Toyer 3. Change Order No. 2 for Water Treatment Expansion Design ATTACHMENT C Staff Presentation: Jim Kelly Council Liaison: Nathan Senff 4. Utilities and Transportation Quarterly Report ATTACHMENT D Staff Presentation: Jim Kelly 5. Community and Economic Development Quarterly Report ATTACHMENT E Staff Presentation: Amy Rusko ADMINISTRATOR & STAFF REPORTS MAYOR’S REPORT COMMENTS FROM COUNCILMEMBERS/COUNCILMEMBER REPORTS Arlington City Council Workshop Monday, April 27, 2026 at 6:00 pm City Council Chambers – 110 E 3rd Street SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 711 (TDD only) prior to the meeting date if special accommodations are required. PUBLIC COMMENT For members of the public who wish to speak to the Council. Please limit your remarks to three minutes. REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING EXECUTIVE SESSION RECONVENE ADJOURNMENT Mayor Pro Tem Michele Blythe / Mayor Don Vanney City of Arlington Council Agenda Bill WS #1 Attachment April 27, 2026 Condemnation ordinance for the 180th St and Smokey Point Blvd Roundabout Project Ordinance with Exhibit A Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A BUDGETED AMOUNT: $3,800,000.00 LEGAL REVIEW: DESCRIPTION: Right of way and temporary construction easement condemnation for the 180th St and Smokey Point Blvd Roundabout Project. Arlington received a grant from Puget Sound Regional Council for the design and construction of a roundabout at 180th St and Smokey Point Blvd as part of the Smokey Point Boulevard Corridor improvement project. This project design is near completion and will be bid early summer. As part of the roundabout project, the city needed to obtain Right of Way (ROW) and Temporary Construction Easements (TCE) from several parcels; all parcels have been acquired except for a property located at the SW corner of the intersection. The property owners have rejected fair, above market offers for the needed ROW and TCE. Construction of this intersection project will provide for mobility and safety, it is for the good of the public and community; as such, we are now moving to obtain the ROW and TCE through condemnation proceedings. ALTERNATIVES: Remand to staff for additional information. Workshop; discussion only. At the May 4, 2026 Council meeting, the recommended motion will be, “I move to approve the ordinance allowing the City to move forward with condemnation proceedings and authorize the mayor to sign the ordinance.” ORDINANCE NO. 2026-XXX AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON PROVIDING FOR THE ACQUISITION, CONDEMNATION, APPROPRIATION, AND TAKING OF PERMANENT AND TEMPORARY REAL PROPERTY RIGHTS IN ORDER TO CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF 180th STREET NE AND SMOKEY POINT BOULEVARD; PROVIDING THAT THE PROJECT COSTS SHALL BE PAID FROM AVAILABLE FUNDS; AND DIRECTING THE CITY ATTORNEY TO PROSECUTE A CONDEMNATION ACTION IN THE MANNER PROVIDED FOR BY LAW WHEREAS, the City of Arlington (“City”) has planned, designed, and is in the process of constructing the Smokey Point Boulevard Corridor Improvements; WHEREAS, as part of that process, the City of Arlington determined that a roundabout should be constructed at the intersection of 180th Street NE and Smokey Point Boulevard (the “Project”) to improve vehicle mobility and increase pedestrian and vehicle safety; and WHEREAS, it is necessary for the City to acquire real property and a temporary construction easement from a private property owner as part of the Project; and WHEREAS, the City has attempted to negotiate voluntary property agreements to acquire the necessary property rights, but an agreement has not been reached with one of the property owners; and WHEREAS, the City Council would like to authorize condemnation of the owner’s property interests if voluntary negotiations are unsuccessful; and WHEREAS, pursuant to RCW 8.25.290, the City mailed and published notice to the property owner whose land this ordinance authorizes to be condemned advising such owner that a final action would be taken to authorize condemnation of the required property interests at the May 4, 2026 Arlington City Council meeting; and WHEREAS, the City Council finds that the property interests described in this Ordinance are necessary to the Project and that it is in the public interest to condemn the property interests for the public health, safety, welfare, and transportation needs. NOW, THEREFORE, the City Council of the City of Arlington does hereby ordain as follows: Section 1. Need for Property – Public Use. The public health, safety, necessity, and convenience demand that the 180th Street NE and Smokey Point Boulevard Roundabout (“Roundabout”) be constructed to improve vehicle mobility and increase pedestrian and vehicle safety. It is necessary that certain property be condemned, appropriated, and taken for the construction of the Roundabout Project, including the real property and temporary construction easement legally described and depicted in Exhibit A and incorporated herein by this reference. This Project is a public use for which the City is authorized to condemn property and property interests under RCW 8.12.030. Section 2. Declaration of Necessity. The City Council has reviewed the planned improvements as part of the review and adoption of the Project and hereby declares that the property rights described and depicted in Exhibit A are necessary for the construction of the Roundabout Project and must be acquired by the City of Arlington. Section 3. Exercise of Eminent Domain Power. The property interests described and depicted in Exhibit A are hereby condemned, appropriated, taken, and damaged through the exercise of eminent domain for the public purposes described herein. The taking of said property interests is subject to the making or payment of just compensation to the owner(s) and possessor(s) of the property, as applicable, in the manner prescribed by law. Section 4. Source of Funds. The entire cost of the property acquisition authorized by this ordinance, including all costs and expenses of any eminent domain proceedings, shall be paid from such available funds as may be appropriate under the circumstances. Section 5. Authority of City Attorney. The City Attorney is hereby authorized and directed to exhaust reasonable efforts through direct negotiations to acquire the necessary property described herein for the Project. In the event reasonable negotiations efforts ae not successful, the City Attorney is hereby authorized and directed to initiate and prosecute legal proceedings to condemn, take, and appropriate the property interests described and depicted in Exhibit A to carry out the provisions of this ordinance. Section 6. Severability. Should any section, paragraph, sentence, clause or phrase of this ordinance, or its application to any person or circumstance, be declared unconstitutional or otherwise invalid for any reason, or should any portion of this ordinance be pre-empted by state or federal law or regulation, such decision or pre-emption shall not affect the validity of the remaining portions of this ordinance or its application to other persons or circumstances. Section 7. Effective Date. The title of this ordinance, which summarizes the contents, shall be published in the official newspaper of the City. This ordinance shall take effect and be in full force five (5) days after the date of publication as provided by law. PASSED by the City Council of the City of Arlington and APPROVED by the Mayor this 4th day of May, 2026. CITY OF ARLINGTON Don E. Vanney, Mayor ATTEST: Raelynn Jones, City Clerk APPROVED AS TO FORM: Oskar Rey, City Attorney Legal Descriptions for City of Arlington 180th St -Smokey Point Blvd Roundabout Right of Way Acquisitions & Dedications TAX PARCEL 31052000403500 17930 SMOKEY POINT BLVD RICKY AND SUSAN GRAHAM That portion of the City of Arlington Vacated Short Plat #Z-04-012, according to the short plat thereof, as recorded under auditors file no. 200405075148, records of Snohomish County, Washington, lying northeasterly of the following described line; Commencing at the southeast corner of said Short Plat #Z-04-012; thence North 1° 14’ 50” East, along said east line, a distance of 53.74 feet to the True Point of Beginning of the herein described line; thence north 6° 35’ 21” west, for a distance of 10.32 feet; thence northwesterly, on a curve to the left, which center bears south 80° 02’ 27” west, having a delta of 9° 33’ 00”, having a radius of 33.50 feet , an arc distance of 5.58 feet; thence northwesterly, on a curve to the left, which center bears south 73° 51’ 11” west, having a delta of 12° 26’ 06”, having a radius of 203.50 feet , an arc distance of 44.17 feet; thence northwesterly, along a curve to the left, which center bears south 61° 25’ 35” west, having a delta angle of 30° 15’ 36”, having a radius of 32.50 feet, an arc distance of 17.17 feet; thence northwesterly, along a curve to the left, which center bears south 31° 03’ 04” west, having a delta angle of 13° 37’ 12”, having a radius of 99.70 feet, an arc distance of 23.70 feet to the north line of said City of Arlington Vacated Short Plat #Z-04-012 and the terminus of the herein described line. Together with a 5.00 feet temporary construction easement adjoining the southwesterly side of the herein described line and said easement extends southeasterly to the said east line of Vacated Short Plat. 31052000403500 180TH ST NE SM O K E Y P O I N T B L V D 1 inch = 40 feetScale:EasementsLayouts/ ROWTCEExhibitB8.5x11_2025 File: 8/28/2025Date:lhbCartographer: City of Arlington Exhibit BRight of Way & Temporary Construction Easement This data is provided ‘as is’ without warranty of any kind. The entire risk as to the results and performance of the data is assumed by you. Should the data prove defective, you assume the entire cost of all necessary servicing, repair, or correction. These data and corresponding attributes are not to be used for design purposes. Further, the City of Arlington does not warrant, guarantee, or make any representations regarding the use of, or results from the use of the data in terms of correctness, accuracy, reliability, currentness, or otherwise; and you rely on the data and results solely at your own risk. There are known gaps and inaccuracies in the current data set and the provided information should be considered a draft and in-progress work. Washington State Law, Ch. 42.56 RCW, prohibits state and local agencies from providing access to lists of individuals intended for use for commercial purposes and thus, no commercial use may be made of any Data comprising lists of individuals contained herein. Legend Right of Way Temporary Construction Easement Building Assessor Parcel ± City of Arlington Council Agenda Bill WS #2 Attachment April 27, 2026 Public Works Water Treatment Plant Operator (WTPO) Position Request Water Treatment Plant Operator-I Job Description Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: Estimated $97,000 salary and benefits BUDGET CATEGORY: Water Operating Fund BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: The Public Works Water Department is requesting a new full-time employee Water Treatment Plant Operator I position to perform duties essential to the operation of the water treatment plant. The WTP expansion project underway and nearing construction, getting an additional WTP operator hired and trained ahead of time is critical. The Department of Health will require the plant to be staffed with an additional operator once the WTP Expansion is completed; this would have been added in the 2027-2028 budget during the budget development process later this year. Staff is requesting the position be advertised early and approved by council in order to be fully staffed during construction of the expansion and to also be fully prepared with trained operators when the WTP Expansion goes on-line in 2027. ALTERNATIVES: Remand to staff for additional information. Workshop; discussion only. At the May 4, 2026 Council meeting, the recommended motion will be, City of Arlington, Washington Water Treatment Plant Operator (WTPO) I CLASS CODE A13 SALARY $30.80 - $40.18 Hourly $5,338.00 - $6,964.00 Monthly $64,056.00 - $83,568.00 Annually BARGAINING UNIT AFSCME Represented ESTABLISHED DATE April 20, 2017 REVISION DATE September 30, 2024 Summar y This entry level position is responsible for performing a full range of duties essential to the operation of the water treatment plant. This individual will work under general super vision and perform routine and non-routine tasks requiring a level of skill and judgment where incorrect decision or action could result in serious risk of physical harm to operator, costly damage to equipment, health hazard to the public, or violations to State and Federal permits. Employees of higher classification may check progress of work and provide instruction on work involving unusual problems or use of unfamiliar equipment. Essential Job Functions Perform all routine maintenance on WTP reservoirs, pump stations, and some PRV equipment, such as lubrication, oil changes, belt changes, and adjust belts and drives. Perform routine repair work, such as disassembly, repair, and installation of valves, switches, process instrumentation, motors, and related equipment. Perform basic technical work in the maintenance and repair of Water Treatment Systems and maintain meters, pumps, valves, air blowers, electrical controls, control panels and related equipment. Perform a variety of minor electrical installations and repairs. Perform daily inspections of all system facilities and equipment, record data properly in the asset management system and correct problems and notify superior. Participate in troubleshooting equipment failure or loss of efficiency, and operational problems by analyzing trending patterns. Perform plant and landscape maintenance duties, including inspection, cleaning, and maintenance of tanks, painting, minor carpentry and plumbing, minor electrical repairs, and mowing and trimming lawns and vegetation. Maintain equipment and facilities in a clean and orderly condition Operate a variety of equipment including specialized testing equipment. Perform all work in accordance with laws, rules, regulations, and in compliance with all departmental safety policies and procedures, including using appropriate safety devices and equipment. Advise Lead and coworkers of work progress and any changes in work conditions. Operate SCADA controlled equipment and process monitoring instrumentation related to the water treatment and distribution system. Collect raw water, in-process and finished samples for in-house and outside analysis. Conduct various laboratory tests and maintain appropriate records. Enter data into and assist in maintenance of laborator y software program. Respond to public inquiries in a courteous manner, provide information within scope of knowledge and refer to supervisor as appropriate. May conduct public tours of the water treatment plant. Participate in a rotating weekend shift in the Water Treatment Plant. Predictable and regular attendance required. Collect, analyze and transport distribution system samples per permitting requirements. Required Knowledge, Skills and Abilities Basic knowledge of mechanical, electrical, pneumatic, and hydraulic theory and application, and be able to read and use manuals and other resources. Basic knowledge of methods, techniques, materials, tools, and equipment used in maintenance, repair and construction work. Knowledge of occupational hazards and safety practices and procedures applicable to assigned work. Knowledge of confined space procedures and use and containment of hazardous chemicals or ability to obtain within six (6) months. Basic knowledge of lock out /tag out procedures, or ability to obtain training within six (6) months. Ability to use and operate hand tools, mechanical equipment, power tools and equipment required for the work in a safe and efficient manner. Ability to operate a personal computer including spreadsheets, databases, word processing, and asset management software. Ability to make sound decisions in the event of extraordinary situations such as equipment malfunctions, rapid deterioration of water quality, or power outages, to ensure the quality of finished water and protect public health. May be required to exercise this judgment while unsuper vised. Ability to communicate clearly and concisely and follow instructions, both orally and in writing. Ability to work independently and apply departmental policies and procedures. Ability to establish and maintain effective working relationships with subordinates, superiors, department personnel, and the public. Capacity for sustained attention to functioning machinery and equipment. Good sensor y perception to monitor plant machiner y and operations visually, audibly, by smell, and by touch (for temperature and vibration) on an ongoing basis. Ability to wear all required safety gear and protective equipment. Physical strength, stamina, and agility sufficient to perform manual labor or engage in continuous physical effor t for extended periods. Qualifications U.S. Citizen or legally eligible to work in the United States.  High school diploma or equivalent. College level course work in relevant field preferred. One year experience in a water treatment plant with experience performing plant maintenance or for a sufficient length of time to prove competency in the skill area. Valid Washington State Driver License, and a driving record acceptable to the City. Washington State cer tification as a Water Treatment Plant Operator 1 or obtained within eighteen (18) months. First Aid and/or CPR cer tification or obtained within six (6) months. Confined Space training completed within six (6) months. Forklift Certification or obtained within six (6) months. Washington State flagger card or obtained within six (6) months. Successfully pass a WSP WATCH background check. Supplementary Information U.S. Citizen or legally eligible to work in the United States. High school diploma or equivalent. College level course work in relevant field preferred. One year experience in a water treatment plant with experience performing plant maintenance or for a sufficient length of time to prove competency in the skill area preferred. Valid Washington State Driver License, and a driving record acceptable to the City. Washington State cer tification as a Water Treatment Plant Operator 1 or obtained within twelve (12) months. First Aid and/or CPR cer tification, or obtained within six (6) months. Confined Space training completed within six (6) months. Washington State flagger card or obtained within six (6) months. Successfully pass a WSP WATCH background check. Working Conditions Work is typically performed in-doors in a noisy and hazardous environment, and outdoors in all types of weather, where conditions may be dirty, uncomfortable and hazardous. Exposure to physical hazards from loud noises, chemical, electrical and mechanical systems, and confined spaces. Work is performed using a computer, specialized equipment, pickup truck, a variety of hand and power tools such as saws, drills, wrenches, rakes, shovels and specialized testing equipment such as multi-meters and amp meters. Physical demands may require bending, stooping, kneeling, climbing, reaching, and grabbing. May lift objects up to 50 pounds. Work may also be performed indoors in an office environment utilizing standard office equipment. Employee will be part of the on-call rotation subject to weekend and holiday shifts and be subject to 24 hour emergency call out. Other This position is represented by the Arlington City Employees, Local 2849 of the Washington State Council of County and City Employees, Council 2, AFSCME City of Arlington Council Agenda Bill WS #3 Attachment April 27, 2026 Scope of Work (SOW) and Fee Estimate from BHC for Amendment No 2 for design services for the Scope of Work and Fee Estimate Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: $260,000.00 BUDGET CATEGORY: Water Capital Funds BUDGETED AMOUNT: $4,500,000.00 (Total Project Budget 2026) LEGAL REVIEW: DESCRIPTION: This scope of work and fee estimate from BHC is for additional fees necessary for completing the Water Treatment Plant Expansion design. To keep up with increasing water demand in the Water utility’s water service area, the Water Utility needs to expand capacity at the Haller Wellfield and to the Water Treatment Plant. In 2023 the City contracted with BHC for the WTP expansion design work (30%-100%), this included the final design to project bidding. Due to multiple unanticipated issues during design (liquifiable soils, numerous existing UG utilities, old 1924 WTP no records, extended filter train design/procurement with Canadian form, etc.), an amendment is being requested to bring the construction package to 100% and ready for bidding. With this scope and fee, BHC will generate final design and bidding documents for the WTP Expansion and provide project management and oversight up to public bid. This project is identified in the Water Comprehensive Plan and has been budgeted for 2024-2027. ALTERNATIVES: Remand to staff for additional information. Workshop; discussion only. At the May 4, 2026 Council meeting, the recommended motion will be, “I move to accept the BHC scope of work and fee for Amendment No. 2 to the Water Treatment Plant Expansion Design and authorize the mayor to sign the contract amendment.” 04/22/26 8:13 AM \\arlington\city\PW_Admin\Contracts\BHC Consultants\07_WTP Expansion Design\Phase 2 (30%-100%)\Amendment 2\Amendment 2_WTP Expan.docx Contract Amendment No. 2 To Professional Services Agreement For Arlington Water Treatment Plant Expansion Design Phase 2 This amendment authorizes the modification of the Professional Services Agreement between the City of Arlington and BHC Consultants, LLC. for the Arlington Water Treatment Plant Expansion Design Phase 2 contract, executed on December 20, 2023. Unless modified below, all terms and conditions contained in the Professional Service Agreement remain current and in effect for the completion of the contract. It is mutually agreed that the above referenced agreement is amended as follows: AMENDMENT 1.Fee - This additional work included under this amendment shall be performed for a not-to- exceed fee of $260,000.00 in accordance with the fee schedule included with this amendment as Exhibit A. EXECUTION IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written. BHC Consultants, LLC City of Arlington Signature: Tom Giese Signature: James X. Kelly, PE Date Date March 13, 2026 James X. Kelly, PE, Public Works Director City of Arlington 10408 144th Street East Arlington, WA 98374 Re: Amendment Proposal to Complete Water Treatment Plant (WTP) Expansion Phase 1 Final Design Dear Jim, Under our original Professional Services Agreement for the subject project executed in December 2023, BHC has provided engineering design services for the City’s WTP expansion that has now reached the estimated 90 percent completion review stage. The design documents (plans, specifications, and estimate, or PS&E) are scheduled to be in City review this month, with submittal of the design package to the City’s Building Department and Washington State Department of Health (DOH) scheduled after City design comments have been received and appropriately incorporated. The project is now scheduled for bidding in the Fall of 2026. Unanticipated Efforts During Design Development During the course of design development, a few key sources of information needed to establish necessary criteria to advance the design required additional unanticipated investigation and coordination effort beyond what had been scoped. We believe these efforts were merited and imperative to identifying value- engineered design solutions for project excavations, enhancing design of the structural foundation to meet or exceed its life expectancy given the discovered site conditions and the latest seismic code requirements, reducing risk through identification and coordination with existing buried utilities not picked up by the City’s surveyor that the contractor will encounter during construction, and more assistance with negotiation and finalization than had been scoped for a City pre-selected treatment package to be manufactured by AWC Solutions (AWC) in British Columbia. More specifically, the required efforts included: 1.Geotechnical Investigations and Report. Geotechnical studies to support facility design were contracted by the City separately with the intent of delivering a report establishing project structural design criteria for the BHC design team. The report and finalized criteria were requested within BHC’s scope by April 2024 to have adequate time to incorporate recommendations and provide a 60 percent design deliverable by June 2024, as originally scheduled. The first draft geotechnical report was issued in August 2024 and included recommendations for soldier pile shoring systems to support excavations and a full pin pile foundation system for adequate lateral load support of the new building in liquifiable soils. In an action that proved to offer significant project cost benefit through estimated construction savings, the City engaged a second geotechnical engineer to perform a peer review of the original report. This effort identified geotechnically acceptable modifications to original system EXHIBIT A City of Arlington Amendment Proposal to Complete WTP Expansion Phase 1 Final Design March 13, 2026 Page 2 recommendations in the form of reducing the length of the shoring system by excavating the entirety of soils between the existing and new buildings, as well as reducing the scope of the foundation to a partially battered, micro pile supported system, both of which offer significant savings beyond the value of this amendment. The peer review memorandum was released in February 2025, stalling the development of structural and site civil disciplines, as well as delaying elements of other discipline design, until well beyond the originally scheduled 90 percent deliverable milestone of September 2024. The revised geotechnical report that incorporated the findings of the peer review (and further clarified structural criteria for which BHC requested direction) was not released until February 2026. BHC had been advancing its structural design as much as possible via email communications and geotechnical criteria confirmations in advance of this document’s finalization. 2.Project Site Existing Utilities Locating. The City also separately engaged professional services to perform the project site survey and develop base mapping for the design. Again, to support intended original deliverable milestones and work products, the base mapping was requested by April 2024. BHC reviewed first base mapping files delivered in July 2024 and noted many unlocated buried facilities missing from the mapping but believed to exist. Based on BHC review comments, the surveyor performed additional field work and provided updated base mapping in September 2024. Some of the missing utilities were located and added, but others remained missing. The revised base mapping also included inconsistencies with utility connections and vertical measurements. BHC added the remaining missing buried utilities to the base mapping by using other source records, differentiating these added items to note that they were not picked up in the base map survey and their locations need to be field verified by the contractor. Although the created composite base mapping allowed BHC site civil work to begin development in earnest, continued efforts were made to address the inconsistencies, including a final field investigation that BHC participated in with City staff on in April 2025 to address inconsistencies involving storm and drainage infrastructure. 3.Pre-Selected Treatment Equipment Package Coordination. At the onset of the preliminary design phase of this project completed in 2022, AWC was pre-selected as the manufacturer to provide this project’s treatment system package for commonality with the existing WTP and for ease in guiding the regulatory approval process. A proposal was received during this phase, with an updated proposal, finalization of the equipment package, and delivery of electronic drawings for the equipment imperative to the new treatment building’s layout and full process design development. During the design development efforts performed in 2024, AWC offered some assistance in providing answers on equipment package questions and potential funding program compliance alternatives, as well as organizing a manufacturing plant visit for the City. In order to complete its design support to BHC and issue the needed drawings for incorporation into design, however, AWC requested contract authorization for the continued design support efforts. The City issued this EXHIBIT A City of Arlington Amendment Proposal to Complete WTP Expansion Phase 1 Final Design March 13, 2026 Page 3 authorization in June 2025, and ongoing equipment package support from AWC continued until BHC received electronic equipment drawings in late November 2025. The connection of mechanical process piping and associated treatment equipment support systems could not be substantially completed before these files were received. Additionally, the layout of the treatment equipment needed to be coordinated with other disciplines to avoid space conflicts. As a result, the delays in the AWC design elements substantially stunted overall design progress. The overall impact of these elongated efforts on BHC’s design process resulted in some substantial unanticipated changes to document development. •BHC submitted an “uneven” set of 60 percent design completion documents to the City to demonstrate progress in August 2024, 2 months delayed from the originally intended submittal date. In reality, many of the disciplines included with the submittal were well below the 60 percent complete level, as survey base mapping, geotechnical/structural design criteria, and full AWC equipment electronic files were not yet available. City comments on the package were received in November 2024. •To again demonstrate design development per City inquiry and attempt to expedite disciplines already behind schedule, BHC submitted an unanticipated “catch up” or “70 percent” set design documents in May 2025 that expanded the erosion control, demolition, temporary construction and site civil plans with then-established base mapping information, as well as limited design of the building interior. As AWC drawings were not yet available at this time, process mechanical and electrical design to be built off of that information were still not achievable. •When AWC drawings became available in November 2025, BHC engaged in a rigorous effort to develop design documents to the full 90 percent level in the most expeditious fashion staffing availability could permit. The intent was to try to limit further schedule elongation and reach the City and regulatory review period at a date that maintained the City’s desire to bid the project in Fall 2026. The expanded staffing resources used to promote this objective and consolidate the development of remaining design discipline elements that were now more than a year behind schedule resulted in 3 months of elevated labor billings. Though BHC’s initially authorized budget was not exceeded through internal billing expenditures until December 2025, it masked the tremendous design effort that still remained to attain both 90 and 100 percent completion project milestones. The expenditures to that point also included the additional communication and coordination efforts that BHC undertook to ultimately assist in the completion of needed design support materials such as the base mapping, geotechnical/structural criteria and recommendations, and AWC design package drawings (where much of those expenditures were intended instead for technical design development). EXHIBIT A City of Arlington Amendment Proposal to Complete WTP Expansion Phase 1 Final Design March 13, 2026 Page 4 Project Budget Status As summarized in recent email communications to you and confirming what was expressed in early December 2025, BHC exceeded the originally authorized project budget with the end of the December 2025 invoicing period. The City negotiated our initial fee based on a best case streamlined design effort that did not materialize despite our best efforts. We have voluntarily chosen to continue design efforts without yet having received an amendment in our pledge to advance project schedule and remain strong partners with the City through the completion of this extremely important legacy project. With this letter, we are again summarizing our budgetary status and requesting authorization of additional design budget via letter amendment. Numbers below are through January 2026, with estimated efforts remaining from that point through the bidding period projected (revised subconsultant proposals incorporated) as follows: 1 Authorized Budget $833,700 2 BHC/Subconsultant Internal Billings thru January 2026 $1,017,400 3 Current Budget Deficit (Item 2 – Item 1) $183,700 4 $16,000 5 $25,300 6 Proposed Additional BHC Efforts to Bid Opening (see attached Fee Estimate) $91,100 7 Proposed Additional Architectural Sub Efforts to Bid Opening $27,700 8 Proposed Additional HVAC/Plumbing Efforts to Bid Opening $5,400 9 $349,200 10 $1,182,900 11 Break-Even Cost on BHC Billings thru January 2026 $853,900 12 Break-Even Cost on BHC Estimated Efforts to Bid Opening $75,200 13 Estimated Subconsultant Cost w/ Amended Budgets (no BHC administrative markup) $165,300 14 $1,094,400 EXHIBIT A City of Arlington Amendment Proposal to Complete WTP Expansion Phase 1 Final Design March 13, 2026 Page 5 Two totaled values are presented in the table – an Amended Contract Value ($1,182,900) based on projected expenditures which includes a small percentage profit with approved fee estimate rates, and a Total Projected Break-Even Cost ($1,094,400) on the project for BHC. The breakeven cost is calculated by taking the sum of the hourly salary charges for each employee on the project through January 2026, BHC’s most recent overhead cost as a multiplier of those salary charges to cover company expenses (such as office space leases, employee benefits, furniture, and computer equipment), and the amended contract values of our subconsultants that is directly reimbursable to them (no BHC markup). By agreeing to an Amended Contract Value that is less than the Break-Even Cost, BHC would be using its cash reserves to pay the remaining BHC employee salaries and overhead costs obligated to the project. BHC would obviously not remain a viable business if it made a common practice of accepting such contractual terms. BHC recognizes that some efforts expended on this project by our design team have not always been as efficient as planned and in some cases are not attributable to unanticipated efforts or the extended project schedule. We have been open with the City in discussing the challenges with project staffing consistency and focus on project objectives. BHC has already written off some of these project efforts with the close of its 2024 fiscal year and both of the above proposed amendments would require further substantial write- offs to complete our scope of work through the bidding period. Requested Amendment Value BHC is requesting an amendment value of $260,000 to complete design and bidding assistance, raising the approved budgetary limit from the original value of $833,746 to $1,093,746. At this revised value, BHC would be projected to break even on the project if efforts are efficient in closing out the design and bidding phases, but BHC also cannot agree to a value up front that would knowingly result in its losing money. The remaining estimated BHC project billings of $89,200 or greater will be written off if not already done in 2024. We believe the revised value is still a competitive fee for the magnitude and complexity of this project. We continue to enjoy the partnership we have built with the City on this project and to value the importance of its completion to present and future generations of the Arlington community. We hope that the offer presented herein is understandable and fair. The estimated BHC and subconsultant fees to complete the design and bidding phases are presented by attachment to this letter for your review. BHC’s estimate is a repeat of labor estimates for the 90 to 100 percent completion phase of the project (which assumes City comments on the 90 percent deliverable do not add to or change the project scope) and the bidding period assistance that were included within our original agreement, with rate adjustments to recognize the 2026 salaries of employees that continue to be involved with the project. Bidding assistance, per City request, has been minimized with the estimate and no standard subconsultant markup has been applied. Should the City request more assistance than is budgeted, we can track the charges and recoup that effort in a subsequent contract for engineering services during construction. Information from our business management and timesheet accounting software that was used to establish break-even values can be made available upon request. EXHIBIT A City of Arlington Amendment Proposal to Complete WTP Expansion Phase 1 Final Design March 13, 2026 Page 6 The revised project milestones upon which this amendment request is based are as follows: 90 Percent City and Regulatory Review Period March – May 2026 100 Percent Issue for Bid Documents September 2026 Bid Period October – November 2026 Should you agree with this proposal, please either sign the authorization below or offer City preferred agreement format to which this letter can be offered as an exhibit. Should you wish to discuss the estimated scope and costs proposed herein further, please do not hesitate to contact me or Tom at (253)344-5084. Thank you again for our partnership. Sincerely, BHC Consultants Authorization: I approve this letter proposal for additional BHC engineering design services associated with the Water Treatment Plant Phase 1 Expansion in the amount of $260,000, amending the project budget to a new not- to-exceed value of $1,093,746. With this authorization, I also approve the extension of original agreement terms to a revised expiration date of December 31, 2026. ______________________________________ _____________________________ _____________ Signature Title (print) Date (print) Attachments: Exhibit B – Budget – City of Arlington WTP Expansion Phase 1 Final Design Amendment Exhibit C – Rolluda Architects – City of Arlington WTP Architectural Design/Documentation Additional Services Fee Proposal Exhibit D – FSi Engineers – Proposal for Professional Services – Arlington WWTP Ph 1 Expansion Add Services EXHIBIT A Exhibit B - Budget City of Arlington WTP Expansion Phase 1 Final Design Amendment 3/10/2026 Architect Mechanical Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Rolluda Fsi 10% Markup 1 Project Management and QA/QC 1.1 Project Setup, Invoicing, Client Communication 20 $5,500 6 $900 $0 26 $6,400 $6,400 1.2 Project Team Coordination $0 0 $0 $0 1.3 QC Reviews 8 $2,200 8 $2,200 $2,200 Subtotal 34 $8,600 5 Bid Document Preparation 5.5 Final Drawings 9 $2,448 16 $4,080 24 $3,720 33 $7,920 10 $1,800 38 $7,030 29 $4,433 68 $10,540 56 $8,400 283 $50,371 $50,371 5.6 Final Specifications 6 $1,623 3 $867 4 $573 6 $1,440 $0 4 $740 9 $1,457 9 $1,395 42 $8,095 $8,095 5.7 Opinions of Probable Construction Cost 8 $2,200 8 $2,040 10 $1,550 8 $1,920 10 $1,800 16 $2,960 24 $3,720 84 $16,190 $16,190 Subtotal 408 $74,656 6 Services During Bidding (Estimated on As-Needed) 6.1 Pre-Bid Meeting 6 $1,650 8 $1,480 $0 14 $3,130 $3,130 6.2 Bidder Questions and Addenda 4 $1,100 6 $1,530 $0 2 $480 8 $1,480 $0 20 $4,590 $4,590 6.3 Assistance with Bid Evaluation 0 $0 $0 Subtotal 34 $7,720 8 $2,200 53 $14,520 33 $8,517 38 $5,844 49 $11,760 20 $3,600 74 $13,690 62 $9,610 68 $10,540 56 $8,400 6 $900 9 $1,395 476 $90,976 $0 $0 $0 $90,976 Other Direct Costs Mileage @ $0.725 per mile $116 Production/Printing and Scanning Platform Fees Subtotal $116 Markup @ 10%$0 TOTAL ODC $116 GRAND TOTAL $91,092 Total CostSubconsultant Cost BHC Consultants Engineer Sr Structural Total LaborStaff Engineer Electrical Staff Eng. Structural Engineer $180 Wildhood Total Direct Labor $275 $275 $255Task DescriptionTask No. QC Project Electrical Reviewer Manager Engineer $240 Giese Kelsey Palmatier Jacoby $155 Russell $155 $150 Project Admin Clerical/WPCAD Drafter $150 $150 CAD Lead $155 Bradley Coughlin Sifferman/McElwainRhodes Project Engineer $185 Garcia/Russell Parker/Black Sifferman/McElwain EXHIBIT A City of Arlington WTP 0 2 4 2 2 0 10 2 6 4 0 0 2 14 0 2 4 0 0 0 6 0 0 4 12 12 0 28 0 2 12 32 40 0 86 0 2 28 0 0 0 30 0 4 16 32 40 0 92 0 2 24 4 0 0 30 0 0 2 0 0 0 2 0 2 8 12 4 0 26 Principal AR Manager DES Architect MP Designer III RZ Designer III AD Specialist JG 2 22 106 94 98 2 324 $310.00 $296.00 $180.00 $132.00 $122.00 $100.00 $620.00 $6,512.00 $19,080.00 $12,408.00 $11,956.00 $200.00 $50,776.00 Principal AR Project Manager DES Senior Architect MP Designer III RZ Designer III AD Contract Specialist JG Task Budgets Remaining Fee at start of 90% Phase $310.00 $296.00 $180.00 $132.00 $122.00 $100.00 Task-1 2 8 8 2 2 2 $5,136.00 $18.05 Task-2 0 2 4 0 0 0 $1,312.00 $13,122.56 Task-4 0 0 4 12 12 0 $3,768.00 $2,795.80 Task-5 0 10 80 68 80 0 $36,096.00 $6,260.40 Task-6 0 2 10 12 4 0 $4,464.00 $749.90 Reimbursable $119.75 Additional Fee Total $50,776.00 $23,066.46 $27,709.54 Revit based 90% Bid Documents (Floor Plan, Roof Plan, Elevations, Sections, Schedules, Details) 90% Architectural Bid Specifications (Divisions 05-10) Project Meetings (virtual) QA/QC Architectural Design/Documentation Additional Services Fee Proposal Permitting Support Scope of Work: Architectural Additional Services Additional Architectural Services will be provided for added coordination and interdisciplinary iterative changes at latter stages of design development that involve: relocating the utilidor pit and supporting clearwell level wall, adding a room w/ door next to the MCC room, dividing the Polymer Pump room into two rooms w/ additional door, completing the outdoor walkway and stairwell to respond to soils design criteria and utility locations and including a valve access area with added platform at landing level, raising the breezeway roof above the primary roofs to accomodate the outdoor tanks, and adjustments in response to necessary process engineering revisions and further refinements to the existing utility locations. The changes listed here were unanticipated and cause extra labor and project durration. This fee proposal projects the remaining efforts to complete the project. This assumes a design-bid-build delivery method and potential increases due to escalation. The completion date for this scope is July 31, 2026. Total Man Hours = Salary Rates = Salary Subtotal = Revit based 100% Bid Documents (Floor Plan, Roof Plan, Elevations, Sections, Schedules, Details) 100% Architectural Bid Specifications (Divisions 05-10) Issued For Construction Documents (all Architectural drawings and specifications) Services During Bidding (minimal; on-call) $50,776.00Date: Donn Stone/Matt Purvis March 10, 2026 Prepared By:Design Fees to Complete Project = Professional/ Stakeholder Meetings Architectural Project Responsibilties March 9, 2026 Reimbursable Expenses: Exhibit C EXHIBIT A Project: 3/5/2026 24002 Scope: Me c h a n i c a l P r i n c i p a l En g i n e e r Me c h a n i c a l P r o j e c t Ma n a g e r A El e c t r i c a l P r o j e c t Ma n a g e r A Me c h a n i c a l E n g i n e e r Le v e l 6 El e c t r i c a l E n g i n e e r Le v e l 6 Me c h a n i c a l E n g i n e e r Le v e l 5 El e c t r i c a l E n g i n e e r Le v e l 5 Me c h a n i c a l E n g i n e e r Le v e l 4 El e c t r i c a l E n g i n e e r Le v e l 4 Me c h a n i c a l E n g i n e e r Le v e l 2 El e c t r i c a l E n g i n e e r Le v e l 2 CA D A Pr o j e c t C o o r d . Design Period Services $303 $237 $237 $209 $209 $204 $204 $182 $182 $149 $149 $154 $143 Task total HVAC & Plumbing Evaluation, Design & Detailing 2 12 $2,651 Coordination with Other Disciplines 4 2 $1,309 Cost Estimating 2 4 $1,199 Design Meetings 4 $726 Project Management 8 $1,892 Quality Assurance 2 2 $836 CAD/REVIT Quality Control 2 $308 Prep Prelim Submittals 2 2 2 $957 Evaluate, Respond to Review Comments 2 2 $836 Design Subtotal 20 28 4 2 $10,714 FSi Labor Total 20 28 4 2 $10,714 Subconsultant Costs Electrical Architectural Structural Subconsultant Subtotal With markup > FSi Reimbursable Costs Outside Plotting, Deliveries Mileage/Parking Reimbursable Subtotal With markup > Grand Total 50% Discount: $5,357 Prepared by:Accepted by: Andy Langdon Name Signature Associate Principal Title FSi consulting engineers Company Date STD B 2025 10.0% $10,714 10.0% Latter stage design development changes to HVAC and plumbing systems that include finalizing unit heater locations, energy code compliance, envelope consulting, dehumidifier coordination and adjusting to architectural layout changes, necessitating additional coordination and submittal package changes. Proposal for Professional Services Date: Arlington WWTP Ph 1 Expansion Add Services FSi Job Number: Client Job Number: PO Box 4219, Seattle, WA 98194 206.622.3321 Exhibit D EXHIBIT A City of Arlington Council Agenda Bill WS #4 Attachment April 27, 2026 Public Works Quarterly Report and Update Public Works Quarterly Report and Update DEPARTMENT OF ORIGIN Public Works; Jim Kelly, Director EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: Public Works Quarterly Report and Project Update Review of current personnel, regulatory, maintenance and project issues affecting Public Works’ Transportation, Utilities, Cemetery, Engineering, GIS and Administration departments for the first quarter of 2026 and start of second quarter 2026. To maximize time and efficiency, please read the attached report and bring questions to the Council Workshop. ALTERNATIVES: None. Workshop; discussion only. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 1 of 6 This summary report will update you on projects and issues at the forefront of our workload. Further project detail is provided for your review on subsequent pages. 2026 Staffing Updates Status Senior Engineer – Senior Engineer was selected following interviews, start date will be June 15, 2026. Complete Yes City Engineer – Interviews completed, negotiating with possible candidate for start. Complete Yes WTPO Position – Pending No Stormwater Seasonal, Utilities Seasonal – Applications are under review. Pending No 2026 Utility Projects - Current Status Projects in Construction 1. MBR Program – The new Kubota MBR operating program has been installed, and operational bugs are minimal. This project is substantially complete. 2. MBR Blower Installation – Installation of Turbo Blower #1 and Blower Control Unit (BCU) is complete. Start-up of the first blower is complete, and the plant is largely relying on the new blower for membrane air scour needs. The variable frequency drive motor control unit that failed was under warranty and the replacement unit was provided. Programming the unit was a challenge as it came without instructions. A new Human Machine Interface (HMI) has been ordered that will allow the new turbo blower to be controlled remotely, saving the City from excessive overtime call outs as the inevitable bugs are worked out of the programming. Installation of the 2nd turbo blower is scheduled to be installed in early May. 3. WTP New PLC & SCADA Update – The PLC and the new SCADA program, System Platform, are installed. New SCADA screens are developed. System program and integration into WTP operating system is pending availability of system integrator and is currently being programmed (our system programmer is extremely busy). System Programmer is chipping away at this project as time allows. Site visits will ramp up as testing continues with an estimated switch to the new PLC in the next three weeks (mid May). 4. 640 Booster Pump – The project is complete. The pipe size from the reservoir to the pump station is 6-inches and causing cavitation, this triggers system fault and shuts down the BPS when flows exceed 1,100 gallons per minute (gpm). City crews are installing a second feed to the BPS in order to add additional intake volume to the station. 5. Lift Station 02 Pump #3 Controls – Hardware has arrived. System integrator finished programing the third pump into LS-02 rotation on April 20th, it is currently installed and working as designed. Utility Projects out for Bid/Pending Bid 1. LS-11 Bid Package – A draft bid package for the procurement of a premanufactured lift station has been drafted by City Engineering Dept. and reviewed by RH2. Bid for the new LS-11 is scheduled to go to ad in early May. 2. Prairie Creek & BNSF Bridge – BNSF-COA agreement has been signed and staff met with BNSF engineering/construction. We are working on developing a construction schedule. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 2 of 6 Utility Projects in Design 1. WTP Expansion – 90% submittal package is under review by the City and by the Department of Health. A purchase order has been issued for the procurement of the two 800-GPM filtration units. The WTP Expansion funding package is complete; target is to bid the project in Sep 2026. 2. Haller South Wellfield Improvements – Project is moving forward with in-house work and contractor management. Well pumps 2, 3A and 3B have been fully replaced (new pump, rebuilt motor). VFD’s have been installed and connected to the MCC, they have not yet been energized. A few building movers have determined it is not reasonable to relocate old Well House #1 over to new Well #4. Back to the drawing board. These well houses are at Haller Park. 3. Lift Station 11 Improvements – Consultant RH2 is designing the site improvements at LS-11 necessary to receive the new premanufactured lift station. Improvements include new wet well, underground power, and site paving. Estimated fall 2026 construction. Misc Utility Items 1. Haller North – Procurement of this property is moving forward; purchase and sale agreement was fully executed on April 21st. Project funding has interest from Senator Cantwell’s office ($1M) and Representative DelBene’s office ($1M); the balance will come from FEMA BRIC (Building Resilient Infrastructure and Communities) grant. 2026 Transportation/Other Projects - Current Status Budget Category Status Projects in Construction 1. 74th Ave Trail – Project is substantially complete, waiting streetlights. Street light manufacturers expected ship date in May 23, 2026. All grant funds have been expended on this project. 2. 2025 UPP Project – Project is complete, final punch list items will be completed in April. 3. Broadway/Division Rehabilitation – Project is substantially complete. Remaining punch list items are striping and MMA crosswalk, these items are waiting for warmer weather. 4. 188th & Smokey Point Blvd Roundabout – Project has been awarded to SRV Construction and is under construction. At start of project it was realized there was need to extend the sewer line to Lift Station 6 (1,000 ft). Staff is working with design team and will be bringing forward a change order to council. This will be funded by Sewer Capital Funds. 5. Pickle Ball Court – Project complete except for final striping, this will be completed in spring. Three out of five courts are open for play. 6. Jensen Park Improvements – Parking lot complete and stripped, bathroom installed and has power. Project is substantially complete, developing punch list. Transportation Projects out for Bid 1. There are no transportation projects currently out for bid. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 3 of 6 Transportation/Other Projects in Design 1. Smokey Point Blvd Corridor – Project moving forward, focusing on completion of all intersection phases from 60% to 100%; however, a design phase change order is forthcoming. 2. 180th St Roundabout – Project at 90% design, ROW acquisition progressing. This project will be ready for bidding in June 2026. The City has a $2.2 million construction grant for this project and it is budgeted for 2026. 3. SR-530 & SPB Roundabout – Compensatory storage issues have been resolved, project compensatory storage will be at the Pape compensatory storage facility. SEPA has been completed and is out for public comment, a Determination of Non-Significance (DNS) will be issued on Apr 23rd following close of comment period. The project 90% design package (PS&E) was delivered to the COA for review. Two notable comments stopped the review pending resolution with consultant, one involved a discrepancy in drainage pipe/pond elevations, and the other was incorporation of COA landscaping standards. 4. 174th St Roundabout – Design is at 60%, CN obligation is June 2028. We will look at completing final design and possibly advance Construction (CN) funding to 2027 pending staff workload. 5. 169th St Connector – Due to high groundwater, we are reevaluating project costs to see if there is sufficient funding. We might look at phasing this construction. 6. 180th St Connector – Design is moving forward, 60% design completion (including NEPA categorical exclusion) will be ready in late Feb 2026. 7. SR-531 Widening – The SR-531 Widening project is scheduled for bid in Sep 2026. 8. Jensen Pump Track – Design is moving forward, scheduled for June 2026 start of construction, July 20th grand opening. Public Works Grant Update and Status Active Grants/Low Interest Public Loans 1. Public Works Trust Fund (Loan) – Loan amount: $10,000,000. Loan agreement fully executed, will start drawing on loan funds in May 2026. 2. Drinking Water SRF Loan – Loan amount: $2,200,000. Loan agreement fully executed, will start drawing on loan funds during construction. 3. DAHP Cemetery Grant – This grant is funding three Cemetery activities; two are fully completed and the last project will be complete May 16th. 4. FEMA / Prairie Creek: This grant was cancelled by Federal Executive Order but has been activated again, extension given to June 2026. Due to various issues with this project, it is unknown if we will fully be able to utilize all grant funding. 5. NHS Grant Broadway/Division – Grant fully billed out/closed; project CN is complete pending spring final striping. 6. FHWA 169th St Connector – The City rebalanced this project and it is now on the state TIP. Staff is reevaluating project costs based on high groundwater. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 4 of 6 7.PSRC Smokey Point Blvd Corridor Design – This project design has a target completion in 2027, grant is fully billed out, remaining expenditures are local funds. 8. 188th Roundabout (active) – Grant amount is $2,485,000. The project is still active, construction is in progress. 9. 180th Roundabout – Grant amount is $2,200,000. Expenditure of grant is pending start of construction in June 2026. Additional $1,445,975 has been awarded to project, this brings grant amount to $3,645,975. 10. 174th Roundabout - Grant amount is $2,967,500. Design pending restart later this year for construction in 2028. 11. PSRC 74th St Trail –Project in process, grant has been fully billed out. 12. PSRC 180th St Connector (PE) – Project in process and being billed against grant, reimbursements coming in. 13. SR-531 Widening Project (WSDOT project) – Project remains in state budget under the Connecting WA Program; however, the grant can only fund ½ of the project. 14. Coordinated Prevention (Recycling) Grant: Grant has been awarded for years 2025-2027, billing against grant with City’s Waste Management Education & Outreach consultant (Blue Marble). 15. Ecology Stormwater Capacity Grant – Grant contract signed, City is billing against this grant. 16. SnoCo Pump Track Grant – Grant amount: $100,000. Received grant for construction of pump tract, will draw on grant in June 2026. 17. SnoCo Pickle Ball Grant – Grant amount $200,000. Received grant for construction of the Pickle Ball project. 18. Snohomish PUD Energy Efficiency Rebate – Public Works received a $188K energy efficiency rebate for the energy savings that will be realized from the two magnetic bearing turbo blowers being installed at the Water Reclamation Facility. Grants Applied for/Pending Notice 1. 180th St Connector Construction – Grant funding for this project is on the PSRC Regional contingency list. 2. Senator Cantwell CDS – 180th RAB, 640 Reservoir, Island Crossing Water Main and Haller North project were submitted for Congressional funding. The Senator selected one of the phases of Haller North for funding. 3. Representative DelBene – 180th RAB, 640 Reservoir, Island Crossing Water Main and Haller North project were submitted for Congressional funding. As of this date all projects appear to be in progress to receive funding from the Representative. Detail and Update on Operations and GIS Enterprise Activities 1. Cemetery Operations – As follows: - Staff worked with the Cemetery Board to re-evaluate and select a new columbarium layout to better match criteria established by other cemeteries and the VA Cemetery guidelines. - Three Cemetery Board terms were expiring, two Board members elected not to continue as a member of the Cemetery Board. Allen Ice, who has been on the Board for over 25 years, is retiring. Jordan Mohrenne will not be renewing his term, Jordan joined the Board in 2022. - The new columbarium has been delivered. Engineering work load too intense at this time to prepare bid drawings for foundation and slab. Will try to bid construction in May. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 5 of 6 2. Water Reclamation & Sewer Collections – As follows: - New WRF Operator Angel Perez-Garcia is working well and Sewer Collections staff have welcomed new employee Max Turkal. - Staff have wrapped up improvement projects to lift stations LS-02 and are currently working on improvement projects to, LS-9 and LS-11. - Staff cleaned up preventative flooding actions (taping and sanding all doors on the MBR building and Secondary Support building). - Pretreatment team continues to work hard at implementing City’s Pretreatment Program. The Pretreatment Program manages industrial and commercial wastewater to have harmful pollutants removed before it enters the public sewer system, protecting treatment plants, workers, and the environment from damage, interference, or pollution of receiving waters - All crews came together (Public Works, M&O, private contractors) to address a blockage at the Water Reclamation Facility’s headworks. Cleanup is ongoing and nearing completion. 3. Water Treatment & Water Distribution – As follows: - Distribution Staff are busy with system maintenance, inspections for new development and construction projects. - The WTP staff completed a Dept of Health Sanitary Survey on Oct 29th (inside of plant) and on Oct 30th (outside of plant). The System passed with flying colors – great job to the WTP crew!! - The drive-by water meter reading software is being upgraded to Sensus FlexRead. Staff has been working with the Sensus team for several months on implementation, and it went live for January meter reading. 4. Storm Activities – As follows: - The Snohomish Conservation District (SCD) and the City of Arlington Public Works will work together on a project to restore the riparian buffer along the mainstem Stillaguamish River at Stormwater Wetlands Park; this will improve water quality, fish and wildlife habitat, enhance long-term forest and river health, and foster public engagement. An ILA will be coming forward to Council for their approval. - Stormwater staff is working to obtain a Hydraulic Permit to perform maintenance dredging at several creeks/streams in Arlington. An HPA application has been submitted to Washington Dept of Fish & Wildlife. - Stormwater staff is responding to a citizen concern at 17920 31st Drive regarding lack of drainage. All roadside ditches in this area have been filled (without permits, for parking), so drainage is impacted (slow infiltration). Stormwater staff have identified a 300-ft section of asphalt curbing that should be removed to facilitate drainage. Public Works Utilities, Transportation, Cemetery, Engineering & GIS Quarterly Update April 27, 2026 PW Quarterly Report Q1-2026 Page 6 of 6 5. GIS Activities: - Continue building a City owned parcels experience that includes City parcels, City facilities and power meters - Katie participated in mock interviews in early March and presented on GIS & Engineering to the 8th grade Engineering class at Post Middle School in late March - Prepared a list of priority poles for PUD to add street lights along Smokey Point Blvd - Katie is assisting WAGISA (state GIS association) with the May state GIS Conference - GIS assisted a variety of departments in preparing graphics and maps for Community Engagement - Katie is assisting with the new Polimorphic Chat Bot program that will be on the City’s webpages - Created a series of elevation-derived flood inundation maps based on river flood stage for Haller Park area - Finished tree canopy mapping for the NPDES permit - more work will eventually be done to support the permit based on Ecology requirements - Continue building a City own experience that includes City parcels, City facilities and power meters - Processed potential reservoir site along McElroy Rd - Updating GIS with UPP and capital projects information from 2025 - Completed dashboards for all the power meters in the City - Working on quotes for updated image server as the current one doesn’t support the Deep Learning Tools (DLT) and DLT models - Continuing to review storm billing and impervious area between GIS and Caselle Revised filter for Engineering to track which tasks are waiting for M&O work before closing - Cleaned up duplicate fixed assets and currently doing an audit of all fixed assets broken up by Water, Wastewater and Storm (treatment plant assets are not included in this audit) 0 10 20 30 40 50 60 70 80 90 Ta s k H o u r s Task Type Katie Abe Liliana City of Arlington Council Agenda Bill WS #5 Attachment COUNCIL MEETING DATE: April 27, 2026 SUBJECT: Community and Economic Development Quarterly Report ATTACHMENTS: First Quarter Report DEPARTMENT OF ORIGIN Community & Economic Development; Amy Rusko, Director EXPENDITURES REQUESTED: None BUDGET CATEGORY: BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: HISTORY: that Council may have. ALTERNATIVES: Page 1 of 6 x Allen Townhomes – 36-unit residential townhome unit lot subdivision project located east of the 172nd Street and State Route 9 intersection. x Amber Grove – 84-lot residential townhome preliminary unit subdivision project located at southeast of the 197th Place NE and 74th Avenue NE intersection. x Arlington Center – Floodplain violation and code enforcement action north of the Weller building in Island Crossing. x Arlington Townhomes – 17-unit residential townhome unit lot subdivision project located along Highland Drive. x Ashford Place – 103-unit multi-family mixed-use project located southeast of the 166th Street and Smokey Point Boulevard intersection. x Crash Champions – 𖇔‹‘”ƒ†‹–‡”‹‘”‘†‹ϐ‹…ƒ–‹‘•–‘‡š‹•–‹‰„—‹Ž†‹‰ƒ–͸Ͳʹͳͳͻͻth Street NE. x Harmony at Arlington – 61-lot townhouse unit lot subdivision located northwest of the 204th Street and State Route 9 intersection. x Ironwood Place – 102-unit multi-family mixed-use project located northeast of the 67th Avenue and Woodlands Way intersection. x Jaspen’s Inc. – ƒ—ˆƒ…–—”‹‰Ȁˆϐ‹…‡—‹Ž†‹‰ƒ–ͳͻͷͳ͸”Ž‹‰–‘ƒŽŽ‡›‘ƒ† x Jensen 4 – 4-lot townhouse unit lot subdivision located at the Jensen Farm Lane and Anna Lane intersection. x Jensen Park Improvements – Restroom, parking lot, and landscaping at Jensen Park. x Northsound Logistics – 186,873 square foot warehouse building located southwest of the ͷͳst Avenue NE and Longhouse Trail Lane intersection between The Outpost and Emerald ’”‹‰•ƒ”Ǥ x Pilot Flying J EV Chargers – Installation of four Level 3 fast electric vehicle charging stations Ž‘…ƒ–‡†ƒ–ʹͶ͵Ͳͷ͵ͲǤ x RNW Distribution – ͳͷǡ͹Ͷͺ•“—ƒ”‡ˆ‘‘–™ƒ”‡Š‘—•‡„—‹Ž†‹‰located at 7304 197th Place x Snohomish County Operations Center – Redevelopment of current site with new administrative building located at 19700 67th Avenue NE. x Snohomish County PUD Battery Energy Storage System – New BESS facility located east of the existing clean energy campus at 17623 63rd Avenue NE. x Snohomish County PUD Transmission Line – Consolidation of existing distribution poles and installation of a new transmission line from existing substation at the north end of 63rd Avenue to the new Crosswinds substation at the North County PUD property. x Stillaguamish Townhomes – 7-lot residential townhouse preliminary unit lot subdivision located southeast of the Tveit Road and Stillaguamish Avenue intersection. x Stillaguamish Valley Museum – Garage for equipment storage located at 20722 67th Avenue x Temperate Habits Brewery – Construction of a new 10,488 square foot brewing and tasting room Ž‘…ƒ–‡†‘”Ž‹‰–‘ƒŽŽ‡›‘ƒ†Ǥ x Walmart Expansion and EV Charger (public and employee) – Proposed 4,640 square foot building expansion to accommodate outdoor grocery pickup at 4010 172nd Street. Community & Economic Development 2026 1st Quarter Report – Amy Rusko, Director Active Development Projects Under Construction Page 2 of 6 x Arlington Garden Apartments – Civil Permit x Arlington Marriott StudioRes Hotel – Zoning Permit x Atonement Church – Grading Permit x Coast Construction Group Headquarters – Zoning Permit x Atonement Church – Grading Permit x Coast Construction Group Headquarters – Zoning Permit x East Hill Subarea Plan – Subarea Plan and Planned Action Ordinance x Fire District #21 – Water Line Extension x Haller Triplexes – Civil Permit x Holman Recovery II – Civil Permit x King Short Plat – Civil Permit x Knights Landing Townhomes – Conditional Use Permit x Lindsay Project 1 – Conditional Use Permit x MATA – Civil Permit x Medallion Inn and Suites – Binding Site Plan x Pioneer Point – Special Use Permit x Portage Creek Village – Civil Permit x Portage Townhomes – Conditional Use Permit x Project Cascade – Early Grading Permit x Reece Construction Debris Sorting Facility – Zoning Permit x Rivertown Townhomes – Civil Permit x Quail Ridge Re-Plat of Tract 999 – Preliminary Short Plat x Smartcap Arlington Airport North – Civil Permits x Smokey Point Boulevard Corridor Project – SEPA x Smokey Point Industrial – Special Use Permit and Civil Permit – On Hold x Smokey Point Ridge – Civil Permit x State Route 530 and Smokey Point Boulevard Roundabout – SEPA x Stream Passage Project - SEPA x Taco Bell – Civil Permit x Tacos Tecalitlan – Civil Permit x The Outpost Phase III/IV for Buildings 7 and 8 – Civil Permit x Thunder Bird Hangars –Civil Permit x Vanderyacht – Grading and Paving Permit x Visconsi Medical Facility – Civil Permit x Walmart Store Expansion – Civil Permit x Zahradnik/The District – Civil Permit Current Land Use and/or Civil Permits Under Review Page 3 of 6 x Lane Commercial Complex – Proposed development of two retail buildings that are approximately 20,000 and 30,000 square feet, site improvements and compensatory ϐŽ‘‘†‹–‹‰ƒ–‹‘Ǥ x McDonald’s – Proposed construction of a 4,216 square foot building for a new restaurant ƒ–ʹ͵ͳͲͷ͵ͲǤ x 35th Avenue Adult Family Home – Proposed Adult Family Home and two Accessory Dwelling Units Ž‘…ƒ–‡†‡ƒ•–‘ˆ͵ͷth Avenue between Smokey Point Boulevard and 188th Street NE. x Snohomish County Recycling – Proposed recycling center located northwest of the 67th Avenue and 197th Street intersection. x Chelsea Village – Proposed four story multi-family residential building with 30-36 units located at 3211 182nd Street. x Tacos La Mas Fregona – Proposed new location for a mobile food vendor at 217 First Street. x Quick Quack Carwash – Proposed development of the site for a car wash with a two lane queue, single car wash tube and vacuum stalls at 17216 Smokey Point Drive. x Rock Creek Church – Proposed improvements to current parking lot at 730 E Highland Drive. x Island Crossing Driving Range – Proposed development of a golf driving range at 2431 –ƒ–‡‘—–‡ͷ͵ͲǤ General Information Meetings – January to March Page 4 of 6 Issued Building Permits – January to March Applied Building Permits – January to March Page 5 of 6 Code Enforcement Cases and Types of Complaints – January to March Page 6 of 6 x Advertising now for Associate Planner replacement. x The Permit Technicians attended the WABO Front Counter Plan Review Training. x ‡”‹–…ƒ‹‰ƒ†ƒ•‡”ϐ‹…Ї’†ƒ–‡ǣApproximately 11,000 building permits have been scanned. Of these 6,000 permits Šƒ˜‡„‡‡—’Ž‘ƒ†‡†‹–‘ƒ•‡”ϐ‹…Ї and we have approximat‡Ž›ͷǡͲͲͲ”‡ƒ‹‹‰. ‡Šƒ˜‡ͳʹͲ‹˜‹Ž‡”‹–•—’Ž‘ƒ†‡†‹–‘ƒ•‡”ϐ‹…ЇǤ x Looking for a new permitting software. The current Civic Plus software is not working out. We are scheduling demo’s and will need to decide on a permitting system in the next month to ensure we can cancel the current systems prior to paying for another year of service. x Working on Arlington and Marysville Interlocal Agreement for Project Cascade x Working on Development Agreement for Haggen’s Building x City ‘—…‹Ž‡‡–‹‰ –‡•ǣ o May 11th and 18th ǣ ƒ Arlington-Marysville Interlocal Agreement for Project Cascade ƒ AMC Chapter 20.76 – Screening and Trees ƒ AMC Chapter 20.94 – Annexations ƒ AMC Chapter 20.98 – State Environmental Policy Act o June 8th ƒ†ͳͷthǣ ƒ AMC Chapter 20.16 – Permits and Land Division ƒ AMC Chapter 20.40 – Permissible Uses ƒ AMC Chapter 20.110 – Mixed-Use Development Regulations o July 13th and 20thǣ ƒ AMC Chapter 20.44 – Supplemental Uses ƒ AMC Chapter 20.48 – Density and Dimensional Standards ƒ Development Design Standards x 2026 Spring Clean Up Event is scheduled for June 13th. The notice has been sent out in the utility bills and will be posted on social media in the coming weeks. New Programs Staff Updates Current Contracts/Grants/Agreements Upcoming Items