Loading...
HomeMy WebLinkAboutCompleted Utility Availability Certificate WATER AND SEWER AVAILABILITY REQUEST Community and Economic Development City of Arlington• 18204 59th Avenue NE•Arlington,WA 98223 • Phone(360)403-3551 Submittal Requirements: 1 Complete Application 2. 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: ❑ Water Only ❑ Sewer Only ❑✓ Water and Sewer Location/Legal Property Address: 8500 Block of 207th St NE, Arlington, WA 98223 Lot#: Parcel ID No(s): 31051200301000,31051200301400,31051200301500 Subdivision: Project Scope of Work: 22 single-family homes Owner Name: Layoy Inc. Office No.: (425) 770-0888 Email Address: jjfrew@thefrontierassociates.com Cell No.: Mailing Address: 1602 4th St, #4 city: Marysville State: WA zip:98270 Owners Agent.. Nicole Larsen Office No.: (425) 303-9363 Email Address: nicole@insightengineering.net Cell No.: (425) 923-9672 Mailing Address: PO Box 1478 city: Everett State: WA zip: 98206 RESIDENTIAL INFORMATION ❑✓ Proposed Single Family Residence ❑Existing Single Family Residence ❑Accessory Dwelling Unit ❑Proposed Multi-Family Residence: #of Units #of Buildings ❑Residential Plat:#of Lots COMMERCIAL INFORMATION ❑Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage TYPE OF COMMERCIAL USE ❑Hotel/Motel ❑ Food Service ❑Medical/Dental ❑Office ❑ Retail ❑Vehicle Service ❑Warehouse/Storage ❑ Industrial ❑ Other(specify): Commercial Water Usage: Monthly Estimation: Gallons WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? ❑Yes FV_jNo Is there an existing Septic System on-site? ❑Yes ❑✓ No Water Meter Size Requested? ❑ 5/8" ❑✓ 1" ❑ 1.5" ❑ 2" ❑ 3" ❑4" ❑ 6" Type of Fire Protection Requested? ❑ Fire Sprinkler System ❑ Fire Hydrant ❑✓ Unknown I,the undersigned,request City of Arlington Utilities Division to certify willingness to provide water and/or sewer as indicated. The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above information must be reported immediately to the City ofArlington Utilities Division as a condition of Utility Availability approval. x�4 zl_, L Nicole Larsen 11/24/25 Signature Cowner/agent) Print Name Date Page 1 of 2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION I CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. NO A water main or other capital facility improvement ❑ is required; ® is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and YES specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate: STATIC PRESSURE 77.PSI RESIDUAL PRESSURE 60 PSI FLOW 3,517 GPM NO A sanitary sewer main or other capital facility improvement ❑ is required; ® is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced YES property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Other: Water and Sewer service is available at this location per the below conditions. Approved By: Date: 1 2— EXPIRES 18 MONTH4 FRO DATE OF ISSUE COMMENTS: 1. Due to previous geologic instability in this area, the City will not be extending public utilities past where they are currently constructed (water, sewer and storm). Developer may connect to City water and sewer utilities at these existing locations and extend services to proposed residential developments. 2. Water service is available for this project at the east end of water main segment M-5. Please coordinate with the Arlington City Engineer for water water service line connection, meter locations, backflow protection, utility easements, on-site water main alignment, and any other City of Arlington water supply requirements. 3. Sewer service is available for this project at sanitary sewer manhole MH-2010. Please coordinate with the Arlington City Engineer for specifics pertaining to off-site sewer connection point, service location, utility easements, required pipe slope, monitoring manhole location (if needed), pretreatment requirements, and any other City of Arlington sewer requirements. 4. Any wells and septic systems on the development property are to be abandoned per Arlington Municipal Codes 13.04.140 and 13.08.160 as a condition of service. 5. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards. 6. Fire flow data is from water model node 2025-J-215 in 207th Ave. N 9!' _ I F 'it m - 0 I ow n acr o a n "y O rmez- --11Nn0�,F1SINpNONSSV � ' c t ,t.Kcr �1 '' oe n! _ • ,� __ _ fa'.•o.w a�a����� Z 0. � < �,ot•[. "� "'.71—_��r��"j'�`.'� jV Al i-x b 94 g-S �e to PA '✓d ram' �-� \ \\ r l _ Wc• ,•! r1 \ \ 1 $ s g I` SI.I. d KI kb�4 Nil A �`J•' Y3 1tlin 1q1• .�sr Q~.138•1M — y I - rDfIFAYPU)-am" 9 �=iR .2L 6csz ea3a -�