Loading...
HomeMy WebLinkAboutCompleted Utility Availability Certificate WATER AND SEWER AVAILABILITY REQUEST Community and Economic Development City of Arlington• 18204 591"Avenue NE •Arlington,WA 98223 • Phone(360)403-3551 Submittal Requirements: 1 Complete Application 2. 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: ❑ Water Only ❑ Sewer Only ❑✓ Water and Sewer Location/Legal Property Address: 16620 51st Ave NE Arlington WA 98223 Lot#: 1 Parcel ID No(s): 31052800101900 Subdivision: Project Scope of Work: New commercial building - restaurant Owner Name: Arlington 51 st St LLC Office No.: 360-755-3101 Email Address: Paul@bykconstruction.com Cell No.: 360-661-5325 Mailing Address: PO Box 619 city: Sedro-Wooley State: WA zip:98284 Owners Agent: BYK Construction-Madison Bowman Office No.: Email Address: madison@bykconstruction.com Cell No.: 360-305-6930 Mailina Address: PO Box 619 city: Sedro-Woolley State: WA zip: 98284 RESIDENTIAL INFORMATION ❑ Proposed Single Family Residence ❑Existing Single Family Residence ❑Accessory Dwelling Unit ❑ Proposed Multi-Family Residence: #of Units #of Buildings ❑Residential Plat:#of Lots COMMERCIAL INFORMATION ❑ Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage TYPE OF COMMERCIAL USE ❑Hotel/Motel ❑✓ Food Service ❑ Medical/Dental ❑Office ❑ Retail ❑Vehicle Service ❑Warehouse/Storage ❑ Industrial ❑ Other(specify): Commercial Water Usage: Monthly Estimation: 105,000 Gallons F_ WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? Yes allo Is there an existing Septic System on-site? Yes ❑✓ No Water Meter Size Requested? ❑ 5/8" ❑✓ 1" ❑ 1.5" ❑ 2" ❑3" ❑4" ❑ 6" Type of Fire Protection Requested? ❑ Fire Sprinkler System ❑✓ Fire Hydrant ❑Unknown 1,the undersigned,request City ofArlington Utilities Division to certify willingness to provide water and/or sewer as indicated. The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above information must be reported immediately to the City ofArlington Utilities Division as a condition of Utility Availability approval. po" � Madison Bowman 1/20/19 Signature(owner/agent) Print Name Date Page 1 of 2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION I CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. NO A water main or other capital facility improvement ❑ is required; ® is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and YES specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate: STATIC PRESSURE 92 PSI RESIDUAL PRESSURE 60 PSI FLOW 3,841 GPM NO A sanitary sewer main or other capital facility improvement ❑ is required; ® is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced YES property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges Other: Water and Sewer service is available at this location per the below conditions. Approved By: Date: 0,2/17' /W.::2-6 EXPIRES 18 MOAITHS FROM DATE OF ISSUE COMMENTS: 1. Water service is available for this project. Please coordinate with the Arlington City Engineer for water service line connection, meter locations, backflow protection, utility easements, on- site water main alignment, and any other City of Arlington water supply requirements. 2. Sewer service is available for this project, connection will be to sanitary sewer manhole MH- 3855, or other location as approved by the City Engineer. Please coordinate with the Arlington City Engineer for specifics pertaining to sewer connection point, service location, utility easements, on-site sewer main alignment, required pipe size and slope, monitoring manhole location (if needed), pretreatment requirements, and any other City of Arlington sewer requirements. 3. Any wells and septic systems on the development property are to be abandoned per Arlington Municipal Codes 13.04.140 and 13.08.160 as a condition of service. 4. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards. 5. Fire flow data is from water model node 2025-J-1131 at the NE vicinity of the property development site.