Loading...
HomeMy WebLinkAbout2026.05.18 Sewer Redlines a ;a � D K r A o = m 6" PVC 45 Bend 6" PVC 11.25 Bend 5 LF 6" PVC 6" PVC 11.25 Bend 6"Clean Outs 6" PVC 45 Bend 6"to 4"Fernco to 4"ABS Existing Maintenance Manhole 19 LF 6" PVC RIM = 139 IE (E,W) = 130.5 6 LF 6" PVC Existing 8"x8"Tee 3 LF 6" PVC a Existing 8" Main 10 LF 6" PVC co Existing MH-1685 Rim = 138.32 IE = 129.04 1 192 nd St NF 92nd St NE a D K T C =