Loading...
HomeMy WebLinkAboutIssued Utility Availability Certificate WATER AND SEWER AVAILABILITY REQUEST Community and Economic Development City of Arlington• 18204 591h Avenue NE •Arlington,WA 98223 • Phone(360)403-3551 Submittal Requirements: 1 Complete Application 2. 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: ❑ Water Only ❑ Sewer Only ❑✓ Water and Sewer Location/Legal Property Address: xx S Stillaguamish Ave NE, Arlington, WA 98223 Lot#: Parcel ID No(s): 31051100405300 Subdivision: Project Scope of work: 48 unit-lot subdivision for the construction of 48 townhome units Owner Name: Gary Graber Office No.: Email Address: Cell No.: Mailing Address: 21301 SR 530 NE city: Arlington State: WA zip:98223 Owners Agent: Brian Kalab Office No.: (425) 303-9363 Email Address: brian@insightengineering.net Cell No.: Mailing Address: PO Box 1478 City: Everett State: WA Zip:98206 RESIDENTIAL INFORMATION ❑Proposed Single Family Residence ❑ Existing Single Family Residence ❑Accessory Dwelling Unit ❑✓ Proposed Multi-Family Residence:#of Units 48 #of Buildings 10 ❑Residential Plat: #of Lots 48 COMMERCIAL INFORMATION ❑ Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage TYPE OF COMMERCIAL USE ❑Hotel/Motel ❑Food Service ❑ Medical/Dental ❑Office ❑ Retail ❑Vehicle Service ❑Warehouse/Storage ❑ Industrial ❑ Other(specify): Commercial Water Usage: Monthly Estimation: Gallons WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? Yes F,/�No Is there an existing Septic System on-site? Yes ✓INo Water Meter Size Requested? ❑ 5/8" ❑✓ 1" ❑ 1.5" ❑ 2" ❑3" ❑4" ❑6" Type of Fire Protection Requested? ❑Fire Sprinkler System ❑ Fire Hydrant r❑Unknown I,the undersigned,request City of Arlington Utilities Division to certify willingness to provide water and/or sewer as indicated. The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above information must be reported immediately to the City of Arlington Utilities Division as a condition of Utility Availability approval. 5t4� , Xla4l,� Brian Kalab 3/2/26 Signature(owner/agent) Print Name Date Page 1 of 2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION I CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. NO A water main or other capital facility improvement ❑ is required; ® is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and YES specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate: STATIC PRESSURE 77 PSI RESIDUAL PRESSURE _52 PSI FLOW 4,517 GPM NO A sanitary sewer main or other capital facility improvement ❑ is required; ® is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced YES property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Other: Water and Sewer service is available at this location per the below conditions. Approved By: Date: D 2oZd EXPIRES 18 MO THS FROM DATE OF ISSUE COMMENTS: 1. Water service is available for this project. Please coordinate with the Arlington City Engineer for water service line connection, meter locations, backflow protection, utility easements, on- site water main alignment, and any other City of Arlington water supply requirements. 2. Sewer service is available for this project. Please coordinate with the Arlington City Engineer for specifics pertaining to sewer utility easements, development on-site sewer main alignment, required pipe size and slope, monitoring manhole location (if needed), pretreatment requirements, and any other City of Arlington sewer requirements. 3. Any wells and septic systems on the development property are to be abandoned per Arlington Municipal Codes 13.04.140 and 13.08.160 as a condition of service. 4. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards. 5. Fire flow data is from water model node 2025-J-3)2 at the SW corner of the development site in Stillaguamish Ave.