Loading...
HomeMy WebLinkAboutIssued Utility Availability Certificate WATER AND SEWER AVAILABILITY REQUEST Community and Economic Development City of Arlington• 18204 S91h Avenue NE•Arlington,WA 98223•Phone(360)403-3SS1 Submittal Requirements: 1 Complete Application 2. 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: Water Only ❑ Seewye�r Only ❑ Water and Sewer LC Location/Legal Property Address: ��� {<U ic./v /2—& Lot#: _ _ Parcel ID No(s):13/_Q l { 1-y�j�� ( Subdivision: Project Scope of Work:I V1 0PV 0_/ l� S�i2�C Owner Name: f/bj2Z LtJ &u �rJ Office No.: Email Address: & ) - ' Cuti_ 7 1 CNy y/`��� �'6`l Cell No.: Mailing Address:/I U: �(, �l_ Cit :/1)'0 -ell)l f State:" Zip: 70 Owners Agent: /! >�(� Ste/ Office No.: Email Address: ��� G.% Si/� .Y7CPL G/�/f/` •(UfjCell No.: <?S= E Mailin Address: 121 City: lL State: tz, • Zi :)i_�270 RESIDENTIAL INFORMATION 0 Proposed Single Family Residence Existing Single Family Residence Accessory Dwelling Unit ❑Proposed Multi-Family Residence:#of Units #of Buildings ❑Residential Plat:#of Lots COMMERCIAL INFORMATION L/A :1 ❑Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage TYPE OF COMMERCIAL USE ❑Hotel/Motel ❑ Food Service ❑ Medical/Dental ❑Office ❑Retail ❑Vehicle Service ❑Warehouse/Storage ❑Industrial ❑ Other(specify): Commercial Water Usage:Monthly Estimation: Gallons WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? Yes F_jNo Is there an existing Septic System on-site? Yes❑No Water Meter Size Requested? 5/8" ❑1" ❑1.5" ❑2" ❑3" ❑4" ❑6" Type of Fire Protection Requested? ❑ Fire Sprinkler System ❑ Fire Hydrant ❑Unknown I,the undersigned,request City of Arlington Utilities Division to certify willingness to provide water and/orsewer as indicated. The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above 2:�Z= City of Arlington Utilities Division as a condition of Utility Availability approval. *U,,�_ Z 3 -10-2-6— ignature(owner/agent) Print Name Date Pagel oF2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION / CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. NO A water main or other capital facility improvement ❑ is required; ® is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and YES specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate. STATIC PRESSURE 78 PSI RESIDUAL PRESSURE 76 PSI FLOW 936 GPM NO A sanitary sewer main or other capital facility improvement ❑ is required; ® is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced N/A property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Other: Water service is available at this location per the below conditions. Approved By: Date: D OZ i EXPIRES 18 MO HS FROM DATE OF ISSUE COMMENTS: 1. Water service is available for this project. Please coordinate with the Arlington City Engineer for water service line connection, meter locations, backflow protection, utility easements, on- site water main alignment, and any other City of Arlington water supply requirements. 2. Any wells on the development property are to be abandoned per Arlington Municipal Codes 13.04.140 and 13.08.160 as a condition of service. 3. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards. 4. Fire flow data is from water model node 2025-J-594 located at the intersection of Burn Rd and 107th Ave (near the NW corner of the property development site). Applicant will be required to complete (2) 1" service taps of the watermain with at least 2 feet of separation.The applicant will be required to pay the full water connection fees for the first service prior to the water meter being installed.When the applicant provides an approved Snohomish County building permit for the new SFR,the water connection fees for that residential permit will be 50%of the connection fees that are in place at the time of building permit submittal.These fees must be paid prior to water meter installation.When there is an ADU on the property, one connection is considered full fees, and the other is considered at 50% percent per code.