Loading...
HomeMy WebLinkAboutUtility Availability Certificate WATER AND SEWER AVAILABILITY REQUEST 4i Community and Economic Development City of Arlington• 18204 5911,Avenue NE•Arlington,WA 98223 •Phone(360)403-3551 Submittal Requirements: 1 Complete Application 2 8-1/2"x 11"Site Plan/Sketch of the Proposal Type of Request: ❑ Water Only ❑✓ Sewer Only ❑ Water and Sewer Location/Legal Property Address: 18722 59th DR NE Lot#: 41A Parcel ID No(s]: 31052200200100 Subdivision: Project Scope of work: Connect exisitng building to sewer Owner Name: Mission Aviation Training Academy Office No.: 360-435-8179 Email Address: dary.finck@mata-usa.org Cell No.: Mailina Address: 19002 59th DR NE city: Arlington State: WA zi :98223 Owners Agent: Dary Finck Office No.: Email Address: dary.finck@mata-usa.org Cell No.: 425-231-5818 Mailing Address: 19002 59th DR NE city: Arlington State: WA zip:982 RESIDENTIAL INFORMATION ❑Proposed Single Family Residence ❑Existing Single Family Residence ❑Accessory Dwelling Unit ❑Proposed Multi-Family Residence: #of Units #of Buildings ❑Residential Plat:#of Lots COMMERCIAL INFORMATION Binding Site Plan/Plat:#of Lots #of Phases #of Buildings Total Square Footage 8000 TYPE OF COMMERCIAL USE ❑ Hotel/Motel ❑ Food Service ❑Medical/Dental ❑✓ Office ❑ Retail ❑Vehicle Service ❑Warehouse/Storage ❑Industrial ❑✓ Other(specify): education Commercial Water Usage: Monthly Estimation: 1500 Gallons WATER,SEPTIC SYSTEM AND FIRE Is there an existing Well on the property? FYes 7No Is there an existing Septic System on-site? ZYes []No Water Meter Size Requested? ❑ 5/8" ❑ 1" ❑ 1.5" ❑ 2" ❑ 3" ❑4" ❑ 6" Type of Fire Protection Requested? ❑ Fire Sprinkler System ❑ Fire Hydrant ❑Unknown 1, the undersigned,request City of Arlington Utilities Division to certify willingness to provide water and/orsewer as indicated. The above information is complete and accurate to the best of my knowledge. 1 understand that any changes to the above information must be reported immediately to the City of Arlington Utilities Division as a condition of Utility Availability approval. Signature(owner/agent) Print Name Date Page 1 oF2 REV02.2022 TO BE COMPLETED BY THE CITY OF ARLINGTON CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION / CERTIFICATION This non-binding preliminary commitment is only valid for the above referenced property in accordance with City of Arlington policies and for only 18 months. N/A A water main or other capital facility improvement ❑ is required; ® is not required (If required, refer to below conditions) Water is presently available from City of Arlington to service the above referenced property and N/A specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Fire Flow Estimate: STATIC PRESSURE _PSI RESIDUAL PRESSURE_ PSI FLOW_ _GPM YES A sanitary sewer main or other capital facility improvement ❑ is required; ® is not required (If required, refer to attached conditions) Sanitary sewer is presently available from City of Arlington to service the above referenced YES property and specified number of connections per the below conditions and upon payment of applicable connection fees and charges. Other: Sewer service is available at this location oer the below conditions. Approved : ! �� Date: a-L D rOL6 PP B Y EXPIRES 18 MONT S FR M DATE OF ISSUE COMMENTS: 1. Sewer service is available for this project, please coordinate with the Arlington City Engineer for specifics pertaining to off-site sewer connection point, sewer main alignment, service location, utility easements, required pipe slope, monitoring manhole location, pretreatment requirements, and any other City of Arlington sewer requirements. 2. Any septic systems on the development property are to be abandoned per Arlington Municipal Code 13.08.160 as a condition of service. 3. Water and Sewer system improvements shall be designed and constructed in accordance with City of Arlington Design and Construction Standards.