HomeMy WebLinkAbout20260316_PJ26-0018_NoticeOfDecision CITY OF ARLINGTON • NOTICE OF DECISION Visconsi Medical Facility Binding Site Plan Zoning Permit Administrative Design Review The City of Arlington has issued a Notice of Decision for a Binding Site Plan, Zoning Permit, and Administrative Design Review as required by Arlington Municipal Code. The following project has been APPROVED,with the conditions listed in the attached permit decision. Project Name: Visconsi Medical Facility Proponent: Nick Wecker, Barghausen Consulting Firm Project Number: PLN #1415, PLN#1416&PLN#1417/ PJ26-0015, PJ26-0016 & PJ26-0018 Description of Proposal: Binding Site Plan and Medical Facility Location: Permit Decision:Approved,with Conditions Notice of Decision Date: March 12, 2026 End of Appeal Period: March 26, 2026 Zoning Permit Expiration Date: March 12, 2028 Appeals: A Party of Record may file an appeal of this decision within fourteen (14) calendar days from issuance of this Notice of Decision.Appeals shall be delivered to the City of Arlington,pursuant the Land Use Petition Act, Chapter 36.70 RCW, by March 26, 2026. Staff Contact: Ameresia Lawlis,Associate Planner, alawlisParlingtonwa.gov i Community and Economic Development TA Planning Division 18204 59th Avenue NE,Arlington,WA 98223 BINDING SITE PLAN ZONING PERMIT - SITE PLAN REVIEW ADMINISTRATIVE DESIGN REVIEW STAFF REPORT AND PERMIT DECISION GENERAL INFORMATION File Number: PLN #1415, PLN#1416&PLN#1417 PJ26-0015, PJ26-0016 &PJ26-0018 Project Title: Visconsi Medical Facility Owner: Public Hospital District#3 Snohomish County Applicant: VWM Arlington MOB,LLC Contact: Nick Wecker, Barghausen Consulting Engineers Description: Lot Binding Site Plan&Medical Facility Location: Northwest of 212th St NE and Medical Center Drive Tax Parcel ID: 31051200202700 &31051200200400 Lot Size: 5.32 acres Topographical Description: Generally Flat Zoning Classification: Medical Services/Residential High Capacity Land Use Designation: Medical Services /Residential High Capacity Proposed Use Classification: Binding Site Plan&Health Care Facility City Approvals Required: Binding Site Plan, Zoning Permit, Design Review Board, Site Civil Construction Permit, Building Permits,and Utility Permits Decision Date: March 12, 2026 Decision: APPROVED,with Conditions Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 1 of 25 I. NATURE OF APPLICATION A. Request The applicant is proposing a binding site plan to change the existing properties lines and create a Tract for the stormwater pond. Currently,the subject property is split zoned between Medical Services (MS) and Residential High-Capacity (RH) zoning designations. The MS zoning regulation will apply in accordance with City Code provisions for split zoning conditions.The proposal includes the construction of a three-story 30,000-square-foot Medical Office Building.Additional site improvements will include surface parking,stormwater improvements,utility connections,perimeter and interior landscaping. The proposed Medical Office Building will operate exclusively as an outpatient facility. Hours of operation will generally fall between 7:00 a.m. and 7:00 p.m.,though exact hours are subject to change. Ambulance services will not be provided on site; the only circumstance in which an ambulance would arrive is in response to a 911 emergency,consistent with any other public location. A driveway is proposed onto 212th Street N.E. near the southwest corner of the subject property and furthest away from the intersection with Medical Center Drive.Additionally,a driveway to be located at the northwest corner of the subject property is proposed onto Medical Center Drive. The building is proposed near the southeast corner of the subject property near the intersection corner. All parking areas are located to the side and rear of the building. Grading will include site preparation for hardscapes, landscaping, the building, and retaining walls. Approximate quantities of grading activities are 7,000 cubic yards of cut and 8,000 cubic yards of fill, with a total affected area of 2.48 acres. The building will be constructed with a variety of high-quality building materials including textured concrete, metal panels (simulated wood), and brick veneer. The building includes three stories and stands at a height of 43 feet 6 inches. The building's facade includes several large windows situated inside various bays spaced at 20 feet.The building features a prominent entrance with a dark grey glass door surrounded by glass panels. B. Project Chronology/Background The application for a Zoning Permit and a Binding Site Plan was received on October 17, 2025.The application was deemed incomplete on November 13, 2025 and notified the applicant.The applicant submitted the remaining documents on November 20, 2025.The application was deemed complete on November 21, 2025.The city issued review comments on November 21, 2025, December 15, 2025 and January 21, 2026.The applicant submitted revised plans and requested information on December 12, 2025,January 16, 2026 and February 24, 2026. The Notice of Application was issued on December 3,2025 and was published in the city's official newspaper(The Herald),posted on site,mailed to required parties,and posted on the City's website on December 3, 2025. The City issued a Determination of Non-significance (DNS) per AMC 20.98.120 on December 17, 2025. The notice was published in The Herald,posted on site,mailed to required parties,and posted on the City's website on December 19, 2026. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 2 of 25 C. Site Location/Description "Apmrp � yam: r,r - ' }'fo • F Y r litn, b.r w ZIL w 1, .'y lam i 212t, The project is located northwest of 212th St NE and Medical Center Dr D. Site and Adjacent Zoning/Uses I•, Subject Site V 1 i ll T.Wt Rd OTRD=Old Town Residential District , RHC=Residential High Capacity r-I MS=Medical Services Area Zoning g Existin Use Subject Site Medical Services Vacant Parkin Stormwater detention North Medical Services Medical Offices South Medical Services Medical Offices East Residential High Capacity Apartments FWest Medical Services Hospital Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-001 5 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 3 of 25 Il. PROJECT CONSISTENCY WITH TITLE 20 AMC, ZONING A. Applicable Review Criteria and Process The binding site plan request is subject to review for conformity with the Arlington Municipal Code (AMC),including but not limited to the following: Regulation I Analysis Meets Chapter 20.16 AMC,Permits and Final Plat Approval 20.16.100(b) Permits Required. Zoning The applicant submitted for a Zoning Permits are issued under this title only when a Permit review. The Community review of the application submitted,including Development Director is responsible for Yes the plans contained therein, indicates that the the permit decision and the decision is development will comply with the provisions appealable to the Hearing Examiner. of this title if completed as proposed. 20.16.100 (c) Permits Required. Physical The applicant submitted for a Zoning improvements to land to be subdivided may Permit review for a Binding Site Plan and not be commenced except in accordance with project site plan review.The Community Yes a zoning permit issued by the Community Development Director is responsible for Development Director for short subdivisions. the permit decision and the decision is appealable to the Hearing Examiner. 20.16.110 Who May Submit Permit The owner of the property is Public Applications. (a)Applications for zoning, Hospital District#3,Snohomish County,a special use, conditional use, or sign permits or governor of the corporation signed the subdivision plat approval will be accepted permit applications that were submitted only from persons having the legal authority to the city. to take action in accordance with the permit or the subdivision plat approval. By way of Yes illustration,in general this means that applications should be made by the owners or lessees of property,or their agents,or persons who have contracted to purchase property contingent upon their ability to acquire the necessary permits under this title. 20.16.120 Official Representative of the The owner, Public Hospital District#3, Applicant.The applicant for each land use Snohomish County has designated Shawn permit shall designate an official Jurisch of Visconsi, as the official representative,which may be himself,to representative for the subject permits. Yes receive all correspondence, determinations, and notices regarding the application. 20.16.130 Staff Consultation Before Formal The city held a General Information Application.To minimize development Meeting with the project applicant on planning costs,avoid misunderstanding or February 7, 2025. misinterpretation,and ensure compliance with the requirements of this title,a general Yes information meeting between the developer and the planning staff is encouraged as provided in this section. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 4 of 25 Regulation Analysis Meets 20.16.140 Submittal of Application. The project applicant scheduled a (a) To minimize development planning costs, submittal intake appointment with the avoid misunderstanding or Community and Economic Development misinterpretations,and ensure compliance Department and submitted the Yes with the requirements of this title,a submittal applications on October 17,2025. intake appointment is required between the developer and the Community Development staff as provided in this section. 20.16.150 Vesting of Permits. The proposed application for the Visconsi (1) Land use permit applications shall be Medical Facility vested on November 21, considered vested on the date that an 2025,with the issuance of the Notice of application is deemed complete pursuant to Complete Application.The required 20.16.205 and applications shall be processed impact fees for the subdivision do not vest under the land use regulations in effect on with the project and the fee in place at the that date. However,subsequent permits on time of payment is the amount due. Yes the same property are not vested on this date. (2) Filing of a permit application does not vest the payment of fees.Fees due,including impact mitigation fees,application fees,or other charges,shall be those fees in effect on the date the fee is paid in accordance with the most current city council fee resolution. 20.16.160 Processing Multiple Permits. The applicant has submitted a Zoning (a)Whenever a proposed project requires Permit for the Medical Facility,Design more than one permit,multiple permits,by Review and a Binding Site Plan for this title,the entire application will be linked dividing the lots.The Binding Site Plan is and processed simultaneously using the less than 9 lots and is typically processed Yes process specified for the permit requiring the as a Zoning Permit.All applications have highest degree of review and decision-making. gone through the entire process following the Zoning Permit requirements. 20.16.200 Applications to Be Complete. The applicant submitted a complete (a)All applications for zoning,special use, application for the Visconsi Medical conditional use,or sign permits must be Facility Zoning Permit, Design Review and Yes complete before the permit-issuing authority Binding Site Plan. is required to consider the application. 20.16.205 (c) Complete Application.Within 28 The application was submitted on October days of receiving the permit application,the 17, 2025.The City issued a Notice of Community Development Director shall mail Incomplete Application on November 13, Yes or provide in person a written determination 2025.The Notice was issued within the to the applicant. 28-day timeframe. 20.16.205 (g)Within fourteen (14) days after Additional documents were submitted on an applicant has submitted to the Community November 20, 2025.The City issued a and Economic Development Director the Notice of Incomplete Application on additional information identified as being November 21, 2025.The Notice was necessary for a complete application,the issued within the 14-day timeframe. Yes Community and Economic Development Director shall notify the applicant whether the application is complete or what additional information is necessary Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 5 of 25 Regulation Analysis Meets 20.16.215 Distribution of Application.Upon The applications were routed to all receipt of a conditional use permit application, effected city departments on October 17, the Planning Official shall,in addition to all 2025,and after each resubmittal on interested City Department,send a copy of the November 21, 2025,December 11, 2025, Yes application to the authorities and agencies January 15, 2026 and February 24, 2026. reviewing or furnishing water, fire,school, and sanitary sewer service to the proposed project. 20.16.220 Zoning Permits. (a)A completed The zoning permit and binding site plan application form for a zoning permit shall be were submitted to city staff and reviewed submitted to the Community and Economic for compliance with the Arlington Yes Development Director by filing a copy of the Municipal Code. application with the planning department. 20.16.435 Major and Minor Binding Site Plans. 1.The applicant has submitted a binding (b) Standards. Binding site plans are subject site plan to redivide the (2) properties to the following standards: into 2 lots and 1 tract. Lot 1 is for the (1) The binding site plan shall ensure that the existing parking a helipad, Lot 2 is for the collective lots continue to function as one site Medical Facility,and Tract A is for the with respect to,but not limited to,lot access, existing stormwater detention. interior circulation,open space,landscaping, 2.The binding site plan documents have drainage facilities,facility maintenance and identified all public streets,private drive parking. aisles,parking areas,utilities, open space, (2) The binding site plan shall: park areas,landscaping,topography, and (A) Identify the areas and locations of all drainage locations.The binding site plan streets,roads,improvements,utilities,open matches the site plans and landscape spaces, sensitive areas,parking areas, plans that have been submitted with the landscaped areas,surveyed topography for zoning permit. map,water bodies,and drainage features and The binding site plan meets all regulatory building envelopes. requirements of the Arlington Municipal (B) Contain inscriptions or attachments Code. setting forth such limitations and conditions Yes for the use of the land as are established by 3. No natural vegetation, significant the community and economic development trees or critical areas are located director or the hearing examiner; and within this site. (C) Contain provisions requiring any development or division of land to be in conformance with the approved site plan. (D) Contain requirements for street right-of- way realignment, dedication,or widening either required by the city or voluntary agreement. (E)Adhere to all applicable provisions set forth in the land use code. (3) Both the design and development shall preserve the trees and vegetation, natural drainage, existing topsoil,and wetlands/critical areas to the fullest extent that is reasonably possible. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 6 of 25 Regulation Analysis Meets (4) Conditions of use,maintenance,and The binding site plan shows covenants, restrictions on redevelopment of required conditions,and restrictions on Sheet 1 of open space,parking,access,and other the plans. Yes improvements shall be identified and enforced by covenants,easements, dedications,or other similar mechanisms. 20.16.270 Time Limitations for Permit The proposed Visconsi Medical Facility Processing. (a)The City shall issue its notice of zoning permit decision was issued on day final decision on a permit application within 120 21 of the 65-day timeframe per the days after the Community and Economic following dates: Development Director notifies the applicant that Action Date the application is complete,as provided in Date of Application 10/17/2025 20.16.205.In determining the number of days Notice of Incomplete that have elapsed,the following periods shall be 11/13/2025 Application excluded: Resubmittal 11/20/2025 (1)Any period during which the applicant has Notice of Complete been requested to correct plans,perform Application 11/21/2025 Yes required studies,or provide additional required information. Review Comments Sent 11/21/2025 1st Resubmittal 12/12/2026 2❑d Comments 12/15/2026 2nd Resubmittal 01/16/2026 3rd Comments 1/21/2026 3rd Resubmittal 2/24/2026 Decision 3/12/2026 Total Process Days: 23 of 65 Days Chapter 20.36 AMC,Zoning Districts and Zoning Ma 20.36.036 Medical Services District The proposed binding site plan and Established.The Medical Services District Medical Facility provide for additional (MS) zone is hereby established.This district medical services within this zone is created to allow hospitals and related including doctor's offices,urgent care and medical services uses that have developed other related uses. around the Cascade Valley Hospital in an Yes otherwise residential neighborhood. Medical services include hospitals,doctors' offices, birthing centers,and other related uses,but not including manufacturing of medical equipment. 20.36.105 Lots Divided by District Lines This property is located within the Whenever a single lot one acre or less in size Residential High Capacity zone as well as is located within two or more different zoning the Medical Services zone.It has been Yes districts,the district regulations applicable to determined that MS is the appropriate the district within which the larger portion of zoning for this lot. the lot lies shall apply to the entire lot. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 7 of 25 Regulation I Analysis Meets Chapter 20.38 AMC,Airport Protection District 20.38.080 Performance Standards and The property is located under Subdistrict Miscellaneous Restrictions. Restrictions of the D.The binding site plans provides details following zones are required of all regarding the Airport Subdistrict. Yes development under the Airport Protection District Boundaries: d Subdistrict A, B, C, and D 20.38.090 Notice to Future Owners.All The applicant is required to sign a property owners within the Airport disclosure notice prior to completion of Protection Subdistrict D seeking a land use or construction. Yes building permit or conditional use permit or undertaking substantial reconstruction shall sign a disclosure notice Chapter 20.40.150 AMC,Special Zones Permissible Use Table 20.40.010 Table of Permissible Uses. The proposed Health Care Facility is an The Tables of Permissible Uses sets forth the allowed use per the permissible use table permissible uses within the respective zoning within the Medical Services zones. classifications in the city,subject to other applicable provisions in this title.It should be Yes read in close conjunction with the definitions of terms set forth in section 20.08 and the other interpretive provisions set forth in this article. Use BP2,3 AF 1,2,3 NIS4 Office Health Care Facility ZS7,$ ZS 1 Such uses allowed only for aviation related uses in compliance with the intent of the zone as established by Section 20.36.034 Aviation Flightline District Established and at the discretion of the Arlington Municipal Airport. 2 Subject to Section 20.38.070-Restrictions on Certain Use Classifications on Arlington Airport Property 3 Subject to Section 20.38.080-Performance Standards and Miscellaneous Restrictions 4 Such uses allowed only if in compliance with the intent of the zone as established in Section 20.36.036-Medical Services District Established 7 Subject to obtaining an Arlington Municipal Airport lease and compatible surrounding uses. 8 Subject to Section 20.44.070-Homes Emphasizing Special Services,Treatment,or Supervision. Chapter 20.46 AMC,Design 20.46.010 Conformance with Design The Design Review application was Standards. (a) Structures are subject to the submitted to the city and is reviewed relevant design standards adopted in this concurrently with the Zoning Permit.The Yes chapter and the Development Design design of this structure is in compliance Standards. with the design regulations listed within the Development Design Standards. 20.46.030(a)The following developments or Ordinance 2026-003 repealed the projects that are over 12 units or more,new Design Review Board.As a result, mixed-use developments (not part of the although the project would previously mixed-use development regulations),new have been subject to Design Review commercial,or new industrial structures are Board review,design review is now subject to design review board: processed as an administrative (5) Commercial decision as the provisions enabling the Board have been repealed. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#14161 PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 8 of 25 Regulation Analysis Meets Development Design Standards 1.0 Street Character and Liveliness The proposed medical facility has been designed so that its street-facing fagades appear active and inhabited.Due to the existing grade difference between the street and the building pad,accessible walkways,ramps,and landscaped transitions have been carefully integrated Yes to bridge this elevation change onto Medical Center Drive.These features ensure that despite the grade separation, the project maintains a visible and welcoming presence at the street edge and activates the pedestrian realm. 2.0 Pedestrian Environment Retaining walls are proposed along both rights-of-way and will be constructed with a textured face.Landscape setbacks and planting standards are still satisfied after Yes consideration of the retaining walls.The site plan incorporates perimeter landscaped beds along all public street frontages and property edges adjacent to parking. 3.0 Landscape Design The Landscape Plan for the project proposes a combination of Vine Maple and Western Red Cedar trees along the public Yes right-of-way.The trees were selected to be compatible with the existing landscape planting areas within the vicinity of the site 4.0 Transition Between Occupied Spaces This proposal does not include and Street residential units. Yes 5.0 Neighborhood Character The primary building frontage is oriented toward Medical Center Drive,consistent with the corridor's institutional and medical character.While portions of the site are buffered by required parking and landscaping,the building massing and entry placement establish a consistent Yes rhythm with neighboring development. Landscaping along the perimeter reinforces the street edge and softens transitions to surface parking..The main entry is clearly visible from the street, establishing a presence that contributes to the area's identity. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 9 of 25 Regulation Analysis Meets 6.0 Adjacent Properties The nearest residential uses are located on the opposite side of Medical Center Drive.This separation,combined with the street right-of-way and existing grade difference,helps provide additional screening and a buffer from the nearest residential uses.The project does not include rear-yard projections that extend into residential lots.All building massing is contained within required setbacks.All surface parking areas along the street frontage are buffered with landscaped Yes screening beds designed to minimize the potential for headlight glare and limit direct views into first-floor windows of residences across the street.The perimeter landscape plan includes street trees and shrub beds along Medical Center Drive,which soften views into the parking lot.These plantings, combined with site grading,reduce visibility of parked cars from residential vantage points. 7.0 Siting Off-street parking stalls are located to the side and rear of the building.No parking is proposed within the front-yard setback areas, ensuring that the building frontage and landscaping define the street edge rather than vehicle areas.No parking has been placed directly at the intersection corner; instead,the corner is landscaped to maintain visibility,safety,and an Yes attractive street presence.Driveways are limited and positioned so that parking and vehicular areas do not dominate the street frontage.Alley access is not available for this site.Parallel to street parking is not provided directly adjacent to the site due to the functional classification of Medical Center Drive and traffic safety considerations. 8.0 Transit Facilitation A transit stop is provided within walking distance of this site.Sidewalks and crosswalks are provided along the route. Yes The current bus stop provides weather protection and seating. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 10 of 25 Regulation Analysis Meets 9.Architectural Character The massing is a simple square and minimizes solar heat gain through windows by limiting fenestration where low,western light becomes problematic in warming months.The building opens the majority of its windows to the north,east, and south where street trees and longer views of the surrounding area can be found.The building is closer to the west side,responding to the location of the existing Helipad.The building uses a background material (concrete)with two other primary cladding types to define simple,harmonic 1/3 vs 2/3 asymmetries yes around the building.The concrete background,with a consistent rhythm of paired windows,ties all equal facades together.At the main entry,there is a deep overhang,large windows,and an entry vestibule which the cladding types respond to.An overhang accent is used at the skyline of the building to create a shadow line and cast rain away from the upper walls. Flat rooflines,consistent window rhythm patterns,deep entry overhangs,and street setbacks are all incorporated into the design of the proposed building. 10. Character and Massing Deep overhangs at all entry and exits create shadow-lines and interest,along with a pairing of the wood material,to define and orient the user to the parts and pieces of the building.Human scaled windows and masonry units are used on all elevations to ground the building to the user experience. Material modulations, along with paired windows and trim,are used to define elements of the building. yes The main entry and commons spaces are defined by larger expanses of glass and wood above. Fenestration patterns keep the building organized and we hope that in the evening,these will glow and create a classic,formal set of facades on the site's corner.Cladding effectively breaks down the overall mass of the building both vertically at the third floor and horizontally throughout. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 11 of 25 Regulation Analysis Meets 11.Architectural Elements All entries employ an overhang that does not exceed the height of the second floor.Windows are recessed into adjacent cladding types to the base concrete wall.Wood plank and brick materials are easily recognized on all facades to be comfortable to the human Yes scale.Larger areas of fenestration and a deep entry roof with vestibule is used to call attention to the main entry. Secondary and tertiary entries also have larger glass doors and overhangs,but do not match the main entry. 12. Exterior Finish Materials All building materials meet requirements and are standard for this Yes type of structure. 13. Parking Garages No parking garages are proposed with Yes this development. 14. Mixed-Use Buildings This proposal does not include mixed- Yes use. 15. Old Town Business District This proposal is not within the OTBD. Yes Table 20.48-1 Density and Dimensional Standards Lot 1 Lot 2 Minimum Lot Size: 0 square feet 91,657 s ft 103,081 s ft Yes Minimum Lot Width: 70 feet 174.12' 383.29' Yes Front Lot BoundaryLine: 25 feet N A 36+ft Yes Rear Lot Boundary Line-Primary: 20 feet N A 36+ft Yes Side Lot Line or Alley Building Setback: 5 feet N/A 36+ft Yes Building Height Limitation: 45 feet N/A >50ft Yes Maximum Lot Coverage: 100% N/A 71% Yes Chapter 20.56 AMC,Streets and Sidewalks 20.56.015 Complete Streets. The applicant submitted a Complete (a)The city will,to the maximum extent practical, Streets Checklist.The checklist was implement complete streets.For this section, reviewed,and city staff agrees that the "complete streets"means streets that provide intent of the complete streets policy has appropriate facilities to meet the mobility needs been met. of people of all ages and abilities who are The proposed development includes walking,bicycling,riding transit,driving,and improvements to 212th St NE right of transporting goods. way and Medical Center Drive right of (b)The application of complete streets may way.This area will serve vehicles, require the property owner or developer to pedestrians,bicycles through a shared Yes install additional improvements for the lane. installation of certain street types or provide additional right-of-way dedication depending on the location of a proposed project and the surrounding areas level of street improvements. The applicant is required to work with the community and economic development department regarding the specific type of street required. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 12 of 25 Regulation Analysis Meets (c) Complete streets will be implemented There are sidewalks,crosswalks and through the scoping,planning,designing, bicycle racks located on the site. building,operating,and maintaining an The applicant has met the intent of the integrated and connected transportation complete streets policy. system. Yes (d)All development projects shall submit a complete streets checklist with permit application and follow the complete streets policy. 20.56.020 Costs of Right-of-Way Installation The applicant or developer of the and Improvements Borne by Applicant.When proposed project is financially responsible rights-of-way improvements are required or for the construction of improvements volunteer in conjunction with permit along 212th St and Medical Center Drive. yes approval,all costs,and expenses incident to These improvements shall be discussed the installation of the improvement to be and determined during the Civil Permit. dedicated to the public shall be borne by the applicant. 20.56.030 Access to Lots.Every lot shall have The binding site plan provides vehicle, access to it that is sufficient to afford a pedestrian,and bicycle access to Lot A reasonable means of ingress and egress for from Medical Center Drive.The binding emergency vehicles as well as for all those site plan provides vehicular,pedestrian, yes likely to need or desire access to the property and bicycle access to Lot B from 212th St in its intended use.Access includes vehicular, NE and pedestrian access from Medical pedestrian,bicycle,and other common forms Center Drive. of transportation. 20.56.050 Entrances to Streets. (a)All The proposed medical facility provides driveway entrances and other openings onto driveway access from 212th St NE.The streets within the city's planning jurisdiction Binding Site Plan does not effect driveway shall be constructed so that: access for Lot A off Medical Center Drive. 1.Vehicles can enter and exit from the lot in The proposed project complies with the question without posing any substantial following City of Arlington Standards and danger to themselves,pedestrians,or vehicles Specifications: traveling in abutting streets,and • The proposed entrances have the 2. Interference with the free and convenient appropriate signage,stop bars,and flow of traffic in abutting or surrounding crosswalks to protect vehicles, streets is minimized. pedestrians,and bicyclists. Yes 3. Driveway cuts shall be limited so the • The proposed driveway entrances are in narrowest width necessary to provide safe areas that would have the least ingress and egress onto and from the interference with surrounding streets. property. • The proposed driveway cut is 35'of 4. Driveways shall not be located adjacent to 212th St NE.This is within the allowed one another in such a manner as to create a width limits to provide safe access to the "double width" driveway without any site. landscaping between the driveways. • The proposed driveways are not"double width"and are private drive aisles to accommodate a vehicle moving in both directions. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 13 of 25 Regulation Analysis Meets 20.56.130 Construction Standards and The proposed project is subject to a Civil Specifications. Construction and design permit prior to the installation of standards and specifications for streets, improvements on the site and a Right-of- sidewalks,and curbs and gutters are Way permit prior to the installation of contained in the"Public Works Construction improvement within the public right-of- Yes Standards and Specifications,"and all such way. facilities shall be completed in accordance with these standards. Chapter 20.60 AMC,Utilities 20.60.100 Sewage Disposal Facilities The proposed project is required to Required.Every principal use and every lot connect to City of Arlington Sanitary within a subdivision shall be served by a Sewer.The construction of utilities will sewage disposal system that is adequate to take place after Site Civil Permit approval Yes accommodate the reasonable needs of such and shall meet all requirements of the use or subdivision lot and that complies with Public Works Construction Standards and all applicable health regulations. Specifications. 20.60.300 Water Supply System Required. The proposed project is required to Every principal use and every lot within a connect to City of Arlington water.The subdivision shall be served by a water supply construction of utilities will take place system that is adequate to accommodate the after Site Civil Permit approval and shall Yes reasonable needs of such use or subdivision meet all requirements of the Public Works lot and that complies with all applicable Construction Standards and Specifications. health regulations. 20.60.400 Lighting Requirements. The applicant is required to submit (a)All public streets,sidewalks,and other lighting plans and details with the Site common areas or facilities shall be sufficiently Civil permit.This has been added as a illuminated to ensure security of property and condition of the binding site plan. Yes the safety of persons using such streets, sidewalks and other common areas or facilities. (c)All entrances and exits in substantial The applicant is required to submit buildings used for nonresidential purposes lighting plans and details with the Site shall be adequately lighted to ensure the Civil permit.This has been added as a Yes safety of persons and the security of buildings. condition of the binding site plan. (d)All outdoor lights shall be low sodium or The applicant is required to submit similar lamp type and be down shielded to lighting plans and details with the Site prevent light pollution. Civil permit.This has been added as a Yes condition of the binding site plan. 20.60.410 Excessive Illumination. Lighting The applicant is required to submit within any lot that unnecessarily illuminates lighting plans and details with the Site any other lot or public right-of-way and Civil permit.This has been added as a substantially interferes with the use or condition of the binding site plan. Yes enjoyment of such other lot or public right-of- way is prohibited. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 14 of 25 Regulation Analysis Meets 20.60.450 Underground Utilities.All existing, The applicant is required to show all extended,new electrical power lines, utilities underground on the Site Civil telephone,gas distribution,cable television, plans.This has been added as a condition and other communication and utility lines of the binding site plan. shall be placed underground in accordance Yes with the specifications and policies of the respective utility service providers and located in accordance with the Public Works Construction Standards and Specifications. Chapter 20.72 AMC,Parking 20.72.010 Number of Parking Spaces Required. Health Care Facility: 1 space per 400 (a)All developments in all zoning districts shall square feet of gross floor area provide a sufficient number of parking spaces Square Footage: 30,000sf to accommodate the number of vehicles that ordinarily are likely to be attracted to the Proposed Parking Spaces development in question. Yes Vehicles ADA All proposed uses shall comply with Table Required 75 3 20.72-1: Table of Parking Requirements. Proposed 112 9 Total On-Site Parking Spaces: 121 20.72.060 Parking Area Surface. The project site plan shows paving (a)All parking areas shall be graded and throughout all drive aisles and parking surfaced with asphalt, concrete or other spaces on the site,with all parking spaces material that will provide equivalent striped. These requirements shall be protection against potholes, erosion,and dust. reviewed and approved through the Civil Specifications for surfaces meeting the permit. standard set forth in this subsection are Yes contained in the Public Works Construction Standards and Specifications. (b) Parking spaces shall be appropriately demarcated with painted lines or other markings. (c) Parking areas shall be properly maintained in all respects. 20.72.064 Accessible Parking Spaces.All The project site plan shows the layout of handicapped parking spaces shall meet all the accessible parking spaces.The State and Federal Regulations. The parking proposed spaces provide 8-foot stalls spaces shall be at least 8 feet wide and shall with 5-8 feet of adjacent striped area, have an adjacent access aisle at least 5 feet along with appropriate striping and Yes wide.The parking spaces shall have adjacent signage. aisle access to the sidewalk,have required striping and provide display symbols required on the pavement and signage. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 15 of 25 Regulation Analysis Meets Chapter 20.76 AMC,Screening and Trees 20.76.020 General Screening Standard. Every This proposal includes the use of proper development shall provide sufficient screening screening from adjacent medical uses as sot that: well as type A screening near the 1. Neighboring properties are shielded from adjacent residential buildings.Screening any adverse external effects of that includes the use of both a retaining wall Yes development. and plantings. 2. The development is shielded from the negative impacts of adjacent uses such as streets and railroads. 20.76.030 Compliance with Screening The project is in the Medical Services Standard.The table set forth in 20.76.050,in zone. The proposed landscape plan conjunction with the explanations in 20.76.040 shows that adequate screening and street concerning the types of screens,establishes trees are provided between the proposed screening requirements that presumptively use and the street.A wall has also been Yes satisfy the general standards established in proposed on the site. 20.76.020.The table uses the permissible use designation to determine the type of screening that is required between two uses. 20.76.110 Required Trees Along Dedicated The landscape plan shows street trees Streets.The developer shall either plant or have been provided along all adjacent retain sufficient trees so that within the streets. The applicant shall provide the landscape strip there is for every 30 feet of City of Arlington Planting Strip Behind street frontage at least an average of one Sidewalk Tree Detail R-260 that shows deciduous tree of two inches dbh at the time of the installation of street trees with a root planting and with a canopy that starts at least barrier on both sides of the root ball Yes eight feet above finished grade and has or will facing the right-of-way and sidewalk on have when fully mature a trunk at least 8 the site civil construction plans. inches in diameter. Root barriers shall be provided for all street trees and the landscape strip shall be planted per the Department of Public Works Standards and Specifications. 20.76.130 Shade Trees in Parking Area.Vehicle The landscape plans show the vehicle accommodation areas that are paved are accommodation area shaded with trees Yes required to provide trees that shade 20 percent planted in landscape island planting beds of the parking area. throughout the entire site. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 16 of 25 Regulation Analysis Meets 20.76.140 Maintenance of Screening and The property owner is required to Shading Elements.All screening and shading maintain the landscaping on the property elements required by this Chapter shall be and within the right-of-way per AMC maintained by the owner for the life of the 20.76.The final landscape plan shall be project to the following standards: approved with the Site Civil Permit. 1.All plant material shall be maintained with respect to pruning,trimming,mowing, watering,insect control,and fertilizing to maintain a healthy growing condition,create an attractive appearance,and to accomplish the purpose for which it was required. 2. Dead, diseased,stolen,vandalized,or Yes damaged plants shall be replaced within three months of the plants indicated on the approved landscape plans. 3.All screening and shading elements shall be maintained reasonably free of weeds and trash. 4.All screening and shading elements located within the public right-of-way shall be maintained by the abutting property owner. Chapter 20.90 AMC,Concurrency&Impact Fees 20.90.040 (a) Imposition of Impact Fees on The applicant provided a Traffic Impact Development Activity.All development Analysis prepared by Kimley Horn in projects within the City shall be assessed a September 2025.The traffic analysis transportation impact fee,at the rate of concluded that the proposed use would $3,355.00,based on peak p.m.trips,as produce 55 new PM peak-hour-trips to Yes computed in accordance with the most current the site. edition of the Institute of Transportation Engineers Trip Generation Manual,as applied to the City's transportation element of the adopted Comprehensive Plan. Chapter 20.93 AMC,Critical Area Ordinance 20.93.230 Compliance.All land uses or The City of Arlington concludes that the development applications shall be reviewed to subject property does not contain determine whether an environmentally critical environmentally critical areas and does area exists on the property for which the not impact nearby critical areas. Yes application is filed,what the action's impact to any existing environmentally critical area would be,and what actions are required for compliance with this chapter. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 17 of 25 Regulation Analysis Meets Chapter 20.98 AMC,State Environmental Policy Act(SEPA) 20.98.110 (a) Environmental Checklist.A The applicant provided an environmental completed environmental checklist in the form checklist with the application.The City of provided in WAC 197-11-960, shall be filed at Arlington was determined to be the lead the same time as an application for a permit, agency.A Mitigated Determination of license,certificate, or other approval not Non-Significance was issued for the specifically exempted in this ordinance.The proposal on December 17,2025.The Yes City shall use the environmental checklist to comment period for the MDNS was from determine the lead agency and for determining December 19, 2025 to January 2, 2026. the responsible official and for making the The city received comments during the threshold determination. public comment period,which are listed under Section IV. Chapter 20.114 Alternative Energy Systems and Technologies 20.114.445 Off-Street Electric Vehicle Charging a) The proposed project provides more Station Spaces - than 10 percent of the parking spaces on a) The number of electric vehicles charging the site as electric vehicle parking stalls spaces shall be required per Table as required per Table 20.114.425T. 20.114.425T. b) Location and Design Criteria.The provisions b) Location and Design Criteria Provided: of electric vehicle parking will vary based on the design and use of the primary parking lot. The following required and additional locational and design criteria are provided in recognition of the various parking lot layout options. (1) Signage. Signage,as required under (1) A condition will be added tha EV §20.114.455 for each charging station space, parking signage will be provided as shall be posted indicating the space is only for required in AMC 20.114.455. electric vehicle charging purposes. Days and hours of operations shall be included if time Yes limits or tow away provisions are enforced. (2) Maintenance. Charging station equipment (2) A condition will be added that shall be maintained in all respects,including charging station equipment will be the functioning of the charging equipment.A maintained on site with contact phone number or other contact information information provided. shall be provided on the charging station equipment for reporting when the equipment is not functioning,or other problems are encountered. (3)Accessibility.Where charging equipment is (3) EV charging equipment is proposed provided within an adjacent pedestrian fronting the EV stalls.The ADA EV circulation area, such as a sidewalk or charging equipment will be positioned to accessible route to the interfere with accommodate the accessibility accessibility requirements of WAC 51-50-005. requirements within the walkway. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 18 of 25 Regulation Analysis Meets (4.) Lighting.Where charging station (4) The site plan shows lot lighting equipment is installed, adequate site lighting proposed within the parking areas are shall exist,unless charging is for daytime adequate to provide lighting for the EV purposes only. stalls. c) Parking for electric vehicles should also A condition has been added to this permit consider the following: for compliance with signage, (1) Notification. Information on the charging maintenance,accessibility and lighting in station,identifying voltage and amperage compliance with 20.114.445,accordingly. Yes levels and any time of use,fees, or safety information. (2) Signage. Installation of directional signs at the parking lot for entrance and at appropriate decision points to effectively guide motorists to the charging station space(s). Chapter 13.28 AMC,Stormwater 13.28.070 Applicability of the Utility.The The stormwater proposed on the site following actions or applications for the shall meet the most current version of the following permit and/or approvals will require Department of Ecology Stormwater submittal for approval by the utility: site plans, Manual for Western Washington and the design drawings,and operations and City of Arlington Public Works Standards yes maintenance plans.Submittals shall be and Specifications.All stormwater will be consistent with the provisions of this Code,and approved through a separate Site Civil shall comply with the stormwater manual and Construction Permit. engineering standards: (3) New Development Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 19 of 25 III. CONCLUSIONS Under AMC 20.16.220 and AMC 20.16.352,the Community Development Director shall issue the requested zoning permit and zoning permit for a binding site plan,unless she concludes after reviewing the application that: Regulation Analysis Meets Chapter 20.16.220 AMC,Zoning Permits (1) The requested permit is not within his The property is within the city limits and jurisdiction according to the Table of the City of Arlington Zoning Map identifies Permissible Uses the subject property as Medical Services. Yes The Medical Facility building is allowed by meeting the regulations of Title 20. 2) The application is incomplete The City determined the subject application complete on November 21, Yes 2025. (3) If completed as proposed in the The proposed binding site plan complies application,the development will not comply with all required sections of AMC Title 20 with one or more requirements of this title per the above staff analysis. (not including those requirements concerning Yes which a variance has been granted or those the applicant is not required to comply with under the circumstances specified in§20.32, (Nonconforming Situations (4) The proposed project has not complied The City issued an MDNS on December 19, with SEPA 2025. No parties appealed the DNS,and Yes the received public comment concurred with the applicants proposal. (5) The proposed project is not in The requested Zoning Permit, as conformance with the Comprehensive Plan or conditioned,is consistent with all AMC other adopted plans,regulations, or policies. Title 20 requirements: permit processing Yes procedures,and all other applicable plans, regulations,and policies. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 20 of 25 Regulation Analysis Meets Chapter 20.16.435 AMC,Major and Minor Binding Site Plans (b)(1) The binding site plan shall ensure that The binding site plan shows connectivity the collective lots continue to function as one between all lots through interior drive site with respect to,but not limited to,lot aisles,parking areas,open space,drainage, access,interior circulation,open space, and landscaping within the complex. Yes landscaping,drainage facilities,facility maintenance,and parking. (2)(A) Identify the areas and locations of all The binding site plan shows all proposed streets,roads,improvements,utilities, open roads, drive aisles,parking areas, spaces,sensitive areas,parking areas, landscaping,open spaces,drainage,legal landscaped areas,surveyed topography for boundaries,and building footprints within Yes preliminary map,water bodies,and drainage the complex. features and building envelopes; (2)(B) Contain inscriptions or attachments The project is subject to the conditions of setting forth such limitations and conditions the permit decision. for the use of the land as are established by the community development director or Yes hearing examiner; (2)(C) Contain provisions requiring any The proposed binding site plan is subject development or division of land to be in to the approved plans submitted on Yes conformance with the approved site plan; January 16,2026. (2)(D) Contain requirements for street right- No right-of-way dedication,realignment of-way realignment,dedication or widening or widening was necessary with this Yes either required by the city or by voluntary development. agreement. The binding site plan shall meet: The proposed binding site plan has met all Adhere to all applicable provisions set forth in required sections of the Arlington Yes the land use code. Municipal Code per this permit decision. (3) Both the design and development shall The proposed binding site plan and preserve the trees and vegetation,natural development of the property has met the drainage,existing topsoil,and wetland/critical requirements of the Arlington Municipal Yes areas to the fullest extent that is reasonably Code. possible. (4)Conditions of use,maintenance,and other The Binding Site Plan shows easements, restrictions on redevelopment of required dedications,covenants, conditions,and open space,parking,access,and other restrictions for the complex. improvements shall be identified and Yes enforced by covenants,easements, dedications,or other similar mechanisms. Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 21 of 25 IV. PUBLIC COMMENTS A comment was received from DAHP and the Stillaguamish tribe stating they concur with the applicant's proposal to proceed with an Inadvertent Discovery Plan for ground disturbance. V. ADMINISTRATIVE DECISION The proposed project was found to be consistent with and meets the intent of the Arlington Zoning Code, Comprehensive Plan,and the Arlington Municipal Code,therefore the Visconsi Medical Facility Binding Site Plan,Zoning Permit and Design Review(PJ26-0015, PJ26-0016&PJ26-0018) are hereby APPROVED,subject to the following conditions. VI. CONDITIONS Binding Site Plan/Zoning Permit: 1. All development shall be in substantial conformance with the Site Plan, Landscape Plans,and Architectural Plans received on February 24, 2026,subject to any conditions or modifications that may be required as part of the permit and construction plan review. 2. The Binding Site Plan shall be in substantial conformance with the plans received on February 24, 2026. 3. The applicant is required to provide the city with a signed binding site plan prior to city signatures and recording with the Snohomish County Auditor's Office. 4. The approved Zoning Permit shall expire two years after the date of the Notice of Decision per AMC §20.16.220. 5. The construction and final development shall meet all Title 20 AMC regulation requirements. 6. The developer shall meet all local,state, or federal code requirements.Attached as Attachment A is a list of code requirements that are specifically called to the developer's attention. It is in no way intended to be a complete list of code requirements,but a general checklist of major steps and issues. 7. The developer shall clear any outstanding Planning Division permit-processing accounts with the City within 60 days of issuance of this permit. 8. No permits and/or construction pursuant to the Zoning Permit shall begin or be authorized until 14 days from the date of the decision. 9. The binding site plan shall comply with all permits and conditions thereof from the City of Arlington and other government agencies with jurisdiction. 10. Prior to any future development approval, the binding site plan shall be recorded with the Snohomish County Auditor's Office. 11. The applicant shall contact the Stillaguamish Tribe of Indians prior to any ground disturbance of the site for Tribal Monitoring. 12. The applicant shall record and provide the City of Arlington Community and Economic Development Department with a conformed copy of the recorded Binding Site Plan within 30 days of approval. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 22 of 25 Design Review: 13. The building permit elevations and constructed site shall be consistent with the design elevations,materials,colors,and details approved by the Design Review Board.Revised building articulation for the north facing building wall shall be required pursuant to 10.1.4.2. 14. All service elements, electrical meters, and mechanical equipment shall be screened from the public street and view per 2.3.3.1, 2.3.3.3, 2.3.3.4, 2.7.3.1., 2.7.3.2, 2.7.3.3,2.7.3.4, 2.7.3.5, 7.3.3.1, 7.3.3.2, 7.3.3.4, 7.3.3.5, 7.3.3.6, and 10.3.3.2. 15. All service elements,electrical meters,and mechanical equipment shall be incorporated into the overall design of the building per 7.3.3.E,11.1.4.2(g) 16. Lighting fixtures to be reviewed at the time of building permit and shall be consistent with the Design Review Standards including 10'-12'pole heights throughout parking areas. Lighting bollards 3-4'in height can illuminate paths and walkways and is required to be down shielded per 2.7.3.2, 2.7.3.3, 2.7.3.5. Site Civil Permit: 17. Prior to any construction activities,the applicant shall file and receive approval of civil construction plans which comply with all requirements of the Land Use Code, International Building Code,International Fire Code and Public Works Construction Standards and Specifications.Said plans shall address all site improvements,either required or voluntarily provided. 18. All stormwater is required to meet the 2019 Department of Ecology Stormwater Management Manual for Western Washington.The final drainage plan shall be approved with the Civil permit. 19. The Applicant is required to obtain utility permits from the City of Arlington for water and sanitary sewer connections. 20. The Applicant is required to provide an automatic irrigation system on the site.The proposed irrigation plan shall be submitted with the Civil Permit. 21. The Applicant shall construct all existing, extended,and new electrical power lines (not to include transformers or enclosures containing electrical equipment including but not limited to,switches,meters, or capacitors which may be pad mounted),telephone,gas distribution, cable television,and other communication and utility lines in or adjacent to any land use or building permit approved after the effective date of this chapter shall be placed underground in accordance with the specifications and policies of the respective utility service providers and located in accordance with the administrative guideline entitled"Public Works Construction Standards and Specification." Even in the event the distribution line originates from a point opposite any public roadway from the new construction the service lines shall be placed beneath said roadway by means of boring or surface excavation across said roadway. 22. The placement of Snohomish County PUD transformer cases shall be reviewed and approved by the city.All cases that abut public right-of-way are required to be decoratively wrapped. 23. The Applicant shall follow the Inadvertent Discovery Plan received October 17, 2025.The plan is required to be on-site and followed should archaeological resources or human remains be encountered. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 23 of 25 Other: 24. City of Arlington Traffic Impact Fees shall be paid prior to issuance of the building permit for (55) PM Peak Hour Trips. 25. Prior to issuance of the building permit, the applicant shall complete all required or voluntary improvements unless otherwise secured and authorized by the City Engineer. 26. The applicant shall submit building plans meeting the architectural standards of AMC 20.110,as approved with this permit. 27. Business Licenses for all contractors working on the site shall be required to obtain a City of Arlington Business License. 28. Building signage is required to be permitted through a sign permit application. All signage requires city approval prior to installation. The signage shall meet all code requirements and blend in with the overall building design. 29. All EV charging stations shall provide proper signage and noticing per AMC 20.114. EXPIRATION Per AMC 20.16.220,a Zoning Permit shall expire automatically if,within two (2)years after the issuance of such permits: 1. The use authorized by such permits has not commenced,in circumstances where no substantial construction,erection, alteration,excavation, demolition,or similar work is necessary before commencement of such use, or 2. Less than 10 percent of the total cost of all construction, erection,alteration,excavation, demolition, or similar work on any development authorized by such permits has been completed on the site. The design review decision shall be approved for a maximum of two years with a valid land use permit or shall expire at the time of the land use permit, if not extended. Per AMC 20.16.435,a Binding Site Plan shall expire if the binding site plan is not recorded and a conformed copy is not returned to the city within the required timeline. (d)All binding site plan approvals are subject to being recorded with the Snohomish County Auditor by the applicant.The applicant is required to submit the binding site plan documents with all required notarized and official signatures to the city for review and signature within thirty(30) days of the binding site plan approval. Once the city has signed the binding site plan documents the applicant is required to record the binding site plan with the Snohomish County Auditor within thirty(30) days of the date signed by the city.A conformed copy of the recorded documents shall be returned to the City of Arlington. If the binding site plan is not recorded and a conformed copy is not returned to the city within this time period,the city may expire the binding site plan decision. Visconsi Medical Facility Binding Site Plan-PLN#1 415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 24 of 25 VII. APPEAL This decision may be appealed pursuant to AMC 20.20.010,which provides for a hearing of the Zoning Permit decision before the Hearing Examiner.Any aggrieved party of record may file an appeal within 14 days of the permit decision. An appeal shall be considered filed when a written notice of appeal, specifying the grounds and arguments, therefore, is delivered to the Department of Community and Economic Development by 5:00 PM on Tuesday, March 26, 2026, and the appeal fee as set by resolution is paid. Prepared by:Ameresia Lawlis,Associate Planner Date: March 12, 2026 ORDERED THIS ON THE_12th DAY OF March .2026 Amy Rusko,Community and Economic Development Department Director Distributed to the Following Parties: Shawn Jurisch,Visconsi (Applicant) Nick Wecker,Core States (Contact) Visconsi Medical Facility Binding Site Plan-PLN#1415/PJ26-0015 Zoning Permit-PLN#1416/PJ26-0016 Design Review-PLN#1417/PJ26-0018 Page 25 of 25