Loading...
HomeMy WebLinkAbout20251212_PLN1417_Floor Plans FLOOR PLAN ABBREVIATIONS KEY: CLEAN CLEAN UTILITY ROOM CHANGE CHANGE ROOM EQUIP EQUIPMENT HSKP HOUSEKEEPING OM Z E RYAS EVS ENVIRONMENTAL SERVICES NURSE NURSES'STATIONS Architects SOILED SOILED UTILITY ROOM STOR STORAGE ULTRA ULTRASOUND ROOM �9587 R ST EGIERED \l ARCHITECT I I\ 1� 15'-6„ 1 28'-7" 1 20'-9" T-9" 5'_9" 1 21'-8" YIILL GENERAL PLAN NOTES 1.ALL INTERIOR WALLS TYPE"," 19' 9" UNLESS NOTED OTHERWISE. OMIT GWB ON INTERIOR SIDE OF 9'-101/2" 91-101/2" ALL MECHANICAL AND PLUMBING CHASE WALLS,TYP. 2.WALL DIMENSIONS ARE TO FACE OF STUD AND CONCRETE VESTIBULE UNLESS NOTED OTHERWISE, 01 TYP. 3.WHERE DOORS ARE SHOWN NEAR ADJACENT WALL PROVIDE PUBLIC PUBET LIC 4"FROM DOOR OPENING TO OILET TOIL FACE OF STUD OR CONCRETE ELEC. ELEV. T 7, UNLESS NOTED OTHERWISE, E1 104A N 105 1 106 TYP. CHECK-IN 4.AT EXAM ROOMS,LATCH SIDE WAITING OF SWING DOORS TO BE 18" 104 FROM ADJACENT WALL,U.N.O. SCALE SCALE 5.FOR RETURN AIR TRANSFER CORR. 132A 107A - FRAMED OPENINGS,LOCATIONS 15 ELEV. 1 E2 AND SIZES REFER TO MECHANICAL DRAWINGS. — — — = EGISTRATION I I 1 6.SEE G SHEETS FOR ASSEMBLIES,TYP. HSKP SOILED TRIAGE — 124 114 108 —— 7.SEE RCPS FOR CEILING BREAK ROOM EXTENTS,HEIGHTS AND STAIR r— TRANSITIONS,TYP. STAFF � 125 TC1 L S2 — � .OILET—I — — — B 8.SEE INTERIOR FINISH SHEETS Pp133 — AND ELEVATIONS FOR ALL IIF 135 INTERIOR FINISHES,TVP. II � IEXAM#5EXAM#1 1 — — L—L— _ — 127 ,26 109 N J j ATIEN r CORR. r— TOILET 115 T u Mir f 134 _ 116 — Illr T _ CORR. IL- 3� J 1R ONTROL 35A CORR. ALCOVE 117 CORR. STOR 10 136 137 EXA$#6 EXAM FL-1 EVS o I I WORK 143 — 141 CHANGE QEm C — — —ELEC. — CHANGE ORR. 153 144 132 10 EXAM#7 CORR. CORR. EXAM#3 129 120 118 111 r_PATIENT F—PATIEN I� TOILET TOILET -I' 147 I STOR 10 EXAM#8 NURSE EXAM#4 = ULTRA#1� 1 130 119 112 L � — LAB MECH. 149 , CORR. tss 1rQ, Dw 1 107 DESIGN DEVELOPMENT —— EQUIP. CORR.I EQUIP. ® 1 121C 121 D 121A REV ISSUED FOR DATE EQUIP. — RECEIVING PATIENT p — — — — LOOD DRAW TI E T — — 121E 157 148 �r 138 RISER 156 TREATMENT#3 TREATMENT#2 TREATMENT#1 ® D — 131 L—— 122 1 _ 113 r 1 T T r l I� F -- -- NORTH. PLAN. SCALE. — STAIR CORR. I UP S1 STOR. As indicated �= L—I, 139 123 SRH MOB o- - - - ARLINGTON - iE I I I I I I I I z VISCONSI DEVELOPMENT I `o OVERALL FIRST 12 FLOOR PLAN PROJE- 0 R CHECK n FIRST FLOOR PLAN a IssuED. 12.03.2025 A2.00T1 N U FLOOR PLAN ABBREVIATIONS KEY: CLEAN CLEAN UTILITY ROOM CHANGE CHANGE ROOM EQUIP EQUIPMENT HSKP HOUSEKEEPING OM Z E RYAS EVS ENVIRONMENTAL SERVICES NURSE NURSES'STATIONS Architects SOILED SOILED UTILITY ROOM STOR STORAGE ULTRA ULTRASOUND ROOM �9587 R ST EGIERED \l ARCHITECT I I\ 1� 100,-0" Y I, 15'-6" 28'-7" 20'-9" 7'-9" 5'-9" 21'-8" GENERAL PLAN NOTES 1.ALL INTERIOR WALLS TYPE"1" UNLESS NOTED OTHERWISE. OMIT GWB ON INTERIOR SIDE OF ALL MECHANICAL AND PLUMBING CHASE WALLS,TYP. 2.WALL DIMENSIONS ARE TO FACE OF STUD AND CONCRETE UNLESS NOTED OTHERWISE, TYP. 3.WHERE DOORS ARE SHOWN NEAR ADJACENT WALL PROVIDE PUBLICJ. ,GPUBLIC 4"FROM DOOR OPENING TO FACEELEV. STUD ELEC. ��TOILET `TOILET UNLE SFNOT DOOTHERW SE,E E7 204A I LI 205 1 206 TYP, 4.AT EXAM ROOMS,LATCH SIDE CHECK-IN WAITING OF SWING DOORS TO BE 18" ELEV.LOBBY 202 204 FROM ADJACENT WALL,U.N.O. 201 SCALE v 243A 5.FOR RETURN AIR TRANSFER ELEV. - FRAMED OPENINGS,LOCATIONS E2 AND SIZES REFER TO MECHANICAL DRAWINGS. SCALE SCALE EXAM#18 229A EXAM#10 EXAM#4 207A 6.SEE G SHEETS FOR ASSEMBLIES,TYP. STAIR REGISTRATION 238 STOR. 223 11 216 HSKP. __ r-- -_ 7.SEE RCPS FOR CEILING 52 203 231 208 EXTENTS,HEIGHTS AND --- TRANSITIONS,TYP. 8.SEE INTERIOR FINISH SHEETS -UP- TREATMENT#2 EXAM#1 AND E EVATIONS FOR ALL EXAM#22 232 L I�°, hI 209 INTERIOR FINISHES,TYP. EVS - 244 __ CORR. COREXAM#19 Pt 1 EXAM#5239 -- 0 217 - -J EXAM#12 XAM# --J- TREATMENT#3 ATIENT- `-PATIENT 225 218 240 - 246 _TOILET- - TOILET - �� �� 233 EXAM#2 � � 210 ELEC. 10'-11/4" 10'-11/8' 250 \ CORR. CORR. EXAM 243 23SOILED _ 219 211 0 ^per 4 - -- 9'-111/4" v - - - -DATA 251 CORR. BREAK ROOM ICLEAN EXAM ° EXAM#7 249 247 235 226 220 _ I __ -- I II I I - EXAM#20 EXAM#16 EXAM#14 EXAM#6 TREATMENT#1 241 236 227 221 212 - - � e — �❑ -,ram�PATIENT 1 DESIGN DEVELOPMENT �� -- -- -- -- , TOILET- 213 A EXAM#21 EXAM#17 EXAM#15 EXAM#9 - REv ISSUED FOR DATE FLOW 237 228 222 STATIONS 242 - - - _ , STAFF 248 , � s s � e � e R�1 -T TOILETy QUIET ROOM E{ 4 214 FLOW STATIONS \ 229 NORTH, RLAN. STAIR \ OFFICE SCALE. Up Ell z1s As indicated SRH MOB o- — — — — — — ARLINGTON — �I I I I I I I I I z VISCONSI DEVELOPMENT I `o OVERALL SECOND FLOOR N PLAN PROJE— b b b 4.1 4b 4.2 6b R I DHECK SN ISSUED. 12.03.2025 °D Q� 1 SECOND FLOOR PLAN IN 18" °" A2.01 TI Rd FLOOR PLAN ABBREVIATIONS KEY: CLEAN CLEAN UTILITY ROOM CHANGE CHANGE ROOM EQUIP EQUIPMENT HSKP HOUSEKEEPING OM Z E RYAS EVS ENVIRONMENTAL SERVICES NURSE NURSES'STATIONS Architects SOILED SOILED UTILITY ROOM STOR STORAGE ULTRA ULTRASOUND ROOM �9587 R ST EGIERED \l ARCHITECT I I\ 1� TT GENERAL PLAN NOTES 15'_6" T 28'_7" T 20._9" 1 1. 1. 1 61_9. 1 21,_8" 1 1.ALL INTERIOR WALLS TYPE"1" UNLESS NOTED OTHERWISE. OMIT GWB ON INTERIOR SIDE OF ALL MECHANICAL AND PLUMBING CHASE WALLS,TYP. 2.WALL DIMENSIONS ARE TO FACE OF STUD AND CONCRETE UNLESS NOTED OTHERWISE, TYP. 3.WHERE DOORS ARE SHOWN NEAR ADJACENT WALL PROVIDE 4"FROM DOOR OPENING TO FACE OF STUD OR CONCRETE UNLESS NOTED OTHERWISE, ELEV. TYP. E7 4.AT EXAM ROOMS,LATCH SIDE OF SWING DOORS TO BE 18" FROM ADJACENT WALL,U.N.O. 5.FOR RETURN AIR TRANSFER ELEV. - FRAMED OPENINGS,LOCATIONS E2 AND SIZES REFER TO MECHANICAL DRAWINGS. 6.SEE G SHEETS FOR ASSEMBLIES,TYP. 7.SEE RCPS FOR CEILING STAIR EXTENTS,HEIGHTS AND S2 TRANSITIONS,TYP. SEE INTERIOR FINISH SHEETS B1 — ON AND ELEVATIONS FOR ALL INTERIOR FINISHES,TYP. I I I I I SHELL F3070 ELEC 55 DATA 359 I I I I I I I I I I DESIGN DEVELOPMENT REV ISSUED FOR DATE l — — — -- — — — — - -- — — — NORTH, RLAN. DN SCALE. STAIR s1 I I I I As indicated SRH MOB - - - - - E ARLINGTON - I I I I I I I I z VISCONSI DEVELOPMENT I `o OVERALL THIRD 12 E1. 1 2 3 41 4 42 5 FLOOR PLAN 0 PROJE— R CHECK 0 n THIRD FLOOR PLAN ssuEo. 12.03.2025 118 A2.02T1 N U