Loading...
HomeMy WebLinkAbout20251212_PLN1417_DumpsterEnclosureDetails STAINLESS STEEL REMOVABLE BOLLARD STONE CAP. STONE CAP. HANDLES,TYP. Z E RYAS Architects TYPED N TYPE D-R7 === ^9587 REGISTERED ARCHITECT p w ,,�✓ o I R !EK o ON � I — ————————— — ———————— — � I I ILI L III �L IJI I II ILJI ILJI ILJI 10'-0" 19'-9„ L URETHANE CANE BOLTS SLEEVES 3N" W EE PVC PROVIDE TRACK,L J I GATES,PAINTED. AT EACH GATE. L—1 CONCRETE,TYP. TYR n DUMPSTER ENCLOSURE ELEVATIONS #5 BARS @ 16" O.C.EACH WAY. SEE STRUCTURAL 8"CMU BLOCK. CONC.PARKING BLOCK TYP. d (2)#5 BARS CONT. 4"SAND CUSHION. A TOP AND BOTTOM. DUMPSTER ENCLOSURE FOUNDATION SECTION 1 1/2"=1'-0" STONE CAP. r - r TOP OF STEEL PIPE CONCRETE FILL TO BE STRIKED OFF FLAT. Z 8"BLOCK. UPPER ALUM BRACKET. p 6"STEEL PIPE 18"DIAMETER FINISH AS SCHEDULE. O ID (PAINTED)FILLED CONCRETE FOOTING. 6 CUBIC YARD 6 CUBIC YARD ~z W/CONC.SMOOTH DUMPSER PROVIDED DUMPSER PROVIDED a p TROWEL CROWN TOP. BY OTHERS. BY OTHERS. O �O' 6"STEEL PIPE, m 6"RD.STEEL SCHEDULE 40 PAINTED. O i` GALV.PIPE SHOWN DASHED SET 18" w� CONCRETE FOOTITI NG. a0 I I I I <w — — — — — — — — — — — — — — — — — — — — — — J m REMOVABLE BOLLARD 127/128' 1'- 18'-51/128" �0ilQll 5" 3" PROVIDE PVC SLEEVES CONC.MIN.3000 IN CONCRETE PSI @ 28 DAYS. CROWN CONCRETE SLAB, FOOTING. SLOPE TO DRAIN. PROVIDE JOCKEY EDGE OF SLAB. WHEEL AND TRACK REINFORCINGTOP, .4 III III III •�e.�-.,:-,._"�'_ ". "�.'`r;d.� BOTTOM,AND MIDDLE. III III—III—III- - —III—III—III— DESIGN DEVELOPMENT MUELLERCOR-6 .� 11-111-1 I— III—III—I 1(— ENCLOSURE DOOR. ❑ " —III—III—III—III—III III—III—III—III—I I I—III—III—III—III—I 14"REAR I—III—III—III—III R�, Iss�EOFaR DATE L J 1/2"X B PROVIDE CONCRETE APRON IN FRONT OF PP H E BOTH .4 P. — — 1 — —I DUMPSTER ENCLOSURE ENTRANCE WHICH SHALL I—III—III—III III —III III III _ BE CAPABLE OF WITHSTANDING A 20 TON CONCRETE FOOTING, STATIONARY LOAD;REFERENCE CIVIL.----- POST AND FOOTING. 1"STL.BOTTOM. REFER TO STRUCTURAL. I ❑ L J �18 � NORTH. PLAN. FINISH AS SCHEDULED. 7 SCALE. PROVIDE 3/4"PVC /1 DUMPSTER SECTION DETAILS 8"CMU BLOCK As indicated SLEEVES IN CONCRETE,TYP. 1/4"=1'-0" TRASH ENCLOSURE. � STONE CAP SRH MOB ARLINGTON - ALIGN. wl _ o GATE CLOSED POSITION zl VISCONSI DEVELOPMENT 8"CMU BLOCK WALL. zI k- 1 DUMPSTER n DUMPSTER ENCLSURE#2 FINISH AS SCHEDULED. j PIPE BOLLARD. ENCLOSURE 12 DETAILS MUELLER ENCLOSURE GATE. PROJE— 2— Opaz CHECK. 9 6"STEEL JAMB POST. ssu O 12.03.2025 SNCONCRETE FILLED. m PAINTED PER SCHEDULE. N DU PS ER PST ENCLOSURE DETAILS GATE,OPEN POSITION. �r A 1 .01 CS