HomeMy WebLinkAbout20251212_PLN1417_DumpsterEnclosureDetails STAINLESS STEEL REMOVABLE BOLLARD
STONE CAP. STONE CAP. HANDLES,TYP.
Z E RYAS
Architects
TYPED N TYPE D-R7 ===
^9587 REGISTERED
ARCHITECT
p
w ,,�✓
o I R !EK
o ON
� I
—
————————— — ———————— —
� I I ILI L III �L IJI I
II ILJI ILJI ILJI
10'-0" 19'-9„ L URETHANE CANE BOLTS
SLEEVES 3N" W EE
PVC PROVIDE
TRACK,L J I
GATES,PAINTED. AT EACH GATE. L—1 CONCRETE,TYP. TYR
n DUMPSTER ENCLOSURE ELEVATIONS
#5 BARS @ 16"
O.C.EACH WAY. SEE STRUCTURAL
8"CMU BLOCK. CONC.PARKING BLOCK TYP.
d (2)#5 BARS CONT. 4"SAND CUSHION. A
TOP AND BOTTOM.
DUMPSTER ENCLOSURE FOUNDATION SECTION 1
1/2"=1'-0"
STONE CAP.
r - r TOP OF STEEL PIPE
CONCRETE FILL TO BE
STRIKED OFF FLAT.
Z 8"BLOCK.
UPPER ALUM BRACKET.
p 6"STEEL PIPE 18"DIAMETER FINISH AS SCHEDULE.
O ID (PAINTED)FILLED CONCRETE FOOTING.
6 CUBIC YARD 6 CUBIC YARD ~z W/CONC.SMOOTH
DUMPSER PROVIDED DUMPSER PROVIDED a p TROWEL CROWN TOP.
BY OTHERS. BY OTHERS. O
�O' 6"STEEL PIPE,
m 6"RD.STEEL SCHEDULE 40 PAINTED.
O i` GALV.PIPE SHOWN
DASHED SET 18"
w� CONCRETE FOOTITI NG.
a0
I I I I <w
— — — — — — — — — — — — — — — — — — — — — — J m
REMOVABLE BOLLARD
127/128' 1'-
18'-51/128" �0ilQll
5"
3"
PROVIDE PVC SLEEVES CONC.MIN.3000
IN CONCRETE PSI @ 28 DAYS.
CROWN CONCRETE SLAB,
FOOTING. SLOPE TO DRAIN.
PROVIDE JOCKEY EDGE OF SLAB.
WHEEL AND TRACK REINFORCINGTOP, .4 III III III •�e.�-.,:-,._"�'_ ". "�.'`r;d.�
BOTTOM,AND MIDDLE. III III—III—III-
- —III—III—III— DESIGN DEVELOPMENT
MUELLERCOR-6 .� 11-111-1 I— III—III—I 1(—
ENCLOSURE DOOR. ❑ " —III—III—III—III—III III—III—III—III—I
I I—III—III—III—III—I 14"REAR I—III—III—III—III R�, Iss�EOFaR DATE
L J 1/2"X B
PROVIDE CONCRETE APRON IN FRONT OF PP H E BOTH .4 P. — — 1 — —I
DUMPSTER ENCLOSURE ENTRANCE WHICH SHALL I—III—III—III III —III III III _
BE CAPABLE OF WITHSTANDING A 20 TON CONCRETE FOOTING,
STATIONARY LOAD;REFERENCE CIVIL.----- POST AND FOOTING. 1"STL.BOTTOM. REFER TO STRUCTURAL.
I ❑
L J �18
� NORTH. PLAN.
FINISH AS SCHEDULED. 7
SCALE.
PROVIDE 3/4"PVC /1 DUMPSTER SECTION DETAILS 8"CMU BLOCK As indicated
SLEEVES IN CONCRETE,TYP. 1/4"=1'-0" TRASH ENCLOSURE.
� STONE CAP SRH MOB
ARLINGTON -
ALIGN.
wl _
o GATE CLOSED POSITION
zl VISCONSI DEVELOPMENT
8"CMU BLOCK WALL. zI k- 1
DUMPSTER
n DUMPSTER ENCLSURE#2 FINISH AS SCHEDULED. j PIPE BOLLARD. ENCLOSURE
12 DETAILS
MUELLER ENCLOSURE GATE.
PROJE— 2—
Opaz CHECK.
9 6"STEEL JAMB POST. ssu O 12.03.2025
SNCONCRETE FILLED.
m PAINTED PER SCHEDULE.
N DU PS
ER PST ENCLOSURE DETAILS GATE,OPEN POSITION. �r A 1 .01 CS