HomeMy WebLinkAbout20251017_PLN1415_Dumpster Enclosure STAINLESS STEEL
STONE CAP. STONE CAP. HANDLES,TYP.
Z E RYAS
Architects
TYPEFREGISTEREDI
D I
Od ` ARCHIT CT
U
OF l�
--------------------- -- T --------- ----------
\ I \ LI 11 I I \-L I-1 I
12 8• 26 8 U MUELLER 5/8"X 24"S.S. U PROVIDE 3/4"PVC I "
URETHANE CANE BOLT SLEEVES IN
L GATES,PAINTED. AT EACH GATE. L CONCRETE,TYP. L I
n DUMPSTER ENCLOSURE ELEVATIONS
#5 BARS @ 16"
O.C.EACH WAY. SEE STRUCTURAL
26'-8" • a - d - 4 a - p- d 'Q •-- w
8"CMU BLOCK. CONC.PARKING BLOCK TYP.
(2)#5 BARS CONT. L 4"SAND CUSHION.
TOP AND BOTTOM.
DUMPSTER ENCLOSURE FOUNDATION SECTION 1
1/2"=1'-0" D
STONE CAP.
r r TOP OF STEEL PIPE
CONCRETE FILL TO BE
STRIKED OFF FLAT.
Z 8"BLOCK.
UPPER ALUM BRACKET.
p 6"STEEL PIPE 18"DIAMETER FINISH AS SCHEDULE.
O O (PAINTED)FILLED CONCRETE FOOTING.
6 CUBIC YARD 6 CUBIC YARD w 3 W/GONG.SMOOTH
DUMPSER PROVIDED DUMPSER PROVIDED a p TROWEL CROWN TOP.
BY OTHERS. BY OTHERS. 09
U' 6"STEEL PIPE,
6"RD.STEEL SCHEDULE
40 PAINTED.
O i` GALV.PIPE SHOWN
DASHED SET IN 18" -
w U CONCRETE FOOTING. ---
I I I I a ---
- w -
vw
1
—0-
10'-8" 5' 4" 10' 8"
5" 3"
CONC.MIN.3000
PSI @ 28 DAYS.
CROWN CONCRETESLAB,
O _ FOOTING. SLOPE TO DRAIN.
PROVIDE PVC SLEEVES _
IN CONCRETE.TYP.
REINFORCING TO
P, a —
BOTTOM,AND MIDDLE.
IIIMUELLER COR-6 —III—III—III— :4" ..' PROJECT STATUS
ENCLOSURE DOOR. "n„ —III—III—III—III— +--III—III—I.
4 " ❑ . -III-III-III-III-III III-III-
III-III-I RE 99UEDFOR DATE
EDGE OF SLAB. -I -I -III-III-III-I 2"X,4"KEBAB _III III-III-III-III-
ANCHORS THRU s--Q
PIPE BOTH WAYS. o, —
PROVIDE 3/4"PVC PROVIDE 3/4"PVC - CONCRETE FOOTING,
SLEEVES IN CONCRETE,TYP. SLEEVES IN CONCRETE,TYP. POST AND FOOTING. REFER TO STRUCTURAL.
I I 1"STL.BOTTOM. � �
z L JU FINISH AS SCHEDULED. SCALE.
PROVIDE CONCRETE APRON IN FRONT OF NORTH, PLAN.
DUMPSTER ENCLOSURE ENTRANCE WHICH SHALL
BE CAPABLE OF WITHSTANDING A 20 TON TRASH ENCLOSURE.
�. STATIONARY LOAD;REFERENCE CIVIL. r1 DUMPSTER SECTION DETAILS 8"CMU BLOCK S indicated
STONE CAP _ 1/4 -1'-0 SRH MOB
ALIGN. ARLINGTON
vl
o GATE CLOSED POSITION
zl N VISCONSI DEVELOPMENT
8"CMU BLOCK WALL. z
O DUMPSTER
n DUMPSTER ENCLSURE#2 FINISH AS SCHEDULED. j i PIPE BOLLARD. ENCLOSURE
1/z°=r-o° w DETAILS
W II I
E. w MUELLER ENCLOSURE GATE. I
I
p I--r—rti Az CHECK.
9 6"STEEL JAMB POST. i I ssueo. 10/01/2025
CONCRETE FILLED.
m PAINTED PER SCHEDULE.
N DU PS
ER PST ENCLOSURE DETAILS GATE,OPEN POSITION. �� A1 .01