Loading...
HomeMy WebLinkAbout20260224_PJA26-0015_Applicant Responses CORE STATES GROUP February 24, 2026 Community& Economic Development Department City of Arlington 18204 59th Avenue NE Arlington, WA 98223 RE: City of Arlington—Responses to Comments Visconsi Medical Facility NWC 212th Street N.E. and Medical Center Drive,Arlington,Washington 98223 Permit No. PLN#1415 BCE#24413 We have revised the plans and technical documents for the above-mentioned project in accordance with your comment letter dated February 5, 2026. Enclosed are the following documents for your review and approval: 1. One (1) copy of the revised BSP, prepared by Barghausen Consulting Engineers, LLC., a Division of Core States Group, dated February 24, 2026. The following outline provides each of your comments in italics exactly as written, along with a narrative response describing how each comment was addressed: Sheet 1: • Revise to include names having signature authority • Revise certification to include information related to the survey Response:The sheet has been revised to include ethe names having signature authority.The certification has been revised to include information related to the survey. Sheet 2: • Clarify with supporting information for difference of right of way centerline and subdivision line. Referenced divergence noted. Provide establishment information for right of way that clarifies divergence. • Show any corners or monuments found from prior surveys Response:The sheet has been revised to include Detail A that provides the requested information. All monuments are shown, and no property corners were found on-site. Sheet 3: • Symbols and text need to be scaled for clarity • Label contours "Mmimmm Page 1 Community & Economic Development CORE STATES City of Arlington GROUP • Include controlling elements on this sheet Response: Symbols and text have been revised for clarity, contour labels have been added, and controlling elements are now shown on this sheet. Sheet 6 • Revise new parcel lines to thicker linetype for clarity • Symbols and text need to be scaled for clarity Response:The parcel lines are now shown with a thicker linetype, and the symbols and text have been scaled for clarity. We believe that the above responses, together with the enclosed revised plans and technical documents, address all the comments in your letter dated February 5, 2025. Please review the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me.Thank you. Sincerely, Z; "'4- Alex White, P.E. Senior Civil Project Manager (425) 656—7476 1 awhite@core-states.com AW/ae 24413c.002 enc: As noted cc:James Fleharty, Core States Group Aspen Lee, Core States Group Page 2