Civil Use - Right of Way Permit
Parcel:00847300000400 Permit#:26-081
Permit Address:7705 204TH ST NE Permit Expiration: July 10, 2026
Description of Work:Access Hub H3015 and
install jumper,then from the existing handhole
install a new drop in the terminal and bore
approximately 60 feet across Olympic PI NE.
Continue boring 173 feet south along Olympic PI NE
to existing Pedestal 8099,then pull fiber through
existing conduit to the customer location at 7705
204th St NE.
OWNER APPLICANT CONTRACTOR
ATCO Telecommunications Ziply Fiber
Ziply Fiber 708 First St. 303 GARDNER RD BURLINGTON,WA,90233
303 GARDNER RD BURLINGTON,WA,90233 4026708384
permits@atcotelecom.com registration_number:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this
Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance
advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to
allow construction activity during any period of time when such construction is prohibited or restricted by any state or
federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not
authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a
structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or
executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of
the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in
error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation
or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.
It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a
Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on
private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a
separate permit. The property owner shall ensure that the construction project complies with all applicable zoning
codes and regulations.
The property owner shall also ensure that the construction project does not cause any adverse impact on the
surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits
and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the
construction project complies with all applicable design review requirements.
CONDITIONS
Inspection Standards The applicant is required to notify the City for inspections. Failure to give notice will result
1 ) in violation of AMC Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call
360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state
and federal laws, ordinances, code and regulation in performing the work authorized by this permit.
Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday-
Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or
2.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized
facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal
to the existing conditions of the site.
Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating
3.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating
service. Private property owners which may be affected by the proposed work must be notified in advance of
potential disruptions in access or utility services.
Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict
existing use of right of way. Please take special note of secondary accesses that are used for RVA€"s, boats, or
4 ) other special uses. Restoration of any infrastructure affected by the installation shall be per City of Arlington
Standards & Specifications within a period not to exceed 7 days from completion of the installation. Trench
Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration
requirements, 360-403-3512.
INSPECTIONS
Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire
Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and
provide preference of morning or afternoon inspection.
Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit.
APPROVED BY
Admin - Thad Newport
Development Services Engineering Manager
ASSOCIATED FEES
Date Description Paid Date Amount Paid Balance
April 1, 2026 Processing/Technology Fee(320.341.43.00.02) $25.00
April 1, 2026 Right of Way(006.322.40.00.02) $650.82
TOTAL: Project Fees $675.82 $675.82
Credit/Debit Card 504 Payment Successful April 2, 2026 $675.82 $0.00