Loading...
HomeMy WebLinkAbout2026021315_C_0_159_Projects-CivilPermit 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:31051300300900 Permit#:26-0012 Permit Address:8822 196TH ST NE Permit Expiration: May 14, 2026 Description of Work: OWNER APPLICANT CONTRACTOR GUNNER MITCHELL Pacific Cable Construction Ziply Fiber Northwest,LLC dba Ziply Fiber 4155 SW CEDAR HILL BLVD PO Box 573,Woodinville,WA 98072 8822 196TH ST NE ARLINGTON,WA,98223-8976 4695102840 luke@paccab.compermit.zoneln@ziply.com registration number:PACI FCC954PJ PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 1 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 2.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 3.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 4') disruptions in access or utility services. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 5.) existing use of right of way. Please take special note of secondary accesses that are used for RVA€"s, boats, or other special uses. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 6.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance January 28, Processing/Technology Fee(320.341.43.00.02) $25.00 2026 January 28, Right of Way(006.322.40.00.02) $1,100.00 2026 TOTAL: Project Fees $1,125.00 $1,125.00 Credit/Debit Card 268 Payment Successful February 13, 2026 $1,125.00 $0.00