Loading...
HomeMy WebLinkAbout387_214192---TCP ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) lAl" O A R L I N G T O N ATCO COMMUNICATIONS SERVICES,llC www.atcotelecom.com 360.563.9000 708 First Street Snohomish,WA 98290 iplyfibel Everett,WA 98206 IL cli z 0 o a' LLJ0 a - , PHASE 1 N z Q U i Q O N w a_ Z off$ Q z N W Portage S# co o _ N c w > Jensen Park T U w w m c� z < z w St NE U U O < Q Z U LU � a O � Elem DATE: 5.6.2026 REVIEWED BY: M. LUNA WTCS#001040 DESIGNED BY: T.PLOUGH ATCO CONTACT: 425.551.0919 Trevor.Plough@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE NO: 1 OF 2 LEGEND: ® DRIVEWAY SIGN LEGEND: WORK DETAILS: PHASE 1 O CONE(CANDLESTICK) PULL FIBER THROUGH EXISTING CONDUIT FROM VAULT TO EXISTING FLOWERPOTS O DIRECTION OF TRAFFIC ROAD ALONG 79TH DR NE(PRIVATE RD).BORE EAST (NOT PAVEMENT MARKINGS) WORK SHOULDER AND PLACE ONE NEW FLOWERPOT.WORK ATCO COMMUNICATIONS SERVICES,LLC rr > < WORK CONTINUES ON PRIVATE PROPERTY. www.atcotelecom.com AHEAD 360.563.9000 WORK TRUCK ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. 708 First Street WORK ZONE LIMITS APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY Snohomish,WA 98290 N W20-1 W21-5 ENFORCEMENT SHALLO EITY A RESULT IN THE TOFF THDE APPROVAUTILL•REF.ZATION MU AND DI20P 9EMAEN 1A(1100N OF THIS PLAN PORTABLE SIGN O N (n m SIDEWALK iplyfibe, wy FLAGGER-SPOTTER - _ CLOSED Everett,WA 98206 = r W20-1 `J z R9-9 R8-3a Z � m o 0 X W20-1 N z < 7 J ` ♦-� 1 W21-5 200 Q a Q wo J El w N PARKING z o' ° J M PORTAGE STREET � Q x o (25 MPH) N • •• O O PARKINS z O EP €°HH O V40' ' • SHOULDER �I rr7 RIVATE ROAD U TAPER N EGINS HERE LL CONTRACTOR TO PLACE NO cn PARKING SIGNS 72 HOURS LL PRIOR TO STARTING WORK 7 W W m C\1 T ❑ A' SPOTTERS NEEDED FOR V 1 r PEDESTRIAN TRAFFIC AND = X Z Ilii w DRIVEWAY ACCESS 0 z [MOON TE: w w z m .-FRI.=7:00am TO 4:00pm O 0 0 LU J d a O LL W20-1 CHANNELIZATION DEVICE SPACING(feet) MPH TAPER I TANGENT 50/70 40 80 DATE: 5.6.2026 35/45 au 60 25/30 20 1 40 REVIEWED BY: M.LUNA WTCS#001040 SIGN SPACING=X(1) FREEWAY&EXPRESSWAYS 55/70MPH 1500'± DESIGNED BY: T.PLOUGH RURAL HIGHWAYS 60/65 MPH 800'± ATCO CONTACT: 425.551.0919 RURAL ROADS 45/55MPH 500'± Trevor.Plough@atcotelecom.com MINIMUM SHOULDER TAPER LENGTH=L/3(feet) RURAL ROADS&URBAN ARTERIALS 35/40MPH 350'± SHOULDER POSTED SPEED(MPH) RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: WIDTH RESIDENTIAL&BUSINESS DISTRICTS (feet) 25 30 35 40 45 50 55 60 65 70 URBAN STREETS 25 MPH OR LESS 100'± (2) 0^ 8 40 40 60 90 120 130 150 160 170 190 ' L (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 1"=30 10 _757 60 1 90 1 90 1 150 1 170 1 190 1 220 220 240 AT-GRADE INTERSECTIONS AND DRIVEWAYS USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:2 OF 2