HomeMy WebLinkAbout152_20260108_PJA26-0005_TCP TC P Completed By: T. Buttel
Completion Date: 12/8/2025 Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223
Job Type: Forced Relocates Site Latitude: Tie-In Latitude: N
Job Subtype: Reimbursable Site Longitude: Tie-In Longitude: :+
Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are — - ,J
COMICAST Project Manager: summarized on Survey Rollup tab.
s
P2 ID: JB0002376209 Are Additional Pages Needed: No
Legend Provide Clear Route Overview Construction Details
Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW
Underground Route CABLE 280'NW TO POLE 3.AT POLE 3,OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN.
Aerial Route
Underground Overpull SIGN SPACING =X (1)
AerialOverlash BUFFER DATA
RURAL HIGHAXIYS 60/65 MPH a004:
LONGITUDINAL BUFFER SPACE = B RURAL ROADS 45 155 MP+I 5W.L W20." :PTIOR C L
SPEED F
Footages RURAL ROADS 6 URBAA ARTERIALS TS 140 MPH ]Sds
;MPH; 25 30 3� 40 45 50 i� W 6) 70 RURAL ROADS.URBAN ARTERIALS. 25 130 MPH 1W4.I21
RESIDENTIAL 6 BUSINESS DISTRICTS 48" 4d-
Aerial UG Footage 150' LENGTH ;•ezn zoo zso 305 SEA .zs 495 57o fees 730 uRBAN STREETS a MPH OR LF55 +ar:I21 SE RDA
{II ALL SPACING MAY BE ADAASTED TO ACCONMCOATE PflEPAREO WORK I
Aerial Overlash 150 OL TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R zIITNi+IBR�w INGSMIIYBERREDUCEU IN uReAN AREAS TD FIT 70ST13P AHEAD
ROADVSAY CONDITIONS
Over ull Conduit 150 OP HOST VEHICLE YiEIGHi HOST VEHICLE WEIGHT 15. Id" �. adF
p � 9,900 TO 22,OOo IDa, ' 22.000 Imo• ONE LANE N'20.1
Interior Footage 150' IN < 45 MPH 4565 MPH SS h1�H < 45 MPH 4"S MPH > SS MPH W2478 ROAD
Conduit Tic
100' 123 ?2 74 tour 150' / AHEAD
40• ee•
PROTECTIVE VEHICLE (WORK VEHICLE)= R
Support 6 cE IcE z DEV C;E W20-7A W20-4
❑ NO SPCCI�ICJ DISTANCE RCC..IRC MIN Is ■ MIN, x x K x
Pedestal I�-�I
Vault v❑ d
Manhole MH 4po A
Hand Hole HH at
Lockbox/Dmark a
Telco/Cable Pole Q
a tt 1 n:
Joint Use Pole ® a--��
B 4V SMOKEY POINT BLVD
Joint Transformer Pole ® ONE LANE
ROAD 1�'�—s/ CHANNELIZATION DEVICE
Power Pole
X AHEAD SPACING FEET
40 44. MPH TAPER 1 TANGENT
Pole Tag PT-123 4e 4 ' saws 10 tom so
W20-4 1J W20.7A 35,e5 10 TO 20 1 60
Riser ® ROAD BE 25 jo t0 TO 20 1 40
WORK PREPARED
Power Supply PS HEAD
TO STOP
Addresses 48. 4Y'
020.1 W2o•T8
Address Number 1234 W:r^78 ICPTIONAL IF
40 MPH UR ASS Vacant Lot VL NOTES
Fiber 1. ALL SIGNS ARE BLACK ON ORANGE.
2. EXTENDING THE CHANNEIIZING DEVICE TAPER ACROSS
Splice Case LEGEND SHOULDER IS RECOMMENDED.
4� FLAGGING STATION Slack 3. NIGHT WORK REQUIRES ADDI-IONAL ROADWAY LIG-ITING AT
q TEMPORARY SIGN LOCATION FLAGGING ONE-LANE, TWO-WAY TRAFFIC CONTROL FOR ADDITIONAL DETAILS.
THE STANDARD SPECIFICATIONS
Callouts RS CHANNELIZINa DEVICES WITH L�
Callout Arrow ® FLAGGERS 4, SEE SPECIAL PROVISIONS FOR WORK HOUR 116STRICIIONS•
PROTECTIVE VEHICLE •■
NOT TO SCALE
r.Y NAYt s R►a S'Atl'-u•.fs.:a• , a,, a1-rib n•4 r I.IC1 Lm Ira a Ccutrn♦ _ 0— — N• I c Cvnho III,
PINrl•WNIC.,,dau - t
Ilrr 1:0544 4 ""i'• ^^ Ft:D,A IG PROA,NO, •.�.
MIL 11312"S —�/—
PLOTTED By 114ed1 WAS -„ TC'I
DESIGNED BY -"••"•
FNTFRFD e� Washington State •�'
c«rKrD s. ••--� -�-• Department of Transportation
Pwo�,rrcB• ..,. .,.. TRAFFIC CONTROL PLAN •••
REGIONAL ADM, REVISION DATE BY